Loading...
HomeMy WebLinkAboutFIN-19-023 - T19-013 Sandra Avenue, Third Avenue and Connaught Street Road ReconstructionREPORT TO:Committee of the Whole DATE OF MEETING:2019-04-01 SUBMITTED BY:Margaret Fisher,Director of Procurement,519-741-2200 ext. 7214 PREPARED BY:Polina Semenov, ProcurementSpecialist,519-741-2200 ext. 7037 WARD (S) INVOLVED:Wards3 and 9 DATE OF REPORT:2019-03-13 REPORT NO.:FIN-19-023 SUBJECT:T19-013Sandra Avenue (Belmont AvenueWestto Patricia Avenue), Third Avenue (Connaught Streetto Kingsway Drive) and Connaught Street (Second Avenueto Third Avenue)Road Reconstruction __________________________________________________________________________________________ RECOMMENDATION: That Tender T19-013 Sandra Avenue (Belmont AvenueWestto Patricia Avenue), Third Avenue (Connaught Streetto Kingsway Drive) and Connaught Street (Second Avenueto Third Avenue) Road Reconstruction, be awarded to Regional Sewer and Watermain Ltd., Cambridge, Ontario, at their tendered price of $3,372,798.49,including contingencies of $255,000.,plus H.S.T. of $438,463.80, for a total of $3,811,262.29. BACKGROUND: Engineering Services is proceeding with the reconstruction of SandraAvenue between Belmont Avenue Westand Patricia Avenue having a length of approximately 270 m, Third Avenue between Kingsway Drive and Connaught Street, approximately 410 m long, and a 120 m section of Connaught Street between Third Avenue and Second Avenue. This work is being completed The work includes the replacement of the existing sanitary sewer, storm sewer, water supply system, roadway, curb and gutter, sidewalks and municipal service connections to the street property line. replacement. Council as part of the 2019 budget process has approved full funding for this project. A surplus is projected in the project. The project is scheduled to begin April 22, 2019, weather permitting. ***This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994for assistance. 1.i - 1 REPORT: Tenders were advertised publiclyonthe City of Kitchener website. Documents were downloaded by thirty-four (34) interested parties and by the closing date of Friday February 15, 2019, seven (7) tenders had been received. The following tenders were received: Bid Price Regional Sewer and WatermainLtd.Cambridge ON$3,811,262.29* J.Weber Contracting LimitedBreslauON$3,985,164.58 Sierra Infrastructure IncWoodstock ON$4,261,337.36 Navacon Construction Inc.Brantford ON$4,263,469.43 Gedco Excavating Ltd.Brantford ON$4,350,546.32 Elgin ConstructionSt. ThomasON$4,358,868.54 Steed and Evans LimitedSt. Jacobs ON$4,415,880.54 The tenders were reviewed by A. Lootsma,IBI GROUP S.Shah,Design Engineerwho concur with the above recommendation. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: the delivery of core service. 1.i - 2 FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes allregulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital forecast. The estimated surplus (E) will be returned to the WIP Road Reconstruction general account, and will be used to fund unexpected deficits in WIP Road Reconstruction projects. Tender T19-013 Sandra Ave. and Third Ave. Reconstruction The total budget for all phases of this project is $4,896,168.00 Estimated Cost for this Phase of Work Tender T19-013 costs, including HST3,811,262.29 less: HST rebate on tender(379,102.38) Net Cost Being Awarded3,432,159.91 A Costs Incurred to Date Projected Costs: Staff Time/Material Testing 57,257.00 Total Estimated Cost for this Phase of Work$3,489,416.91 C Budget for this Phase of Work WIP Road Reconstruction -Sanitary Utility2,001,543.00 WIP Road Reconstruction -Stormwater Utility1,000,771.00 WIP Road Reconstruction -Water Utility1,348,866.00 $ 4,351,180.00 B Estimated Surplus/(Deficit) for this Phase of Work (B -C)861,763.09 D Estimated Surplus/(Deficit) from previous phases(7,191.51) Total Estimated Surplus/(Deficit) $854,571.58 E 1.i - 3 COMMUNITY ENGAGEMENT: INFORM This report has been posted council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not Applicable ACKNOWLEDGED BY: Jonathan Lautenbach, Chief Financial Officer, Financial Services Department 1.i - 4