Loading...
HomeMy WebLinkAboutDSD-18-055 - Breithaupt Block Phase 3REPORT TO: Council DATE OF MEETING: June 25, 2018 SUBMITTED BY: Alain Pinard, Director of Planning, 519-741-2200 x 7319 PREPARED BY: Garett Stevenson, Planner, 519-741-2200 x 7070 WARD INVOLVED: Ward 10 DATE OF REPORT: June 15, 2018 REPORT NO.: DSD-18-055 SUBJECT: Follow Up to CSD-18-051 Official Plan Amendment OP17/005/W/GS Zone Change Application ZC17/014/W/GS Breithaupt Block Inc., 2184647 Ontario Limited, Frederick Andrew Dobson, Paul Raymond Taylor, Kim Taylor, & Daniel Paul Taylor 43, 47, 53, & 55 Wellington Street North, 2-12 & 26 Moore Avenue, 20 Breithaupt Street Location Map: Subject Property EXECUTIVE SUMMARY: On April 16, 2018, Kitchener City Council deferred consideration of the above noted applications to the Council meeting scheduled for June 25, 2018. The purpose of the deferral was to allow further discussion/negotiations between neighbourhood residents, city planners and developers. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 8.a.1 ThePlanning Division received a revised development concept and presented it to the community at a drop-in information meeting on June 5, 2018. At that meeting, interested residents provided oral comments to Planning Staff and some followed with additional written comments, attached as Appendix While Planning staff remain supportive of the Recommendations of Report CSD-18-051, Planning staff have also prepared a revised Official Plan Amendment and amending Zone Change by-law, attached to supportive of the Recommendations noted below as the revised Official Plan Amendment and Zone Change amendment achieve similar planning objectives but with a slightly different built form. If approved, the Recommendations of this report would permit the revised concept, being a ten storey office building, a five storey parking garage, a new privately owned and maintained parkette (POMPA) at the corner of Moore Avenue and Wellington Street North, and the reconfiguration of the existing lane. RECOMMENDATION: A.That Official Plan Amendment Application OP17/005/W/GS for Breithaupt Block Inc., 2184647 Ontario Limited, Frederick Andrew Dobson, Paul Raymond Taylor, Kim Taylor, & Daniel Paul Taylor requesting a change in designation from General Industrial Employment and Low Rise Residential to Mixed Use with Specific Policy Area 39 to permit a mixed use development on the parcel of land specified and illustrated on Report DSD-18-055as Waterloo for approval; AND B.That Zone Change Application ZC17/014/W/GS for Breithaupt Block Inc., 2184647 Ontario Limited, Frederick Andrew Dobson, Paul Raymond Taylor, Kim Taylor, & Daniel Paul Taylor requesting a change from Residential Five (R-5) with Special Use Provision 129U & 411U and Industrial Residential Zone (M-1) to High Intensity Mixed Use Corridor (MU-3) with Special Regulation Provisions 716R, 717R, & 718R and Special Use Provisions465U and 468U on the parcel of land specified and illustrated on Map No. 1, be approved in the -DSD-18- 055 C.That the Urban Design Brief dated February 2018, and attached to Report CSD-18-051 as through the Site Plan Approval process; AND D.That Kitchener City Council declare as surplus to City needs and sell at fair market value to Breithaupt Block Inc. and/or 2184647 Ontario Limited, a portion of the laneway between Moore Avenue and Waterloo Street illustrated on the Map of Proposed Lane Closure, attached to Report CSD 18- E.That Planning staff be directed to involve a number of interested residents who reside or own property immediately adjacent to the proposed parking garage, in the review of the building façade treatments (elevation plan review), at the site planning stage: AND FURTHER 8.a.2 F.That Planning staff be directed to involve a number of representatives from the community in the review of the design of the privately owned and maintained publically accessible parkette (amenity area) plans at the corner of Moore Avenue and Wellington Street North, at the site planning stage. REPORT: Planning staff received a revised development concept and presented it to the community at a drop-in Neighbourhood Information Meeting (NIM) on June 5, 2018. At that meeting, interested residents provided oral comments to Planning staff and provided additional written comments, attached as Appendix The development concept presented to the Planning and Strategic Initiatives Committee on April 9, 2018 and to Council on April 16, 2018, has been revised as follows: The height of the tower has been reduced by two storeys, reducing the overall height from 60 metres to 49.6 metres. The width and depth of the office building has increased and the building is now closer to Breithaupt Street and Moore Avenue. New floor area is shown on floors one through ten of the office tower (larger floor plates). Three areas have been identified for potential additional floor area, including: redesigning the recessed corner entry at Moore Avenue and Breithaupt Street; between the office tower and the parking garage above the proposed new lane, and between the parking garage and Breithaupt Street. In all cases, any additional floor area would be located within the proposed 50 metres (office tower) and 18 metres (parking garage) height limits. To provide for greater flexibility in the ultimate design of the floor plates and the potential for additional floor area noted above, the FSR is now requested to be up to 4.5, rather than 4.2. The parking garage has been setback from the exterior side yard by 0.685 metres and the yard abutting the lane by 0.964 metres. ADDITIONAL NEIGHBOURHOOD COMMENTS: In addition to written comments attached to Report CSD-18-051, Planning staff have attached all written submissions received between March 7, 2018 and June 15, 2018 Some of these comments were submitted in advance of the preparation of the revised concept. Oral comments were received at the second NIM on June 5, 2018. Further discussion on the comments received from community members during the additional consultation on these applications is outlined in greater detail below. Any comments received after June 15, 2018 will be provided directly to Council in advance of the June 25, 2018 Council meeting. Copies of these comments will form part of the public record and can be obtained upon request. 8.a.3 Revised Office Tower Building Height Attendees of the second NIM expressed mixed initial reactions on the revised development concept, some appreciated the compromise and others felt it was still too tall. Some residents felt that the building should be six storeys in height. The revised development concept is similar to the previous version; however the office building is approximately 10 metres shorter and slightly deeper and wider. Planning staff are confident that the lding Guidelines and further refinement of the building will occur at the site planning stage. The revised by-law has been amended to reduce the maximum height of the office building to 50 metres. Additionally, 0.0 metre setbacks are proposed for Moore Avenue and Breithaupt, rather than 1.5 metres, to accommodate the wider and deeper floor plates. Residential Uses/Zoning along Wellington Street North Comments were received suggesting that the portion of the subject lands between Wellington Street North and the existing lane be zoned to permit low density residential uses which are targeted to families, rather than empty nesters and young singles. It was suggested that not permitting residential uses in this location could lead to speculative land purchases, additional deterioration of the housing stock, new low-quality rental housing, the erosion of the neighbourhood, and the devaluation of property value due to the increased risk of the conversion of the remainder of the neighbourhood. The Innovation Employment land use designation discussed in the PARTS Central Plan is a new land use district may include residential uses to provide for a transition between the Low Rise Residential land use designation and Mixed Use and Innovation District land use designations, where it can be demonstrated that the residential use is compatible with Innovation Employment uses on the subject lands and adjacent lands. The initial application did not specifically seek permission for residential uses and the current owner does not intendto develop the site with residential uses. Planning staff have further considered the opportunity for residential uses along Wellington Street North within a mixed-use building fronting the parkette and the revised zoning by-law, attached to this report , permits residential uses on the lands between Wellington Street North and the lane. As part of the special use provision, residential uses would be subject to a Record of Site Condition, as required by the Ministry of the Environment and Climate Change, as the lands were previously used for automobile parking. Proposed residential uses now include: Duplex Dwelling, Dwelling Unit, Home Business, Multiple Dwelling, Residential Care Facility, Single Detached Dwelling, Street Townhouse Dwelling, and Tourist Home. Updated Shadow Study & Impacts Planning staff received comments that the shadows would shade the neighbourhood in the winter months. Updated Revised shadow studies have been provided for the revised development concept of this report. 