HomeMy WebLinkAboutFIN-19-028 - T19-046 Dalewood Dr and Queen's Blvd Infrastructure ReplacementREPORT TO:Committee of the Whole DATE OF MEETING:2019-04-01 SUBMITTED BY:Margaret Fisher,Director of Procurement,519-741-2200 ext. 7214 PREPARED BY:Polina Semenov,Procurement Specialist,519-741-2200 ext. 7037 WARD (S) INVOLVED:Wards3 and 8 DATE OF REPORT:2019-03-20 REPORT NO.:FIN-19-028 SUBJECT:T19-046Dalewood Drive (75 Dalewood Drive to Rosewood Drive)and Queens Boulevard (Kelly Drive to Warren Road)Infrastructure Replacement __________________________________________________________________________________________ RECOMMENDATION: That Tender T19-046Dalewood Drive (75 Dalewood Drive to Rosewood Drive) and Queens Boulevard (Kelly Drive to Warren Road) Infrastructure Replacement, be awarded to 410754 Ontario Limited o/a Sousa Concrete,Cambridge, Ontario, at theirtendered price of $1,278,829.31including contingencies of $70,000.,plus H.S.T. of $166,247.81, for a total of $1,445,077.12 BACKGROUND: Engineering Services is proceeding with sanitary sewer and watermain replacement on Dalewood Drive (75 Dalewood Drive to Rosewood Drive), and sanitary sewer replacement on Queens Boulevard (Kelly Drive to Warren Road) at a total distance of approximately 400 metres in length. Funds for construction have been approved by Council as part of the 2019 budget and through Council approved transfer of maintenance funding to the capital budget for the repair of the Dalewood Drive sewer (DSD-18-167). The services were originally constructed in The administration, design and tendering of this project has been completed by City staff, the construction administration and inspection of this project will be completed by City staff as well. The project is scheduled to begin May 13, 2019, weather permitting. REPORT: Tenders were advertised publiclyonthe City of Kitchener website. Documents were downloaded by thirty (30) interested parties and by the closing date of Thursday March 14, 2019, nine (9) tenders had been received. ***This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994for assistance. 1.v - 1 The following tenders were received: Bid Price 410754 Ontario Limited o/a Sousa Concrete Cambridge ON $1,445,077.12* Elgin Construction St. Thomas ON $1,456,877.83 CH Excavating (2013) London ON $1,488,818.14 Oxford Civil Group Inc. Woodstock ON $1,514,134.97 GedcoExcavating Ltd. Brantford ON $1,543,017.21 Steed and Evans Limited St. Jacobs ON $1,561,999.01 Sierra Infrastructure Inc Woodstock ON $1,575,528.46 Bel-Air Excavating & Grading Ltd. Cambridge ON $1,578,533.89 Regional Sewer and Watermain Ltd Cambridge ON $1,698,999.40 The tenders were reviewed by J. Seip,Engineering Technologistwho concurswith the above recommendation. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievemen the delivery of core service. 1.v - 2 FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources fromacross the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget, as well as the funding transfer set out in DSD -18- 167. The estimated surplus (E) will be returned to the sanitary and water utilities capital reserve upon completion of the project, on a pro-rated basis. Tender T19-046 Dalewood Drive and Queens Boulevard Infrastructure Replacement The total budget for all phases of this project is $ 1,522,484.00 Estimated Cost for this Phase of Work Tender T19-046 costs, including HST 1,445,077.12 less: HST rebate on tender (143,740.35) Net Cost Being Awarded 1,301,336.77 A Costs Incurredto Date 20,801.74 Projected Costs: Staff Time/Material Testing 12,610.00 Total Estimated Cost for this Phase of Work$ 1,334,748.51 C Budget for this Phase of Work Sanitary Utility 1,167,994.00 Water Utility 254,490.00 Total Budget for this Phase of Work$ 1,422,484.00 B Estimated Surplus/(Deficit) for this Phase of Work (B -C) 87,735.49 D Estimated Surplus/(Deficit) from previous phases (21,816.41) Total Estimated Surplus/(Deficit) $ 65,919.08 E 1.v - 3 COMMUNITY ENGAGEMENT: INFORM the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not Applicable ACKNOWLEDGED BY: Jonathan Lautenbach, Chief Financial Officer, Financial Services Department 1.v - 4