Planning & Strategic Initiatives Committee
Agenda
Monday, September 30, 2019
6:00 p.m. 7:30 p.m.
Office of the City Clerk
Council Chamber
Kitchener City Hall
nd
200 King St. W. - 2 Floor
Kitchener ON N2G 4G7
Page 1
Chair - Councillor S. Marsh Vice-Chair - Councillor D. Chapman
Delegations
-law, delegations are permitted to address the Committee for a
maximum of 5 minutes.
None at this time.
Discussion Items
1. DSD-19-206 - Kitchener Growth Management Plan (KGMP) 2019-2021+ (60 min)
(Staff will provide a 5 minute presentation on this matter)
Public Hearing Matters under the Planning Act (7:00 p.m.)
This is a formal public meeting to consider applications under the Planning Act. If a person or public
body that would otherwise have an ability to appeal a decision of the City of Kitchener to the Local
Planning Appeal Tribunal, but the person or public body does not make oral submissions at the public
meeting or make written submissions to the City of Kitchener before the by-law is passed, the person
or public body is not entitled to appeal the decision.
2. DSD-19-188 - Draft Plan of Condominium (Vacant Land) - 30CDM-19204
- 800 Fairway Road North, Waterloo Region District School Board (10 min)
(Staff will provide a 5 minute presentation on this matter)
3. DSD-19-190 - Zoning By-law Amendment Application - ZBA/007/V/CD
- Temporary Use By-law Renewal
- 87 Victoria Street North, The Working Centre (10 min)
(Staff will provide a 5 minute presentation on this matter)
Information Items
Unfinished Business List
Dianna Saunderson
Committee Administrator
** Accessible formats and communication supports are available upon request. If you require assistance to
take part in a city meeting or event, please call 519-741-2345 or TTY 1-866-969-9994 **
REPORT TO:Planning and Strategic InitiativesCommittee
DATE OF MEETING:September 30, 2019
SUBMITTED BY:Alain Pinard, Director of Planning, 519-741-2200 ext. 7319
PREPARED BY:TimDonegani,Senior Planner, 519-741-2200 ext. 7067
WARD(S) INVOLVED:ALL
DATE OF REPORT:September 16, 2019
REPORT NO.:DSD-19-206
SUBJECT:Kitchener Growth Management Plan (KGMP) 2019-2021
______________________________________________________________________
THATthe Kitchener Growth Management Plan Fall 2019to Fall 2021, attached to
report DSD-19-206, be approved.
BACKGROUND:
In January 2009, Council approved the Kitchener Growth Management Strategy(KGMS).
A key action item from the KGMS was to evolve the 40 year old practice of the Staging of
Development into a comprehensive plan to manage growth-related projects,
infrastructure, land use planning and development applications. In May 2009, Council
approved the first Kitchener Growth Management Plan (KGMP). Subsequent KGMPs
were approved by Council in 2011, 2013, 2015and 2017. This report provides a KGMP
for the 2019to 2021timeframe.
REPORT:
The KGMP assigns a relative priority to properties in intensification areas and greenfield
growth areas in consideration of timing of related infrastructure and community facilities.
The KGMP is tabled for Council approval biannually in the Fall to inform the sequence of
growth related infrastructure in the Capital Budget process for the following year. The
KGMP also informs and aligns with the2019 DevelopmentCharges background Study.
The KGMP is used by City divisions, the Region, the GRCA, School Boards and other
agencies to prioritize their work loads.
KGMP 2017-2019Achievements
Since the KGMP 2017-2019, 3 plans of subdivision received draft approval,either through
Council or the Local Planning Appeals Tribunal (LPAT). In late 2017, 2018 and early 2019,
a total of 293 dwelling units were draft approved. Additionally,in these years, 8 plans of
subdivision or stages of plans were registered containing a total of 963 units.This
historically low level of development approvals through subdivision can be compared to
an increase in intensification. Over the same period, 1486 units were created within the
Built-up Area.
1 - 1
KGMP 2019-2021
Process
Aninternal staff team, comprised of Planning, Engineering, Transportation, Building,
Financial Planning,Parks and Cemeteries, Neighbourhood Programs,and Information
Technology,conducted a preliminary analysis of parcels and project timing based on the
Growth Management Plan criteria. Adraft KGMP was prepared, including the assignment
of relative priorities to land parcels. The draft KGMP was circulated to City departments,
agencies, landowners and their representatives in July. The KGMPwas discussed at the
August meeting of the Waterloo Region Homebuilders Association Kitchener Liaison
Committee. The internal staff team reviewed all comments received in order to provide
responses (which are contained later in this report) and produce the final KGMP.
Highlights
The KGMP 2019-2021(AppendixA)includes a relative priority ranking based on three
categories:
Relative PriorityDescription
Priority A (Green)Development applications would complete the community and no
additional major infrastructure is required
Priority B (Orange)Some additional infrastructure is required and/or there is
dependency upon other lands
Priority C (Red)The timing of major infrastructure or the completion of macro-
level studies is farther into the futureor required before detailed
plans can be considered
The outlook for the KGMP 2019-2021includes the consideration and relative prioritization
of a significant number of parcels of land and growth-related initiatives. The following is a
summary of the recommended prioritization of land parcels:
Priority APriority BPriority C
24andmore than 20 194
intensification areas
The recommended Priority A and B lands combined consist of 20 draft approved plans,
7 plans in circulation and 16future plans (pending) for a total of 43parcels. One Priority
C parcel is draft approved, one is in circulation and two are future plans, all of which
require future works/applications. Although lands indicated as Priority C are the lowest
priority for development applications, there are often initiatives recommended to be
undertaken and completed within each of these areas in advance of the submission
of development applications during the upcoming 2-year timeframe.
The approach to growth management is not just about prioritizing the number of plans of
allocation of resources towards conducting studies that are needed before development
can be considered along with completing initiatives that are required to move lands for
draft approval to registration and construction. These initiatives include proceeding with
1 - 2
environmental assessments and detailed design for roads, sanitary servicing
infrastructure and improvements, intersection upgrades, new cycling path construction,
neighbourhood planning reviews,secondary plans,complete community considerations
and park/trail implementation.
Preliminary CirculationComments
There were 20comments received on the preliminary circulation regarding 25
parcels/areas. These comments were from landowners,consultants on behalf of
landownersand the GRCA. The comments received on the preliminary circulation are
contained within AppendixBto this report. The following is a summary, by Planning
Community, of the comments and staff responses.
Major Transit Station Area
607-641 KING STREET WEST MHBC on behalf of Centre Ice LP
Comment MHBC supports the staff recommended Priority A timing.
Mixed Use Nodes
North Side of Huron Road, east of Strasburg RoadMHBC on behalf of Activa Holdings
Inc.
Commentistent with
the balance of the node.
Response
The community node (recently fully in
effect via LPAT).A future KGMP will reflect the new intensification areasidentified in
the 2014 Official Planfollowing an update to the strategic growth areas as part of a future
provincial and regional policy conformity amendment process (expected for the next
versionof the KGMP).
Grand River North
KGMP Plan ID# 87MHBC on behalf of Hallman Construction Ltd.
Comment MHBC supports the staff recommended Priority A timing.
Grand River South
KGMP Plan ID# 66Woolner Trail Community Association and Grand River
Conservation Authority
Comment -The portion of the parcel south of the Woolner Farm should be removed
because the lands have not been deemed surplus by the GRCA.
Staff responseStaff agree, south portion of removed from parcel #66.