8.a.4 Building Guidelines for shadow impacts, as there is at least five cumulative hours of direct sunlight for both the March and September equinoxes, and the reduction in height of 10 metres has reduced the length of some shadows. While the shadows are greater in length during the winter months, the shadows do travel across the neighbourhood from west to east. An updated shadow study will be required, along with an updated 3D Model, at the site planning stage to confirm potential shadow impacts. Parking Garage Design & Setback Planning staff received varying comments and suggestions on the setback of the parking garage from the lane. Some residents wanted a setback that would accommodate snow storage but not be large enough to become a social gathering space. Planning staff also heard suggestions about setting the garage back to provide a sidewalk along the lane as part of a placemaking opportunity. Some residents suggested that stepbacks be applied for upper storeys, or that the building mass could be softened with landscaping or wall treatments. Some residents also questioned whether there is an appropriate transition between the neighbourhood and the parking garage. With agreement from the Developer, Planning staff are recommending that Council direct staff to work with residents who reside or own property immediately adjacent to the lane, in the review of the building elevations at the site planning stage. The garage setback currently shown provides room for façade treatments which could include a living wall. There have been no detailed design submissions made to the City on the garage design, as this level of detail is typically addressed at the site planning stage. for the parking garage, attached as Appendix Planning staff have reviewed other lanes in the Breithaupt Mount Hope neighbourhood and observed that the typical function of the lanes in the neighbourhood is utilitarian, providing access to the rear yard and rear yard parking or garages. Many of the lanes are lined with tall privacy fences, expansive driveways or parking pads, as well as blank garage walls and doors. Typically, in neighbourhoods with a fine grid street pattern with street facing and ground oriented land uses, the sidewalks adjacent to the streets are the more pleasing pedestrian connections through the neighbourhood. Planning staff recommend that any placemaking opportunities be directed to the publically accessible and highly visible parkette space along Wellington Street North. The parking structure will transition between the dwellings on Wellington Street North and the taller first phase of the Breithaupt Block; as well as between the dwellings on Breithaupt and Waterloo Streets and the taller proposed office tower.The subject lands are also a transition between the stable neighbourhood and locations planned for large scaled development and redevelopment within the Urban Growth Centre (Downtown), the future HUB, SIXO, and along the King Street West Mixed Use Corridor. The revised by-law now includes a requirement to provide a 0.75 metre (minimum) setback from the property line of the lane and the exterior side yard. Snow Removal A resident on Wellington Street North expressed concern about the snow removal operations for the proposed reconfigured lane. There were also concerns that the new north-south lane would not be adequately sized to handle the volume of vehicle traffic to this site or the delivery trucks that would service the future building. 8.a.5 and has confirmed that the City can continue to operate and maintain the lane, including snow removal. Access rights for the public will be maintained during and after construction. The current lane is only one-way travel, from Waterloo Street to Moore Avenue. There is no change proposed in this regard. The new lane, from Wellington Street North to Breithaupt Street, will be subject to detailed design at the site planning stage and will be des-way private driveway standards. Additionally, at the site planning stage, detailed truck turning plans will be required and will be reviewed by Transportation Services staff, to ensure that the existing and proposed lanes will adequately function. Privately Owned and Maintained Publically Accessible (POMPA) Parkette Some residents expressed concern about the initial renderings and design of the parkette along Wellington Street North. While some residents liked the idea of the parkette, there was some concern about the space becoming an opportunity for negative behaviour. Some residents preferred to eliminate the parkette altogether and have residential development in the same location. Other residents suggested the parkette could be used for a restaurant or café patio space. Some residents were concerned that public access would not be maintained, and some comments were received suggesting that part of the parkette will not be useable with the parking access ramp located within it. The proposed site-specific zoning requires that any future building be setback 15 metres from the streetline along Wellington Street North to provide an at-grade privately owned and maintained publically accessible parkette. The parkette is proposed to be maintained by the Owner and public access will be secured through an easement prior to final site plan approval. The publically accessible parkette was included in the overall design of the site to create a gathering point for social interaction and to act as a transition between the residential development and the office building. The Applicant included precedent images in the Urban Design Brief (attached to Report CSD-18-051 as Appendix e landscape designas part of the parkette amenity. The proposed base zoning, High Intensity Mixed Use (MU-3), permits several uses including restaurants. The ultimate uses of the building, or portions thereof, will be determined by the Developer and/or future lease and tenant arrangements. The parkette will have public access and Planning staff are recommending that the detailed design of that space be further reviewed with the community at the site planning stage as discussed above. The Developer has agreed to involve a number of representatives from the community in the review of the parkette plans at the corner of Moore Avenue and Wellington Street North, at the site planning ultimate approval authority for the design of the parkette, however input and suggestions will be solicited from the community as part of the process. Comprehensive Transportation and Traffic Analysis At the second NIM, some residents expressed concerns that the Transportation Impact Study should address the existing traffic as well as potential traffic generated from other potential developments. A Transportation Impact and Demand Management Study, prepared by Paradigm Transportation Solutions Limited, was prepared to support the proposed development. As part of that study, traffic volumes were counted at the proposed driveway locations (for movements into the parking area) and on Wellington Street North and Waterloo Street. Background growth rates were determined with 8.a.6 information from the Region of Waterloo for the ION corridor. The growth forecasts include traffic volumes before the ION is built, after ION is built, and long range forecasts for 2031 and 2036.The proposed traffic generation of the proposed development was evaluated against these different criteria. One of the initial recommendations from the report was to