Loading...
HomeMy WebLinkAboutDSD-19-175 - B 2019-051 to B 2019-054 & A 2019-082 - 83 Elmsdale DrStaff Repod De velopment Services Department REPORT TO: DATE OF MEETING: SUBMITTED BY: PREPARED BY: WARD: DATE OF REPORT: REPORT #: SUBJECT: REPORT J tax www.kitchenerca Committee of Adjustment July 16, 2019 Juliane von Westerholt, Senior Planner - 519-741-2200 ext. 7157 Katie Anderl, Senior Planner— 519-741-2200 ext. 7987 #6 July 10, 2019 DSD -19-175 A2019-082, B2019-051, B2019-052, B2019-053, B2019-054 83 Elmsdale Drive Owner — Novacore (83 Elmsdale) Inc. Defer + A4G f aa�rt � f •ParcelA • PART E�®ment � } ?0 a OMQ (Lr) ` l r Planning Comments: The subject lands are located at 83 Elmsdale Drive and are proposed to be developed with mix of commercial and residential uses. This large site is being developed comprehensively, having a shared private street connecting several separately owned parcels. The owner, NovaCore, previously severed the lands into three parcels with various access and servicing easements. These parcels have now been created and the deed registered. The subject applications seek to further subdivide *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. Parcel C into Parcels C (severed), D (retained) & E (severed) as shown on the sketch above. These parcels will all share access over the private driveway. New easements for access and servicing are proposed over Parcels C and E, and the owner is proposing amendments to the existing easements over Parcels A & B to reflect the proposed access and servicing for the new lots. The owner is also requesting a minor variance to permit a lot width of 14.2 metres for proposed Parcel C. The subject property is designated Mixed Use (with Specific Policy Area 31). The property is zoned Neighbourhood Shopping Centre Zone (C-2) with Special Regulation Provision 649R, Special Use Provision 436U and Holding Provision 71 H, under Zoning By-law 85-1 and MIX -1 (42) (7H) under Zoning By-law 2019-051 (under appeal). The intent of the zones under both by-laws is to permit and support development of the lands with a mix of commercial and residential uses. Future severance of this site was anticipated as a likely scenario when the zoning and designation were applied to the lands. The proposed Parcel and driveway configuration is in keeping with the layout considered by the Master Plan endorsed by Council at the time the zoning and designation were applied to the lands. The proposed size and shape of the parcels will allow for development which will generally comply with the applicable regulations and policies, however a variance is required to permit the width of Parcel C at Ottawa Street South. A range of uses is permitted by the zoning for each of Parcels C, D and E, and a Holding Provision continues to require Ministry acknowledgement of a Record of Site Condition, and that a Noise Study be completed to the satisfaction of the Region prior to sensitive uses being permitted on the lands. Development of each future Parcel will be subject to Site Plan Approval, and the parcels are proposed to be addressed from the private street(s), which will be formally named through a future Council approval. Consent Applications: The proposed consents result in parcels as follows: Parcel C (severed) is proposed to have a width on Ottawa Street South of 14.2 metres, and an area of 1.22 ha; Parcel E (severed) is proposed to have a width on Ottawa Street South of 167.8 metres and an area of 0.89 ha; and Parcel D (retained) is proposed to have a width on Ottawa Street South 83.4 metres, and an area of 0.55 ha. In addition, the applicant is requesting easements over Parcels, A, B, C, and E for the purposes mutual access, fire -routing, and servicing (water and sanitary) as shown in the table below. Easement #: Purpose: In favour of Parcels: 1 (over Parcel A, & being Parts 5 & 7 on 58R-18985) Access & Fire Route B, C, D E Servicing (water) C, E 2 (over Parcel B, & being Part 2 on 58R-18985) Access & Fire Route A, C, D, E Servicing (water) D 3 (over Parcel C) Access & Fire Route A, B, D, E Servicing (water D 4 (over Parcel C) Access & Fire Route A, B, D, E Servicing (water) E 5 (over Parcel C) Access & Fire Route E Servicing (water) E 6 (over Parcel C) Access & Fire Route A, B, D, E 7 (over Parcel E) Servicing (sanitary) C, D 8 (over Parcel C) Access & Fire Route A, B, D, E Servicing (sanitary) D From a Planning and Transportation Planning perspective staff is generally satisfied with the proposed configuration of the Parcels C, D and E and are of the opinion that the orientation and width of the shared private roadway is appropriate for a range of future uses and associated parcel configurations. A Functional Servicing and Stormwater Management Report was submitted in support of the applications. City and Regional staff have reviewed the report and are requesting that the applications be deferred to allow additional time to work with the applicant to verify the servicing