Hidden Valley
KGMP Plan ID#s 57, 58&GPeter Benninger on behalf of Pearl Valley Development
Corp.
1 - 3
Comment Request priorityberaised fromCto Bto reflectadvancesin the planning
process, contribution to intensificationand densitytargets, complete
communities and housing choices, andcompletion of the River Road Extension EA.
Response Priority C is being recommended as the secondary plan and infrastructure
including the sanitary EA is required prior to development applications being considered.
Recently, the Hidden Valley Land Use Master Plan was approved and provides direction
to undertake the detailed planning and engineering studiesin 2020.The KGMP assigns
these projects as the highest priorityA.The completion of those projects is expected by
the next KGMP and these macro-level studies should be prioritized. Continuing to
resource these projectswill better position these lands to potentially elevate their priority
inafuture KGMP.Staff recommends retaining Priority C timing for these lands and
is recommending Priority A for the Hidden ValleySecondary Plan and Wastewater
ServicingEA.
KGMP Plan ID#115MHBC on behalf of Hidden Valley KitchenerLTD (Peter Kruse)
Comment MHBC supports the staff recommended Priority A timing.
Doon South Phase 2
Lands East of Parcel #97 John Vos
Comment Owner questioned why lands are not included in KGMP and if this would
present challenges to comprehensive development of parcel #97 and the subject lands.
Response Thesubject lands arenot included because they are a registered block in a
subdivision. Non-inclusion in KGMP will not be an obstacle to comprehensive
development.No change recommended.
KGMP Plan ID#90 MHBC on behalf of Activa Holdings Inc
Comment MHBC supports the staff recommended Priority A timing.
Brigadoonand Brigadoon South
KGMP Plan IDs #33, #34 and #35-MHBC on behalf of property owners
Comment MHBC supports the staff recommended Priority A timing and requests
clarification that Biehn drive is a road and sanitary sewer project.
Repose Added claritythat Biehn Drive (SA1, R10 & W6) includes coordinated sanitary,
road and watermain components.
Huron
KGMP Plan ID#28 MHBC on behalf of Activa Holdings Inc
Comment MHBC supports the staff recommended Priority A timing.
1 - 4
Dundee North
Lands Immediately Eastof KGMP Plan ID#35 and#36MHBC on behalf of Activa
Holdings Inc.
Comment MHBC requests that these lands be included in the KGMP as part of a logical
extension of the Brigadoon growth area and that Priority B be assigned
Response
macro-level planning process. It is the
without an urban land use designation. Currently, these lands are not included in the
BrigadoonCommunity Planwhich is why they have not been shown within the Brigadoon
Growth Area. Through the Dundee North Secondary Planning process, it may be
determined that these lands along Strasburg Road relate to a certain area for
infrastructure, land use or community planning reasons. Until suchtime, staff will
continue to recommend no priorityas part of the KGMP.
General Comments MHBC on behalf of Activa Holdings Inc.
Comment MHBC supports the identification of Dundee North in the KGMPand the
confirmation of secondary plan timing identified fromthe Regional and City Official Plans.
MHBC suggests that the following additional matters be identified in the growth area
including: that funding for the secondary plan and related studies have an approved
budget; that the South Strasburg Sanitary Trunk Sewer has been extended with gravity
limits to be confirmed; that the alignment of Strasburg Road South has been confirmed;
that an east west collector road and Blair Creek drive extension shouldbe coordinated
with the secondary plan; and that the KGMP should identify Dundee North lands as
Priority C.
Response Staff appreciate these comments.Consistent with past City practice in the
KGMP the comprehensive studies and subsequent Official Plan amendment for urban
land use designations need to be completed prior to identifying a development priority.
This isthe same treatment as the southwest master plan area prior to the approval of the
Rosenberg Secondary Plan and subsequent identification of individual parcels. Once this
work has been completed future KGMPs will assign individual ID numbers, provide details
oninfrastructure, timing and,assign relative priorities.Staff do not recommend
assigning a priority at this time,but do recommend identifying the necessary
studies as high priority for 2019-2021.Staff haveadded additional descriptionof
the required transportation and sanitary studies and infrastructure for the growth
area.
KGMP Plan ID#147MHBC on behalf of Activa Holdings Inc.
Comment
Dundee north or Huron South subarea plans. Please insure these lands are included
Response Staff have included these lands in the Huron South subarea.
Rosenberg
1 - 5
KGMP Plan ID#122and #126 MHBC on behalf of Activa Holdings Inc.
Comment -MHBC supports the staff recommended Priority Band request clarifying
that properties can proceed subjecttothe construction of Middle Strasburg Trunk Sanitary
Sewer (MSTSS).
Response Staff confirm that the MSTSS is the main constraint to developing these
parcelsalong with the requirement to rezone the lands.
KGMP Plan ID#120 GSP onbehalf of South Estates Ltd.
Comment Recommend upgrading from Priority B to A because the approval of the
Rosenberg secondary plan demonstrates support ofCity, Regional and Provincial
objectives;these landswould contribute to increasing the supply of low rise residential
units in the City; improvethe balance of Priority A parcels located within the Designated
Greenfield Area; the infrastructure projectsadvancing in 2020 including the MSTSS,
Fischer-Hallmanroad reconstruction; RBJ Schlegel Park;and supporting budgets.
Response Priority B status provides for this application to be worked on within the next
two years and provides for Credit for Service agreements to advance the infrastructure
needed to support development. Staff continue to recommend Priority Bfor most
properties in Rosenberg, including the subjectlands in order to advance the
criteriaand objectives including:prioritizingresources, aligning development with
infrastructure and ensuring complete communities.Also, there are other lands that
servicing must go through prior to development of this plan.
KGMP Plan ID#132 MHBC on behalf of Stamm Investments Ltd.
Comment -MHBC supports the staff recommended Priority Band requests that
comments regarding the Middle Strasburg Trunk Sanitary Sewer (MSTSS)relating to
parcel #133 and 134 be revised to describe other parcels over which the MSTSS will pass
as well asother infrastructure dependencies.
ResponseStaff have revised the description of parcels133 and 134to be consistent
with infrastructure comments on other parcels.
SGL on behalf of Kitchener Green Developments Inc.
Comment SGLsupports the staff recommended Priority B ranking and request that the
Response -Name updated
Laurentian West Phase 3b
KGMP Plan ID#117 MHBC on behalf of Activa Holdings Inc
Comment MHBC supports the staff recommended Priority A timing.
KGMP Parcel ID#145-Polocorp INCon behalf of Kitchener Trussler Holdings Inc.
1 - 6
Comment Requesting priority be elevated to A because the site is within the Built-up
Area,hasservicing available, the required sanitary pumping station is under construction,
and the required planning applications are intended to be submitted in the near future.
ResponseTheportion of the parcel located south of the old Ottawa Street alignment is
within the Built-up Area.Consistent with past practice, staff recommend that this portion
of thepropertybe removedfromparcel 145.Development parcels within the Built-up
Area, but outside of intensification areas,may upon written request, be identified as a Site
Specific Intensification Opportunity (SSIO) at the discretion of the Directorof Planning.
SSIOs have priority A status.
The triangular portion of the parcel north of the old Ottawa Street alignment is withinthe
Designated Greenfield Areaand should continue to be assigned a priority.No
development application has been received to date and staff continue to recommend
priority B.