establish a left turn lane with 15.0 metres of storage on Wellington Street North into the new private laneway. The feasibility of this occurring is unlikely, so City Transportation staff requested that additional evaluation be completed without the left turn lane and that traffic be allocated to other entries. When this evaluation was completed, Transportation staff had no objections to the proposed Official Plan Amendment and Zone Change applications and are satisfied with the lane reconfiguration, subject to detailed design at the site planning stage (see Appendix E of Report CSD-18-051).The two accesses to the parking garage will accommodate a majority of the vehicle parking on site. One access is located internal to the site and the second access directly from Breithaupt Street. The ramp to the smaller underground parking under the office tower is located towards Wellington Street North. Site Light and Light Pollution Some commenters highlighted concern about the potential for light pollution from the office building, outdoor lighting, and the parking garage lighting. garage will have to be designed to avoid light spill onto the adjacent properties. Low level or motion censored lighting will be explored through the CPTED review, at the site planning stage, to ensure that areas that are less publically visible are well lit. Loading Area Some residents who live on Wellington Street North expressed concerns about the location of the loading area and any potential noise generated from air brakes and back up beeping from delivery trucks. Noise mitigation measures will be evaluated at the site planning stage which will specifically evaluate any loading associated noise generation sources, as well as any potential noise mitigation required for the HVAC systems. At the site planning stage, truck turning plans will be required to show the travelled path of the delivery vehicles to ensure maneuverability of the site and the access. CONCLUSION: Planning staff remain supportive of the recommendation of Report CSD-18-051, however,Planning staff have prepared a revised Official Plan Amendment and amending zoning by-law attached as Appendixes. These revised documents, if approved, would regulate the future development to a built form that is in keeping with the revised development concept attached to this report. Planning staff are also supportive of the Recommendations noted in this report as the revised Official Plan Amendment and amending Zone Change by-law achieve similar planning objectives but with a slightly different built form. Planning staff also recommend that given the interest of the neighbourhood, and the willingness of the Developer to participate, that Council direct Planning staff to work with key representatives of the community and the adjacent residents and property owners along Wellington Street North, on the proposed design of the parkette and parking garage. Staff Report CSD- 8.a.7 18-051 should be read in conjunction with this report for a comprehensive planning analysis of the applications. REVIEWED BY: Della Ross, Manager of Development Review ACKNOWLEDGED BY: Justin Readman, General Manager, Development Services ATTACHMENTS: Revised OPA and OPA Map -law & Map No. 1 8.a.8 DSD-18-055 AMENDMENT NO. 2 TO THE OFFICIAL PLAN OF THE CITY OF KITCHENER CITY OF KITCHENER Breithaupt Block Phase 3 8.a.9 AMENDMENT NO. 2 TO THE OFFICIAL PLAN OF THE CITY OF KITCHENER CITY OF KITCHENER Breithaupt Block Phase 3 INDEX SECTION 1 TITLE AND COMPONENTS SECTION 2 PURPOSE OF THE AMENDMENT SECTION 3 BASIS OF THE AMENDMENT SECTION 4 THE AMENDMENT APPENDICES APPENDIX 1 Notice of the Meeting of Planning and Strategic Initiatives Committee of April 9, 2018 APPENDIX 2 Minutes of the Meeting of Planning and Strategic Initiatives Committee April 9, 2018 APPENDIX 3 Minutes of the Meeting of City Council April 16, 2018 APPENDIX 4 Minutes of the Meeting of City Council June 25, 2018 8.a.10 AMENDMENT NO. 2 TO THE OFFICIAL PLAN OF THE CITY OF KITCHENER SECTION 1 TITLE AND COMPONENTS This amendment shall be referred to as Amendment No. 2 to the Official Plan of the City of Kitchener. This amendment is comprised of Sections 1 to 4 inclusive. SECTION 2 PURPOSE OF THE AMENDMENT The purpose of the Official Plan Amendment is change the land use designation and amend Map 3 as well as to add a site specifc policy area and amend Map 5 to permit the development of the subject lands with a newmixed-use office and commercial development. The amendment comprises of the following changes: Map 3 is amended by changing the land use designation from General Insutrial Employment and from Low Rise Resdiential to Mixed Use, Map 5 is amended by adding Specific Policy Area 39, Adding Policy 15.D.12.39to Section 15.D.12to permit a maximum Floor Space Ratio of 4.5. SECTION 3 BASIS OF THE AMENDMENT The subject lands are currently designated as General Industrial Employment and Low Rise Residential in the 2014 Official Plan. The current General Industrial land use designation from the 1994 plan was brought forward into the 2014 plan as General Industrial Employment. The Low Rise residential land use designation is also carried forward from the 1994 plan and permits a variety of low density residential uses and neighbourhood scaled compatible non-residential uses. The existing Secondary Plans were not reviewed as part of the 2014 Plan as station area planning exercises were contemplated for large portions of the Secondary Plan areas. While the subject lands are not within a Secondary Plan area, they were identified as a Major Transit Station Area Major Transit Station Area Intensification Areas are planned to accommodate growth through development to support existing and planned transit and rapid transit service levels, while preserving stable residential neighbourhoods which are not the primary focus for intensification. Official Plans. The Official Plan for the City of Kitchener was adopted by Kitchener City Council on June 30, 2014 and approved by the Region of Waterloo on November 19, 2014. While some policies remain under appeal, including the Major Transit Station Area Intensification Area urban structure component and the General Industrial Employment and Mixed Use land use designations, the balance of the plan is now in force and effect, with an in effect date of September 23, 2015, being the date the appeal to the entire 2014 Official Plan was withdrawn. Where policies of the 2014 Official Plan were specifically appealed, those specific policies are not in effect. Planning staff are recommending that the land use designation for the subject lands be amended to Mixed Use. However, the Mixed Use land use designation is under appeal in the 2014 Official Plan. Until such time as the new Mixed Use land use designation is fully implemented, the Mixed Use 3 8.a.11 Node land use designation from the 1994 Official Plan would apply with the approval of Official Plan Amendment application outlined in Pl For lands designated as Mixed Use, permitted non-residential uses include compatible commercial uses such as, but not limited to, retail, commercial entertainment, restaurants, financial establishments, personal services, office, health-related uses such as health offices and health clinics and institutional uses such as daycare facilities, religious institutions, and educational establishments but not including elementary schools, social service establishment, and studio and artisan-related uses. As the Mixed Use land use designation from the 2014 Official Plan is under appeal, with approval of policies from the 1994 Official Plan would apply to the subject property. The Mixed Use Node land designation is also appropriate for the subject lands. The policies are quite similar to the Mixed Use land use designation policies in the 2014 Plan. Lands designated as Mixed Use Node are planned to be developed with intensive, transit supportive development in a compact form. The Floor Space Ratio for all new residential or mixed use building developments with the Major Transit Station Area shall be a minimum of 0.6 and a maximum 4.0. Area Specific/Site Specific Policy Area 39 is proposed to permit a total FSR of 4.5. Site specific zoning regulations and well as a Council-adopted proponent prepared Urban Design Breif will ensure that the ultimate development is compatible with the surrounding community. Section 13.C.3.12 of the 