Loading...
HomeMy WebLinkAboutFCS-18-036 - T18-035 Freeport Sanitary Forcemain Phase 2 - Hidden Valley Road to Wabanaki DriveREPORT TO: Committee of the Whole DATE OF MEETING: 2018-04-16 SUBMITTED BY: Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 PREPARED BY: Adam Buchholtz, Buyer, 519-741-2200 ext. 7217 WARD(S) INVOLVED: Ward 3 DATE OF REPORT: 2018-03-27 REPORT NO.: FCS-18-036 SUBJECT: T18-035 Freeport Sanitary Forcemain Phase 2 – Hidden Valley Road to Wabanaki Drive ___________________________________________________________________________ RECOMMENDATION: That Tender T18-035 Freeport Sanitary Forcemain Phase 2 – Hidden Valley Road to Wabanaki Drive, be awarded to 410754 Ontario Limited o/a Sousa Concrete, Branchton, Ontario, at their tendered price of $2,886,842.74, including provisional items and contingencies of $389,275., plus H.S.T. of $375,289.56, for a total of $3,262,132.30. BACKGROUND: The City is proceeding with the construction of the twin Freeport Sanitary Forcemains (Hidden Valley Road to Wabanaki Drive). The work includes the construction of twin 400mm diameter (nominal) sanitary sewage forcemains, including associated structures, connection to the sanitary forcemain stub located on Hidden Valley Road and all associated road restoration. Two (2) portions of the work shall be completed by trenchless means; one located on Wabanaki Drive and the other location on Hidden Valley Road near the existing Hydro Tower. The administration, design and tendering of this project has been completed by MTE Consultants, the construction administration and inspection of this project will be completed by MTE Consultants as well. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1.iii - 1 REPORT: Tenders were advertised on the City of Kitchener website. Documents were downloaded by forty-two (42) interested parties and by the closing date of Thursday March 22, 2018, nine (9) tenders had been received. The tenders were reviewed by G. Charlebois, MTE Consultants Inc., the City’s Consultant for the project and K. Pietrzak, Project Manager, Development Engineering who concur with the above recommendation. The following tenders were received: Bid Price 410754 Ontario Limited o/a Sousa Concrete Branchton ON $3,262,132.30* E. & E. Seegmiller Limited Kitchener ON $3,299,525.65 Navacon Construction Inc. Brantford ON $3,569,169.07 Regional Sewer and Watermain Ltd. Cambridge ON $3,641,714.14 Network Sewer and Watermain Ltd. Cambridge ON $3,689,468.97 Sierra Infrastructure Inc. Woodstock ON $3,698,996.59 Kieswetter Excavating Inc. St. Clements ON $3,763,813.61 Bel-Air Excavating & Grading Ltd. Cambridge ON $3,821,551.82 Varcon Construction Corporation Concord ON $5,385,027.10 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city’s strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital forecast. The estimated surplus (E) will be proportionately returned to the development charge and sanitary capital reserves. 1.iii - 2 Tender T18-035 Freeport Forcemains Phase 2 The total budget for this project is $ 19,965,645.00 Estimated Cost for this Work Tender T18-035 3,262,132.30 less: HST rebate on tender (324,480.98) Net Cost Being Awarded 2,937,651.32 A Projected Costs: Staff Time/Material Testing 38,267.00 Total Estimated Cost for this Phase of Work 2,975,918.32 C Budget for this Work Development Charges 2,771,000.00 Sanitary Utility 1,558,000.00 Total Budget for this Phase of Work 4,329,000.00 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) 1,353,081.68 D Estimated Surplus/(Deficit) from previous phases 3,916,015.47 Total Estimated Surplus/(Deficit) 5,269,097.15 E COMMUNITY ENGAGEMENT: INFORM – This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Jonathan Lautenbach, Chief Financial Officer, Financial Services Department 1.iii - 3