Loading...
HomeMy WebLinkAboutHK - 2018-11-06 - Item 1b - Heritage Impact Assessment (HIA) - Stage II - 200 Fairway Road South - Sears BuildingHeritage Impact Assessment- Stage Two 200 Fairway Road South, Sears Kitchener, Ontario October 15, 2018 T F A R D +VG Architects Southwest Ground View, South Facade - 72 Stafford Street, Suite 200, Toronto, Ontario Sears, 200 Fairway Road South. T.416.588.6370 SECTION TABLE OFCONTENTS T Section 1.0:Background 1.1: Executive Summary 1.2: Research Materials Consulted 1.3: Principles of the HIA Section 2.0:Introduction of the Development Site 2.1: Description of the Site & Adjacent Properties at 200 Fairway Road South Fairway Road South Fairway Road South 2.2: Adjacent Properties Section 3.0:Background Research 3.1: Introduction to Site 3.2: Lot History Section 4.0:Statement of Significance 4.1: Architectural Visual Description Section 5.0:Existing Conditions Section 6.0:Impact of Development Impact of Development 6.1: Proposed Development Proposed Development 6.2: Sears Redevelopment Sears Redevelopment 6.3: Architectural Description of the Proposed DevelopmentArchitectural Description of the Proposed DevelopmentArchitectural Description of the Proposed Development 6.4: Architectural Description of the Retained Sears Architectural Description of the Retained Sears Architectural Description of the Retained Sears BBuilding uilding Section 7.0:Proposed Demolition Outlined on the Original Sears Design roposed Demolition Outlined on the Original Sears Design roposed Demolition Outlined on the Original Sears Design Section 8.0:PProposed Demolition Outlined on the Proposed Designroposed Demolition Outlined on the Proposed Designroposed Demolition Outlined on the Proposed Design Section 9.0:Section 9.0:Section 9.0:Considered Alternatives & Mitigation Strategies Considered Alternatives & Mitigation Strategies Considered Alternatives & Mitigation Strategies 9.1: 9.1: 9.1: General General 9.2: 9.2: 9.2: C Conservation Strategies onservation Strategies onservation Strategies Section 10.0:Section 10.0:Section 10.0: Considered Alternatives & Mitigation StrategiesConsidered Alternatives & Mitigation StrategiesConsidered Alternatives & Mitigation Strategies 10.1: 10.1: 10.1: General General 10.2: 10.2: 10.2: Description of ImpactDescription of ImpactDescription of Impact 10.2.1:10.2.1:10.2.1: Potential Impacts- Sears Building 10.3: Summary of ImpactSummary of ImpactSummary of Impact 200 Fairway Road South+VG Architects HIA | June 04, 2018 Section 11.0: Conclusions 11.1: Conclusions Section A.0: Appendix A.1: Heritage Kitchener Statement Of Significance A 2: Drawings A 3: Site Photographs A 4: Archival Research A.5: Record of Pre-Submission Consultation A.6: Fairview Park Mall- Urban Design Report 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION BACKGROUND 1 +VG was retained to guide and evaluate design during the development process. Prior to submission, +VG was retained to guide and evaluate design during the development process. Prior to submission, +VG was retained to guide and evaluate design during the development process. Prior to submission, both heritage and the design team worked together to form a strategy and approach for the adaptation both heritage and the design team worked together to form a strategy and approach for the adaptation both heritage and the design team worked together to form a strategy and approach for the adaptation of the cultural resource on the site. Historical analysis, design recommendations and coordination are of the cultural resource on the site. Historical analysis, design recommendations and coordination are of the cultural resource on the site. Historical analysis, design recommendations and coordination are required to address both the existing property and the resulting impact of the proposed alteration and required to address both the existing property and the resulting impact of the proposed alteration and required to address both the existing property and the resulting impact of the proposed alteration and construction following the City of Kitchener’s planning requirements and the Ontario Heritage Act. ity of Kitchener’s planning requirements and the Ontario Heritage Act. ity of Kitchener’s planning requirements and the Ontario Heritage Act. T Recommendations contained in this report are based on an understanding of the significance and Recommendations contained in this report are based on an understanding of the significance and Recommendations contained in this report are based on an understanding of the significance and heritage attributes of the building on the development site. In this report, both conservation and heritage attributes of the building on the development site. In this report, both conservation and heritage attributes of the building on the development site. In this report, both conservation and mitigation options are considered, where appropriate, in order to propose a development which mitigation options are considered, where appropriate, in order to propose a development which mitigation options are considered, where appropriate, in order to propose a development which appropriately conserves, adapts and adds to its existing cultural resources. The adaptation strategy appropriately conserves, adapts and adds to its existing cultural resources. The adaptation strategy appropriately conserves, adapts and adds to its existing cultural resources. The adaptation strategy F applies conservation principles balanced with new construction techniques to mitigate potential applies conservation principles balanced with new construction techniques to mitigate potential applies conservation principles balanced with new construction techniques to mitigate potential negative impacts to both the original structure and decorative features. A balanced approach to negative impacts to both the original structure and decorative features. A balanced approach to negative impacts to both the original structure and decorative features. A balanced approach to conservation and adaptation has guided the development design in all areas and will continue to do so conservation and adaptation has guided the development design in all areas and will continue to do so conservation and adaptation has guided the development design in all areas and will continue to do so in future phases. The adaptive reuse strategy recommendations will be general with the intention to in future phases. The adaptive reuse strategy recommendations will be general with the intention to in future phases. The adaptive reuse strategy recommendations will be general with the intention to become more specific and detailed in future design phases in order to inform decisions and direct the become more specific and detailed in future design phases in order to inform decisions and direct the become more specific and detailed in future design phases in order to inform decisions and direct the 200 Fairway Road South development throughout the process.200 Fairway Road South development throughout the process.200 Fairway Road South development throughout the process. A R D 200 Fairway Road South +VG Architects HIA | June 4, 2018 TT Commissioning of the Report ommissioning of the Report +VG Architects is a multidisciplinary architectural firm including heritage +VG Architects is a multidisciplinary architectural firm including heritage conservation. The design approach to this project aims to preserve and conservation. The design approach to this project aims to preserve and enhance the heritage significance of the building. The decision making enhance the heritage significance of the building. The decision making FF process is predicated on a balancing of the heritage requirements, client process is predicated on a balancing of the heritage requirements, client needs, compliance with building code and environmentally sustainable needs, compliance with building code and environmentally sustainable conditions. conditions. AA RR DD 200 Fairway Road South +VG Architects HIA | June 4, 2018 1.1 Executive Summary This Heritage Impact Assessment (HIA) describes the impact of the proposed development of the Fairview Park Mall on the existing structure and to propose way to minimize the impact on the heritage structure. This Heritage Impact Assessment began with a Stage 1 HIA in order to identify any existing cultural heritage that would meet the criteria for designation. The HIA stage 1 identified that the building does have some heritage significance, however it does not merit designation under the criteria established by the Ontario Regulation 9/06 “Criteria for determining Cultural Heritage Value or interest”. In this report, the proposed design has been reviewed for its potential impacts, possible alternatives and In this report, the proposed design has been reviewed for its potential impacts, possible alternatives and In this report, the proposed design has been reviewed for its potential impacts, possible alternatives and mitigative strategies. In this report we have balanced the need to respect the heritage attributes, with the mitigative strategies. In this report we have balanced the need to respect the heritage attributes, with the mitigative strategies. In this report we have balanced the need to respect the heritage attributes, with the need to address contemporary concerns by establishing design guidelines that can meaningfully incorporate need to address contemporary concerns by establishing design guidelines that can meaningfully incorporate need to address contemporary concerns by establishing design guidelines that can meaningfully incorporate the existing building fabric within a new context and in relationship with new buildings.the existing building fabric within a new context and in relationship with new buildings.the existing building fabric within a new context and in relationship with new buildings. The heritage significance is evaluated in accordance with criteria established by the Ontario Regulation 9/06 The heritage significance is evaluated in accordance with criteria established by the Ontario Regulation 9/06 The heritage significance is evaluated in accordance with criteria established by the Ontario Regulation 9/06 “Criteria for determining Cultural Heritage Value or interest”.ultural Heritage Value or interest”.ultural Heritage Value or interest”. 1.2 Research Materials Consulted T Materials consulted and referenced in this report to assign cultural heritage value or interest of the site and Materials consulted and referenced in this report to assign cultural heritage value or interest of the site and Materials consulted and referenced in this report to assign cultural heritage value or interest of the site and surrounding district includes: Record of Pre-Submission prepared by The Record of Pre-Submission prepared by The Record of Pre-Submission prepared by The CCCity of Kitchener, Development Service Department.ity of Kitchener, Development Service Department.ity of Kitchener, Development Service Department. Archival research provided by the Kitchener Public Archival research provided by the Kitchener Public Archival research provided by the Kitchener Public LLLibrary included in the Appendixibrary included in the Appendixibrary included in the Appendix City of Kitchener’s Statement of Significance of 200 Fairway Road South provided by Michelle ity of Kitchener’s Statement of Significance of 200 Fairway Road South provided by Michelle ity of Kitchener’s Statement of Significance of 200 Fairway Road South provided by Michelle F Drake The review is based the following design proposal documents:The review is based the following design proposal documents:The review is based the following design proposal documents: Record of Pre-Submission prepared by The Record of Pre-Submission prepared by The Record of Pre-Submission prepared by The CCCity of Kitchener, Development Service Department.ity of Kitchener, Development Service Department.ity of Kitchener, Development Service Department. 