KGMP Parcel ID#146 -Polocorp INC on behalf of Dr. Steven Taylor
Comment Requesting priority be elevated to A because the site is within the Built-up
Area, has servicing available, the required sanitary pumping station is under construction,
andthe required planning applications are intended to be submitted in the near future.
ResponseThe site is within the Built-up Area. Consistent with past practice, staff
recommend that this parcel not have a priority assigned.Development parcels within
the Built-up Area, but outside of intensification areas, may upon written request, be
identified as SSIO at the discretion of the Director of Planning. SSIOs have priority A
status.
Response-No development application has been received to date and staff continue
to recommend priority B.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
through the delivery of core service.
FINANCIALIMPLICATIONS:
Decisions on the KGMP are intended to inform the growth-related Capital Budget forecast
and assist withthe coordinationof the provision of services and timing of development.
Changes to the KGMP may impact the timing and/or financial implications of infrastructure
and non-infrastructure projects (although there are numerous other factors and
influences). The KGMP is reflective of the 2019Development Charges Background Study
and has informed the in progress2020Capital Budget.
COMMUNITY ENGAGEMENT:
INFORM
of the committee meeting.
1 - 7
CONSULT A draft KGMP was circulated to landowners and their representatives in
July. Consideration of their comments is reflected in this report. This item was also
discussed at the Augustmeeting of the Waterloo Region Homebuilders Association
Kitchener Liaison Committee.
CONCLUSION:
The KGMP provides a comprehensive plan that identifies the relative priority for
development applications, studies and infrastructure projects within growth areas. The
KGMP implements the KGMS and the Developme
City for everyone
REVIEWED BY:
Brandon Sloan, Manager, Long Range and Policy Planning
Della Ross, Manager, Development Review
Linda Cooper, Manager, Development Engineering
Mark Hildebrand, Director, Neighbourhood Programs
Dan Ritz, Supervisor, Parks Design and Development
Ruth-Anne Goetz, Senior Financial Analyst
ACKNOWLEDGED BY:
Justin Readman,General Manager, Development Services
Appendix A-Kitchener Growth Management Plan 2019-2021(available online
www.kitchener.ca
Appendix B-Preliminary Circulation Comments Received
1 - 8
2021
Fall
-
2019
Fall
Kitchener Growth Management Plan (KGMP)
, 2019
10
Draft Final September
1 - 9
2
333449
6
34 4 778
4
3
.
........
...........
....................
...................
........................................
...........................
.......................
................................
................................
................................
................................
................................
................................................................
UBPLANS
................................
S
................................................................
REA
................................
A
................................
................................
................................................................
ROWTH
................................
................................
G
................................
OALS
G
................................
................................
................................................................
AP AND
................................
................................................................
M
TRATEGYTRATEGY
SS
EVELOPMENT
D
IVISION
RITERIA
ROCESS
PC
D
UMMARY
................................
LAN LAN
S
CHIEVEMENTS
................................
PP
ANAGEMENT ANAGEMENT
A
+
MM................................
1
192
TAGING OF
UBPLANS
................................
S
S
2020
KGMP
LANNING
AGEMENT
--
RITERIA
ROWTH ROWTH
C
GG
P
ANAGEMENT AN
REA
A:
1719
MMA
2020
TH
Overall CriteriaArea Specific AnalysisRelative Priority Ranking
ROWROWTH ROWTH
ISTORICAL
URPOSEITCHENER ITCHENER
PKKGHGG
RITERIA FOR
PPENDIX
NTRODUCTION
4 ¡«¤ ®¥ #®³¤³² ICKGMPKGMPA
ECHNOLOGY
EPARTMENT
T
D
EPARTMENTS
D
-
the ERVICES
,
were
S
evolve
NFORMATION
I
Directions to
ITCHENER
city along with
K
in Kitchener
the
A Regional Concept,
orseshoe growth plan,
EVELOPMENT
ITY OF
H
-
future
D ALONG WITH AND INPUT FROM ALL
C
:
rapid growth of 100,000 new
. This document, the Growth Y
again leads the way in Ontario
ars the process became known
B
for the
many other municipalities in Ontario
to more than double in 20 years. The
trowth management strategy. Social,
approved report led the way as an
-
ed
forecasting
to evolve the old Staging of Development
REPARED
P
titled, Kitchener 2000 the way for coordinating subdivision growth in
yet necessary.
en
as come
Following work on a new Official Plan in 1968
nce again
,
h
a logical economic means for developing the city was
,
paved
Monitoring Report, once
Evolution of a Leadership Process
(the Staging of Development Story)
100,000 was expect
2031. Our citizens have told us that doing more on growth
-
is part of a provincial Greater Golden
the growth management landscape significantly changed. For
,
closely relate to the financial ability of the City to provide
velopment.
rapid growth
Management
. Our Region has an approved g
population of
the provision of engineering services with the timing of approving new
Kitchener Planning Department undertook and participated in several long
predicted
that would
The
a certain percent of growth to the existing built up area of
ded
the Staging of De
rea.
In the 1960s, population growth and expectations soaring. proactive range studies aimed at guiding the future growth of Kitchener and the surrounding aOne of these studies from 1964
given the neeinfrastructure services for an area. Planning Department started preparing an annual Lot Levies Report. This report coordinatedsubdivisions. At the time, the annual Councileffective
tool for managing growth and after several yeas The Staging of Development Kitchener. It was nearly 30 or more years later thaimplemented a formal staging program. As with all processes,
the need to arises. After 40 yearsthe first time, KitchenerPlaces to Growenvironmental and economic objectives have become more complex. orientmonitoring growth data are difficultThe
projections for Kitchener are oresidents between 2006management and improving the quality of life in the context of this potential growth is important for our future. The time into
the new Kitchener Growth Management StrategyManagement Plan, represents one of the implementation tools that coupled with an Annual Growth to effectively manage our growth for a better
Kitchener.
1 - 10
3
the
nnial
Once
with a
ement
.
KGMS
update
provide
based on
The Growth
can
static
.
established in
There will be a
Places to Grow early Fall
is
evolution of this
presented
n to utilize existing
related items in
-
the
al Growth Management
i
for
meeting in
this report.
nn
are to be
Bie
hed Studies, etc.).
Monitoring Report and a Bie
later in
intensification areas and all of the
2 year period.
.
Growth Management Plan is
Although the KGMS data
for a
al
.i
consideration of growth
identified
is
nn
Management
Committee of Council
growth of the city. New engineering infrastructure
staging new subdivision development with new
Bie
Monitoring Report would be prepared immediately
eport could also provide opportunity to update the
rogram
further described
orp
both greenfield and intensification areas
Growth Management Plan
are
. The
Monitoring Report would provide the annual
. The r
al
as
i
nn
Kitchener. The Growth Management Plan must be adhered to
approach f
Bie
that still have some greenfield lands left in Kitchener
an
an Annual Growth
, June 16th
and deliberation at a
Management
as part of an ongoing
inventory, intensification levels and other data items presented in the
The Growth Management Plan
prepare
ide the timing and location of
new development
growth areas
Current Baseline Report
to
he Growth
Places to Grow
intensification efforts and opportunities are now considered and new
for consideration
forms the strategic basis for informing the
t
The detailed criteria and analysis
so that
estimated land use
criteria for the staging of development in the
Growth Management Plan ProcessThe City of Kitchener developed was tied to development tool. The Kitchener Growth Management Strategy provides process Growth Plan measures are tracked.