2014 Plan provides direction for development applications in advance of the full implementation of Amendment will permit the development of the subject lands with a mixed-use development that is in a compact form with uses that are transit supportive. The proposed development is located within walking distance to the future multi-modal transit hub at King and Victoria Streets, the planned intensification corrid The Official Plan Amendment and Zone Change applications have been reviewed in consultation with the Council-adopted Planning Around Rapid Transit Station Areas (PARTS) Central Plan. While the proposed land use designation differs from the Central PARTS Preferred Plan, the concept of locating employment uses in a compact form that is buffered from the low rise residential neighbourhood is largely achieved with the proposed site specific permitted uses and set back regulations. The 2014 Plan permits the conversion of employment lands to other non-industrial employment uses. Policy 15.D.12.22 permits lands to convert to other non-industrial employment uses or non- employment uses without the requirement for a municipal comprehensive review provided the proposal is in accordance with the Transit-Oriented Development Policies in the Section 13.C.3. Since the approval of the 2014 Official Plan, new policies came into effect in the 2017 update to the Growth Plan for the Greater Golden Horseshoe which requires a Municipal Comprehensive Review to be completed by the Region of Waterloo to permit the conversion of employment lands to other non-industrial employment uses. In 2010, as part of the Official Plan review, the City undertook the Comprehensive Review of Employment Lands study (CREL). The purpose of the study was to complete a provincially mandate employment lands (industrial lands) to ensure that the City has sufficient lands to meet long term industrial employment needs, to protect prime industrial employment lands and to identify industrial employment lands that are suitable for conversion to other employment uses and non-employment uses. The study recommended that lands identified within the Urban Growth Centre and Major Transit Station Areas were not required to be retained for employment uses for the purposes of accommodating the employment projections. As a result, planning applications for employment lands conversions could be considered and processed in these specific areas, provided that each application demonstrate how the proposed development will meet the objectives of any Provincial or 4 8.a.12 Regional policies associated with such areas.The proposed development is in accordance with the Transit-Oriented Development Policies in the Section 13.C.3 of the Official Plan as it will facilitate a development that promotes a walkable and transit-suportive employment use. The development concept is compact and within walking distance of the King and Victoria Street multi-modal transit station. The proposed building, streetscapes, and publically accessible parkette will be support a high quality public realm which will enhance the identity of the area and create a gathering point for social interaction. The proposed development supports various transportation modes including walking and cycling. Planning staff is of the opinion that the applications comply with the Kitchner Growth Management Strategy as it allows for the appropriate intensification of the subject property which better utilizes the existing and planned infrastructure with development at a transit-supportive density. The applications align with Provincial, Regional, and City policies and will contribute to and support the newly constructed ION rapid transit system. Planning staff is of the opinion that the applications conform to the Growth Plan. The development of the subject lands with a mix of uses at a density that will support the rapid transit system. Planning staff is of the opinion that the proposed applications are consistent with the PPS as they will facilitate the development of the subject property with a compact mixed-use development that is located within walking distance to the future multi-modal transit hub at King and Victoria Streets, the Urban Growth Centre. The proposed development will provide additional employment opportunities and will better utilizes lands that are currently be used for surface parking. Planning staff is of the opinion that the applications conform to the Regional Official Plan. Within the Transit Station Areas, Reurbanization Corridors, Major Local Nodes and Urban Designated Greenfield Areas. In general, these areas will be planned to create a more compact urban form with a greater mix of employment, housing and services in close proximity to each other. The applicant has also applied for a Zone Change to change the zoning the lands from Residential Five (R-5) with Special Use Provision 129U & 411U and Industrial Residential Zone (M-1) to High Intensity Mixed Use Corridor (MU-3) with Special Regulation Provisions 716R, 717R, & 718R and Special Use Provisions 465U and 468U. Special Use Provision 465U prohibits certain non- employment commercial type uses that are more appropriate for a mixed use corridor, providing further direction for innovation employment type uses. Special Use Provision 468U permits compatible residential uses along Wellington Street North. Special Regulation Provisions 716R, 717R, and 718R define the location of the front yard along Breithaupt Street as well as podium and tower setbacks, stepbacks, and heights along Wellington Street. Regulations on site specific vehicle and bicycle parking standards, maximum FSR, and building height are also further regulated. 5 8.a.13 SECTION 4 THE AMENDMENT 1. The City of Kitchener Official Plan is hereby amended as follows: a) Part D, Section 15.D.12 is amended by adding Site Specific Policy Area 15.D.12.39 as follows: 15.D.12.39. Breithaupt Block Phase 3 Notwithstanding the Mixed Use land use designation and policies, on the lands municipally known as 43, 47, 53 and 55 Wellington Street North, 2-12 and 26 Moore Avenue, and 20 Breithaupt street, a maximum Floor Space Ratio of 4.5 will be permitted. b) Amend Map No. 3 Land Use by: i)General Industrial Employment and Low Rise Residential, as shown on the attached Schedule c) Amend Map No. 5 Specific Policy Areas by: i) Adding Specific Policy Area 39to the subject lands as shown on the attached 6 8.a.14 APPENDIX 1 Notice of the Meeting of Planning and Strategic Initiatives Committee of April 9, 2018 Advertised in The Record March 16, 2018 PROPERTY OWNERS AND INTERESTED PARTIES ARE INVITED TO ATTEND A PUBLIC MEETING TO DISCUSS A PROPOSED OFFICIAL PLAN AMENDMENT AND AMENDMENTS TO THE KITCHENER ZONING BY-LAW UNDER SECTIONS 17, 22 AND 34 OF THE PLANNING ACT Breithaupt Block Phase 3 The City of Kitchener has received an application for an Official Plan Amendment for the lands shown above to change the land use designation from General Industrial Employment and Low Rise Residential to Mixed Use with Special Policy Area 39 to permit a maximum Floor Space Ratio (FSR) of 4.2. The City has also received a Zone Change Application to change the zoning from Residential Five (R-5) with Special Use Provisions 128U &411U and Industrial Residential Zone (M-1) to High Intensity Mixed Use Corridor (MU-3) with Special Use and Special Regulation Provisions to permit a new 12 storey office and commercial development. The public meeting will be held by the Planning & Strategic Initiatives Committee, a Committee of Council which deals with planning matters, on: MONDAY, APRIL 9, 2018 at 7:00 P.M. nd COUNCIL CHAMBERS, 2 FLOOR, CITY HALL 200 KING STREET WEST, KITCHENER. Any person may attend the public meeting and make written and/or verbal representation either in support of, or in opposition to, the above noted proposals. If a person or public body would otherwise have an ability to appeal the decision of the City of Kitchener to the Local Planning Appeal Tribunal, but the person or public body does not make oral submissions at a public meeting or make written submissions to the City of Kitchener prior to approval/refusal of these proposals, the person or public body is not entitled to appeal the decision. ADDITIONAL INFORMATION is available by contacting the staff person noted below, viewing the staff report which will be available approximately 10 days before the meeting (https://calendar.kitchener.ca/council - click on the meeting date th in the calendar, scroll down & select meeting), or in person at the Planning Division, 6 Floor, City Hall, 200 King Street West, Kitchener between 8:30 a.m. - 5:00 p.m. (Monday to Friday). Garett Stevenson, Planner - 519-741-2200 ext.7070 (TTY: 1-866-969-9994); garett.stevenson@kitchener.ca 8.a.15 APPENDIX 2 Minutes of the Meeting of Planning and Strategic Initiatives Committee April 9, 2018 8 8.a.16 APPENDIX 3 Minutes of the Meeting of City Council April 16, 2018 9 8.a.17 APPENDIX 4 Minutes of the Meeting of City Council June 25, 2018 10 8.a.18 8.a.19 8.a.20 DSD-18-055 Appendix B PROPOSED BY LAW June 15,2018 BY-LAW NUMBER ___ OF THE CORPORATION OF THE CITY OF KITCHENER (Being a by-law to amend By-law 85-1, as amended, known as the Zoning By-law for the City of Kitchener -Breithaupt Block Inc., 2184647 Ontario Limited, Frederick Andrew Dobson, Paul Raymond Taylor, Kim Taylor, Daniel Paul Taylor Breithaupt Block Phase 3) WHEREAS it is deemed expedient to amend By-law 85-1 for the lands specified above; NOW THEREFORE the Council of the Corporation of the City of Kitchener enacts as follows: 1.Schedule Numbers 74 and 84 o-law Number 85-1are hereby amended by changing the zoning applicable to the parcel of land specified and illustrated as Area 1 on Map No. 1, in the City of Kitchener, attached hereto, from Residential Five Zone (R-5) with Special Use Provision 129U to High Intensity Mixed Use Corridor Zone (MU-3) with Special Use Provision 468Uand Special Regulation Provisions 716R and 717R. 2.Schedule Numbers 74 and 84 -law Number 85-1are hereby amended by changing the zoning applicable to the parcel of land specified and illustrated as Area 2 on Map No. 1, in the City of Kitchener, attached hereto, from Residential Five Zone (R-5) with Special Use Provision 411U to High Intensity Mixed Use Corridor Zone (MU-3) with Special Use Provision 468U and Special Regulation Provisions 716R and 717R. 3.Schedule Numbers 74 and 84 -law Number 85-1are hereby amended by changing the zoning applicable to the parcel of land specified and illustrated as Area 3 on Map No. 1, in the City of Kitchener, attached hereto, from Industrial Residential Zone (M-1) to High Intensity Mixed Use Corridor Zone(MU-3) with Special Use Provision 465U and Special Regulation Provisions 716R and 717R. 4.-law Number 85-1are hereby amended by changing the zoning applicable to the parcel of land specified and illustrated as Area 4 on Map No. 1, in the City of Kitchener, attached hereto, from Industrial Residential Zone (M-1) to 8.a.21 High Intensity Mixed Use Corridor Zone(MU-3) with Special Use Provision 465U and Special Regulation Provisions 716R and 718R. 5. Schedule Numbers 74 and 84 -law Number 85-1are hereby further amended by incorporating additional zone boundaries as shown on Map No. 1 attached hereto. 6.-law 85-1 is hereby amended by adding Section 465 thereto as follows: 465. Notwithstanding Section 55.1 of this By-law, within the lands zoned MU-3 as shown on Schedules 74 and 84 s affected by this section, the following uses are prohibited; Commercial Entertainment Conference or Convention Facility Duplex Dwelling Dwelling Unit Home Business Hospice Hotel Lodging House Multiple Dwelling Museum Private Club or Lodge Religious Institution Residential Care Facility Single Detached Dwelling Street Townhouse Dwelling Tourist Home 7.-law 85-1 is hereby amended by adding Section 468 thereto as follows: 468.i. Notwithstanding Section 55.1 of this By-law, within the lands zoned MU-3 as following uses are prohibited; 8.a.22 Commercial Entertainment Conference or Convention Facility Hotel Lodging House Museum Private Club or Lodge Religious Institution ii.Notwithstanding Sections 55.1 of this By-law, within the lands zoned MU-3 as shown on Schedules 74and 84tion, the following uses shall not be permitted unless the City of Kitchener has received acknowledgment from the Ministry of the Environment advising that a Record of Site Condition has been completed in accordance with the relevant Ontario legislation; Duplex Dwelling Home Business Hospice Lodging House Multiple Dwelling Private Home Day Care Residential Care Facility Single Detached Dwelling Street Townhouse Dwelling Tourist Home 8.-law 85-1 is hereby amended by adding Section 716 thereto as follows: 716. Notwithstanding Sections 6.1.2a), 6.1.2b), 6.1.2d), and 55.2 of this By-law, within the lands zoned High Intensity Mixed Use Corridor Zone (MU-3), shown as affected by this subsection, on Schedules74 and 84 of A,a mixed-use development shall be permitted in accordance with the following: a.The required off-street parking for all uses shall be 1 parking space per 93 space metres of gross floor area. 8.a.23 b. A minimum of 1 bicycle parking space, which is either in a building or structure or within a secure area such as a supervised parking lot or enclosure with a secure entrance or within a bicycle locker, per 333 square metres of gross floor area of all uses shall be provided. c. A minimum of 1bicycle parking space, which is located in accessible and highly visible locations near the entrance of a building and are accessible to the general public, per 500 square metres of gross floor area of all uses shall be provided. d. The front yard shall be the lot line abutting Breithaupt Street. e. The maximumFloor Space Ratio shall be 4.5. 9. -law 85-1 is hereby amended by adding Section 717 thereto as follows: 17. Notwithstanding Sections 55.2 of this By-law, within the lands zoned High Intensity Mixed Use Corridor Zone (MU-3), shown as affected by this subsection, on Schedules 74 and 84 -use development shall be permitted in accordance with the following: a. The rear yard shall be lot line abutting Wellington Street North. i. The minimum rear yard abutting a street along Wellington Street North for any portion of a building with a height less than 21.0 metres shall be 15.0 metres. ii. The minimum rear yard abutting a street along Wellington Street North for any portion of a building with a height greater than 21.0 metres shall be 31.5 metres. b. A building used for access to underground parking which is combined with an amenity or landscape feature shall not be subject to regulation a. above. c. The maximum building height is 50 metres. 8.a.24 d. The minimum front yard setback from Breithaupt Street and the minimum side yard abutting a street setback from Moore Avenue shall be 0.0 metres. 10. -law 85-1 is hereby amended by adding Section 718 thereto as follows: Notwithstanding Sections 55.2 of this By-law, within the lands zoned High Intensity Mixed Use Corridor Zone (MU-3), shown as affected by this subsection, on Schedules 74 and 84 -use development shall be permitted in accordance with the following: a. The maximum building height is 18 metres. b. The minimum exterior side yard and the minimum setback from the lane shall be 11. This By-law shall come into effect only upon approval by the Minister of Municipal Affairs and Housing, or his/her delegate, of Official Plan Amendment No. 2,Breithaupt Block Phase 3,but upon such approval, the provisions hereof affecting such lands shall be deemed to have come into force on the date of passing hereof. PASSED at the Council Chambers in the City of Kitchener this ______day of ___________,2018 _____________________________ Mayor _____________________________ Clerk 8.a.25 4 2 7 T 63 R 1 A 6 P 3 N 2 92 1 A 150 P A L 31 TR 2 1 1 - P2 R 7 G 8 T E5 3 R 6C AP R E TR 1 T G 7 AP G TR R P 2 31 2 L 11 A APTT 5 T A TR 6 3RR 5 P R N AA 1PP 6N A AP 113 TR T 4 4 P 7 2 R3 A4 AP A T 2 TR 8 5 T P 1 L 6 R T AP T 1 TR 6 R R P A O 7 P A 3 ARA P 1 TAP P 75 TR L P7 3 P RAAP 1 T TR G 84P8 RA1 1 2 1 T 94 F N APT T 1 TR E 9 RR 5 A T A O A R 0 PP T L R 5 RA N P P RA 1 T P P05 15 A RA T A 89 8 P1 P RA R 1 T 74PP L 1 RARA G- T T 9979 8 P RA 3 T 1 T 64PP RARA 4E74P 1 T T 0069 0 P9 5 R RA 1 TP 54RAP 6 1 TRAT R A 1 10 T L 259 P 5 RAR 2R P 21 T 8 44PPP RARARAA 2 7EA 1 T T T 4 204901- TPP G RA R 1 T 34PPP 8 1P RRARARA 5 1 T T T PI 303911 AP RA 3L 1 T 6 P24PP A RARA 9 1 T T 4021 7NC 7I 4 1PP 4 RAPRA 3 6 TRA T 2513 T31 371 103 1 0T 6N4 RPP 1TARAPRA P TRA T 8 23 T41 T92 2 9R 4 P- NU R0PRA TA 8 ARAP T R P TRA51 P 2RA33 T 8 RP T82 5 29 A A P T PP M TPRAPRA RAP TRA T 1 TRA43 T61 P50 T72 L R RRA19 1 TP 74PRA 3 ARAP T PP TRA71 A PRARA53 T PRA1 T T62 P 1 T6009 P 64P 1 PPRA RARA T P T T81 RAP6352 