1.3 Principles of the HIA1.3 Principles of the HIA1.3 Principles of the HIA A This HIA is based on ‘Heritage Impact Statement Terms of Reference’ (August 2011 update), available on This HIA is based on ‘Heritage Impact Statement Terms of Reference’ (August 2011 update), available on This HIA is based on ‘Heritage Impact Statement Terms of Reference’ (August 2011 update), available on the City of Toronto website.ity of Toronto website.ity of Toronto website. The Parks The Parks The Parks CCanada Standards and Guidelines for the anada Standards and Guidelines for the anada Standards and Guidelines for the Conservation of Historic Places in Canada (2010); R The Ontario Heritage T ool Kit;The Ontario Heritage T ool Kit;The Ontario Heritage T ool Kit; Ontario Ministry of Ontario Ministry of Ontario Ministry of CCCulture’s ulture’s ulture’s Eight Guiding Principles in the Conservation of Historic Properties (1997);(1997);(1997); Ontario Ministry of Ontario Ministry of Ontario Ministry of Culture’s Heritage Conservation Principle’s for Land Use Planning (2007); Well Preserved: the Ontario Heritage Foundation’s Manual of Principles and Practice for Well Preserved: the Ontario Heritage Foundation’s Manual of Principles and Practice for Well Preserved: the Ontario Heritage Foundation’s Manual of Principles and Practice for Architectural Architectural Architectural Conservation (1988). D Ontario Regulation 9/06 under the Ontario Heritage Act 200 Fairway Road South +VG Architects HIA | June 4, 2018 T F A Image 01: Proposed Development Site - 200 Fairway Road SouthImage 01: Proposed Development Site - 200 Fairway Road South R D 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION INTRODUCTION TO THE DEVELOPMENT SITE 2 2.1 Description of the Site & Adjacent Properties at 200 Fairway Road South The Site is located in southwest Kitchener, north of Fairway Road and west of Highway 7/8, the Site is located in the Fairway area of Kitchener, southeast of the Vanier and Kingsdale residential neighbourhoods. Fairview Park Mall and the immediately surrounding area is a major commercial node with a of range Fairview Park Mall and the immediately surrounding area is a major commercial node with a of range Fairview Park Mall and the immediately surrounding area is a major commercial node with a of range commercial, retail and office uses located on both the north and south side of Fairway Road and is a planned commercial, retail and office uses located on both the north and south side of Fairway Road and is a planned commercial, retail and office uses located on both the north and south side of Fairway Road and is a planned focal point for growth within the City of Kitchener due to the presence of the future Fairway IOity of Kitchener due to the presence of the future Fairway IOity of Kitchener due to the presence of the future Fairway ION Station. An existing servicing corridor owned by Hydro One currently transverses the site, which is generally An existing servicing corridor owned by Hydro One currently transverses the site, which is generally An existing servicing corridor owned by Hydro One currently transverses the site, which is generally situated between the existing mall structure and Fairway Road. The existing Hydro One corridor has been situated between the existing mall structure and Fairway Road. The existing Hydro One corridor has been situated between the existing mall structure and Fairway Road. The existing Hydro One corridor has been used to accommodate the future LRT and Fairway ION Station. Beyond the Site there is a broad mix of land uses. To the north of the Site there are two large multiple eyond the Site there is a broad mix of land uses. To the north of the Site there are two large multiple eyond the Site there is a broad mix of land uses. To the north of the Site there are two large multiple residential buildings approximately 20 storeys in height; beyond the existing multiple residential buildings, residential buildings approximately 20 storeys in height; beyond the existing multiple residential buildings, residential buildings approximately 20 storeys in height; beyond the existing multiple residential buildings, there are existing low-rise residential uses comprised of three-storey apartments, townhouses and single there are existing low-rise residential uses comprised of three-storey apartments, townhouses and single there are existing low-rise residential uses comprised of three-storey apartments, townhouses and single detached dwellings. Existing commercial and retail uses are located to the west of the site, on both the xisting commercial and retail uses are located to the west of the site, on both the xisting commercial and retail uses are located to the west of the site, on both the T west side of Wilson Avenue and the south side of Fairway Road. west side of Wilson Avenue and the south side of Fairway Road. The urban fabric of Fairview Park Mall and the surrounding community is somewhat irregular, with regular The urban fabric of Fairview Park Mall and the surrounding community is somewhat irregular, with regular The urban fabric of Fairview Park Mall and the surrounding community is somewhat irregular, with regular and irregular blocks as a result of different uses, road realignments and the presence of a hydro corridor and irregular blocks as a result of different uses, road realignments and the presence of a hydro corridor and irregular blocks as a result of different uses, road realignments and the presence of a hydro corridor and future LRT services. There are many existing surface parking lots located on the Site. RT services. There are many existing surface parking lots located on the Site. RT services. There are many existing surface parking lots located on the Site. F The proposed development site was formerly occupied by a Sears department store it is now being The proposed development site was formerly occupied by a Sears department store it is now being The proposed development site was formerly occupied by a Sears department store it is now being prepared for redevelopment. The site is not designated under the Ontario Heritage Act. However, the site prepared for redevelopment. The site is not designated under the Ontario Heritage Act. However, the site prepared for redevelopment. The site is not designated under the Ontario Heritage Act. However, the site holds cultural value due to its architectural style and associative vales. holds cultural value due to its architectural style and associative vales. holds cultural value due to its architectural style and associative vales. A The Site is generally flat with a slight decrease in grade towards the centre of the property from Fairway The Site is generally flat with a slight decrease in grade towards the centre of the property from Fairway The Site is generally flat with a slight decrease in grade towards the centre of the property from Fairway Road and with a marginal increase in grade towards Wilson Avenue and Kingsway Drive.Road and with a marginal increase in grade towards Wilson Avenue and Kingsway Drive.Road and with a marginal increase in grade towards Wilson Avenue and Kingsway Drive. The Site forms a large, irregularly shaped block with an area of approximately 20 hectares. It is bound by The Site forms a large, irregularly shaped block with an area of approximately 20 hectares. It is bound by The Site forms a large, irregularly shaped block with an area of approximately 20 hectares. It is bound by Kingsway Drive to the north, Wilson Avenue to the west, Fairway Road to the south, and Highway 8 to the Kingsway Drive to the north, Wilson Avenue to the west, Fairway Road to the south, and Highway 8 to the Kingsway Drive to the north, Wilson Avenue to the west, Fairway Road to the south, and Highway 8 to the east. Due to its “shopping centre” morphology, the Site is void of street animation and orientation on any east. Due to its “shopping centre” morphology, the Site is void of street animation and orientation on any east. Due to its “shopping centre” morphology, the Site is void of street animation and orientation on any R of the public frontages; the periphery of the property, adjacent to all streets, is largely devoted to surface of the public frontages; the periphery of the property, adjacent to all streets, is largely devoted to surface of the public frontages; the periphery of the property, adjacent to all streets, is largely devoted to surface parking facilities with limited pedestrian facilities providing connection from the street to the mall itself.parking facilities with limited pedestrian facilities providing connection from the street to the mall itself.parking facilities with limited pedestrian facilities providing connection from the street to the mall itself. D Present owner’s contact details are: Cadillac Fairview, 20 Queen Street West, 5th floor, Toronto, Ontario, M5H 3R4 200 Fairway Road South +VG Architects HIA | June 4, 2018 2.2 Adjacent Properties There are currently two buildings present on the 200 Fairway Road South Site. The first is the main Fairview Park Mall building that is currently one to two-storeys in height, which includes the Hudsons Park Mall building that is currently one to two-storeys in height, which includes the Hudsons Park Mall building that is currently one to two-storeys in height, which includes the Hudsons Bay at the west end, the former Sears Canada at the south, and the existing Walmart at the east. The other is the anada at the south, and the existing Walmart at the east. The other is the anada at the south, and the existing Walmart at the east. The other is the former Sear Automotive Centre, located at the southern edge of the property adjacent to Fairway Road. entre, located at the southern edge of the property adjacent to Fairway Road. entre, located at the southern edge of the property adjacent to Fairway Road. Surface parking lots with associated circulation lanes are present around all buildings in the Site, and there Surface parking lots with associated circulation lanes are present around all buildings in the Site, and there Surface parking lots with associated circulation lanes are present around all buildings in the Site, and there are a number of loading and service areas adjacent to some of the buildings. are a number of loading and service areas adjacent to some of the buildings. are a number of loading and service areas adjacent to some of the buildings. The Site is currently occupied by an existing GRT terminal, located immediately west of the Hudson’s The Site is currently occupied by an existing GRT terminal, located immediately west of the Hudson’s The Site is currently occupied by an existing GRT terminal, located immediately west of the Hudson’s BBay. ay. The Fairway ION Rapid Transit Station is located interior to the Site, and it is the terminus of Stage 1 of the Rapid Transit Station is located interior to the Site, and it is the terminus of Stage 1 of the Rapid Transit Station is located interior to the Site, and it is the terminus of Stage 1 of the ION Rapid Transit line from Conestoga Mall in Waterloo, to Fairview Park Mall in Kitchener.onestoga Mall in Waterloo, to Fairview Park Mall in Kitchener.onestoga Mall in Waterloo, to Fairview Park