It also provides an opportunity to more comprehensively understand and coordinate many of the elements that happen in the development process (Environmental Assessments, Master Plans,
Subdivisions, SubwatersThe new approach is to Growth Management Plan a dynamic format, tof the Background Study after the date of implementation of the KGMS recommendations/new actions
and comment on the implementation of other objectives from the Provincial and Regional Growth PlansThe Monitoring Report provides part of the basis to then consider the Plan. This
Plan includes the Urban Growth Centre, the planning communities/Act, Provincial Policy Statement and Places to Grow Growth Plan that intensificatioinfrastructure and services is a high
priority. The numerous factors, including the achievement of Provincial, Regional and City growth managobjectives. balanced approach positive benefits to the quality of life in in considering
development applications and related initiatives in the forthcoming year(s).The Annual Monitoring Report and covering reporapproved, thisCapital Budget process.
in
Official
priority.
existing
to support
high
provide the new
Kitchener
include identified
lso a
this is achieved
to
the use of
, the
by which
and new actions
vision, the strategic direction
maximizing
esources
initiativesKitchener.
anner
in
the goals of the KGMS.
s
current
o live, invest and be creative
the Kitchener context. They are reflected in the
achieve
and implementing intensification is a
e quality of life
outline of
has evolved. The process is now
hoice
growth
for
tegy includes Background Study reports and a Strategy
yield a relative priority for each growth area, enhance
growth areas and is to have a more complete analysis of the
people want t
tool
how
and an
ltural and recreational network
enhance th
where
Natural and Cultural Heritage R
and are adapted to
conomy
legislation, municipalities are charged with ensuring that they direct proper
to help
and address
,
Communities
the healthy community model
gement Plan is based on the principle that
Ontario
Staging of Development process. Through the Kitchener Growth Management Strategy
trengthen
building communities improving the social, cu
Enhance our Valued Create Vibrant Urban Places Ensure Greater Transportation CSFoster a Strong EManage Change in an Effective and Coordinated M
, with the most significant being the Region of Waterloo Official Plan
Goal 1: Goal 2: Goal 3: Goal 4: Goal 5: Goal 6:
IntroductionPurposeIn accordance with and orderly development within their boundary. There are many methods KitchenerPlan and the (KGMS), the Staging of Development intensification areas
along with greenfieldrequirements for growth in each area, coordination of initiativesThis Growth Manainfrastructure is preferred and that planning Kitchener Growth Management StrategyThe
Kitchener Growth Management Stradocument. The final Strategy includes an outline of the overall community for the KGMS, the supporting goals growth management in Kitchener. The Strategy
helps to ensure that growth is managed effectively, that we can achieve the required density and intensification targets while accomplishing our desired built form and function and
Kitchener Growth Management Strategy GoalsThe KGMS embodiesdevelopment and growth for the Kitchener of tomorrow, certain strategic directionsactions that are recommended for Kitchener.
These build upon the six overall goals of the Regional Growth Management Strategy following:
1 - 11
4
of
Some
table
indicated in
draft)
s are
: based on Region
Note
Partial existing(
CommentMostly outsideGreenfield area includes mixed use nodeCommentOfficial Plan Laurentian W. Master Drainage Plan
,
,
and the description
(s)
up Area
-
all areas to yield a Relative Priority.
oals
(such as community plans or secondary
g
ESPA
,
Area,
(s)
Valleyland,
, Under review,
x KGMS
elopment left to be built includes a summary
initiatives
EIS required
, Woodland
(name)
(s)
comparative analysis of
Description Inside, Outside, BothIdentified Intensification Greenfield Area, Both, Portion of Greenfield Area, Mainly BuiltIntensification only, Would complete partial existing, New/vacant,
ExistingDescription Regional Recharge, Wellhead, Surface Intake, NoneComplete, Pending, Required, N/AStudy requirements include (comment)Includes WetlandNone, UnknownPublic/Private,Includes
known designated (or undesignated) resource, under review, incl./adj. heritage district HIA required, Implements policies, Proposes new techniques, None proposed, High/Medium/Low (H/M/L)Potentially
H/M/L, Existing service, other, required infrastructure
is table includes considerations to building complete communities,
. Th
for intensification areas (Mixed Use Nodes, Mixed Use Corridors, etc) and
items
lans
infrastructure and planning
Conservation
Subp
Functional
.
Heritage
Provision
and forms part of the basis for
Impact on Heating/Electric
wnership)
Growth Area
Planning Community A (Generic Example):LocationRelation to Built BoundaryTypeComplete Community StatusGoal 1: Enhance our Valued Natural and Cultural Heritage ResourcesAnalysisSource
Water Protection Area Subwatershed/Drainage StudyNatural (Feature, Designation, OCultural Heritage ConservationEnergy Conservation
*
Area Specific AnalysisThe each planning community that has greenfield devarea specific analysiscoordinating major plans)The area specific analysis is organized into the sithe table below
.
a
is
that
to help
for each
criteria:
Growth Area
rall criteria
rk priorities and
riorities
bjectives
overall
ove
and combined with
being of citizens is
-
for each
shall ensure that there
area specific analysis
lan.
details
growth management principles
overall criteria
Subp
There is a list of
identify
year requirements)
-
ations to the following
the health and wellother directives.
Other Municipal Strategic Priorities
lans
and 10
that
-
. It also includes Subp
evolved into new
along with
nment and energy, protection of our drinking water,
with consider
of initiatives.
are
These factors include the City's Ten Year Capital Budget;
Growth Area
/ Land Supply (3
balanced
ection of the environment.
The
Construction Activity
s and time to work on various studies, initiatives, review technical
is based on numerous factors.
s is
and Agency Input
planning community
Growth Management Plan that indicates Relative P
is included in each Growth Area
that
Inventory
evels
ctly adhered to.
Land
Provincial, Regional and City Growth Plan and Official Plan O
, provisions of the Planning Act and best practice
nd greenfield
relative to other growth areas of the city is a modification of the historic approach
a
ty
Resource L
area
year time frame (while at the same time planning for future development). In addition, Potential Intensification Level StatusRecent and Expected
timing of growth area
-
ooo
apital Budget/Forecast, Development Charges and
area specific analysis
Achievement of Annual Monitoring Report:Balanced Growth (Intensification and Greenfield)Timing of Sewage Treatment Plant ImprovementsMunicipal C
municipality is also charged with helping ensure
document includes an overall
potential
Criteria for Staging of DevelopmentIn accordance with Section 2 of the Ontario Planning Act, the Provincial Policy Statement, provincial, regional and city growth plans and the City
Official Plan, the municipality plan in place to ensure there is proper and orderly development and that growth is managed effectively. The maintained along with conservation of the
enviroproviding a range of housing including affordable, This intensification The historical Staging of Development criteria the goals of the KGMSto form Historical CriteriaThe criteria
for determining the historical Staging of Development included many considerations that in some years were not strithe development charge revenue available on an annual basis to provide
funding for growth related capital works; recommended Regional priorities and Regional financing schedules; woallocation of staff resources; strategic priorities; the prior or imminent
approval of Community or Secondary Plans; and the work programs of the other agencies and City Departments responsible for the delivery of services and/or the protGrowth Management
Plan CriteriaThe level of priorito the Staging of Development and staff and Council consider with respect to balancing realistic growth and development expectations in the coming 2each
growth area requires resourceplans and development applications. ensure complete communities and coordination Overall CriteriaThe
1 - 12
5
soccer)
Unbuilt (4 ball, 2 Potential 2012
CommentCommentComplete
= Lowest Consideration
TBD, comment
space, Existing full,
H/M/L, cost, TBD, commentH/M/L, cost, TBD, commentH/M/L, cost, TBD, comment
lylyly
Description Existing, Required in planning community, Unbuilt, Type (District, Community, Nbhd.), TBDIndicate potential yearExisting, TBD, Unbuilt in planning community, Not in planning
communityIndicate potential yearExisting, Potential, New development proposing, Outside of planning commty, Includes institutionalExisting withRequires new unbuilt, None plannedIndicate
potential yearPotential H/M/L, None proposedDescription Existing urban designation, Existing urban proposed amendment, New urban proposedN/A, Rescinded, Approved, Underway, RequiredExisting,
Required, Underway, N/AExisting, Existing requires amendment, New urban zoning requiredComplete, Required, Type, UnknownPotentialPotentialPotentialPotentially H/M/L, cost,Potentially
H/M/L
= Highest Consideration
TimingTimingTiming
initiatives and plans move through the development process this will change the analysis in future versions)
Goal 5: Strengthen CommunitiesAnalysisActive Park ProvisionLeisure/Community FacilitiesProvision of Social/Cultural InstitutionsElementary School AccommodationAffordable Housing ProvisionGoal
6: Managing Change in an Effective and Coordinated MannerAnalysisOfficial Plan StatusCommunity Plan StatusNeighbourhood Concept Plan/Master Plan StatusZoning StatusStatus of Master
Engineering PlansImpact on cost of engineering infrastructureImpact on Cost of Park/Leisure/Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance
Implications Denotes Critical Factor
*
(as
planned
Comment planned higherCommentNot existing (30 min. service)CommentIncludes planned office blocks.