solution and to confirm the size and location of the associated servicing easements over parcels C, D and E. Based on the foregoing, staff recommend that the applications be deferred for a period of up to 3 months (October 15, 2019), but that they be permitted to return sooner. Minor Variance Application: A minor variance is requested for proposed Parcel C to permit a lot width of 14.2 metres, whereas the Neighbourhood Shopping Centre Zone (C-2) of By-law 85-1 requires a minimum lot width of 30.0 metres, and the MIX -1 Zone of By-law 2019-051 (under appeal) required a minimum lot width of 15.0 metres. Planning staff recommends that consideration of the requested variance be deferred until such time as the associated consent applications are considered by the Committee. Operations (Design and Development) Comments: Parkland dedication for redevelopment of the parcels will be deferred to the Site Plan application process. Parkland dedication will be calculated for each redevelopment parcel in response to detailed site plan applications and according to the City's Parkland Dedication Policy. Building Comments: The Building Division has no objections to the proposed consent applications. Transportation Services Comments: Transportation Services has no objections to the proposed consent applications. Engineering Services Comments: Engineering Services staff has expressed to Planning staff that further review and consultation with the applicant is required to confirm the width and locations of the requested servicing easements. Engineering staff also acknowledge that the Region has raised concerns with the proposed sanitary outlet, and request that consideration of the application be deferred. At such time as the proposed easements are confirmed and the consent applications move forward, staff anticipates comments and conditions as follows: Severance of any blocks within the subject lands will require separate, individual service connections for sanitary, storm, and water, in accordance with City policies. The owner is required to make satisfactory financial arrangements with the Engineering Division for the installation of new service connections that may be required to service this property, all prior to severance approval. Our records indicate sanitary, storm and water municipal services are currently available to service this property. Any further enquiries in this regard should be directed to Jason Brule (519-741-2200 ext. 7419). Any new driveways are to be built to City of Kitchener standards. All works is at the owner's expense and all work needs to be completed prior to occupancy of the building. A servicing plan showing outlets to the municipal servicing system and proposed easements will be required to the satisfaction of the Engineering Division prior to severance approval. As per the Public Sector Accounting Board (PSAB) S. 3150 the Development and Reconstruction As -Recorded Tracking Form is required to be filled out and submitted along with a digital submission of all AutoCAD drawings required for the site (Grading, Servicing etc.) with the corresponding correct layer names and numbering system to the satisfaction of the Engineering Division prior to severance approval. The owner must ensure that the basement elevation of the building can be drained by gravity to the street sewers. If this is not the case, then the owner would have to pump the sewage via a pump and forcemain to the property line and have a gravity sewer from the property line to the street. Region of Waterloo Comments: Regional Staff request deferral of consent applications B2019-051 through B2019-054 due to concerns with the proposed sanitary connection and would recommend that the owner/applicant discuss with Regional/City Staff to ensure a proper sanitary sewer is installed. Detailed comments are attached in Appendix A. RECOMMENDATIONS: That Applications A2019-082, B2019-051, B2019-052, B2019-053, and B2019-054 for a period of up to 3 months (October 15, 2019), but that they be permitted to return sooner. Katie Anderl, MICP, RPP Senior Planner Attachments: Appendix A — Region of Waterloo Comments Juliane von Westerholt, MCIP, RPP Senior Planner N* Region of Waterloo Holly Dyson Committee of Adjustment City of Kitchener P.O. Box 1118 200 King Street East Kitchener, ON N2G 4G7 PLANNING, DEVELOPMENT AND LEGISLATIVE SERVICES Community Planning 150 Frederick Street 8th Floor Kitchener Ontario N2G U Canada Telephone: 519-575-4400 TTY: 519-575-4608 Fax: 519-575-4466 www. regionofwaterl oo.ca Matthew Colley 575-4757 ext. 3210 File No. D20-20/19 KIT July 10, 2019 Re: Comments for Consent Application B2019-051 through B2019-054 Committee of Adjustment Hearing July 16, 2019 CITY OF KITCHENER B2019-051 to B2019-054 83 Elmsdale Drive Novacore (83 Elsmdale Dr.) Inc. The subject site has previously been severed which resulted in three new parcels (132018-017 through B2018-020). The proposed consent applications are to sever