Mall in Kitchener. The surrounding urban fabric is generally comprised of low rise commercial buildings with surface parking The surrounding urban fabric is generally comprised of low rise commercial buildings with surface parking The surrounding urban fabric is generally comprised of low rise commercial buildings with surface parking lots. There are a number of residential buildings that range in height from 3 to 19 storeys immediately north lots. There are a number of residential buildings that range in height from 3 to 19 storeys immediately north lots. There are a number of residential buildings that range in height from 3 to 19 storeys immediately north TTT of the Site. These higher density residential buildings function as an edge for the existing lower density of the Site. These higher density residential buildings function as an edge for the existing lower density of the Site. These higher density residential buildings function as an edge for the existing lower density residential neighbourhoods further north. As noted previously, an existing Hydro One corridor cut through residential neighbourhoods further north. As noted previously, an existing Hydro One corridor cut through residential neighbourhoods further north. As noted previously, an existing Hydro One corridor cut through the Site with a power substation located immediately south of Fairview Park Mall, on the south side of the Site with a power substation located immediately south of Fairview Park Mall, on the south side of the Site with a power substation located immediately south of Fairview Park Mall, on the south side of Fairway Road. FFF 2 3 AAA RRR 1 1. Sears DDD 2. Walmart 3. Hudson’s Bay Image 02: Fairview Park Mall Flooring Map. Source: Fairview Park Mall 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION BACKGROUND RESEARCH 3 3.1 Introduction to site The Sears store located at Fairview Park Mall is a commercial building built in 1965 in the Kennedy Era International Modern style. It is reportedly one of the first major precast structures to be built in Southern International Modern style. It is reportedly one of the first major precast structures to be built in Southern International Modern style. It is reportedly one of the first major precast structures to be built in Southern Ontario. The mall’s presence over the years has turned Fairway Road into a major commercial strip. It is Ontario. The mall’s presence over the years has turned Fairway Road into a major commercial strip. It is Ontario. The mall’s presence over the years has turned Fairway Road into a major commercial strip. It is one of the four biggest malls in the region with 730,000 square feet (68,000 m2) of gross leasable area. one of the four biggest malls in the region with 730,000 square feet (68,000 m2) of gross leasable area. one of the four biggest malls in the region with 730,000 square feet (68,000 m2) of gross leasable area. The Simpsons-Sears Building at the Fairview Park Mall was completed in 1965, had an estimated cost of uilding at the Fairview Park Mall was completed in 1965, had an estimated cost of uilding at the Fairview Park Mall was completed in 1965, had an estimated cost of $2,000,000 and included 100,000 square feet of selling space, in addition to 40,000 for service facilities . $2,000,000 and included 100,000 square feet of selling space, in addition to 40,000 for service facilities . $2,000,000 and included 100,000 square feet of selling space, in addition to 40,000 for service facilities . CCF Fairview Park (commonly known as Fairview Park Mall) is a large shopping mall of 120 stores in Kitchener, Fairview Park (commonly known as Fairview Park Mall) is a large shopping mall of 120 stores in Kitchener, Fairview Park (commonly known as Fairview Park Mall) is a large shopping mall of 120 stores in Kitchener, Ontario, Canada. The Fairview Park Mall, was the largest of its kind in this part of Southwestern Ontario at anada. The Fairview Park Mall, was the largest of its kind in this part of Southwestern Ontario at anada. The Fairview Park Mall, was the largest of its kind in this part of Southwestern Ontario at the time, and after a nine-year-long hunt for a suitable site, Simpsons- Sears the time, and after a nine-year-long hunt for a suitable site, Simpsons- Sears the time, and after a nine-year-long hunt for a suitable site, Simpsons- Sears LLtd selected the location for a td selected the location for a td selected the location for a new site. J.W. Button, Simpsons- Sear’s president, said the firm had been actively looking for a location here utton, Simpsons- Sear’s president, said the firm had been actively looking for a location here utton, Simpsons- Sear’s president, said the firm had been actively looking for a location here since 1953. It was the 16th major department store to be built by Simpsons-Sears since 1954, bringing the since 1953. It was the 16th major department store to be built by Simpsons-Sears since 1954, bringing the since 1953. It was the 16th major department store to be built by Simpsons-Sears since 1954, bringing the total number of retail and mail order units in operation at the time from coast to coast to 365. total number of retail and mail order units in operation at the time from coast to coast to 365. total number of retail and mail order units in operation at the time from coast to coast to 365. T 3.2 Lot History Prior to the construction of the Fairview Park Mall the site was farmland with a portion of the property Prior to the construction of the Fairview Park Mall the site was farmland with a portion of the property Prior to the construction of the Fairview Park Mall the site was farmland with a portion of the property owned by A.I Rosenberg of the K-W owned by A.I Rosenberg of the K-W NNaval Veterans Association. As reported in the Waterloo Record in aval Veterans Association. As reported in the Waterloo Record in aval Veterans Association. As reported in the Waterloo Record in F 1962, the site of the current Fairway Park Mall was to reside within the 50-acre area between Parkway 1962, the site of the current Fairway Park Mall was to reside within the 50-acre area between Parkway 1962, the site of the current Fairway Park Mall was to reside within the 50-acre area between Parkway Drive, Block Rnoad and Highway 8. The work for the Simpsons-Sears department store began in the fall lock Rnoad and Highway 8. The work for the Simpsons-Sears department store began in the fall lock Rnoad and Highway 8. The work for the Simpsons-Sears department store began in the fall of 1964. Executive consultant of Fairview, J. F. Harris, stated the new plaza would in no way resemble or xecutive consultant of Fairview, J. F. Harris, stated the new plaza would in no way resemble or xecutive consultant of Fairview, J. F. Harris, stated the new plaza would in no way resemble or be operated as a discount center. Sears planned to place a strong emphasis on fashion and quality in family be operated as a discount center. Sears planned to place a strong emphasis on fashion and quality in family be operated as a discount center. Sears planned to place a strong emphasis on fashion and quality in family clothing in the new Kitchener store. Plans were held up because of a long delay in the approval of zoning clothing in the new Kitchener store. Plans were held up because of a long delay in the approval of zoning clothing in the new Kitchener store. Plans were held up because of a long delay in the approval of zoning A regulations allowing the Fairview Park Mall to run as a shopping center development. The site was zoned regulations allowing the Fairview Park Mall to run as a shopping center development. The site was zoned regulations allowing the Fairview Park Mall to run as a shopping center development. The site was zoned to allow the shopping development on August 15, 1963 and currently listed as a to allow the shopping development on August 15, 1963 and currently listed as a to allow the shopping development on August 15, 1963 and currently listed as a C-5 zone. R D 200 Fairway Road South +VG Architects HIA | June 4, 2018 TTT FFF Image 04: Proposed Development Site - 200 Fairway Road SouthImage 04: Proposed Development Site - 200 Fairway Road South Image 03: Fairview Park Mall Design 1962Image 03: Fairview Park Mall Design 1962 Source: City of Kitchener Archives ity of Kitchener Archives AAA RRR Image 05: Simpsons-Sears store when it open on Fairway Road in 1965, Fairview Park Mall opened a year later Image 05: Simpsons-Sears store when it open on Fairway Road in 1965, Fairview Park Mall opened a year later attached to the Storeattached to the Store Source: Source: CCity of Kitchener Archives ity of Kitchener Archives DDD 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION STATEMENT OF SIGNIFICANCE 4 A previous Statement of Significance was completed by Michelle Drake in May 5, 2012 to define design and A previous Statement of Significance was completed by Michelle Drake in May 5, 2012 to define design and A previous Statement of Significance was completed by Michelle Drake in May 5, 2012 to define design and physical value and the heritage background for the Sears Building located at 200 Fairway Road South. A uilding located at 200 Fairway Road South. A uilding located at 200 Fairway Road South. A copy of the Statement of Significance for 200 Fairway Road South, is attached in the appendix. The Sears copy of the Statement of Significance for 200 Fairway Road South, is attached in the appendix. The Sears copy of the Statement of Significance for 200 Fairway Road South, is attached in the appendix. The Sears Building is listed on the Municipal Heritage Register as a “Non-Designated Property of on-Designated Property of on-Designated Property of CCCultural Heritage ultural Heritage ultural Heritage Value or Interest”. The MHR is the City’s official list or record of properties identified by ity’s official list or record of properties identified by ity’s official list or record of properties identified by CCCity ity ity CCouncil as ouncil as being of cultural heritage value or interest. Non-designated properties, which are considered to be of cultural heritage value or interest that are placed on-designated properties, which are considered to be of cultural heritage value or interest that are placed on-designated properties, which are considered to be of cultural heritage value or interest that are placed on the Municipal Heritage Register are not provided protection under the Ontario Heritage Act; or the on the Municipal Heritage Register are not provided protection under the Ontario Heritage Act; or the on the Municipal Heritage Register are not provided protection under the Ontario Heritage Act; or the T imposed restrictions or obligations related to obtaining heritage approvals. This means property owners imposed restrictions or obligations related to obtaining heritage approvals. This means property owners imposed restrictions or obligations related to obtaining heritage approvals. This means property owners are not subject to the heritage-permit process or a Heritage Kitchener review; and they are not required are not subject to the heritage-permit process or a Heritage Kitchener review; and they are not required are not subject to the heritage-permit process or a Heritage Kitchener review; and they are not required to obtain city council approval to make alterations to their properties.to obtain city council approval to make alterations to their properties.to obtain city council approval to make alterations to their properties. 