-
Direct
development,
single use, TBD
Description Complete, Pending, Required, N/A Community includes existing, Community planned to include, Potential for development site to include, Primarily All types, Mixed, High/medium
rise multi, Single/semi/towns, One type, Existing neighbourhood mixedExisting, None required, May be required, New development, N/ADowntown, 40%, Greenfield density target, Unknown,
commentDescription Within Central Transit Corridor, Include transit hub, Existing transit, Planned transit, Level of service, Unknown Existing, Potential widening of existing, New
required prior to New with development, EA requiredExisting, Potential widening of existing, New required prior to development, New with development, EA requiredExisting cycling route,
Includes planned route, Unknown, (indicate location)Includes destinations, Based on 5minute walk, Potentially H/M/L, Primarily recreational only Potentially H/M/LDescription Includes
existing, Planned or potential in community, None, Type, commentIncluded, Close proximity, connections, Beyond walking/cycling distance, Indirect, comment, TBDExisting, Potentially
requires upgrades, New infrastructure required, TypePotentially H/M/LPotentially included, None, UnknownPotentially H/M/L
Places
Talent
Goal 2: Create Vibrant Urban AnalysisStatus of Urban Design Guidelines Mixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow Numerical
TargetsGoal 3: Ensure Greater Transportation ChoiceAnalysisTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDMGoal
4: Foster a Strong EconomyAnalysisProvision of Industrial/Skilled Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Redev. OpportunitiesAttraction of
1 - 13
6
individual
riorities are shown.
a map showing
properties / subdivision parcels)
(Examples of Relative P
Each Growth Area has
Sample Portion of Growth Management Plan
.
in
for :
take
given
.
1)
-
ranking
during the
competing
will prevail
the coming
will be
in
priority
levels of
Both Priority A and
priority
Relative Priority
rastructure may be
year timeframe. These
-
If there is a
three
next 2
with high priority
on
applications and initiatives with this
se initiatives may be commenced or
are eligible for consideration of potential
ed.
, staff recommends a
and initiatives with this Priority B applications may require some
.
development
. Notwithstanding this, Priority A applications
These applications complete the community and
ing the timeframe of this KGMP.
.
r
there is a competition for resources, etc.
applications
u
lands/development applications will be considered
pment applications
priority
for time/resources with other rankings, this
will also be actively worked
area specific analysis
. The Relative Priorities are reflected in
develo
year timeframe
-
Developmenthighestrequire no additional major infrastructure. interestThe Urban Growth Centre has the overall highest priority (AThe intent is that priority 2precedence if timeframe
of this KGMPadditional infrastructure. Some of this infconstructed dBDevelopment Charge Credit Refund Agreement for infrastructure.Lands identified as Priority C do not meet the KGMP
overall or area specific criteria for consideration in the lands may have significant environmental, servicing timing or financial implications. Often these lands require infrastructure
to come through other lands that are given a higher priority first before these lands can be developPriority C premature and will not be actively worked on during the timeframe of this
KGMP. There may be specific high level initiatives, broad studies/environmental assessments required to be completedthese areas first. Some of thecompleted during the timeframe of this
KGMP.
and the
ea and major initiative
overall criteria
Red
GreenOrange
,,
Relative Priority RankingBased on the each growth arPriority APriority BPriority C,
Lowest
Highest
1 - 14
7
lan
tion
P
t still
e not
official
map above
ay be prioritized
anagement
Departments and
obtained from the
M
is
other
rowth
G
Forecast and Development
of City representatives from:
s
could affect the staging proposed.
Director of Planning in consulta
or lands
be considered a Site Specific Intensification
may
lative priority for all development applications within
and Community Services. Input lands
the
,
development charge budgets, inclusion of a project in the Capital
s and agencies
upon written request to the satisfaction of the
,
law. Overall, the intent is to provide a tool that helps coordinate and prioritize the timing
ap
-epartment
The intent is to link the relative priority of a growth area from this Growth Management Plan with
The staff review and recommendation of the overall criteria and area specific analysis as it applies to lands within the Kitchener Growth Management Plan consistPlanning, Engineering,
Finance, Building Region of Waterloo, the School Boards and the Grand River Conservation Authority.A number of factors have been considered in determining what developments mto proceed.
Significant changes in any of these factors In budgeting for adequate funds for the construction of bridges, culverts, major roads, trunk sewers, etc. through capital works or Budget
and Forecast does not constitute approval to proceed with any specific project. It only reflects the City's priorities at the date of adoption of the Budget. Individual projects musreceive
specific Council approval and allocation prior to being undertaken.the timing of its needed infrastructure in the Capital Budget and Charges Byof development with the goals of the Kitchener
Growth Management Strategy.The intent of the KGMP is to help guide the rea growth area. The primary focus is on plans of subdivision, vacant land condominiums and plan amendments for
new urban land use designations within growth areas that have not previously been considered in past Staging of Development Reports. indicated or given a priority timing in the staging
of development program. The identification of potential draft plan of subdivision approval timing may prejudice consideration of any Official Plan Amendment.cases, if they are not within
an identified intensification area on the Overview Mwith other dOpportunity and prioritized accordingly (current Priority A).Development applications or initiatives proposed for parcels
that are not shown on the may be given a priority by the Director of Planning, in consultation with Agencies.
.
Notes:1. 2. 3. 4. 5.67.
in
is
one
were registered
4
welling units were
Priority C
plans in circulation and
293 d
7
draft approved,
, a total of
The following is a summary of the
approval (either through Council or
k/trail implementation.
year timeframe.
on or stages of plans
-
si
draft
Priority C parcel is
draft approved plans,
and early 2019
19
within each of these areas in advance of the
One
20
8
related initiatives.
Priority B
-
201
,
plans of subdivi
7
8
,
parcels.
201
3
+ includes the consideration and relative prioritization of a
4
late
2021
-
plans of subdivision received
3
.