the existing "Parcel U into three separate Parcels (C, D, and E) with easements for servicing and access. Regional Comments: Community Planning: Regional Staff acknowledge receipt of the required consent review fee ($700.00). Stormwater Management and Site Grading: Regional Staff have reviewed the Functional Servicing and Stormwater Management Report submitted by WalterFedy (June, 2019). The report addresses the proposed servicing for the severed/retained parcels and proposes two stormwater sewer service connections and one sanitary sewer connection to the Ottawa Street South right of way. The provided report specifies that "As design development has progressed, the Region has permitted a sanitary connection for the original Parcel C to Ottawa Street." Regional Staff have no documentation to indicate their support for the proposed connection to the existing sanitary sewer on Ottawa Street South. Regional Staff recommendation for the owner/applicant is to not connect into the sanitary line on Ottawa Street due to reasons including, but not limited to, methane being present in the Ottawa Street manholes which can cause varying levels of sanitary conveyance; previous situations where challenges arise (i.e. clogging) when sanitary lines that were designed and built based on the transference of only liquids are inundated with solids; and the potential for odours to be present. Regional Staff request deferral of consent applications B2019-051 through B2019-054 due to concerns with the proposed sanitary connection and would recommend that the owner/applicant discuss with Regional/City Staff to ensure a proper sanitary sewer is installed. Record of Site Condition: The Region's Implementation Guidelines For the Review of Development Applications On or Adjacent to Known and Potentially Contaminated Sites specifies that the completion of an RSC is required prior to final approval of a consent application. Regional Staff acknowledge that a Record of Site Condition (RSC) is currently secured through a Holding Provision on Zoning By-law Amendment application ZC 13/15/E/KA and is to be submitted for the entirety of the subj ect lands. Regional Staff is satisfied with the use of a holding provision for this proposed development. Regional Road Dedication: The proposed severed and retained parcels have direct frontage onto Ottawa Street South (RR #04). Regional Staff identified a road widening dedication along Ottawa Street South for consent applications B2018-017, B2018-019 and B2018-020. This road widening dedication, receipted as WR1173649, was registered on March 15, 2019. Regional Staff advise that should road improvements be necessary, the owner/applicant may be required to dedicate the lands to implement those improvements, and be responsible for those costs associated with any land dedication and capital costs related to the road mitigation. Transportation Impact Study (TIS): The subject property has no existing vehicular access directly to Ottawa Street South (RR #04). Regional Staff and the owner/applicant have agreed to a new access location from the subject property to Ottawa Street South, directly across from the McLennan Park entrance. This shared access location is correctly identified as Part 10 on the sketches provided with the application. A second vehicular access to the subject property is located on Elmsdale Drive. A Transportation Impact Study (TIS) was submitted to the Region for review under the OPA/ZC applications for the subject lands. Regional Staff concurred with the conclusions and recommendations of the TIS which included: an eastbound left turn lane on Ottawa Street South at Elmsdale Drive, an eastbound left turn lane on Ottawa Street South at the proposed access, and a pedestrian refuge island on Ottawa Street South at Elmsdale Drive. The TIS found that traffic signals were not warranted at either the Elmsdale Road/Ottawa Street South intersection or the proposed access from the development onto Ottawa Street South. Regional Staff are aware that the owner/applicant is completing an update to the TIS to reflect the updated development concept/design to reflect the change in built form. Regional Staff require the updated TIS to be submitted for review and approval, and if necessary, enter into an agreement with the Region to implemented required improvements to the Ottawa Street right-of- way at a future development stage (i.e. Site Plan). The Region will require the owner/applicant to complete the cost estimate, functional plan, legal agreement and appropriate funds related to the Ottawa Street South improvements identified in the existing TIS related to the overall 83 Elmsdale Drive development prior to final approval of the proposed consent applications. The required improvements to the Ottawa Street South right of way may change based on the updated TIS, if accepted and approved by the Region of Waterloo. Access Permit: A Regional Road Access Permit will be required for the