4.1 Architectural Visual Description4.1 Architectural Visual Description F The Statement of Significance provided by the The Statement of Significance provided by the The Statement of Significance provided by the CCity of Kitchener’s ity of Kitchener’s ity of Kitchener’s CCultural Heritage Planning Department ultural Heritage Planning Department states that the “principal resource that contributes to heritage value is the department store”. The single that the “principal resource that contributes to heritage value is the department store”. The single that the “principal resource that contributes to heritage value is the department store”. The single storey structure was built by Dunker storey structure was built by Dunker storey structure was built by Dunker CConstruction onstruction onstruction LLtd.td.td. A The Sears Building located at the Fairview Park Mall was an early example of precast clad buildings in uilding located at the Fairview Park Mall was an early example of precast clad buildings in uilding located at the Fairview Park Mall was an early example of precast clad buildings in Ontario and serves as a unique example of the Kennedy Ontario and serves as a unique example of the Kennedy Ontario and serves as a unique example of the Kennedy Era International style of architecture in the area. The facade consists of an eight-foot base wall of dark green antique glazed brick and a series of 20-foot-high The facade consists of an eight-foot base wall of dark green antique glazed brick and a series of 20-foot-high The facade consists of an eight-foot base wall of dark green antique glazed brick and a series of 20-foot-high white precast moulded panels that extend vertically to the roof line and cover all four sides of the structure. white precast moulded panels that extend vertically to the roof line and cover all four sides of the structure. white precast moulded panels that extend vertically to the roof line and cover all four sides of the structure. Each panel is 4 feet wide and weigh 16,000 pounds. Deep recesses in the panels provide light and shadow ach panel is 4 feet wide and weigh 16,000 pounds. Deep recesses in the panels provide light and shadow ach panel is 4 feet wide and weigh 16,000 pounds. Deep recesses in the panels provide light and shadow contrast during the day. At night, light concealed in the store facade accentuate the heavily moulded arches.contrast during the day. At night, light concealed in the store facade accentuate the heavily moulded arches.contrast during the day. At night, light concealed in the store facade accentuate the heavily moulded arches. R The east west and south facade of the Sears Structure is original with the exception of updated signage. The east west and south facade of the Sears Structure is original with the exception of updated signage. The east west and south facade of the Sears Structure is original with the exception of updated signage. Stage 1 of the H.I.A determined that there are no other existing physical heritage features on the site.Stage 1 of the H.I.A determined that there are no other existing physical heritage features on the site.Stage 1 of the H.I.A determined that there are no other existing physical heritage features on the site. D 200 Fairway Road South +VG Architects HIA | June 4, 2018 Significant Attributes (Labeled in Image 06) 1. Pre-cast concrete construction 2. 20 foot high precast moulded stone facing panels 3. 8- foot- high walls made up of dark green antique glazed bricks3. 8- foot- high walls made up of dark green antique glazed bricks 4. Decorative brick patterns near doors TTT FFF AAA RRR 1 2 34 Image 06: 200 Fairway South. South Facade. Kitchener, Ontario. Significant Attributes are represented in red. Image 06: 200 Fairway South. South Facade. Kitchener, Ontario. Significant Attributes are represented in red. Source: +VGSource: +VG DDD 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION EXISTINGCONDITIONS 5 T Image 07: 200 Fairway Road South, Sears. Image 07: 200 Fairway Road South, Sears. EEast and ast and North Facade. Kitchener Ontario.orth Facade. Kitchener Ontario. F A Image 08: 200 Fairway Road South, Sears. Image 08: 200 Fairway Road South, Sears. East Facade. Kitchener Ontario. R Image 09: 200 Fairway Road South, Sears Front Entrance. South Facade. Kitchener Ontario. D 200 Fairway Road South +VG Architects HIA | June 4, 2018 Image 10: 200 Fairway Road South, Sears Front Entrance. South Facade. Kitchener Ontario.ntrance. South Facade. Kitchener Ontario. T fig 26. 200 Fairway Road South, Sears Front Entrance. South Facade. Kitchener Ontario. F Image 11: 200 Fairway Road South, Sears. West Facade. Kitchener Ontario.Image 11: 200 Fairway Road South, Sears. West Facade. Kitchener Ontario. A R D Image 12: 200 Fairway Road South, Sears. South West Facade. Kitchener Ontario. 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION PROPOSEDDEVELOPMENT 6 6.1 Proposed Development Designed by Petroff Partnership Architects, Phase 1 of the Proposed Development includes the renovation of the former Sears space at Fairview Park Mall to include new outdoor facing commercial units, a new four-of the former Sears space at Fairview Park Mall to include new outdoor facing commercial units, a new four-of the former Sears space at Fairview Park Mall to include new outdoor facing commercial units, a new four- storey retail and office building located at the intersection of the main driveway and Fairway Road and two storey retail and office building located at the intersection of the main driveway and Fairway Road and two storey retail and office building located at the intersection of the main driveway and Fairway Road and two stand alone restaurant buildings placed around pedestrian oriented walkways located at the intersection stand alone restaurant buildings placed around pedestrian oriented walkways located at the intersection stand alone restaurant buildings placed around pedestrian oriented walkways located at the intersection of the main driveway and Fairway Road. Further phases will include a parking garage, an additional office of the main driveway and Fairway Road. Further phases will include a parking garage, an additional office of the main driveway and Fairway Road. Further phases will include a parking garage, an additional office building, and residential towers to the north of the Site. The proposed office building is four storeys with ground floor retail. This building is located at the main The proposed office building is four storeys with ground floor retail. This building is located at the main The proposed office building is four storeys with ground floor retail. This building is located at the main vehicular entrance of Fairview Park Mall, framing the corner and acting as a landmark entrance to the Site. vehicular entrance of Fairview Park Mall, framing the corner and acting as a landmark entrance to the Site. vehicular entrance of Fairview Park Mall, framing the corner and acting as a landmark entrance to the Site. The ground floor retail portion of this building is oriented towards the sidewalk and an enhanced pedestrian The ground floor retail portion of this building is oriented towards the sidewalk and an enhanced pedestrian The ground floor retail portion of this building is oriented towards the sidewalk and an enhanced pedestrian walkway can provide opportunities for “spill over” activities associated with the retail units. walkway can provide opportunities for “spill over” activities associated with the retail units. walkway can provide opportunities for “spill over” activities associated with the retail units. Two standalone restaurants are proposed to the east of the office and retail building. The future restaurants Two standalone restaurants are proposed to the east of the office and retail building. The future restaurants Two standalone restaurants are proposed to the east of the office and retail building. The future restaurants are surrounded by a pedestrian walkway that is connected to the public sidewalk an enhanced walkway are surrounded by a pedestrian walkway that is connected to the public sidewalk an enhanced walkway are surrounded by a pedestrian walkway that is connected to the public sidewalk an enhanced walkway TTT associated with the office and retail building. The pedestrian walkway acts as an outdoor ‘promenade’ associated with the office and retail building. The pedestrian walkway acts as an outdoor ‘promenade’ associated with the office and retail building. The pedestrian walkway acts as an outdoor ‘promenade’ and provides opportunities for patios, café seating and outdoor facing retail and restaurant entrances that and provides opportunities for patios, café seating and outdoor facing retail and restaurant entrances that and provides opportunities for patios, café seating and outdoor facing retail and restaurant entrances that create an inviting pedestrian experience. FFF AAA RRR DDD Image 13: Birds eye view of the Proposed Development looking north Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 Approximately, a total of 3,243 parking spaces will be provided for the Site as a whole, including a number of parallel parking spaces along the new commercial frontage that will help create an internal street-like of parallel parking spaces along the new commercial frontage that will help create an internal street-like of parallel parking spaces along the new commercial frontage that will help create an internal street-like system for the Site. Outdoor bike parking spaces will be provided, and will be located in proximity to the system for the Site. Outdoor bike parking spaces will be provided, and will be located in proximity to the system for the Site. Outdoor bike parking spaces will be provided, and will be located in proximity to the entrances for the new commercial units. The Proposed Development ranges from one to four storeys in height, making it compatible with the The Proposed Development ranges from one to four storeys in height, making it compatible with the The Proposed Development ranges from one to four storeys in height, making it compatible with the urban form in the vicinity. The massing of the four-storey west office building consists of a rectangular form urban form in the vicinity. The massing of the four-storey west office building consists of a rectangular form urban form in the vicinity. The massing of the four-storey west office building consists of a rectangular form that is accentuated by façade detailing and variation. Behind the west office building, the two single storey ehind the west office building, the two single storey ehind the west office building, the two single storey restaurant buildings act as a transition between the four storey office building and the parking area. This restaurant buildings act as a transition between the four storey office building and the parking area. This restaurant buildings act as a transition between the four storey office building and the parking area. This group of buildings forms a cluster that is appropriately human-scaled and provides for a public realm in the group of buildings forms a cluster that is appropriately human-scaled and provides for a public realm in the group of buildings forms a cluster that is appropriately human-scaled and provides for a public realm in the spaces between the buildings. The proposed massing and height minimizes potential microclimatic issues spaces between the buildings. The proposed massing and height minimizes potential microclimatic issues spaces between the buildings. The proposed massing and height minimizes potential microclimatic issues such as shadow and wind impacts. TTT FFF