2019
,
units
2019
-
KGMP
are future plans, all of which require future works/applications. Although lands
963
Priority A and B lands consist of
Achievements
2017
8
Additionally in these years
Areas
two
21
Priority A
than 20 Intensification
20120
--
several growth areas. In
7
19
plans (pending) for a total of
+ more
4
future
2
6
KGMP 201Since the KGMP the OMB) indraft approved. containing a total of KGMP 20The outlook for the significant number of parcels of land and growthrecommended prioritization of land
parcels: The recommended1circulation and indicated as Priority C may be the lowest priority for development applications, there are often initiatives recommended to be undertaken and
completed submission of development applications during the upcoming 2The approach to growth management is not just about prioritizing the number of plans of subdivision and dwelling
units. Important conallocation of resources towards conducting studies that are needed before development can be considered along with completing initiatives that are required to move
lands from draft approval to registration and construction. These initiatives include proceeding with environmental assessments and detailed design for roads, sanitary servicing infrastructure
and improvements, intersection upgrades, new cycling path construction, PARTS Plans, and par
1 - 15
8
.
--
are
. The
to be
overall
parcels
(Green
land that
significant
and
.Overall potential
a items, are
parcels of
section of this report
individual land
, along with each type of
complete communities
parcel based on the
Growth Area Subplan
residential floor space, jobs
-
is generic to all planning
Map
for
land
h
priority colour and label
r that corresponds to the parcel
is grouped into the six KGMS goals
is the area specific analysis, area
), has a
shows individual
whic
d Greenfield Areas that are not fully
etc.
analysis
Subplans
component
KGMP Summary
Map
The area comments may include an indication of
Area
Monitoring Report.
are also indicated. There may be properties that could be
Criteria for Staging of Development
Summary
the
plan of subdivision, vacant land condominium,
reas
area specific analysis
)
and Growth
. The assignment of a relative
udget Forecast and Development Charges Background Study.
analysis, along with the overall criteria for staging of development
e
. Th
growth area shown on the
& jobs per hectare). This component is similar to the information from the
Growth Management
) is described in
the Relative Priority ranking.
C
-
oric Staging of Development.
area specific analysis
or potentially subject to
(
KGMP Summary Map
:
B, Red
e plan but could be considered Site Specific Intensification Opportunities
-
AGrowth Management Plan
Each parcel has a unique parcel identification numbe
and the
first component includes the
green infrastructure is subject to refinement and the locations may change through the
Kitchener Growth Management Plan (KGMP) Summary Map
ubplan is comprised of two components. The first
Appendix Kitchener The are subject todevelopment applications in growth areas within the Designatedeveloped via plan of subdivision or the like that are within the Built Boundary Line.
These are not shown on thcriteriaA, Orange Parcel identification numbers are shown that correspond to information in the Growth Area Subplan tables and the histThe KGMP Summary Map
also includes the conceptual location of proposed new sanitary trunk sewers and sanitary pumping stations that may be required to service growth. This infrastructure is Development
Charge project numbers are indicated for major engineering infrastructure. The conceptual location for future city parkland (parks and open space) is also indicated. This engineering
and development process.Planning Community/Growth Area SubplansEach planning community/intensification area (Mixed Use Nodes, Mixed Use Corridors, Scomments and major initiatives list.
The second is the parcel specific map and information. The communities/growth areas and intensification areas. This and is primarily qualitativeprovides the basis foroutstanding park
and recreation facilities requirements, engineering infrastructure, or other community infrastructure or may include an indication if some of the major elementsin place. Major initiatives
are indicated with potential timing. The second component includes a more detailed map of the growth area with shown.information indicated in the table. The information includes potential
dwelling units by type, nonresidential land use areas, and estimated number of new residents, nonand density (residents historical Staging of Development report and utilizes the same
parcel ID number. greenfield and intensification area inventory totals, along with other summary datidentified in the Annual
1 - 16
9
3
10111213141517192123252830333538414
______________________________32
_____________________________
________________________
) _
3A
-
ification Opportunities
Growth Area SubplansUrban Growth CentreMixed Use CorridorsNodes (Mixed Use/Primary)Neighbourhood Mixed Use CentresSite Specific IntensBridgeport NorthGrand River NorthGrand River SouthHidden
ValleyDoon South Phase 1Doon South Phase 2BrigadoonBrigadoon SouthDundee North (Name TBDHuronHuron SouthRosenberg____Laurentian West Phase 1Laurentian West Phase 3B
1 - 17
10
high.
-
complete
deferred from CRoZBy
wide sanitary model
)
-
Existing capacity outsideN/ALow
---
High employment location.Included. MediumHighest.Recent improvementPotentially included. Med.Potentially high.DstrTBDExisting. None proposed.N/AIncludes most existing. Potential contribution
to.CcommunityCIncludes. Potential.Existing urban designation. PARTS CentralUpdated OP policies in place UGC stage 1. Timing TBDCitycomplete.Low. Low. CPositive now that DCs are no longer
exempt downtownMedium. Streetscape/roads
along with MTSAs.
GROWTH AREA SUBPLAN
This location is the focus of
225 RJs/ha by 2031.
in an Effective and
Impacts
4: Foster a Strong Economy
TimingTimingTiming
Goal Provision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield Redevelopment OpportunitiesImpact
on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering PlansImpact on Cost
of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment ChargeMaintenance Implications
.
.
2019
The Official Plan includes a target density of
Area Specific Priority Analysis
.
Fall
RJs/ha by
2019
istrict Energy
25
High service.
d
.
RJs/ha in
cture is in place. Development applications ongoing. Lands include rail and bus terminal,
modal hub
-
189
1 exist
multi
guidelines anticipated
Electricity constraints emerging
.dwellings only
location.
Subject to Clean Water Act and ROP requirements.N/ANoneHeritage resources identifiedPrime location, more potentialLowest. Distributed electricity and possibleRevised Includes existing,
potential for moreMultiple King St completeContributes to mandated 22031Includes Exist. Improvements done. Exist.Region Prime High. TDM pilot project.
Primary infrastru
RJs/ha in 2001 to an estimated
Conservation
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation,
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationOwnership)Cultural Heritage ConservationEnergy
Goal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape Projects*Contribution to Places to GrowNumerical
TargetsGoal 3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
sidential is targeted to balance employment growth.
The density has increased from 120
.
2028
-
A1
TBD
Inside
2027
intensification
Intensification area
Proposed TimingExisting, intensification
focus of
the primary
is
UGC
The
Urban Growth Centre
Applications
Remaining Initiatives
Major New UGC ZoningInnovation District Parking StructureDevelopment LocationRelation to Built BoundaryComplete Community StatusGeneral Comments: employment, institutional, arts and
culture and government. Increased re
1 - 18
11
he
Five of t
parks IDed in
designation
General Comments:
wide sanitary model complete.
-
Existing CapacityN/ALow
---
GROWTH AREA SUBPLAN
No new industrial providedWalkable, connectionsExist. High.Potential medium.Potentially includes.Potentially medium.Exist. New potential PARTS areas TBDExist. New potential TBDN/AExist.
Potential for new.CCSignificant potentialExisting urbanNeighbourhood Planning Review in progress.N/Aupdated through CRoZBy stage 1CityNone identified Potentially lowCTypically very
positiveLow. Streetscape.
Engineering infrastructure
TimingTimingTiming
all 7 corridors. Development applications are ongoing.
