HomeMy WebLinkAboutDSD-19-016 - A 2019-006 - 925 Thomas Pedder CrtStaff Report
Dcvolopment Services Department
K -R
www.ki tch en er. c a
REPORT TO:
Committee of Adjustment
DATE OF MEETING:
January 15, 2019
SUBMITTED BY:
Juliane von Westerholt, Senior Planner - 519-741-2200 ext. 7157
PREPARED BY:
Katie Anderl, Senior Planner— 519-741-2200 ext. 7987
WARD:
#4
DATE OF REPORT:
January 7, 2019
REPORT #:
DSD -19-016
SUBJECT:
A2019-006 — 925 Thomas Pedder Court
Owner — Activa Holdings Inc.
Applicant — MHBC Planning
Recommendation: Approve
Location Map: 925 Thomas Pedder Court
aau
r _ -
ILI '
-�x
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
-r
aau
r _ -
ILI '
-�x
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
Photo 1 — 925 Thomas Pedder Court (December 20, 2018)
Photo 2 —View from New Dundee Road
REPORT
Planning Comments:
The subject property is located at 925 Thomas Pedder Court and is proposed to be developed with a
single detached dwelling. The owner is proposing a variance to reduce the rear yard setback from 7.5
metres to 7.0 metres. The rear property line is bounded by a 2.0 metre high noise wall, beyond which is
a Regional landscape buffer. Through the development of the subdivision, the noise wall was
inadvertently constructed on the subject lands, rather than being wholly located within the Regional buffer
as required. To rectify this situation the Regional landscape buffer and maintenance access easement
has been widened by 0.8 metres. The resulting minor change in lot depth has affected the planned
building envelope for the subject lands and as a result the owner is proposing a rear yard setback of 7.0
metres rather than 7.5 metres.
In considering the four tests for minor variances as outlined in Section 45(1) of the Planning Act, R.S.O.,
1990 Chap. P. 13, as amended, Planning staff offers the following comments.
The subject lands are designated Low Rise Residential in the City's Official Plan which permits the
proposed single detached dwelling. The minor change to the rear yard setback maintains the general
intent of the Official Plan.
The subject lands are zoned Residential Four Zone (R-4), 669R, 448U. The proposed single detached
dwelling is permitted. The intent of the 7.5 metre rear yard setback is to ensure appropriate private
amenity space for residents and to ensure appropriate separation from rear yard property owners. The
subject lot is pie shaped with a rear lot width greater than 40 metres. As shown on the variance sketch,
the design of the rear wall of the building is irregular and there are only two instances where points of the
rear wall is located closer than 7.5 metres to the rear lot line. Staff is of the opinion that there is sufficient
private amenity space for future residents. The subject property backs onto a Regional landscape buffer
and New Dundee Road and there are no rear yard neighbours. The rear yard setback and Regional
buffer will provide at least 15 metres separation between the building and the New Dundee Road property
line (staff notes that a 12.0 metre separation is generally considered appropriate for homes backing onto
an arterial road). Further, there is a grade change and noise wall which physically separate the subject
lot from New Dundee Road as well. In accordance with the foregoing, staff is of the opinion that the
general intent of the by-law is maintained, and that the variance is minor and appropriate for the
development and use of the lands.
Heritage Planning Comments:
Heritage Planning staff notes that a portion of the property municipally addressed as 925 Thomas Pedder
Court is adjacent to 508 New Dundee Road which is a designated property under Part IV of the Ontario
Heritage Act. However, based on the nature of the application, there are no heritage planning concerns.
Building Comments:
The Building Division has no objections to the proposed variance provided a building permit for the proposed
addition is obtained prior to construction. Please contact the Building Division @ 519-741-2433 with any
questions.
Transportation Services Comments:
Transportation Services has no concerns with the subject application.
Engineering Comments:
Engineering has no concerns with the subject application.
RECOMMENDATION
That application A2019-006 to permit a rear yard setback of 7.0 metres rather than 7.5 metres be
approved.