P1 TRA 3 RA70 T 1 T98 54PPP G RARARA 58R-15420 P T T T RAP734291 6 P1 TRA RA80 T 1 T88 44PP E RARA 2 PP T T PRARA8332 6 RA1 T T 1 TP9078 14RA 1 TP R 34RAP PP TRA 1 PRARA93 T RAP1 T T22 1 TRA0168 041 T STRATIFIED PLAN 24PP 3 PRARA RAP T T 1 TRA0412 P11 T RA58 1 TP 8 93RAP 5 TRA 2 PP14 T 46 2 RARA02-6 P1 T T 3 2 RA2148 R 1 T 1 83PP 8- 02 PRARA 5R RAP T T 1 TRA3605 8 P31 T 5 8 RA38 1 T 1 73P PRAP 1 RAP TRA 1 TRA26 T5 1 41 T94 P28 1 RAP6 T 1 TRAP4 T 63 TRAT 2 PP16 TR 5 RARA84A 1 T TPR R P5118 RAP6 1 TPRA A 2 53PRA TP A RAP T74RAP 6 1 1 TRA06 TRATP 61 T44 T P0854 P 9 RA 0 1 TPR 43PRA RAP T 1 TRA95A 71 T 2 P97P RARAP 1 TP T 4 33PRA34P RAP TRA 1 TRA85 T 6 81 T24 P87P RARA 7 1 T T 23PP65P 2 RARARA T T T 777555 5 P 3 RA 81 T 13 P 1RA 1 T 67PP PRARA TRA9 T T 1 T14525 N 3 031PPP 1 RARARA 7 RT T T T R573515 PA 1 ARAPP A 1 T0RAP 922 TRA 1 P147 T 1 37 TP4 PRRA L RAA1 T 6 2 1 TP55 82PT RA T 27P 1RAPR P 2 TRA 1171 T P45A 2 TRA 6 R T A07P P P7 1 RA T T G 96P RAT TP 86RA R P T 2RA76R 23 T E P1266 RA 1A A 1 TT 25RT ARPP P PARA 6 P TP R 56RA T8 46 8 PT RA 1 T 35 5R 1 2 1 A 60 7T S PR RA4AP 8 R 11 T2P 721 7 11 T E1 E R TPA 1 RAP 1 T 7 2 T 62 R-G N AP R RA 1 T P15 R P A A6 P 6S8 L2 L 3 A T 5 7 E R N 3D 6 A N 1 P 3 N T A 7 N R 5 A L A A 5 P 9 L S 1 1 D P 5 8 2T 1 N E T 6 A G R 3 E A E P S R 4 RT7 T3 EN A S L R E P E 3G 1 8 RE G 5R T 1 T 2 1 R9P 1 1 T 4S A RL A P T 6PA 4 4 5 40 N 2- O 3 R 8 S 53 L 2 T 7 2 TR 1 T 5 E 33 E R O6 T A 5 6 S L P 8 A R T N - 7 52 D R 9 0 6 0 1L 8 A 0 1- A P 2 R N 5T 8 TR 5 ER RA 6 APP SE 5 G 2 1 P L 0 1 A 7 N 8 T 57 3 6 1 7- R6 4R 8 A 5 P 3 T 5 R1 2 A T P T 1 R 0 RA 1 P 4 A 8 4 P 2 T 1 - R R A 8 P 5 0 9 1 1 2 1 1 5 46 T T 8 T S 44 9 3 R 1R 8 4R A E-3 2R A 7AP 1 - RP1P 1NE-R 8 8 3 5 2 R 5 A SG 8 3 1 3 T L 5 R E A 1P P 6N D T L R 7 3 A N A A 3 L T4 P4 A 1 N R3 T 1 A N T D R5 S P T 4 R A A6 T N 1T AR P8 2 T L R 1 PA 7 AER T 0 AR P P 2 T PAR E E 2 S PAR 1PA GRG T P T T EE R P S1 RE A L P R A T N 2 0 1 S T R 1 A 8 3 P 8 2 7 2 8 4 1 - R 8 5 0 2 4 2 9 8 1T 0 T 0 R N 7 RA 26 AP 6 A 1 P 0 L- 7 R P 6 6 8 1 3 5 - 9 G 8 R 1 8 E - 5 R R 8 A 5 8 6 1 0 T T R 2 A P R A 1 58R-16455 R P T E G R A P 8 B 1 P L 4 2 T A R T A 4 P N 5 T 3R R 3 A P 1 A 7 - 6 P 7 R 8 3 07 T 5 R A P 2 8 3 1 6 0 2 2 2 R 2 E T G N R A P P LA9 3 A NL 0 3 5 7P 8 6 7 5 R T R A -P 50 9G 82 8 E R 71 R 0E 2 0 2 7 1G - 9 1 R 8 5 P a L A e 4 r N 01 38 ELUDEHCS 2 48 ELUDEHCS 1 8 2 A 4 T R A P 8 2 6 0 5 7 01 2 74 SCHEDULE 74 1- - SCHEDULE 75 R1 8 R 5 2 2 8 7 5 1 8 T 6 3 56R 1 30 A - 3 2 9 P R 16 - 8 5R 8 5 C 1 2 4 2 T 5 R A P 2 T 1 R A P 5 2 4 1 R1 2 E G6 5 2 P 8 L23 - A 2 N R P 3 A 7 R 8 6 T 7 1 5 7 3 1 7 2 N 2 A 7 L 9 3 3P2 5 R 7 E1 G- G P T LR E A 2 8 N C R 21 5 8 3G 5 PART 1 6 6 6 T R 1 A P T 4 1 4 2 O2 6L 0 5 7 R F 8 E1 6 G 2 4 0O R P-1 2 L8 1E A58 - RN N8 R R 8 38G 5 -A1 77 62 5 L 69 5 4 5P T P R 2 L A R P EL A G 81AN P L P 6 A I N4 37 C 2 7 I 63 0 4 49N 5 3 - U NR 6 8 5 AM 2 L 9 P ) 6 D G 6 E E5 3 S 7 T R1 R 7 A 4O P - 3 L 7 R 2C N 8( A 5 0 L 7 P G T 1 PAR E R) T 8ED EE 2 S 0R PART 4 2 TO 4 7 1 L NS 2 7 0AC T 7 9( R LY A P 33 P 3 E - GL R E 8 7 NS 5R T E R A A P CW 7 L 0 9 7 9P 1 - 2 R G 6 8 5 7 E 2 3 R 7 P N A 5 6 R 8 T R 2 - A 1 0 1 5 3 0 L 6 4 P- 0 P A R T 1 R3 PART 13 3 G 7 8 T PART 12 E3 5 R R A 1 1 P 6T R TA P R A P 8 7 T 1 R 2 A 0 3 P PART 5 2 8 1 7 -N 7 R 08 A 5 9 1 L 7 - R9 P 8 53 G 3 4 - E 1 2 9 T R R5 T 7 3 R R 8 A 4 P A 5 1 P 1 1 3- 4R T 78 N 8 3 PART 16 5C A 50 T 4L1 2R G A 4 T P2 -P 6 R 8 7 L A R921 31 P 3- 8-3A T R 5P 8 R 5I O 5 8 C L 75 I NF PART 15 UO 1 1 T M R 2 A7 9 TP1 7 RT A T R 73 P A P 5 R 2 33 A7 2 P T 8 T N R 6 R A 8 P A 6 7 1 A 1 L -T P R A P P R 3 8 3 7 2 G - 5 R 8 5 E 4 R 3 76 3 7 8.a.26 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl 8.a.27 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl 8.a.28 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl 8.a.29 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl 8.a.30 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl 8.a.31 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl 8.a.32 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl 8.a.33 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl 8.a.34 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl 8.a.35 4,126 s.f. Total Area27,393 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.279,643 s.f.(25,989 s.m.)Total Area32,881 s.f.37,035 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.174,108 s.f.(16,181 s.m.)453,751 s.f.(42,170 s.m.) Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Office22,135 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.270,259 s.f.(25,117 s.m.) Cvjmejoh!Uisff Parking32,881 s.f.32,985 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.170,058 s.f.(15,805 s.m.) (9,857 s.m.)(40,154 s.m.) Uif!Csfjuibvqu!Cmpdl 106,063 s.f. 432,053 s.f. 4.07 - 4.502,157 s.m./9,857 s.m. (22%)49.6 m 42 Spaces171 Spaces100 Spaces (incl. surface pkg.)101 Spaces101 Spaces101 Spaces 30 Spaces646 Spaces266 Spaces380 Spaces (Ratio 1.36 Spaces / 1,000 s.f.)(1.36 Spaces / 93 s.m.) Retail5,258 s.f.4,126 s.f.9,384 s.f.(872 s.m.)Retail4,050 s.f.4,050 s.f.(377 s.m.) Proposed Project Areas Office Structure L1L2L3L4L5L6L7L8L9L10P.G.Total Parking Structure L0L1L2L3L4L5TotalTotal Project Area Project Data Lot AreaBuilding Floor Area(-21,698 s.f. for parking below grade)Floor Space Ratio (FSR)Landscaped Open SpaceBuilding Height Parking Information P1L0L1L2L3L4L5TotalCurrent Parking LoadNew Parking 555013050130505550 Mfwfm!Q2 Tdbmf!2;611 964 25183 10468 1220 12500 21 6 6700 30 11 Ibudife!Bsfb pg!GTS!Dbmdvmbujpo up Fydmvefe!gps!Qvsqptf 1.3% Slope 7300 10700 7300 3390 1 dn 7 5% Slope 5500 Space ELEV. 10700 M.RM. Typ. Parking 2600 29 10700 42 10700 10700 12500 3000 12000 9000 12000 3000 900090009000900090009000900090009000 8.a.36 4,126 s.f. Total Area27,393 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.279,643 s.f.(25,989 s.m.)Total Area32,881 s.f.37,035 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.174,108 s.f.(16,181 s.m.)453,751 s.f.(42,170 s.m.) Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Office22,135 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.270,259 s.f.(25,117 s.m.) Cvjmejoh!Uisff Parking32,881 s.f.32,985 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.170,058 s.f.(15,805 s.m.) (9,857 s.m.)(40,154 s.m.) Uif!Csfjuibvqu!Cmpdl 106,063 s.f. 432,053 s.f. 4.07 - 4.502,157 s.m./9,857 s.m. (22%)49.6 m 42 Spaces171 Spaces100 Spaces (incl. surface pkg.)101 Spaces101 Spaces101 Spaces 30 Spaces646 Spaces266 Spaces380 Spaces (Ratio 1.36 Spaces / 1,000 s.f.)(1.36 Spaces / 93 s.m.) Retail5,258 s.f.4,126 s.f.9,384 s.f.(872 s.m.)Retail4,050 s.f.4,050 s.f.(377 s.m.) Proposed Project Areas Office Structure L1L2L3L4L5L6L7L8L9L10P.G.Total Parking Structure L0L1L2L3L4L5TotalTotal Project Area Project Data Lot AreaBuilding Floor Area(-21,698 s.f. for parking below grade)Floor Space Ratio (FSR)Landscaped Open SpaceBuilding Height Parking Information P1L0L1L2L3L4L5TotalCurrent Parking LoadNew Parking 555013050130505550 Mfwfm!1 Tdbmf!2;611 946 964 10468 112120 12500 121 91 6700 131 111 up 1.3% Slope 7300 10700 7300 3390 dn 5% Slope 5500 Space ELEV. M.RM.10700 Typ. Parking 2600 10700 130 Ibudife!Bsfb pg!GTS!Dbmdvmbujpo Fydmvefe!gps!Qvsqptf 50 143 43 10700 684 10700 10358 49 92 7060 28226 12500 61 69 ELEV. M.RM. 3297 UNEXCAVATED ELEV. M.RM. 3000 639616 12000 7300 8500 34008500 600615 BF 3352 Space 5500 Typ. BF Parking RM. ELEV. 9000 MACH. 2034 Ibudife!Bsfb BFBF pg!GTS!Dbmdvmbujpo Fydmvefe!gps!Qvsqptf TICKET 591 599 UP 7300 12000 570590 MECH.ROOM 3000 139001229 900090009000900090009000900090009000 8.a.37 4,126 s.f. Total Area27,393 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.279,643 s.f.(25,989 s.m.)Total Area32,881 s.f.37,035 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.174,108 s.f.(16,181 s.m.)453,751 s.f.(42,170 s.m.) Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Office22,135 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.270,259 s.f.(25,117 s.m.) Cvjmejoh!Uisff Parking32,881 s.f.32,985 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.170,058 s.f.(15,805 s.m.) (9,857 s.m.)(40,154 s.m.) Uif!Csfjuibvqu!Cmpdl 106,063 s.f. 432,053 s.f. 4.07 - 4.502,157 s.m./9,857 s.m. (22%)49.6 m 42 Spaces171 Spaces100 Spaces (incl. surface pkg.)101 Spaces101 Spaces101 Spaces 30 Spaces646 Spaces266 Spaces380 Spaces (Ratio 1.36 Spaces / 1,000 s.f.)(1.36 Spaces / 93 s.m.) Retail5,258 s.f.4,126 s.f.9,384 s.f.