proposed access location to Ottawa Street South. The Regional Road Access Permit condition can be deferred to a future Site Plan application, or may be required at the time of the opening of the access to Ottawa Street South in relation to the Ottawa Street South road improvements. The Regional Road Access Permit application can be found on the Region of Waterloo website (https://www.regionofwaterloo. ca/en/doing-business/applications-licences-and-permits. aspx), and there is a $230 fee associated with the application. Environmental Noise: A Noise Feasibility Study was completed under the previous OPA/ZC application and was reviewed by Regional Staff at this time. In accordance with the Holding Provision (H) placed on the site specific zoning By-law for the subject property, a detailed Noise Assessment for the property will be required prior to Site Plan approval. Regional Staff recommend the owner/applicant undertake the Noise Assessment as soon as possible to ensure proper setbacks and building materials are included in the site design. The detailed Noise Assessment is not a requirement of this Consent application. Other: Regional Staff would note that this section of Ottawa Street South is identified in the Region Transportation Capital Program as scheduled for major re -construction and re -habilitation in 2021 and 2022. For more information regarding this project please contact Mr. John Stephenson (519-575-4096). Regional Staff also note that any work required in the Ottawa Street South right-of-way will require Municipal Consent and a Regional Road Work Permit. Regional staff recommends deferral of the proposed consent applications as a result of the following: • The Functional Servicing and Stormwater Management Report submitted by WalterFedy (June, 2019) specifies that Regional Staff have permitted a sanitary connection for the original Parcel C to Ottawa Street. Regional Staff have no documentation to indicate support for the proposed connection. • Regional Staff request to discuss the proposed sanitary connection to Ottawa Street South as Staff recommend the owner/applicant not connect due to reasons including, but not limited to, methane being present in manholes; potential clogging; and odours • Regional Staff have concerns with the proposed sanitary connection and would recommend that the owner/applicant discuss with Regional/City Staff to ensure a proper sanitary sewer is installed. General Comments Regional Staff advise that comments and requirements are based on the information provided by the owner/applicant. Regional Staff advise that based on further discussions regarding these matters that comments are subject to change. Any future development on the lands subject to the above -noted consent application(s) will be subject to the provisions of Regional Development Charge By-law 14-046 or any successor thereof. Please accept this letter as our request for a copy of the staff reports, decisions and minutes pertaining to each of the consent applications noted above. Should you require Regional Staff to be in attendance at the meeting or have any questions, please do not hesitate to contact the undersigned. Yours truly, Matthew Colley Planner N* Region of Waterloo Holly Dyson Committee of Adjustment City of Kitchener P.O. Box 1118 200 King Street East Kitchener, ON N2G 4G7 PLANNING, DEVELOPMENT AND LEGISLATIVE SERVICES Community Planning 150 Frederick Street 8th Floor Kitchener Ontario N2G U Canada Telephone: 519-575-4400 TTY: 519-575-4608 Fax: 519-575-4466 www. regionofwaterl oo.ca Matthew Colley 575-4757 ext. 3210 File No. D20-20/19 KIT July 10, 2019 Re: Comments for Consent Application B2019-051 through B2019-054 Committee of Adjustment Hearing July 16, 2019 CITY OF KITCHENER B2019-051 to B2019-054 83 Elmsdale Drive Novacore (83 Elsmdale Dr.) Inc. The subject site has previously been severed which resulted in three new parcels (132018-017 through B2018-020). The proposed consent applications are to sever the existing "Parcel U into three separate Parcels (C, D, and E) with easements for servicing and access. Regional Comments: Community Planning: Regional Staff acknowledge receipt of the required consent review fee ($700.00). Stormwater Management and Site Grading: Regional Staff have reviewed the Functional Servicing and Stormwater Management Report submitted by WalterFedy (June, 2019). The report addresses the proposed servicing for the severed/retained parcels and proposes two stormwater sewer service connections and one sanitary sewer connection to the Ottawa Street South right of way. The provided report specifies that "As design development has progressed, the Region has permitted a sanitary connection for the original Parcel C to Ottawa Street." Regional Staff have no documentation to indicate their support for the proposed connection to the existing sanitary sewer on Ottawa Street South. Regional Staff recommendation for the owner/applicant is to not connect into the