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Redevelopment OpportunitiesImpact on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable
Housing ProvisionGoal 6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus
of Master Engineering PlansImpact on Cost of Impact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
Fall
is in place for
all 7 corridors. Development applications are ongoing.
guidelines anticipated
Post 2031 pot. Issue.
.
Subject to Clean Water Act and ROP requirements.N/APrimarily none. Portion of Lancaster MUC includes Grand R., floodplain, significant valleyland.Heritage resources identifiedIn some
devt. proposalsLow. Revised 2019Exist. Potential on site.MultiplesComplete (Queen S, Victoria, Belmont, King E)underwayYes, res. devt contributes to intensification level targetExisting
high service (most)Many within RT areaExist.Exist.Belmont Exist. New connections proposedPotentially highPotentially high.
is in place for
Factor
Conservation
Places to Grow Numerical
Denotes Critical
1: Enhance our Valued Natural and
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Area Specific Priority AnalysisGoal Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage Energy ConservationGoal
2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to TargetsGoal 3: Ensure Greater
Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
2021
2021
-
-*
2019
2019
Proposed TimingInsideIntensification Area Existing, intensification
Mixed Use Corridors are major streets that lead into the Urban Growth Centre
jor streets that lead into the Urban Growth Centre
Five of the
Mixed Use Corridors
Plans
Schneider Creek Watercourse Projects
Major Remaining InitiativesNeighbourhood Planning ReviewDevelopment LocationRelation to Built BoundaryComplete Community StatusGeneral Comments: Mixed Use Corridors are ma
1 - 19
12
parks IDed
provided
high
wide sanitary model
-
Existing capacityN/ALow
---
No new industrialExist or planned connectionExist, may require upgradeLikely narrow rangePotential (gas stations)Potentially Exist. New potential in PARTS areasTBDPrimarily exist. N/ASome
incl. More reqd TBDCCPotentialExisting urbanPARTS Plans for Block Line / Fairway forthcoming N/AMost updated through CRoZBy stage 1 Citycomplete.TBD pending studyPotentially lowCTypically
very positivePotentially low. Streetscape.
GROWTH AREA SUBPLAN
Plan Status
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Redevelopment OpportunitiesImpact on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable
Housing ProvisionGoal 6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Nhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master
Engineering PlansImpact on Cost of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
,
, res. devt
mainly private
LRT and RT
planned
.
guidelines anticipated
2019
Subject to Clean Water Act and ROP requirements.Complete, N/ASeveral incl. floodplain, small woodland in Block Line/Strasburg, Potentially highPotentially lowRevised Fall Existing. High
site potentialMultiple dwellingMay be reqd (City/Region)Depending on locationcontributes to intensification level target & Many w. existexisting or On existingExistingServiced by multiple
existing and proposed routesIncl destinations, impr. reqdPotentially high
Analysis
Denotes Critical Factor
*
(Feature, Designation, Ownership)Impact on Heating/Electric
Area Specific Priority Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural
Heritage ConservationEnergy ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution
to Places to Grow Numerical TargetsGoal 3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution
to TDM
are complete.
and Forcemain
2021
-
*
2020
Proposed TimingInside, except 3 sitesIntensification AreaMostly existing
Fairway
(Mixed Use/Primary)
Upgrades to the Freeport Pumping Station
Plans Block Line/
.
Nodes
/ Secondary
Major Remaining InitiativesPARTS Development PlansLocationRelation to Built BoundaryType (Intensification Area/Complete Community StatusGeneral Comments
1 - 20
13
Mediummedium
wide sanitary model
--
-
Existing capacityN/ALow
---
No new industrial providedLowExist. May require upgradeLowLowLowExisting. Any new TBDN/AExistingN/APotential on siteCCPotentialExisting urbanN/A, Rescinded, ApprovedN/AMost updated
through CRoZBy stage 1 Citycomplete.TBD pending study.LowCTypically very positiveLikely revenue>cost
GROWTH AREA SUBPLAN
Provision
of Talent
Social/Cultural
Housing Provision
Cost of Engineering infrastructure
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Redevelopment OpportunitiesImpact on Attraction Goal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of School AccommodationAffordable Goal 6: Manage
Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering PlansImpact
on Impact on Cost of Community FacilitiesImpact on Cost of School Development Charge ImpactsMaintenance Implications
low
-
.
guidelines anticipated
2019
Subject to Clean Water Act and ROP requirements.N/A, completeNonePotential. None proposed.Potentially medium.Revised Fall Permitted. Primarily commercial plaza now.MultipleTBDRes. Development
contributes to intensification level targetMainly existing (30min)ExistExistServiced by multiple existing and proposed routesPotentially mediumPotential medium
Heritage Conservation
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Area Specific Priority AnalysisGoal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Cultural Heritage ConservationEnergy
ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow
Numerical TargetsGoal 3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
*
through Crozby Stage 1
Proposed TimingInside, except 1Intensification AreaExisting, 1 partial
updated
Most Zoning
General Comments:
Neighbourhood Mixed Use Centres
Major Remaining InitiativesDevelopment PlansLocationRelation to Built BoundaryComplete Community Status
1 - 21
14
005).
in
(2
positive
pending
LowHigh
--
Medium
wide sanitary model
-
-
Existing capacityN/ALow
---
No new industrial providedLowExisting. Potential upgradeMediumMediumMediumExisting. Any new TBDN/AExistingN/APotential on siteCCPotentialExisting urbanChanges in new OPSec. Plan review
progress/N/AVarious stages of CRoZByCitycomplete.TBD pending study.LowCTypically very Likely revenue>cost
GROWTH AREA SUBPLAN
Employment
Strong Economy
TimingTimingTiming
Goal 4: Foster a Provision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support Brownfield Redevelopment OpportunitiesImpact
on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering
PlansImpact on Cost of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
Area Specific Priority Analysis
.
enhance, unknown
guidelines anticipated
Development contributes to
2019
Subject to Clean Water Act and ROP requirements.N/ATypically nonePotential opportunitiesPotentially low. Revised Fall Potential to include.Multiples, townsVarious.Res. intensification
level targetExisting ExistingExistingExisting, Allows improvementsPotential medium
ies.
Conservation
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
Goal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow Numerical
TargetsGoal 3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
2021
-
Ongoing
2020
Proposed Timing
InsideIntensification AreaExisting, intensification
law
-
There are currently more than 425 SSIOs identified in the city. These include potential brownfields, greyfields
Review of Zoning By
See general comments below. Currently the SSIO locations
Site Specific Intensification Opportunities (SSIOs)
Note:cannot be shown.Major Remaining InitiativesComprehensive Residential (CRoZBy)Development PlansLocationRelation to Built BoundaryComplete Community StatusGeneral Comments: Additional
opportunities may exist. Many sites may be proposed for a change in use from existing uses for a range of densit
1 - 22
15
rtial
Upgrade.
unbuilt
medium
-
lowHigh
--
TBD
-
Pumping stn.
medium. Mainly vehicle
-
requires new
existing site, unbuilt
-
-
NoneLowExist. Potentially highNoMedium1 City & 1 Nhbd Park ExistNo additional plannedNone proposedCPC & P NoneExisting urbanN/AN/ANew zoning through CRoZBy stage 1 and pending stage
2CompleteExist, lowPotentially lowMediumSome, primarily revenueMedium
GROWTH AREA SUBPLAN
. New housing increases need for unbuilt school in pa
have been lifted
Strengthen Communities
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Redevelopment OpportunitiesImpact on Attraction of TalentGoal 5: Active Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing
ProvisionGoal 6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master
Engineering PlansImpact on Cost of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
; under
Act and
Area Specific Priority Analysis
CHL
complete
-
Designated
-
.
guidelines anticipated
1 exist, 2 proposed
2019
-
traffic/development cap and servicing limitations
Subject to Clean Water ROP requirements.N/AAdjacent to Grand R., incl. Melitzer Creek (coldwater), GRCA Regulated wetlands, floodplain, valley slopes, wooded areas. Greenlands in public
including Kiwanis Park and private ownership.Known Nonreview; knownNone proposedExisting serviced areaRevised Fall Mainly resid. (singles/town)Singles/semis/townsCity of Waterloo to
rebuild Woolwich StreetPlanned low service.Improvements Exist, newCity LowLow
Regional
Previous
Numerical Targets
/community.