(872 s.m.)Retail4,050 s.f.4,050 s.f.(377 s.m.) Proposed Project Areas Office Structure L1L2L3L4L5L6L7L8L9L10P.G.Total Parking Structure L0L1L2L3L4L5TotalTotal Project Area Project Data Lot AreaBuilding Floor Area(-21,698 s.f. for parking below grade)Floor Space Ratio (FSR)Landscaped Open SpaceBuilding Height Parking Information P1L0L1L2L3L4L5TotalCurrent Parking LoadNew Parking 555013050130505550 04984 964 685 5500 209217 218 12500 Space PARKETTE 208 Typ. BF Parking 3400 BF Tjuf!Qmbo!0!Mfwfm!2 Tdbmf!2;611 225 189 5500 Existing Lane Space 10700 Typ. Parking 2600 dn 5% Slope 1 0 LOBBY 8 8 5 10700 TICKET Qpufoujbm!cvjmu!gpsn!gspoujoh!qbsljoh!hbsbhf up 2% Slope 10700 224 151 237 144 10700 RETAIL 53336 Breithaupt Street 7 10700 9 190 5 7 2 645 640 2400 1 150 170 6700 New Lane 17810 161 22861 1001 12500 169162 LOBBY Wellington Street New Lane LOADING LOADING SHIPPING/ RECEIVINGADDITIONAL AREA 3000 Qpufoujbm!nvmuj.mfwfm!dpoofdujpot!cfuxffo!qbsljoh!'!cvjmejoh ELEC. ROOM 4 3 4 8 INDOOR 6 LOADING RETAIL BF WC ROOM MECH. 12000 BF WC WC WC 9000 ABOVE LOBBY BFBFOPEN TO WCWC 21003 PARKETTE OFFICE 12000 Qpufoujbm!dpsofs!sf.eftjho 3000 3619 4014 1040 836101 FFO PORD Moore Avenue 900090009000900090009000900090009000 8.a.38 4,126 s.f. Total Area27,393 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.279,643 s.f.(25,989 s.m.)Total Area32,881 s.f.37,035 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.174,108 s.f.(16,181 s.m.)453,751 s.f.(42,170 s.m.) Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Office22,135 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.270,259 s.f.(25,117 s.m.) Cvjmejoh!Uisff Parking32,881 s.f.32,985 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.170,058 s.f.(15,805 s.m.) (9,857 s.m.)(40,154 s.m.) Uif!Csfjuibvqu!Cmpdl 106,063 s.f. 432,053 s.f. 4.07 - 4.502,157 s.m./9,857 s.m. (22%)49.6 m 42 Spaces171 Spaces100 Spaces (incl. surface pkg.)101 Spaces101 Spaces101 Spaces 30 Spaces646 Spaces266 Spaces380 Spaces (Ratio 1.36 Spaces / 1,000 s.f.)(1.36 Spaces / 93 s.m.) Retail5,258 s.f.4,126 s.f.9,384 s.f.(872 s.m.)Retail4,050 s.f.4,050 s.f.(377 s.m.) Proposed Project Areas Office Structure L1L2L3L4L5L6L7L8L9L10P.G.Total Parking Structure L0L1L2L3L4L5TotalTotal Project Area Project Data Lot AreaBuilding Floor Area(-21,698 s.f. for parking below grade)Floor Space Ratio (FSR)Landscaped Open SpaceBuilding Height Parking Information P1L0L1L2L3L4L5TotalCurrent Parking LoadNew Parking 555013050130505550 Mfwfm!3 Tdbmf!2;611 685 5500 307315 316 12500 Space 306 Typ. BF Parking 3400 BF 326 284 5500 up 1.3% Slope Space 10700 Typ. Parking 2600 dn 5% Slope 10700 325 10700 245 338 238 10700 684 10700 244 265 255 285 28090 12500 264256 ADDITIONAL AREA 81880 3000 15861 12000 20985 WC MECH ROOM BF WC 81399000 LOBBYBELOW 39885 OPEN TO BF ELEVATOR WC 3385 ELEC ROOM COMM RM WC JAN 12000 OFFICE 15885 17600 3000 574 1975664280 900090009000900090009000900090009000 8.a.39 4,126 s.f. Total Area27,393 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.279,643 s.f.(25,989 s.m.)Total Area32,881 s.f.37,035 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.174,108 s.f.(16,181 s.m.)453,751 s.f.(42,170 s.m.) Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Office22,135 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.270,259 s.f.(25,117 s.m.) Cvjmejoh!Uisff Parking32,881 s.f.32,985 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.170,058 s.f.(15,805 s.m.) (9,857 s.m.)(40,154 s.m.) Uif!Csfjuibvqu!Cmpdl 106,063 s.f. 432,053 s.f. 4.07 - 4.502,157 s.m./9,857 s.m. (22%)49.6 m 42 Spaces171 Spaces100 Spaces (incl. surface pkg.)101 Spaces101 Spaces101 Spaces 30 Spaces646 Spaces266 Spaces380 Spaces (Ratio 1.36 Spaces / 1,000 s.f.)(1.36 Spaces / 93 s.m.) Retail5,258 s.f.4,126 s.f.9,384 s.f.(872 s.m.)Retail4,050 s.f.4,050 s.f.(377 s.m.) Proposed Project Areas Office Structure L1L2L3L4L5L6L7L8L9L10P.G.Total Parking Structure L0L1L2L3L4L5TotalTotal Project Area Project Data Lot AreaBuilding Floor Area(-21,698 s.f. for parking below grade)Floor Space Ratio (FSR)Landscaped Open SpaceBuilding Height Parking Information P1L0L1L2L3L4L5TotalCurrent Parking LoadNew Parking 555013050130505550 Mfwfmt!4.5 Tdbmf!2;611 5500 408416 417 12500 Space 407 Typ. BF Parking BF 3400 427 385 5500 up 1.3% Slope Space 10700 Typ. Parking 2600 dn 5% Slope 10700 426 10700 346 439 339 10700 10700 345 366 356 386 28090 12500 365357 ADDITIONAL AREA 81880 3000 15861 OFFICE 12000 20985 WC MECH ROOM BF WC 81399000 LOBBY BELOW 39885 OPEN TO BF ELEVATOR WC 3385 ELEC ROOM COMM RM WC JAN 12000 15885 3000 540 1975664280 900090009000900090009000900090009000 8.a.40 4,126 s.f. Total Area27,393 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.279,643 s.f.(25,989 s.m.)Total Area32,881 s.f.37,035 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.174,108 s.f.(16,181 s.m.)453,751 s.f.(42,170 s.m.) Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Office22,135 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.270,259 s.f.(25,117 s.m.) Cvjmejoh!Uisff Parking32,881 s.f.32,985 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.170,058 s.f.(15,805 s.m.) (9,857 s.m.)(40,154 s.m.) Uif!Csfjuibvqu!Cmpdl 106,063 s.f. 432,053 s.f. 4.07 - 4.502,157 s.m./9,857 s.m. (22%)49.6 m 42 Spaces171 Spaces100 Spaces (incl. surface pkg.)101 Spaces101 Spaces101 Spaces 30 Spaces646 Spaces266 Spaces380 Spaces (Ratio 1.36 Spaces / 1,000 s.f.)(1.36 Spaces / 93 s.m.) Retail5,258 s.f.4,126 s.f.9,384 s.f.(872 s.m.)Retail4,050 s.f.4,050 s.f.(377 s.m.) Proposed Project Areas Office Structure L1L2L3L4L5L6L7L8L9L10P.G.Total Parking Structure L0L1L2L3L4L5TotalTotal Project Area Project Data Lot AreaBuilding Floor Area(-21,698 s.f. for parking below grade)Floor Space Ratio (FSR)Landscaped Open SpaceBuilding Height Parking Information P1L0L1L2L3L4L5TotalCurrent Parking LoadNew Parking 555013050130505550 Mfwfm!6 Tdbmf!2;611 5500 12500 Space Typ. BF Parking BF 3400 5500 up 1.3% Slope Space 10700 Typ. Parking 2600 dn 5% Slope 10700 10700 548 541 10700 10700 547 569 558 568 12500 31073 567559 ADDITIONAL AREA 3000 ROOF TERRACE 12000 WC MECH ROOM BF WC 30879 9000 LOBBY BF ELEVATOR WC ELEC ROOM COMM RM WC JAN ROOF TERRACEOFFICE 12000 34750 4590020985 6709 3000 900090009000900090009000900090009000 8.a.41 4,126 s.f. Total Area27,393 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.279,643 s.f.(25,989 s.m.)Total Area32,881 s.f.37,035 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.174,108 s.f.(16,181 s.m.)453,751 s.f.(42,170 s.m.) Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Office22,135 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.270,259 s.f.(25,117 s.m.) Cvjmejoh!Uisff Parking32,881 s.f.32,985 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.170,058 s.f.(15,805 s.m.) (9,857 s.m.)(40,154 s.m.) Uif!Csfjuibvqu!Cmpdl 106,063 s.f. 432,053 s.f. 4.07 - 4.502,157 s.m./9,857 s.m. (22%)49.6 m 42 Spaces171 Spaces100 Spaces (incl. surface pkg.)101 Spaces101 Spaces101 Spaces 30 Spaces646 Spaces266 Spaces380 Spaces (Ratio 1.36 Spaces / 1,000 s.f.)(1.36 Spaces / 93 s.m.) Retail5,258 s.f.4,126 s.f.9,384 s.f.(872 s.m.)Retail4,050 s.f.4,050 s.f.(377 s.m.) Proposed Project Areas Office Structure L1L2L3L4L5L6L7L8L9L10P.G.Total Parking Structure L0L1L2L3L4L5TotalTotal Project Area Project Data Lot AreaBuilding Floor Area(-21,698 s.f. for parking below grade)Floor Space Ratio (FSR)Landscaped Open SpaceBuilding Height Parking Information P1L0L1L2L3L4L5TotalCurrent Parking LoadNew Parking 555013050130505550 Mfwfm!7.21 Tdbmf!2;611 12500 10700 10700 10700 10700 10700 28089 12500 ADDITIONAL AREA 3000 12000 ADDITIONAL AREA WC MECH ROOM BF WC 9000 LOBBY 39885 BF ELEVATOR WC ELEC ROOM COMM RM WC JAN OFFICE 12000 3000 31750669002985 900090009000900090009000900090009000 ADDITIONAL AREA 8.a.42 4,126 s.f. Total Area27,393 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.279,643 s.f.(25,989 s.m.)Total Area32,881 s.f.37,035 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.174,108 s.f.(16,181 s.m.)453,751 s.f.(42,170 s.m.) Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Office22,135 s.f.29,690 s.f.29,690 s.f.29,690 s.f.15,499 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.28,711 s.f.270,259 s.f.(25,117 s.m.) Cvjmejoh!Uisff Parking32,881 s.f.32,985 s.f.32,824 s.f.32,824 s.f.32,824 s.f.5,720 s.f.170,058 s.f.(15,805 s.m.) (9,857 s.m.)