sanitary line on Ottawa Street due to reasons including, but not limited to, methane being present in the Ottawa Street manholes which can cause varying levels of sanitary conveyance; previous situations where challenges arise (i.e. clogging) when sanitary lines that were designed and built based on the transference of only liquids are inundated with solids; and the potential for odours to be present. Regional Staff request deferral of consent applications B2019-051 through B2019-054 due to concerns with the proposed sanitary connection and would recommend that the owner/applicant discuss with Regional/City Staff to ensure a proper sanitary sewer is installed. Record of Site Condition: The Region's Implementation Guidelines For the Review of Development Applications On or Adjacent to Known and Potentially Contaminated Sites specifies that the completion of an RSC is required prior to final approval of a consent application. Regional Staff acknowledge that a Record of Site Condition (RSC) is currently secured through a Holding Provision on Zoning By-law Amendment application ZC 13/15/E/KA and is to be submitted for the entirety of the subj ect lands. Regional Staff is satisfied with the use of a holding provision for this proposed development. Regional Road Dedication: The proposed severed and retained parcels have direct frontage onto Ottawa Street South (RR #04). Regional Staff identified a road widening dedication along Ottawa Street South for consent applications B2018-017, B2018-019 and B2018-020. This road widening dedication, receipted as WR1173649, was registered on March 15, 2019. Regional Staff advise that should road improvements be necessary, the owner/applicant may be required to dedicate the lands to implement those improvements, and be responsible for those costs associated with any land dedication and capital costs related to the road mitigation. Transportation Impact Study (TIS): The subject property has no existing vehicular access directly to Ottawa Street South (RR #04). Regional Staff and the owner/applicant have agreed to a new access location from the subject property to Ottawa Street South, directly across from the McLennan Park entrance. This shared access location is correctly identified as Part 10 on the sketches provided with the application. A second vehicular access to the subject property is located on Elmsdale Drive. A Transportation Impact Study (TIS) was submitted to the Region for review under the OPA/ZC applications for the subject lands. Regional Staff concurred with the conclusions and recommendations of the TIS which included: an eastbound left turn lane on Ottawa Street South at Elmsdale Drive, an eastbound left turn lane on Ottawa Street South at the proposed access, and a pedestrian refuge island on Ottawa Street South at Elmsdale Drive. The TIS found that traffic signals were not warranted at either the Elmsdale Road/Ottawa Street South intersection or the proposed access from the development onto Ottawa Street South. Regional Staff are aware that the owner/applicant is completing an update to the TIS to reflect the updated development concept/design to reflect the change in built form. Regional Staff require the updated TIS to be submitted for review and approval, and if necessary, enter into an agreement with the Region to implemented required improvements to the Ottawa Street right-of- way at a future development stage (i.e. Site Plan). The Region will require the owner/applicant to complete the cost estimate, functional plan, legal agreement and appropriate funds related to the Ottawa Street South improvements identified in the existing TIS related to the overall 83 Elmsdale Drive development prior to final approval of the proposed consent applications. The required improvements to the Ottawa Street South right of way may change based on the updated TIS, if accepted and approved by the Region of Waterloo. Access Permit: A Regional Road Access Permit will be required for the proposed access location to Ottawa Street South. The Regional Road Access Permit condition can be deferred to a future Site Plan application, or may be required at the time of the opening of the access to Ottawa Street South in relation to the Ottawa Street South road improvements. The Regional Road Access Permit application can be found on the Region of Waterloo website (https://www.regionofwaterloo. ca/en/doing-business/applications-licences-and-permits. aspx), and there is a $230 fee associated with the application. Environmental Noise: A Noise Feasibility Study was completed under the previous OPA/ZC application and was reviewed by Regional Staff at this time. In accordance with the Holding Provision (H) placed on the site specific zoning By-law for the subject property, a detailed Noise Assessment for the property will be required prior to Site Plan approval. Regional Staff recommend the owner/applicant undertake the Noise Assessment as soon as possible to ensure proper