Loading...
HomeMy WebLinkAboutFIN-18-023 - T18-088 Sandrock Greenway Pedestrian Bridge ReplacementREPORT TO:Committee of the Whole DATE OF MEETING:2018-08-27 SUBMITTED BY:Laurie Stecho,Supervisor of Purchasing,519-741-2200 ext. 7089 PREPARED BY:Steve Rudak,Buyer,519-741-2200 ext. 7213 WARD (S) INVOLVED:Ward7 DATE OF REPORT:2018-08-07 REPORT NO.:FIN-18-023 SUBJECT:T18-088 Sandrock Greenway Pedestrian Bridge Replacement __________________________________________________________________________________________ RECOMMENDATION: That Tender T18-088 Sandrock Greenway Pedestrian Bridge Replacement, be awarded to Engineered ConcreteLimited, Kitchener, Ontario, at their tendered price of $220,120., including provisional items and contingencies of $26,500., plus H.S.T. of $28,615.60, for a total of $248,735.60. BACKGROUND: The City of Kitchener owns andoperates 65 pedestrian bridges of various design and conditions located across the city. The city conducts regular maintenance inspections as well as bi-annual engineering inspections guided by the Ontario Structure Inspection Manual (OSIM). Sandrock Greenway Pedestrian Bridge (Bridge ID 863) is a concrete double tee bridge installed in 1979. The structure was identified for further investigation and monitoring due to observation of structural concrete cracking. The follow up investigation undertaken overthe fall and winter of 2017 concluded that based on the age of the structure, the progressive concrete cracking, present value of the bridge, and short/long term cost-benefit analysis, replacement of the bridge in its current location is the preferred rehabilitation method.Ultimately, the precast concrete structure reached the end of its lifespan and is beyond the point of repair. The bridge was closed immediately for public use in January 2018 in preparation for removal and replacement in the fall of 2018with the bridge being re-opened October 30, 2018. ***This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994for assistance. 1.ii - 1 REPORT: Tenders were advertised publicly on the City of Kitchener website. Documents were downloaded by twenty eight (28) interested parties and by the closing date of July 31, 2018, five (5) tenders had been received. The following tenders were received:Bid Price Engineered ConcreteLimitedKitchener ON$248,735.60* 2220742 Ontario Ltdo/a Bronte ConstructionOakville ON$302,444.50 McLean TaylorConstruction Limited$321,941.07 CSL Group LtdAncaster ON$322,163.00 Coco Paving Inc.Hannon ON$326,488.64 The tenders were reviewed by M. Parris, Landscape Architect,who concurswith the above recommendation. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recom the delivery of core service. 1.ii - 2 FINANCIAL IMPLICATIONS: The net cost for this Tender(A), is fair and reasonable for a project of this scope and the upset limit is within the funding available (B) for this project. Funding for this project is included within the approved capital budget. The estimated surplus (D) will be used for further bridge repairs and maintenance across the city. T18-088 SandrockGreenway Pedestrian Bridge Replacement Estimated Cost for this Phase of Work Tender T18-088 costs, including HST248,735.60 less: HST rebate(24,741.48) Projected Costs: Staff Time/Permitting/Signage- Total Estimated Cost for this Phase of Work$223,994.12 C Budget for this Phase of Work Pedestrian Bridge Capital Account250,000.00 Total Budget for this Phase of Work250,000.00 B Estimated Surplus/(Deficit) for this Phase of Work (B -C)26,005.88 D Estimated Surplus/(Deficit) from previous phases- Total Estimated Surplus/(Deficit) $ 26,005.88 E COMMUNITY ENGAGEMENT: INFORM This report has been posted council / committee meeting. ACKNOWLEDGED BY: Jonathan Lautenbach, Chief Financial Officer, Financial Services Department 1.ii - 3