(40,154 s.m.) Uif!Csfjuibvqu!Cmpdl 106,063 s.f. 432,053 s.f. 4.07 - 4.502,157 s.m./9,857 s.m. (22%)49.6 m 42 Spaces171 Spaces100 Spaces (incl. surface pkg.)101 Spaces101 Spaces101 Spaces 30 Spaces646 Spaces266 Spaces380 Spaces (Ratio 1.36 Spaces / 1,000 s.f.)(1.36 Spaces / 93 s.m.) Retail5,258 s.f.4,126 s.f.9,384 s.f.(872 s.m.)Retail4,050 s.f.4,050 s.f.(377 s.m.) Proposed Project Areas Office Structure L1L2L3L4L5L6L7L8L9L10P.G.Total Parking Structure L0L1L2L3L4L5TotalTotal Project Area Project Data Lot AreaBuilding Floor Area(-21,698 s.f. for parking below grade)Floor Space Ratio (FSR)Landscaped Open SpaceBuilding Height Parking Information P1L0L1L2L3L4L5TotalCurrent Parking LoadNew Parking 555013050130505550 Qfouipvtf Tdbmf!2;611 12500 10700 10700 10700 10700 10700 12500 3000 12000 9000 PENTHOUSE 14900 45890 12000 3000 900090009000900090009000900090009000 8.a.43 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl Tpvui!Fmfwbujpo Tdbmf!2;611 8.a.44 Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl Breithaupt Street LINE Cvjmejoh!Tfdujpo Tdbmf!2;611 PROPERTY MAIN LOBBY SECTION EE CC IILOBBY FF ELEVATOR FF OOOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE PENTHOUSE MECHANICAL W/C LANE PARKING BEYOND W/C OFFICE ROOF TERRACE SETBACK 15m 31750 TOWER SETBACK 15000 SETBACK LINE PROPERTY APPROXIMATEOUTLINE OFOUTRIGHT ZONING Wellington Street 46004600460046004600560046004600460072003600 49600 MAX. BUILDING HEIGHT 8.a.45 Kvof!6-!3129 Ljudifofs-!PO Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl Bfsjbm!Wjfx Mppljoh!Tpvui.Xftu 8.a.46 Kvof!6-!3129 Ljudifofs-!PO Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl Bfsjbm!Wjfx Mppljoh!Tpvui 8.a.47 Kvof!6-!3129 Ljudifofs-!PO Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl Qfeftusjbo!Wjfx Xfmmjohupo!Tu/!.!Mppljoh!Xftu 8.a.48 Kvof!6-!3129 Ljudifofs-!PO Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl Qfeftusjbo!Wjfx Xfmmjohupo!Tu/!.!Mppljoh!Fbtu 8.a.49 Kvof!6-!3129 Ljudifofs-!PO Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl Qfeftusjbo!Wjfx Nppsf!Bwf/!.!Mppljoh!Opsui 8.a.50 Kvof!6-!3129 Ljudifofs-!PO Ofx!Efwfmpqnfou Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl Qfeftusjbo!Wjfx Nppsf!Bwf/!.!Mppljoh!Tpvui 8.a.51 8.a.52 8.a.53 8.a.54 8.a.55 8.a.56 8.a.57 8.a.58 8.a.59 8.a.60 8.a.61 8.a.62 8.a.63 8.a.64 8.a.65 8.a.66 8.a.67 8.a.68 8.a.69 8.a.70 8.a.71 8.a.72 8.a.73 8.a.74 8.a.75 8.a.76 8.a.77 8.a.78 8.a.79 8.a.80 8.a.81 8.a.82 8.a.83 8.a.84 8.a.85 8.a.86 8.a.87 8.a.88 8.a.89 8.a.90 8.a.91 8.a.92 8.a.93 8.a.94 8.a.95 8.a.96 north June 4, 20180709C N.T.SNZ Spring Shadows - March 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Study Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X f w B ! f s u p t p Nf X ! u f f O s ! u u T T ! ! h o o p j u L h o j m m f X 21;11bn 8.a.97 north June 4, 20180709C N.T.SNZ Shadow Study Figure SCALE:JOB: Spring Shadows - March 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Outline DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND u T ! u q v b i u j f s C u T ! p p m s f u b X u t f f w B !O f!X s ! u p u p T f ! N f o s p u u T ! h h o j o m j m f L X 23;11qn 8.a.98 north June 4, 20180709C N.T.SNZ Spring Shadows - March 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Study Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! u f w f B ! f f s s p u p NT ! h O ! o u j T ! L o p u h o j m m f X 3;11qn 8.a.99 north June 4, 20180709C N.T.SNZ Shadow Outline Shadow Study Figure SCALE:JOB: Spring Shadows - March 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! u f f s u T ! f h w B O ! o f ! s j u p p T L ! N o p u h o j m m f X 5;11qn 8.a.100 north June 4, 20180709C N.T.SNZ Spring Shadows - March 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Study Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! f u w B f O ! f! f s u p s p T u ! N T ! o h p u o hj o L j m m f X 7;11qn 8.a.101 north June 4, 20180709C N.T.SNZ Shadow Study Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Summer Shadows - June 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! u f f fs w u B ! T f s ! p p h N o O !j u L T ! o p u h o j m m f X 21;11bn 8.a.102 north June 4, 20180709C N.T.SNZ Shadow Study Figure SCALE:JOB: Summer Shadows - June 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Outline DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! u f w f B ! f f s s p u p O T N !! u h T ! o j o L p u h o j m m f X 23;11qn 8.a.103 north June 4, 20180709C N.T.SNZ Summer Shadows - June 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Study Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X u t f f X w ! B ! u f s f p p f N s u T ! h o j O ! L u T ! o p u h o j m m f X 3;11qn 8.a.104 north June 4, 20180709C N.T.SNZ Shadow Outline Shadow Study Figure SCALE:JOB: Summer Shadows - June 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! u f f f w s B ! u f s T p ! p O ! h N u o T j ! L o p u h o j m m f X 5;11qn 8.a.105 north June 4, 20180709C N.T.SNZ Summer Shadows - June 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Study Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X f w B ! f s pu p t N f X ! u f f O s ! u u T T ! ! h o o p j u L h o j m m f X 7;11qn 8.a.106 north June 4, 20180709C N.T.SNZ Shadow Study Autumn Shadows - Sept. 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! u f f w f B ! f s s u p p T N! h O ! o u j T ! L o p u h o j m m f X 21;11bn 8.a.107 north June 4, 20180709C N.T.SNZ Shadow Study Figure SCALE:JOB: Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Outline DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Autumn Shadows - Sept. 21 u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! f u w Bf ! f f s p s p u N T ! O ! h u o T j ! L o p u h o j m m f X 23;11qn 8.a.108 north June 4, 20180709C N.T.SNZ Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Study Autumn Shadows - Sept. 21 Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! f u w f B ! f f s p s p u N T ! O h ! u o j T ! L o p u h o j m m f X 3;11qn 8.a.109 north June 4, 20180709C N.T.SNZ Shadow Outline Shadow Study Figure SCALE:JOB: Autumn Shadows - Sept. 21 Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! f u w B ! f f s f p ps u N T ! h O ! o u j T !L o p u h o j m m f X 5;11qn 8.a.110 north June 4, 20180709C N.T.SNZ Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Study Autumn Shadows - Sept. 21 Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X u t f X ! f u w B ! f f s f p s p u N T O ! ! u h T o ! j o L p u h o j m m f X 7;11qn 8.a.111 north June 4, 20180709C N.T.SNZ Shadow Study Winter Shadows - December 21Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X f w B ! f s p p N u t f X ! u O ! f u f T s ! u o T ! p u h h o j o j mL m f X 21;11bn 8.a.112 north June 4, 20180709C N.T.SNZ Winter Shadows - December 21 Shadow Study Figure SCALE:JOB: Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Outline DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND u T ! u q v b i u j f s C u T ! p p m s f u b X u t f w f B ! f s pX ! p u N f f s u T ! h o O j ! u L T ! o p u h o j m m f X 23;11qn 8.a.113 north June 4, 20180709C N.T.SNZ Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Study Winter Shadows - December 21 Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X u t f w f B ! f s pX ! p u N f f s u T ! h o O j ! u L T ! o p u h o j m m f X 3;11qn 8.a.114 north June 4, 20180709C N.T.SNZ Breithaupt Block Ph. 3City of KitchenerRegional Municipality of Waterloo Shadow Study Winter Shadows - December 21 Figure SCALE:JOB: DATE:DRN: K:\\0709C- Breithaupt Block\\Shadow Analysis\\Shadow Study\\Report Figure Template - June 4, 2018.dwg LEGEND Shadow Outline u T ! u q v b i u j f s C u T ! p p m s f u b X f w u B ! t f s pf p N X ! u f f s u T ! h O o ! j u T L ! o p u h o j m m f X 5;11qn 8.a.115 Tbo!Ejfhp Ljudifofs-!PO Nbz!3:-!3129 Ofx!Efwfmpqnfou Tubogpse!Vojwfstjuz Cvjmejoh!Uisff Uif!Csfjuibvqu!Cmpdl Sfdfttfe!boe!joefoufe!tdsffot!dsfbuf!bo!bsujdvmbufe!wpmvnf/ Njbnj Qsfdfefou!Jnbhft Qbsljoh!Tusvduvsft Dvswfe!wfsujdbm!fmfnfout!ifmq!dsfbuf!wjtvbm!joufsftu!xijmf!csfbljoh!vq!uif!mbshf!wpmvnf/! Qpufoujbm!gps!hsffofsz!bu!sppgupq!mfwfm/!!Qmbzgvm!wfsujdbm!fmfnfout!dsfbuf!b!sizuin/! Nfubm!tdsffo!up!bmmpx!wfhfubujpo!up!hspx!vq!xbmmt/ Vtf!pg!ijhi.rvbmjuz!evsbcmf!nbufsjbmt/!!Gbdbef!cmfoet!jo!xjui!tvsspvoejoh!cvjmejoht/ Dvmwfs!Djuz-!DB Njojnbm!usbotqbsfodz!xjui!joufsftujoh!gbdbef!usfbunfou/!!Njyfe!mbshf!boe!tnbmm!qbofmt/ Wbsjpvt!nbufsjbmt!)dpodsfuf-!nfubm!qbofm-!boe!tdsffot*!hjwf!tusvduvsf/ Mjooz!Qbdjmmp!Qbsljoh!Hbsbhf-!Bodipsbhf 8.a.116