AAA RRR DDD Image 14: View looking west, showing the pedestrian walkway between the restaurants Source: Petroff, July 31 2018 200 Fairway Road South +VG Architects HIA | June 4, 2018 6.2 Sears Redevelopment The renovation of the former Sears space will include new outdoor facing entrances to the commercial units that are oriented towards Fairway Road, with an enhanced pedestrian pathways and connections combined with additional landscaping. The former Sears façade will be renovated with a brick and metal finish, large windows and updated signage. The renovated Sears portion will maintain the same height and massing as it currently exists (one storey), The renovated Sears portion will maintain the same height and massing as it currently exists (one storey), The renovated Sears portion will maintain the same height and massing as it currently exists (one storey), with the only structural changes being to the facade and interior to the building. The existing monolithic with the only structural changes being to the facade and interior to the building. The existing monolithic with the only structural changes being to the facade and interior to the building. The existing monolithic facade is not appropriate for individual retail stores The renovated former Sears space will include an enhanced streetscape along the frontage of the new The renovated former Sears space will include an enhanced streetscape along the frontage of the new The renovated former Sears space will include an enhanced streetscape along the frontage of the new commercial units, with unit paving, on-street parking and clear pedestrian crossings. A new parkette will commercial units, with unit paving, on-street parking and clear pedestrian crossings. A new parkette will commercial units, with unit paving, on-street parking and clear pedestrian crossings. A new parkette will be located near this space, and it will feature unit paving, limestone boulder seating, flowering multi-stem be located near this space, and it will feature unit paving, limestone boulder seating, flowering multi-stem be located near this space, and it will feature unit paving, limestone boulder seating, flowering multi-stem deciduous trees, litter receptacles and light bollards The design of the Proposed Development includes the renovation of this building and a new façade. The The design of the Proposed Development includes the renovation of this building and a new façade. The The design of the Proposed Development includes the renovation of this building and a new façade. The renovation and new façade are designed to increase its landmark and destination potential, which is of renovation and new façade are designed to increase its landmark and destination potential, which is of renovation and new façade are designed to increase its landmark and destination potential, which is of particular importance due to the presence of an IOparticular importance due to the presence of an IONN Rapid Transit Station within the Site. Overall, the Rapid Transit Station within the Site. Overall, the Rapid Transit Station within the Site. Overall, the TT renovation and façade update is expected to be positive for the economic development of the Site and the renovation and façade update is expected to be positive for the economic development of the Site and the renovation and façade update is expected to be positive for the economic development of the Site and the area. FF AA RR DD Image 15: Ground level view of the renovated Sears portion, with the decorative chimney to the rear Source: Petroff, July 31 2018 200 Fairway Road South +VG Architects HIA | June 4, 2018 T Image 16: Ground level view of the renovated Sears portion, with the decorative chimneyImage 16: Ground level view of the renovated Sears portion, with the decorative chimney Source: Petroff, July 31 2018 F A R D Image 17: Ground level view of the renovated Sears, South facade Source: Petroff, July 31 2018 200 Fairway Road South +VG Architects HIA | June 4, 2018 6.3 Architectural Description of the Proposed Development The design of the Proposed Development is contemporary while taking cues of Ontario’s historical industrial architecture. The building elevations show: A. High levels of glazing (shown on image 18) Include materials such (shown on images 18 and 19): 1. Red brick finishes, 2. Precast concrete, 3. Dark metal and 4. Spandrel glass. The Proposed Development also includes a number of placemaking details and features designed to add Proposed Development also includes a number of placemaking details and features designed to add Proposed Development also includes a number of placemaking details and features designed to add character and improve wayfinding throughout the Site. B. One of this elements is a decorative water tower (shown on image 19), to be located near one . One of this elements is a decorative water tower (shown on image 19), to be located near one . One of this elements is a decorative water tower (shown on image 19), to be located near one of the restaurants and visible from the public sidewalk along Fairway R of the restaurants and visible from the public sidewalk along Fairway R of the restaurants and visible from the public sidewalk along Fairway R of the restaurants and visible from the public sidewalk along Fairway Road.oad. TTTTT C. Another placemaking element is a chimney feature with the name of the development (Grand . Another placemaking element is a chimney feature with the name of the development (Grand . Another placemaking element is a chimney feature with the name of the development (Grand Market District), to be located at the southwest corner of the renovated Sears portion (shown Market District), to be located at the southwest corner of the renovated Sears portion (shown Market District), to be located at the southwest corner of the renovated Sears portion (shown on image 20). FFFFF AAAAA 3 1 RRRRR A DDDDD Image 18: Ground level view of the renovated Sears, South facade Source: Petroff, July 31 2018 200 Fairway Road South +VG Architects HIA | June 4, 2018 2 B 4 TTT FFF Image 19: Ground level view from Fairway Road looking northwest, with the decorative water tower to the leftImage 19: Ground level view from Fairway Road looking northwest, with the decorative water tower to the left Source: Petroff, July 31 2018Source: Petroff, July 31 2018 AAA RRR C DDD Image 20: Ground level view of the renovated Sears portion, with the decorative chimney Source: Petroff, July 31 2018 200 Fairway Road South +VG Architects HIA | June 4, 2018 6.4 Architectural Description of the Retained Sears Building The design and physical value of the Sears building at Fairview Park Mall does not merit consideration for heritage designation. However there are attributes that are worthy of being conserved in particular some aspects of the precast facade. A portion of the north facade will be preserved and incorporated in the new design. Within the northern conserved elevation the pre-cast concrete construction 20 foot high precast moulded stone facing panels, 8- foot- high walls made up of dark green antique glazed bricks will be retained and adapted into the proposed design. Images 21-23,25-36 shows the extent of the building being retained and adapted into the proposed design. Images 21-23,25-36 shows the extent of the building being retained and adapted into the proposed design. Images 21-23,25-36 shows the extent of the building being demolished. A legend has been provided for clarity (image 24). As the building has been recently occupied, the building fabric have been kept in good condition. As the building has been recently occupied, the building fabric have been kept in good condition. As the building has been recently occupied, the building fabric have been kept in good condition. Cadilac Fairview has continued to monitor and heat the building since Sears has closed. As the development of Fairview has continued to monitor and heat the building since Sears has closed. As the development of Fairview has continued to monitor and heat the building since Sears has closed. As the development of the site moves forward, further heritage interpretation has been discussed as a possibility. The decorative the site moves forward, further heritage interpretation has been discussed as a possibility. The decorative the site moves forward, further heritage interpretation has been discussed as a possibility. The decorative brick found near the original doorways will not be incorporated in the retained northern elevation due to brick found near the original doorways will not be incorporated in the retained northern elevation due to brick found near the original doorways will not be incorporated in the retained northern elevation due to an inability to incorporate it into this stage of the design. It has been discussed that the decorative brick an inability to incorporate it into this stage of the design. It has been discussed that the decorative brick an inability to incorporate it into this stage of the design. It has been discussed that the decorative brick patterns may be incorporated into other aspects of the final design. patterns may be incorporated into other aspects of the final design. patterns may be incorporated into other aspects of the final design. CCurrently the following significant urrently the following significant urrently the following significant attributes are to remain (labeled on image 22): 1. Pre-cast concrete construction TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTT 2. 20 foot high precast moulded stone facing panels2. 20 foot high precast moulded stone facing panels2. 20 foot high precast moulded stone facing panels 3. 8- foot- high walls made up of dark green antique glazed bricks3. 8- foot- high walls made up of dark green antique glazed bricks3. 8- foot- high walls made up of dark green antique glazed bricks FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFF EXTENT OF SEARS EXISTING WALL RETAINED 110.01 7 110.01 9 D110.01D110.01D110.01D110.01110.01 888888888888855555 AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SEARSSEARSSEARSSEARSSEARSSEARSSEARS SEARS INTERIOR D110.01 3 110.01110.01110.01110.01 66 DEMOLISHEDDEMOLISHEDDEMOLISHEDDEMOLISHEDDEMOLISHEDDEMOLISHED FINISHES AND M&E UPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVELUPPER LEVEL DEMOLITION +/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT.+/- 15,122 SQ. FT. D110.01D110.01 +/- 83,041 SQ. FT. 44 110.01 3 110.01110.01 44 (ROOF AND INTERIOR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRR STRUCTURE REMAINS) 11 112.01112.01 SEARS:SEARS:SEARS: +/- 3,904 SQ. FT. RE-BUILT+/- 3,904 SQ. FT. RE-BUILT+/- 3,904 SQ. FT. RE-BUILT AT UPPER LEVEL AFTERAT UPPER LEVEL AFTERAT UPPER LEVEL AFTERAT UPPER LEVEL AFTERAT UPPER LEVEL AFTERAT UPPER LEVEL AFTERAT UPPER LEVEL AFTER DEMOLITIONDEMOLITION 2 D110.01 5 2 1 1 110.01 110.01 D110.01 110.01 DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDD SEARS EXTENT OF EXTERIOR WALL DEMOLITION/NEW EXTERIOR WALL Image 21: Demolition Drawings. Upper Level Demolition Plan, Floor Plan, Sears Building Plan Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 1 2 3 TT Image 22: North Elevation, West Portion. Sears levation, West Portion. Sears Building Source: +VG FF AA RR DD Image 23: Demolition Drawings. Partial North Elevation, Sears Building Elevation Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION PROPOSEDDEMOLITION OUTLINEDON THE ORIGINAL SEARS DESIGN 7 Legend To Be Retained Facade To Be Demolished Full Demolition Image 24: Demolition Drawings. Legend TT FF Image 25: Demolition Drawings. West Image 25: Demolition Drawings. West EElevation, Sears levation, Sears Building Elevation Source: Petroff Source: Petroff AA RR DD Image 26: Demolition Drawings. East Elevation, Sears Building Elevation Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 T Image 27: Demolition Drawings. Partial South Image 27: Demolition Drawings. Partial South Elevation. East Portion. Sears ast Portion. Sears Building Elevation Source: Petroff F A R D Image 28: Demolition Drawings. Partial South Elevation. West Portion. Sears Building Elevation Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 EXTENT OF SEARS EXISTING WALL RETAINED 110.01 7 110.01 99 D110.01110.01 8888855 SEARS SEARS INTERIOR D110.01 3 110.01 6 DEMOLISHED FINISHES AND M&EFINISHES AND M&E UPPER LEVEL DEMOLITIONDEMOLITIONDEMOLITION +/- 15,122 SQ. FT. D110.01 4+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT.