Loading...
HomeMy WebLinkAboutFIN-18-004 - T18-002 Shantz Lane (Weber Street to Ross Avenue) Road ReconstructionREPORT TO: Committee of the Whole DATE OF MEETING: 2018-05-07 SUBMITTED BY: Laurie Stecho, Supervisor of Purchasing,519-741-2200 ext. 7089 PREPARED BY: Adam Buchholtz,Buyer,519-741-2200 ext. 7217 WARD (S) INVOLVED: Ward 2 DATE OF REPORT: 2018-04-26 REPORT NO.: FIN-18-004 SUBJECT: T18-002 Shantz Lane (Weber Street to Ross Avenue) Road Reconstruction __________________________________________________________________________________________ RECOMMENDATION: That Tender T18-002 Shantz Lane (Weber Street to Ross Avenue) Road Reconstruction, be awarded to Regional Sewer and Watermain Ltd., Cambridge, Ontario, at their tendered price of $1,571,421.80, including provisional items and contingencies of $254,385., plus H.S.T. of $204,284.84., for a total of $1,775,706.64. BACKGROUND: Engineering is proceeding with the reconstruction of Shantz Lane (Weber Street to Ross Avenue). Council, as part of the 2018 budget has approved funds for construction. The services were originally installed in the s and have reached the end of their useful life, requiring full replacement. Sidewalk infill on Shantz Lane was approved by Council on June 26, 2017 (INS-17-050). Sidewalk infill projects do not typically come to Council for approval (as per previous Council direction), but since this Tender is over budget, it must be approved by Council. The deficit will be funded from the WIP Road Reconstruction general account. The project is scheduled to begin May 28, 2018, weather permitting, and is located within the Ward 2 boundary. REPORT: Tenders were advertised on the City of Kitchener website. Documents were downloaded by twenty-eight (28) interested parties and by the closing date of Monday April 23, 2018,ten (10) tenders had been received. The tenders were reviewed by K. Bossie,WSPS. Shah,Design Engineer who concur with the above recommendation. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1.iii - 1 The following tenders were received: Bid Price Regional Sewer and Watermain Ltd. Cambridge ON $1,775,706.64 * Steed and Evans Limited St. Jacobs ON $1,955,719.25 J.Weber Contracting LimitedBreslau ON $1,960,395.54 Oxford Civil Group Inc.Woodstock ON $1,965,627.82 Elgin ConstructionSt. Thomas ON $1,981,557.95 Navacon ConstructionBrantford ON $1,982,039.45 Sierra Infrastructure Inc.Woodstock ON $2,017,362.11 E.& E. Seegmiller LimitedKitchener ON $2,203,459.78 Bel-Air Excavating & Grading Ltd.Cambridge ON $2,231,351.31 Network Sewer and Watermain Ltd.Cambridge ON $2,420,961.17 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in- house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope but the upset limit exceeds the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital forecast, with additional funding from the Stormwater Management Fee account (formerly SWM Cash in Lieu). The Stormwater Management Fee account is funded at time of development by a designated financial and charges schedule. These funds are then applied towards stormwater management in conformance with the recommended approaches of the Integrated Stormwater Management Master Plan (per policy MUN-UTI- 2003). The deficit (E) will be funded from the WIP Road Reconstruction general account. There are sufficient funds in the account to fund the deficit. 1.iii - 2 Tender T18-002 Shantz Lane (Weber Street to Ross Avenue) Reconstruction The total budget for all phases of this project is $ 1,640,040.00 Estimated Cost for this Phase of Work Tender T18-002 costs, including HST1,775,706.64 less: HST rebate on tender(176,627.73) Net Cost Being Awarded1,599,078.91 A Costs Incurred to Date - Projected Costs: Staff Time/Material Testing24,181.30 Total Estimated Cost for this Phase of Work1,623,260.21 C Budget for this Phase of Work WIP -Road Reconstruction -Sanitary Utility613,753.00 WIP -Road Reconstruction -Stormwater Utility306,877.00 WIP -Road Reconstruction -Water Utility413,617.00 Stormwater Management Fee -Oil Grit Separator100,290.00 Total Budget for this Phase of Work1,434,537.00 B Estimated Surplus/(Deficit) for this Phase of Work (B -C)(188,723.21)D Estimated Surplus/(Deficit) from previous phases(3,658.01) Total Estimated Surplus/(Deficit) (192,381.22)E COMMUNITY ENGAGEMENT: INFORM council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: INS-17-041 Sidewalk Infill through Roadway Reconstruction May 29, 2017, Community and Infrastructure Services Committee; and, INS-17-050 2018 Sidewalk Infill Shantz Lane and Bond Street June 12, 2017, Community and Infrastructure Services Committee ACKNOWLEDGED BY: Jonathan Lautenbach, Chief Financial Officer, Financial Services Department 1.iii - 3