setbacks and building materials are included in the site design. The detailed Noise Assessment is not a requirement of this Consent application. Other: Regional Staff would note that this section of Ottawa Street South is identified in the Region Transportation Capital Program as scheduled for major re -construction and re -habilitation in 2021 and 2022. For more information regarding this project please contact Mr. John Stephenson (519-575-4096). Regional Staff also note that any work required in the Ottawa Street South right-of-way will require Municipal Consent and a Regional Road Work Permit. Regional staff recommends deferral of the proposed consent applications as a result of the following: • The Functional Servicing and Stormwater Management Report submitted by WalterFedy (June, 2019) specifies that Regional Staff have permitted a sanitary connection for the original Parcel C to Ottawa Street. Regional Staff have no documentation to indicate support for the proposed connection. • Regional Staff request to discuss the proposed sanitary connection to Ottawa Street South as Staff recommend the owner/applicant not connect due to reasons including, but not limited to, methane being present in manholes; potential clogging; and odours • Regional Staff have concerns with the proposed sanitary connection and would recommend that the owner/applicant discuss with Regional/City Staff to ensure a proper sanitary sewer is installed. General Comments Regional Staff advise that comments and requirements are based on the information provided by the owner/applicant. Regional Staff advise that based on further discussions regarding these matters that comments are subject to change. Any future development on the lands subject to the above -noted consent application(s) will be subject to the provisions of Regional Development Charge By-law 14-046 or any successor thereof. Please accept this letter as our request for a copy of the staff reports, decisions and minutes pertaining to each of the consent applications noted above. Should you require Regional Staff to be in attendance at the meeting or have any questions, please do not hesitate to contact the undersigned. Yours truly, Matthew Colley Planner Region of Waterloo Holly Dyson Committee of Adjustment City of Kitchener P.O. Box 1118 200 King Street East Kitchener, ON N2G 4G7 PLANNING, DEVELOPMENT AND LEGISLATIVE SERVICES Community Planning 150 Frederick Street 8th Floor Kitchener Ontario N2G U Canada Telephone: 519-575-4400 TTY: 519-575-4608 Fax: 519-575-4466 www. reg i o nofwate rl oo. ca Matthew Colley 575-4757 ext. 3210 File No. D20-20/19 KIT July 10, 2019 Re: Comments for Consent Application B2019-051 through B2019-054 Committee of Adjustment Hearing July 16, 2019 CITY OF KITCHENER B2019-051 to B2019-054 83 Elmsdale Drive Novacore (83 Elsmdale Dr.) Inc. The subject site has previously been severed which resulted in three new parcels (82018-017 through B2018-020). The proposed consent applications are to sever the existing "Parcel C' into three separate Parcels (C, D, and E) with easements for servicing and access. Regional Comments: Community Planning: Regional Staff acknowledge receipt of the required consent review fee ($700.00). Stormwater Management and Site Grading: Regional Staff have reviewed the Functional Servicing and Stormwater Management Report submitted by WalterFedy (June, 2019). The report addresses the proposed servicing for the severed/retained parcels and proposes two stormwater sewer service connections and one sanitary sewer connection to the Ottawa Street South right of way. Document Number: 3052816 Version: 1 The provided report specifies that "As design development has progressed, the Region has permitted a sanitary connection for the original Parcel C to Ottawa Street." Regional Staff have no documentation to indicate their support for the proposed connection to the existing sanitary sewer on Ottawa Street South. Regional Staff recommendation for the owner/applicant is to not connect into the sanitary line on Ottawa Street due to reasons including, but not limited to, methane being present in the Ottawa Street manholes which can cause varying levels of sanitary conveyance; previous situations where challenges arise (i.e. clogging) when sanitary lines that were designed and built based on the transference of only liquids are inundated with solids; and the potential for odours to be present. Regional Staff request deferral of consent applications B2019-051 through B2019-054 due to concerns with the proposed sanitary connection and would recommend that the owner/applicant discuss with Regional/City Staff to ensure a proper sanitary sewer is installed. Record of Site Condition: The Region's Implementation Guidelines For the Review of Development Applications On or Adjacent to Known and Potentially Contaminated Sites specifies that the completion of an RSC is required prior to final approval of a consent application. Regional Staff