+/- 83,041 SQ. FT. 110.01 3 110.01 4 (ROOF AND INTERIOR(ROOF AND INTERIOR(ROOF AND INTERIOR(ROOF AND INTERIOR(ROOF AND INTERIOR(ROOF AND INTERIOR(ROOF AND INTERIOR STRUCTURE REMAINS)STRUCTURE REMAINS)STRUCTURE REMAINS)STRUCTURE REMAINS)STRUCTURE REMAINS)STRUCTURE REMAINS)STRUCTURE REMAINS) 11 112.01112.01 SEARS: +/- 3,904 SQ. FT. RE-BUILT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT AT UPPER LEVEL AFTER DEMOLITION 2 D110.01 5 22 1 1 110.01110.01 110.01 D110.01 110.01 SEARS EXTENT OF EXTERIOR FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF WALL DEMOLITION/NEW EXTERIOR WALL Image 29: Upper Image 29: Upper Level Demolition Plan, Floor Plan, Sears evel Demolition Plan, Floor Plan, Sears Building Plan Source: Petroff Source: Petroff AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD Image 30: Demolition Drawings. Partial North Elevation, Sears Building Elevation Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 T F A R D 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION PROPOSEDDEMOLITION OUTLINEDON THE PROPOSED DESIGN 8 Image 31: Demolition Drawings. North Elevation, Sears Building Proposed Development uilding Proposed Development EElevationlevation Source: Petroff Image 32: Demolition Drawings. West Image 32: Demolition Drawings. West EElevation, Sears levation, Sears Building Proposed Development Elevation Source: Petroff Source: Petroff Image 33: Demolition Drawings. East Elevation, Sears Building Proposed Development Elevation Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 T Image 34: Demolition Drawings. South Elevation. Sears levation. Sears BBuilding Proposed Development uilding Proposed Development Elevation Source: Petroff F A R D Image 35: Demolition Drawings. Entrance 1 Image 36: Demolition Drawings. North Elevation. Sears Building Proposed Elevation, Sears Building Proposed Development Development Elevation ElevationSource: Petroff Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION CONSIDEREDALTERNATIVES & MITIGATION STRATEGIES 9 :/2!Hfofsbm The vision for the development of 200 Fairway Road South is to become a place to live, work, shop, relax and play. The Site is planned to transform into a high density, mixed use development comprised of residential towers, office space, grade-related commercial uses, structured parking and high quality of residential towers, office space, grade-related commercial uses, structured parking and high quality of residential towers, office space, grade-related commercial uses, structured parking and high quality outdoor amenity spaces. It will conserve and adapt key components of the original Sears building.outdoor amenity spaces. It will conserve and adapt key components of the original Sears building.outdoor amenity spaces. It will conserve and adapt key components of the original Sears building. There is no single, correct way to mitigate the impacts of new construction on historic structures. There is no single, correct way to mitigate the impacts of new construction on historic structures. There is no single, correct way to mitigate the impacts of new construction on historic structures. Best practices for heritage conservation generally attempts minimal intervention, that is, maintaining the practices for heritage conservation generally attempts minimal intervention, that is, maintaining the practices for heritage conservation generally attempts minimal intervention, that is, maintaining the building in as close to the condition it was encountered. In reality, however, economic, and/ or technical building in as close to the condition it was encountered. In reality, however, economic, and/ or technical building in as close to the condition it was encountered. In reality, however, economic, and/ or technical site considerations may require an alternate method to conserve the cultural heritage value of a structure site considerations may require an alternate method to conserve the cultural heritage value of a structure site considerations may require an alternate method to conserve the cultural heritage value of a structure or property. TT FF AA RR DD Image 37: 200 Fairway Road South, Sears Front Entrance. South Facade Looking East. Kitchener Ontario. Source: City of Kitchener 200 Fairway Road South +VG Architects HIA | June 4, 2018 :/3!Dpotfswbujpo!Tusbufhjft As a result of the impact assessment four conservation options have been identified which are: 1. Preserve and maintain as is, retain the Sears Building as a commercial structure. 2. Incorporate the Sears Building into a new construction and rehabilitate it for compatible uses;uilding into a new construction and rehabilitate it for compatible uses;uilding into a new construction and rehabilitate it for compatible uses; 3. Relocate and rehabilitate for new comparative uses, and; 4. Preserve by record and commemorate: document the Sears Building through written notes, measured uilding through written notes, measured uilding through written notes, measured drawings and photographic records, then demolish. The building may then be commemorated through drawings and photographic records, then demolish. The building may then be commemorated through drawings and photographic records, then demolish. The building may then be commemorated through interpretive signage or displays. The option that best balances the economic vitality and the long term sustainability of the Sears The option that best balances the economic vitality and the long term sustainability of the Sears The option that best balances the economic vitality and the long term sustainability of the Sears BBuilding, uilding, and the one that also minimally impacts the heritage attributes is option 2, which will incorporate the and the one that also minimally impacts the heritage attributes is option 2, which will incorporate the and the one that also minimally impacts the heritage attributes is option 2, which will incorporate the Sears building into a new development and rehabilitate it with compatible new uses. This Option allows Sears building into a new development and rehabilitate it with compatible new uses. This Option allows Sears building into a new development and rehabilitate it with compatible new uses. This Option allows the development team to: TTT public to understand the role of this building as it has evolved over its history;public to understand the role of this building as it has evolved over its history;public to understand the role of this building as it has evolved over its history; FFF long term protection. AAA The Sears building has been well maintained and has positioned itself well to be adaptively The Sears building has been well maintained and has positioned itself well to be adaptively The Sears building has been well maintained and has positioned itself well to be adaptively reused and revitalized within this larger development which has provided an improved pedestrian experience and revitalized within this larger development which has provided an improved pedestrian experience and revitalized within this larger development which has provided an improved pedestrian experience and opportunities to strengthen relations with the surrounding neighbourhood.opportunities to strengthen relations with the surrounding neighbourhood.opportunities to strengthen relations with the surrounding neighbourhood. RRR DDD Image 38: 200 Fairway Road South, Sears Front Entrance. South Facade. Kitchener Ontario. Source: +VG 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION IMPACTOFDEVELOPMENT 10 10.1 General The Vision for the development of 200 Fairway Road South is to become a place to live, work, shop, relax and play. The Site is planned to transform into a high density, mixed use development comprised of residential towers, office space, grade-related commercial uses, structured parking and high quality of residential towers, office space, grade-related commercial uses, structured parking and high quality of residential towers, office space, grade-related commercial uses, structured parking and high quality outdoor amenity spaces. The proposed development will connect the past to the present. It will honour the historical tradition The proposed development will connect the past to the present. It will honour the historical tradition The proposed development will connect the past to the present. It will honour the historical tradition of innovation in this area of the City and contribute to the transformation of the built environment to a ity and contribute to the transformation of the built environment to a ity and contribute to the transformation of the built environment to a contemporary urban setting. It will conserve and adapt significant attributes of the Sears structure reflects contemporary urban setting. It will conserve and adapt significant attributes of the Sears structure reflects contemporary urban setting. It will conserve and adapt significant attributes of the Sears structure reflects the heritage of the site. “Conservation involved in all actions or processes that area aimed at safeguarding the character defining onservation involved in all actions or processes that area aimed at safeguarding the character defining onservation involved in all actions or processes that area aimed at safeguarding the character defining elements of a cultural resource so as to retain its heritage value and extend its physical life. This may involve elements of a cultural resource so as to retain its heritage value and extend its physical life. This may involve elements of a cultural resource so as to retain its heritage value and extend its physical life. This may involve preservation, rehabilitation, restoration, or a combination of these actions or processes, “ preservation, rehabilitation, restoration, or a combination of these actions or processes, “ preservation, rehabilitation, restoration, or a combination of these actions or processes, “ T Parks Canada’s Standard and Guidelines for the anada’s Standard and Guidelines for the anada’s Standard and Guidelines for the CCConservation of Historic Places in onservation of Historic Places in onservation of Historic Places in CCanada, 2003.anada, 2003. F A R D Image 39: Site Plan Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 Through our analysis and application of the criteria as outlined by Ontario Regulation 9/06 under the Ontario Heritage Act, the following identifies the principles from which some of the exterior features of the Sears building that we recommend be retained and conserved: of the complex; structure; making the property relevant and integrated with the community;making the property relevant and integrated with the community;making the property relevant and integrated with the community; T F 10.2 Description of Impact 10.2 Description of Impact 10.2 Description of Impact To determine the effect a development or site alteration may have on a built heritage resource or cultural To determine the effect a development or site alteration may have on a built heritage resource or cultural To determine the effect a development or site alteration may have on a built heritage resource or cultural A landscape the MTlandscape the MTCCS Heritage Resources in S Heritage Resources in S Heritage Resources in LLLand Use Planning Process outlines six potential direct or and Use Planning Process outlines six potential direct or and Use Planning Process outlines six potential direct or indirect impacts:indirect impacts:indirect impacts: R features; or D development or site alteration to fill formerly open spaces. 