Loading...
HomeMy WebLinkAboutHK - 2018-05-01 - Item 1 - Stormwater Initiative to Install Signage in Victoria Park LakeDate: April 16, 2018 To: HeritageCommittee Members From: Samantha Brickman, C.E.T., Design & Construction Project Manager cc: Nick Gollan, C.E.T., Manager of Stormwater Utility, Hans Gross, P.Eng., Director of Engineering Subject:Stormwater Utility Initiative to Install Signage in Victoria Park Lake The City undertook the rehabilitation of Victoria Park Lake (Lake) from 2011-2012. As part of the rehabilitation works, a sediment forebay was installed at the upstream end of the Lake; capturing sediment and limiting the amount entering the Lake body and downstream creek. In order to maintain the effectiveness of the forebayand fulfil our legal obligations as Ownersper regulatory requirements under the Ontario Water Resources Act, it must be regularly cleaned out when the sediment storage capacity has been reached. Based on sediment surveys completed in 2012 and 2017, the forebay is expected to meet its storage capacity by the summer of 2018, thereby requiring sediment removal activities to be carried out. To ensure transparency between the City and its residents, permanent signage is proposed at the forebay and the outlet of the facility that will capture the following message: Victoria Park Lake is a made-man lake that functions like a stormwater pond;and, The lake requiresregular maintenance to ensure that there is no excess of sediment, vegetation and debris effecting itsability to provide flood controland improve water quality tothe downstream creek. On Monday, April 16, 2018, City staff met with the Victoria Park Working Group (VPWG) to inform them of the proposed maintenance works and the proposed signage.TheVPWG are in support of the installation of the permanent signage at the forebay and outlet.Thecomments providedby groupwere: Consider a temporary plaque or sticker stating when the next maintenance work is to occur, Installation of the bench pad and ramp should befullyconcrete not concrete and asphalt, Consider changing the font of the write-up shownon the drawing; and, Schedule a site meeting to decide onthe final location of Sign 2 (Forebay). The comments providedwill beused to update the location of the signs andmessage. st Following the presentation which will be provided to the Heritage committee on May 1, 2018, staff would like to receive endorsement forproposed installation of the two interpretive signs. 1 - 1 1 - 2 1 - 3 - 1 - 4 1 - 5