acknowledge that a Record of Site Condition (RSC) is currently secured through a Holding Provision on Zoning By-law Amendment application ZC13/15/E/KA and is to be submitted for the entirety of the subject lands. Regional Staff is satisfied with the use of a holding provision for this proposed development. Regional Road Dedication: The proposed severed and retained parcels have direct frontage onto Ottawa Street South (RR #04). Regional Staff identified a road widening dedication along Ottawa Street South for consent applications B2018-017, B2018-019 and B2018-020. This road widening dedication, receipted as WR1173649, was registered on March 15, 2019. Regional Staff advise that should road improvements be necessary, the owner/applicant may be required to dedicate the lands to implement those improvements, and be responsible for those costs associated with any land dedication and capital costs related to the road mitigation. Transportation Impact Study (TIS): The subject property has no existing vehicular access directly to Ottawa Street South (RR #04). Regional Staff and the owner/applicant have agreed to a new access location from the subject property to Ottawa Street South, directly across from the McLennan Park entrance. This shared access location is correctly identified as Part 10 on the sketches provided with the application. A second vehicular access to the subject Document Number: 3052816 Version: 1 property is located on Elmsdale Drive. A Transportation Impact Study (TIS) was submitted to the Region for review under the OPA/ZC applications for the subject lands. Regional Staff concurred with the conclusions and recommendations of the TIS which included: an eastbound left turn lane on Ottawa Street South at Elmsdale Drive, an eastbound left turn lane on Ottawa Street South at the proposed access, and a pedestrian refuge island on Ottawa Street South at Elmsdale Drive. The TIS found that traffic signals were not warranted at either the Elmsdale Road/Ottawa Street South intersection or the proposed access from the development onto Ottawa Street South. Regional Staff are aware that the owner/applicant is completing an update to the TIS to reflect the updated development concept/design to reflect the change in built form. Regional Staff require the updated TIS to be submitted for review and approval, and if necessary, enter into an agreement with the Region to implemented required improvements to the Ottawa Street right-of-way at a future development stage (i.e. Site Plan). The Region will require the owner/applicant to complete the cost estimate, functional plan, legal agreement and appropriate funds related to the Ottawa Street South improvements identified in the existing TIS related to the overall 83 Elmsdale Drive development prior to final approval of the proposed consent applications. The required improvements to the Ottawa Street South right of way may change based on the updated TIS, if accepted and approved by the Region of Waterloo. Access Permit: A Regional Road Access Permit will be required for the proposed access location to Ottawa Street South. The Regional Road Access Permit condition can be deferred to a future Site Plan application, or may be required at the time of the opening of the access to Ottawa Street South in relation to the Ottawa Street South road improvements. The Regional Road Access Permit application can be found on the Region of Waterloo website (https://www.regionofwaterloo.ca/en/doing-business/applications-licences-and- permits.aspx), and there is a $230 fee associated with the application. Environmental Noise: A Noise Feasibility Study was completed under the previous OPA/ZC application and was reviewed by Regional Staff at this time. In accordance with the Holding Provision (H) placed on the site specific zoning By-law for the subject property, a detailed Noise Assessment for the property will be required prior to Site Plan approval. Regional Staff recommend the owner/applicant undertake the Noise Assessment as soon as possible to ensure proper setbacks and building materials are included in the site design. The detailed Noise Assessment is not a requirement of this Consent application. Document Number: 3052816 Version: 1 Other: Regional Staff would note that this section of Ottawa Street South is identified in the Region Transportation Capital Program as scheduled for major re -construction and re- habilitation in 2021 and 2022. For more information regarding this project please contact Mr. John Stephenson (519-575-4096). Regional Staff also note that any work required in the Ottawa Street South right-of-way will require Municipal Consent and a Regional Road Work Permit. Regional staff recommends deferral of the proposed consent applications as a result of the following: • The Functional Servicing and Stormwater Management Report submitted by WalterFedy (June, 2019) specifies that Regional Staff have permitted a sanitary connection for the original