200 Fairway Road South +VG Architects HIA | June 4, 2018 10.2.1 Potential Impacts – Sears building In determining the impact of the site alterations and proposed development of the building itself, the potential impacts under consideration are the following: Destruction – the negative impacts of loss of heritage due to demolition have been limited to partial demolition. Typical examples of the significant features have been maintained in the remaining building. A portion of the north facade will be preserved and incorporated in the new design. Within the northern A portion of the north facade will be preserved and incorporated in the new design. Within the northern A portion of the north facade will be preserved and incorporated in the new design. Within the northern conserved elevation the pre-cast concrete construction 20 foot high precast moulded stone facing conserved elevation the pre-cast concrete construction 20 foot high precast moulded stone facing conserved elevation the pre-cast concrete construction 20 foot high precast moulded stone facing panels (image 42), 8- foot- high walls made up of dark green antique glazed bricks (iimages 40 and 41) panels (image 42), 8- foot- high walls made up of dark green antique glazed bricks (iimages 40 and 41) panels (image 42), 8- foot- high walls made up of dark green antique glazed bricks (iimages 40 and 41) will be retained and adapted into the proposed design. The decorative brick found near the original will be retained and adapted into the proposed design. The decorative brick found near the original will be retained and adapted into the proposed design. The decorative brick found near the original doorways (image 40) will not be incorporated in the retained northern elevation due to an inability to doorways (image 40) will not be incorporated in the retained northern elevation due to an inability to doorways (image 40) will not be incorporated in the retained northern elevation due to an inability to incorporate it into this stage of the design (image 44). It has been discussed that the decorative brick incorporate it into this stage of the design (image 44). It has been discussed that the decorative brick incorporate it into this stage of the design (image 44). It has been discussed that the decorative brick patterns may be incorporated into other aspects of the final design.patterns may be incorporated into other aspects of the final design.patterns may be incorporated into other aspects of the final design. Alterations – The simple massing in conjunction with the arrangement of new and existing buildings Alterations – The simple massing in conjunction with the arrangement of new and existing buildings Alterations – The simple massing in conjunction with the arrangement of new and existing buildings make the Proposed Development is an appropriate addition to the urban fabric along Fairway Road. make the Proposed Development is an appropriate addition to the urban fabric along Fairway Road. make the Proposed Development is an appropriate addition to the urban fabric along Fairway Road. The simple and contemporary massing enhances and draws upon its surroundings (lower density The simple and contemporary massing enhances and draws upon its surroundings (lower density The simple and contemporary massing enhances and draws upon its surroundings (lower density commercial focused buildings and higher density residential towers nearby) to create a cohesive and commercial focused buildings and higher density residential towers nearby) to create a cohesive and commercial focused buildings and higher density residential towers nearby) to create a cohesive and attractive urban environment. This group of buildings forms a cluster that is appropriately human-attractive urban environment. This group of buildings forms a cluster that is appropriately human-attractive urban environment. This group of buildings forms a cluster that is appropriately human- scaled and provides for quality public realm in the spaces between the buildings. The proposed massing scaled and provides for quality public realm in the spaces between the buildings. The proposed massing scaled and provides for quality public realm in the spaces between the buildings. The proposed massing and height is optimal to minimize potential microclimatic issues such as shadow and wind impacts. The and height is optimal to minimize potential microclimatic issues such as shadow and wind impacts. The and height is optimal to minimize potential microclimatic issues such as shadow and wind impacts. The renovated Sears portion will maintain the same height and massing as it currently exists (one storey), renovated Sears portion will maintain the same height and massing as it currently exists (one storey), renovated Sears portion will maintain the same height and massing as it currently exists (one storey), with the only structural changes being to the facade and interior to the building. Any alterations will with the only structural changes being to the facade and interior to the building. Any alterations will with the only structural changes being to the facade and interior to the building. Any alterations will be legible, while the design will be different it will be compatible with the original historic fabric and be legible, while the design will be different it will be compatible with the original historic fabric and be legible, while the design will be different it will be compatible with the original historic fabric and contextual relationships. Visual Impacts – The visual connection from the Sears building to the surrounding neighborhood has Visual Impacts – The visual connection from the Sears building to the surrounding neighborhood has Visual Impacts – The visual connection from the Sears building to the surrounding neighborhood has been enhanced. The Proposed Development ranges from one to four storeys in height, making it been enhanced. The Proposed Development ranges from one to four storeys in height, making it been enhanced. The Proposed Development ranges from one to four storeys in height, making it compatible with the urban form in the vicinity. The renovated Sears portion will maintain the same compatible with the urban form in the vicinity. The renovated Sears portion will maintain the same compatible with the urban form in the vicinity. The renovated Sears portion will maintain the same height and massing as it currently exists (one storey), with the only structural changes being to the height and massing as it currently exists (one storey), with the only structural changes being to the height and massing as it currently exists (one storey), with the only structural changes being to the facade and interior to the building. Views from the street have also been maintained through setbacks facade and interior to the building. Views from the street have also been maintained through setbacks facade and interior to the building. Views from the street have also been maintained through setbacks of taller elements.of taller elements.of taller elements. CCChange of hange of hange of LLand Use – this building has always been a commercial structure, the continued function and Use – this building has always been a commercial structure, the continued function and Use – this building has always been a commercial structure, the continued function as commercial structure is appropriate to the historical use of the site. The change to a multi-use as commercial structure is appropriate to the historical use of the site. The change to a multi-use as commercial structure is appropriate to the historical use of the site. The change to a multi-use structure may be appropriate so long as it falls within the parameters of the accepted zoning and is structure may be appropriate so long as it falls within the parameters of the accepted zoning and is structure may be appropriate so long as it falls within the parameters of the accepted zoning and is supported by the vision of the overall development.supported by the vision of the overall development.supported by the vision of the overall development. Land Alterations – There will be significant change to the area surrounding the Sears Structure as and Alterations – There will be significant change to the area surrounding the Sears Structure as and Alterations – There will be significant change to the area surrounding the Sears Structure as the site is enhanced for pedestrian use. The renovated former Sears space will include an enhanced the site is enhanced for pedestrian use. The renovated former Sears space will include an enhanced the site is enhanced for pedestrian use. The renovated former Sears space will include an enhanced streetscape along the frontage of the new commercial units, with unit paving, on-street parking and streetscape along the frontage of the new commercial units, with unit paving, on-street parking and streetscape along the frontage of the new commercial units, with unit paving, on-street parking and clear pedestrian crossings. A new parkette will be located near this space, and it will feature unit paving, limestone boulder seating, flowering multi-stem deciduous trees, litter receptacles and light bollards 200 Fairway Road South +VG Architects HIA | June 4, 2018 Image 40: Close-up of decorative patterns found in the antique glazed Image 41: Close-up of the antique green glazed brick wall. lose-up of the antique green glazed brick wall. green brick wall. 200 Fairway South. South Facade. South- East 200 Fairway South. South Facade. South- 200 Fairway South. South Facade. South- EEast ast Corner. Corner. Kitchener, Ontario. Kitchener, Ontario. Kitchener, Ontario. Source: +VGSource: +VGSource: +VG TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Image 42:20 foot high precast moulded stone facing Precast Panel, Image 42:20 foot high precast moulded stone facing Precast Panel, Image 43: Pre-cast concrete construction, 200 Fairway 200 Fairway South. South Facade. South- 200 Fairway South. South Facade. South- EEast ast CCorner. Kitchener, orner. Kitchener, South. South Facade. South- East Corner. Kitchener, Ontario. 200 Fairway South. South Facade. South- Ontario. 