Katie Anderl, MCIP, RPP
Senior Planner
Juliane von Westerholt, MCIP, RPP
Senior Planner
Region of Waterloo
January 3, 2019
Holly Dyson
City of Kitchener
200 King Street West
P.O. Box 1118
Kitchener, ON N2G 4G7
Dear Ms. Dyson:
PLANNING, DEVELOPMENT
AND LEGISLATIVE SERVICES
150 Frederick Street, 8th Floor
Kitchener ON N2G 4A Canada
Telephone: 519-575-4400
TTY: 519-575-4608
Fax: 519-575-4449
www. reg i o n ofwate r l o o. ca
File No.: D20-20/VAR KIT GEN
1, 3, 4, 5, 6, 8-13, 15-16
Re: Committee of Adjustment Meeting on Tuesday, January 15th, 2019, City of
Kitchener
Regional staff have reviewed the following Committee of Adjustment applications and
have no comments:
1. FN 2019-001
— 27 Glasgow Street, Jay Harrison & Sean Geobey
2. SG 2019-001
— 70 King Street East, EuroPro (Kitchener) GP Inc.
3. SG 2019-002
— 439 Park Street, Jo -Ann Malhotra
4. A 2019-001 —
439 Park Street, Jo -Ann Malholtra
5. A 2019-002 —
106 Idle Creek Drive, James Abohbot
6. A 2019-003 —
487 Riverbend Drive, Grerei Investments Ltd.
7. A 2019-004 —
54 Bridge Street, Marann Homes Ltd.
8. A 2019-005 —
362 Edwin Street, Kirk and Jeraldine Van Os
9. A 2019-006 —
925 Thomas Pedder Court, Activa Holdings Inc.
10.A 2019-007 —
35 Trillium Drive, Huron Creek Holdings Corp.
11.A 2019-008 —
242 Ingleside Place, William Cody Willems
12.A 2019-009 —
63 Pinedale Drive, Sheldon John Foley
13.A 2019-010 —
150 Mill Street, Tom Ferguson
14.A 2019-011 —
270 Spadina Road East, 270 Spadina Kitchener Inc.
15.A 2019-012 —
50 Moore Avenue, Cathy DeBrabandere
16.A 2019-013 —
25 Fourth Avenue, Lino & Angela Santarossa
17.A 2018-127 —
659-663 Victoria Street South, Eight -Loop Inc.
Please be advised that any development on the subject lands is subject to the
provisions of the Regional Development Charge By-law 14-046 or any successor
thereof and may require payment of Regional Development Charges for these
developments prior to the issuance of a building permit.
Document Number: 2898843
The comments contained in this letter pertain to the Application numbers listed. If a site
is subject to more than one application, additional comments may apply.
Please forward any decisions on the above mentioned Application numbers to the
undersigned.
Yours Truly,
Jason Wigglesworth, C.E.T.
Transportation Planner
(519) 575-4835
Filing: 2 — 06 FREDERICK — Crabby Joe's
7 — 52 — 2019641 Ontario Ltd.
14 — VAR KIT — 270 Spadina Kitchener Inc.
17 — 55 — Silicon North Real Estate Inc.
Grand River Conservation Authority
Resource Management Division
Andrew Herreman, Resource Planning
Technician
400 Clyde Road, P.O. Box 729
Cambridge, Ontario N 1 R 5W6
Phone: (519) 621-2761 ext. 2228
E-mail: aherreman@grandriver.ca
PLAN REVIEW REPORT: City of Kitchener
Holly Dyson
DATE: January 3, 2019 YOUR FILE: See below
RE: Applications for Minor Variance (Signs and Fences):
SG 2019-001 70 King Street East
SG 2019-002 439 Park Street
FN 2019-001 27 Glasgow Street
Applications for Minor Variance:
A 2018-127
659-663 Victoria Street South
A 2019-001
439 Park Street
A 2019-003
487 Riverbend Drive
A 2019-004
54 Bridge Street West
A 2019-005
362 Edwin Street
A 2019-006
925 Thomas Pedder Court
A 2019-007
35 Trillium Drive
A 2019-008
242 Ingleside Place
A 2019-009
63 Pinedale Drive
A 2019-010
150 Mill Street
A 2019-011
270 Spadina Road East
A 2019-012
50 Moore Avenue
A 2019-013
25 Fourth Avenue
Applications for Consent:
B 2019-001
427 Old Chicopee Trail
B 2019-002
25 Fourth Avenue
B 2019-003
31 Fourth Avenue
B 2019-004
31 Fourth Avenue
GRCA COMMENT*:
The above noted applications are located outside the Grand River Conservation Authority areas
of interest. As such, we will not undertake a review of the applications and plan review fees will
not be required. If you have any questions, or require additional information, please contact me.
Sincerely,
Andrew Herreman
Resource Planning Technician
Grand River Conservation Authority
"These comments are respectfully submitted as advice and reflect resource concerns within the scope and mandate of the Page 1 of 1
Grand River Conservation Authority.