Parcel C to Ottawa Street. Regional Staff have no documentation to indicate support for the proposed connection. • Regional Staff request to discuss the proposed sanitary connection to Ottawa Street South as Staff recommend the owner/applicant not connect due to reasons including, but not limited to, methane being present in manholes; potential clogging; and odours • Regional Staff have concerns with the proposed sanitary connection and would recommend that the owner/applicant discuss with Regional/City Staff to ensure a proper sanitary sewer is installed. General Comments Regional Staff advise that comments and requirements are based on the information provided by the owner/applicant. Regional Staff advise that based on further discussions regarding these matters that comments are subject to change. Any future development on the lands subject to the above -noted consent application(s) will be subject to the provisions of Regional Development Charge By-law 14-046 or any successor thereof. Please accept this letter as our request for a copy of the staff reports, decisions and minutes pertaining to each of the consent applications noted above. Should you require Regional Staff to be in attendance at the meeting or have any questions, please do not hesitate to contact the undersigned. Yours truly, Matthew Colley Planner Document Number: 3052816 Version: 1 Region of Waterloo July 05, 2019 Holly Dyson City of Kitchener 200 King Street West P.O. Box 1118 Kitchener, ON N2G 4G7 Dear Ms. Dyson: PLANNING, DEVELOPMENT AND LEGISLATIVE SERVICES 150 Frederick Street, Sth Floor Kitchener ON N2G 4A Canada Telephone: 519-575-4400 TTY: 519-575-4608 Fax: 519-575-4449 www. reg i o n ofwate r l o o. ca File No.: D20-20/VAR KIT GEN (7) /08 KING KIT, SPORTSWORLD CROSSING AND CHRISTIAN HORIZONS (10, 11) /12, Charlie Ormston Re: Committee of Adjustment Meeting on July 16, 2019, City of Kitchener Regional staff has reviewed the following Committee of Adjustment applications and have following comments: 1. SG 2019-014 — 150 Pioneer Drive — No Concerns. 2. SG 2019-015 — 2960 Kingsway Drive— No Concerns. 3. A 2019-059 — 364 Heritage Drive — No Concerns. 4. A 2019-060 — 72 Archer Place — No Concerns. 5. A 2019-061 — 15 Peter Street — No Concerns. 6. A 2019-062 — 920 Keewatin Place — No Concerns. 7. A 2019-063 — 4278 King Street East — No Concerns. 8. A 2019-064 — 452 Prospect Avenue — No Concerns. 9. A 2019-065 — 456 Prospect Avenue — No Concerns. 10.A 2019-066 to 073 — 74 to 122 Monarch Woods Drive — No Concerns. 11.A 2019-074 to 081 — 110 to 140 Ian Ormston Drive — No Concerns. 12.A 2019-082 — 83 Elmsdale Drive — No Concerns. Please be advised that any development on the subject lands is subject to the provisions of the Regional Development Charge By-law 14-046 or any successor thereof and may require payment of Regional Development Charges for these developments prior to the issuance of a building permit. The comments contained in this letter pertain to the Application numbers listed. If a site is subject to more than one application, additional comments may apply. Please forward any decisions on the above mentioned Application numbers to the undersigned. Document Number: 3050713 Page 1 of 2 Yours Truly, Joginder Bhatia Transportation Planner (519) 575-4500 Ext 3867 Grand River Conservation Authority 400 Clyde Road, P.O. Box 729 Resource Management Division Cambridge, Ontario N 1 R 5W6 Trisha Hughes, Resource Planner Phone: (519) 621-2761 ext. 2319 E-mail: thughes(u-)grandriver.ca PLAN REVIEW REPORT: City of Kitchener Holly Dyson DATE: July 5, 2019 RE: Applications for Minor Variance: YOUR FILE: See below SG 2019-015 2960 Kingsway Drive A 2019-059 364 Heritage Drive A 2019-060 72 Archer Place A 2019-061 15 Peter Street A 2019-062 920 Keenwatin Place A 2019-063 A 2019-064 A 2019-065 A 2019-066 to 073 A 2019-074 to 081 A 2019-082 4278 King Street East 452 Prospect Avenue 456 Prospect Avenue 78, 84, 86, 94, 104, 112, 110, 116, 118, 124, 126, 83 Elmsdale Drive Applications for Consent: 114, 122 Monarch Woods Drive 132, 134, 140 Ian Ormston Drive B 2019-025 4283 King Street East B 2019-026 4285 King Street East B 2019-029 4278 King Street East B 2019-030 452 Prospect Avenue B 2019-031 456 Prospect Avenue B 2019-032 to 042 78, 84, 86, 94, 104, 112, 114, 122 Monarch Woods Drive B 2019-043 to 050 110, 116, 118, 124, 126, 132, 134, 140 Ian Ormston Drive B 2019-051 to 054 83 Elmsdale Drive GRCA COMMENT: The above noted applications are located outside the Grand River Conservation Authority areas of interest. As such, we will not undertake a review of the applications and plan review fees will not be required. If you have any questions, or require additional information, please contact me. Sincerely, Trisha Hughes Resource Planner Grand River Conservation Authority xThese comments are respectfully submitted as advice and reflect resource concerns within the scope and mandate of the Page 1 of 1 Grand River Conservation Authority