200 Fairway South. South Facade. South- EEast Corner. Ontario. Kitchener, Ontario. Kitchener, Ontario. Source: +VG Source: +VGSource: +VG RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR SEARS RETAINED EXISTING FACADE DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD NEW FACADE Image 44: Demolition Drawings. North Elevation, Sears Building Proposed Development Elevation Source: Petroff 200 Fairway Road South +VG Architects HIA | June 4, 2018 10.3 Summary of Impact This section summarizes the impacts of the proposed design, informed by the key design principles based on the Urban Design Report. The proposed development demonstrates POSITIVE impacts such as: Image The design is welcoming and digresses from the dated facade of the original Sears building.The design is welcoming and digresses from the dated facade of the original Sears building.The design is welcoming and digresses from the dated facade of the original Sears building. Contribution of a new commercial design sensitive to the overall site within a significant area of ontribution of a new commercial design sensitive to the overall site within a significant area of ontribution of a new commercial design sensitive to the overall site within a significant area of Kitchener Built Form The design of the building responds to the existing context, with the form being similar in size, scale The design of the building responds to the existing context, with the form being similar in size, scale The design of the building responds to the existing context, with the form being similar in size, scale and organization to the existing adjacent buildings Increased density through multi-store, small footprint designIncreased density through multi-store, small footprint designIncreased density through multi-store, small footprint design T Materials The building elevations show high levels of glazing and include materials such as red brick finishes, The building elevations show high levels of glazing and include materials such as red brick finishes, The building elevations show high levels of glazing and include materials such as red brick finishes, precast concrete, dark metal and spandrel glass.precast concrete, dark metal and spandrel glass.precast concrete, dark metal and spandrel glass. The chosen material and colour palette with red, dark grey/black and white accents results in coherent The chosen material and colour palette with red, dark grey/black and white accents results in coherent The chosen material and colour palette with red, dark grey/black and white accents results in coherent building elevations. F Subtle design elements add variation to each of the buildings of the Proposed DevelopmentSubtle design elements add variation to each of the buildings of the Proposed DevelopmentSubtle design elements add variation to each of the buildings of the Proposed Development Ground Floor Scale of the FPM is inviting and a prominent entrances creates a sense of arrival on the ground floor Scale of the FPM is inviting and a prominent entrances creates a sense of arrival on the ground floor Scale of the FPM is inviting and a prominent entrances creates a sense of arrival on the ground floor The main canopy denotes a clear sense of entrance through the supporting columns, mildly reminiscent The main canopy denotes a clear sense of entrance through the supporting columns, mildly reminiscent The main canopy denotes a clear sense of entrance through the supporting columns, mildly reminiscent of the pediment without the imposing façade. of the pediment without the imposing façade. of the pediment without the imposing façade. A Public Realm Integrating community pedestrian and cycling access through the site, along with the addition of foliage Integrating community pedestrian and cycling access through the site, along with the addition of foliage Integrating community pedestrian and cycling access through the site, along with the addition of foliage helps to establish an outdoor public “living room”.helps to establish an outdoor public “living room”.helps to establish an outdoor public “living room”. Planting new trees and extensive landscaping to further reinstate streetscape conditionsPlanting new trees and extensive landscaping to further reinstate streetscape conditionsPlanting new trees and extensive landscaping to further reinstate streetscape conditions R D 200 Fairway Road South +VG Architects HIA | June 4, 2018 T F Image 45: Image 45: Landscape Master Planandscape Master Plan Source: Fleisher Ridout, July 27 2018Source: Fleisher Ridout, July 27 2018 A R D Image 46: Landscape plan detail showing the former Sears area Source: Fleisher Ridout, July 27 2018 200 Fairway Road South +VG Architects HIA | June 4, 2018 SECTION CONCLUSIONS 11 11.1 Conclusions We have reviewed the conditions of the buildings on the proposed development site. We find this building We have reviewed the conditions of the buildings on the proposed development site. We find this building We have reviewed the conditions of the buildings on the proposed development site. We find this building to have some heritage significance and has been kept in good condition. Moreover, its associations with to have some heritage significance and has been kept in good condition. Moreover, its associations with to have some heritage significance and has been kept in good condition. Moreover, its associations with Dunker Construction, who have made numerous contributions to the development of onstruction, who have made numerous contributions to the development of onstruction, who have made numerous contributions to the development of BBerlin-Kitchener erlin-Kitchener also add to its significance. The Sears building does meet some of the criteria outlined in section 3.2.1 of also add to its significance. The Sears building does meet some of the criteria outlined in section 3.2.1 of also add to its significance. The Sears building does meet some of the criteria outlined in section 3.2.1 of the Ontario Heritage Act. The Sears structure is a unique example of the Kennedy the Ontario Heritage Act. The Sears structure is a unique example of the Kennedy the Ontario Heritage Act. The Sears structure is a unique example of the Kennedy EEra International Style of ra International Style of ra International Style of architecture as it is the earliest example in the Kitchener region. There are examples that are comparable architecture as it is the earliest example in the Kitchener region. There are examples that are comparable architecture as it is the earliest example in the Kitchener region. There are examples that are comparable to this style of architecture in other municipalities such as Hamilton, to this style of architecture in other municipalities such as Hamilton, to this style of architecture in other municipalities such as Hamilton, LLondon, and Ottawa, however the ondon, and Ottawa, however the ondon, and Ottawa, however the design of the precast panels and dark green glazed antique brick remains unique in the Sears Structure. Any design of the precast panels and dark green glazed antique brick remains unique in the Sears Structure. Any design of the precast panels and dark green glazed antique brick remains unique in the Sears Structure. Any future development should take steps to mitigate impact on the heritage features.future development should take steps to mitigate impact on the heritage features.future development should take steps to mitigate impact on the heritage features. T The areas of concern related to the impact of the proposed design on the existing urban context have been The areas of concern related to the impact of the proposed design on the existing urban context have been The areas of concern related to the impact of the proposed design on the existing urban context have been approached through consideration of a design that reflects the scale of the adjacent existing commercial approached through consideration of a design that reflects the scale of the adjacent existing commercial approached through consideration of a design that reflects the scale of the adjacent existing commercial buildings. The consideration of shadows has been done to avoid shadows cast on any major buildings of buildings. The consideration of shadows has been done to avoid shadows cast on any major buildings of buildings. The consideration of shadows has been done to avoid shadows cast on any major buildings of significance, and further studies may help to understand the shadow affects on those properties to the significance, and further studies may help to understand the shadow affects on those properties to the significance, and further studies may help to understand the shadow affects on those properties to the F north of the site. The design supports the key design principles outlined in the Urban Design Report, as well north of the site. The design supports the key design principles outlined in the Urban Design Report, as well north of the site. The design supports the key design principles outlined in the Urban Design Report, as well as Federal and Provincial standards and guidelines for heritage conservation. This project will contribute to as Federal and Provincial standards and guidelines for heritage conservation. This project will contribute to as Federal and Provincial standards and guidelines for heritage conservation. This project will contribute to the livelihood and longevity of this important commercial precinct in the the livelihood and longevity of this important commercial precinct in the the livelihood and longevity of this important commercial precinct in the City of Kitchener. Using Ontario Regulation 9/06 under the Ontario Heritage Act, we have identified that the original Using Ontario Regulation 9/06 under the Ontario Heritage Act, we have identified that the original Using Ontario Regulation 9/06 under the Ontario Heritage Act, we have identified that the original Sears building has some heritage significance although it does not meet enough of the criteria to warrant Sears building has some heritage significance although it does not meet enough of the criteria to warrant Sears building has some heritage significance although it does not meet enough of the criteria to warrant A designation under the act. However there are attributes that are worthy of being conserved in particular designation under the act. However there are attributes that are worthy of being conserved in particular designation under the act. However there are attributes that are worthy of being conserved in particular some aspects of the precast facade. To mitigate the loss of heritage defining attributes a portion of the some aspects of the precast facade. To mitigate the loss of heritage defining attributes a portion of the some aspects of the precast facade. To mitigate the loss of heritage defining attributes a portion of the north facade will be conserved. It has been determined that by conserving a portion the original design north facade will be conserved. It has been determined that by conserving a portion the original design north facade will be conserved. It has been determined that by conserving a portion the original design the repetitive nature of the precast panel design will be adequately captured. The decorative brick pattern the repetitive nature of the precast panel design will be adequately captured. The decorative brick pattern the repetitive nature of the precast panel design will be adequately captured. The decorative brick pattern that is found near the original doorways will not be retained in this portion final proposed design. Further that is found near the original doorways will not be retained in this portion final proposed design. Further that is found near the original doorways will not be retained in this portion final proposed design. Further R heritage interpretation has been discussed and my be incorporated in future designs. heritage interpretation has been discussed and my be incorporated in future designs. heritage interpretation has been discussed and my be incorporated in future designs. D 200 Fairway Road South +VG Architects HIA | June 4, 2018 Image 47: Fairview Park Mall and Fairway Station Area 200 Fairway Road South +VG Architects HIA | June 4, 2018 T F A R D 200 Fairway Road South +VG Architects HIA | June 4, 2018 T F A R D