Vibrant Urban Places
TDM
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal 2: CreateStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow Goal 3: Ensure Greater
Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to
complete the neighbourhood
2025
-
2024
Proposed TimingBothPartial existing
One stage of remaining subdivision to be registered which will
Station Upgrade
Bridgeport North
Falconridge pumping station upgrade is primarily related to growth in Waterloo.
Major Remaining InitiativesFalconridge Pumping LocationRelation to Built BoundaryComplete Community StatusGeneral Comments: community.
1 - 23
16
1 - 24
17
CRoZBy
through
TBD
-
High
and pending stage 2-
AREA SUBPLAN
full)
Existing inside communityN/ALow
---
Exist. industrialAdjacent (Shirley Ave), exist. connections + futureExistingYesSome potentialLow1 District & Nhbd Park Exist, 1 proposedProposed Existing & in adj. communityN/AAdjacent
communitiesC(school CPotentialExisting urbanRescindedN/ANew zoningstage 1N/APotentially lowPotentially lowCSome, primarily revenueMedium
GROWTH
rtional share of Ottawa Trunk Sewer costs.
Engineering infrastructure
Redevelopment Opportunities
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Impact on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering
PlansImpact on Cost of Impact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
Area Specific Priority Analysis
. density to
designated; known
Grand R., Kolb
-
.
3 exist, 2 proposed
guidelines anticipated
, GRCA Regulated
4 exist, 2 proposed
mediummedium
2019
-
--
Subject to Clean Water Act and ROP requirements.N/AAdjacent to Creekwetland, wooded areas, floodplain, valley slopes, mainly in public ownership w/ some privateKnown nonCHLNone proposed.Currently
low, exist.Revised Fall Community incl commercial, future high & low rise resid.Multiple, towns, singlesNone planned. Potential for signifLow. Future planned corridorExist. Prop. Ottawa
corridorExist, newRegion City LowLow
Design Guidelines
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Mixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow Numerical TargetsGoal
3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
02206 (Hallman) are dependent upon each other for servicing, a second means of access, and both require contribution of propo
-
ing
91005 (Gies) and 30T
-
2025
-
30T
2024
Proposed Timing
BothWould complete exist
The two remaining subdivision plans,
Grand River North
Pumping Station Upgrade
)
Forwell
Major Remaining InitiativesOtterbien (LocationRelation to Built BoundaryType Complete Community StatusGeneral Comments: Completion of the community is a high priority.
1 - 25
18
1 - 26
19
costs,
.
highhigh
--
medium (future +)
-
existing site, Unbuilt
requires new UnbuiltHigh
of Fairway complete
o new industrial provided--
NLowExisting (pumping stn). Requires storage facility.Potentially mediumNoLowNew zoning through CRoZBy St. and pending stage 2TBDIn adjacent communitiesAdjacent communitiesCPTBDLow.
Aff ownership potentialExisting urbanApprovedCompleteNew zoning through CRoZBy stage 1 and pending stage 2SLow LowDSome, primarily revenuePotentially medium
GROWTH AREA SUBPLAN
Lands
Plan/Master Plan Status
Social/Cultural
Future plans require contribution of proportional share to Ottawa Trunk Sewer
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment Effective Use of Existing InfrastructureHousing to Support EmploymentBrownfield Redevelopment
OpportunitiesImpact on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of * School AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Zoning StatusStatus of Master Engineering PlansImpact on Cost
of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
-
Area Specific Priority Analysis
min walk
-
and some
Major infrastructure existing.
.
; known CHLmedium rise)
-
.
2 exist, 2 proposed
low
guidelines anticipated
-
.3 exist, 2 proposed
2019
-
Subject to Clean Water Act and ROP requirements.Subject to Idlewood Creek Master Drainage PlanESPAs (#24, 25), Grand R., Idlewood Cr., Chicopee Cr. wetlands, floodplain, valleylands,
woodlands. Large portion in private ownershippublicDesignated and Known NonDesignatedNone proposedExisting, mediumRevised Fall Commty. planned to includeMixed (lowNone proposedPlannedFairway
extension completedExist, newRegion City E. of Zeller to be 5Medium
Woolner Tr. and S. of Fairway Rd
Projects
Heritage Conservation
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Energy ConservationGoal
2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of StreetscapeContribution to Places to Grow Numerical TargetsGoal
3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
outside
Proposed Timing
MostlyWould complete existing
Completion of community is a high priority.
: A Heritage Impact Assessment, and other studies, are required prior to future development E. of
Grand River South
Initiatives
Major Remaining NoneLocationRelation to Built BoundaryComplete Community StatusGeneral Commentsextension of watermain.
1 - 27
20
1 - 28
21
Studies
. New park proposed
Existing capacity outside N/ALow
---
Potential in community.Potential & adjacent to exist.Add. infrastructure requiredPotential.None/unknownMedium1 existingTBDNone in community.None in community.CcommunityCNoExisting urban
designation. Special Policies re: timing UnderwayUnderwayNew zoning pending CRoZBy and Planning Indiv. Servicing/SWM reqd.Pot. medium None identified.CTBD, potentially significantPotential
medium
GROWTH AREA SUBPLAN
Lands
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/EmploymentAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield Redevelopment
OpportunitiesImpact on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable
Housing ProvisionGoal 6: Manage Change in an Effective and Coordinated MannerOfficial Plan Status* Community/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus
of Master Engineering PlansImpact on Cost of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance
Implications
; known
complete
Area Specific Priority Analysis
Wide mix
.
Wabanaki ext
Wabanaki ext.
-
Designated
-
River Rd EA
.
1 proposed
guidelines anticipated
1 proposed
2019
ks, habitat, woodland, Grand
contribute to greenfield
Subject to Clean Water Act and ROP requirements.Add. works may be requiredIncl. Core Environmental Features, ESPA (#27), PSWs, creeR. floodplain, slope hazardsprivate ownership, comprehensive
EIS requiredKnown NonCHLNone proposed. Potential.Medium.Revised Fall Existing singles only.proposedFull range proposedNew constr. Will density target.Ex. routes adjacentRequired. New
constr. Region City Currently low. Currently low.
Land Use Study underway. ION Stage 2 route parallel to new River Road through Hidden Valley.
.
Transportation
led Environmental Assessment
-
Denotes Critical Factor
*
through a City
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study * Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow
Numerical TargetsGoal 3: Ensure Greater ChoiceTransit Status * Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
))
20212024
--
202120212027
---
2023
202020202026
development areas to be determined
Proposed Timing
(Region 2020(Region
BothPartial existing/limited service
Manitou)
-
Hidden Valley
Sanitary requirements for future
Hidden Valley Rd)
-
Secondary Plan, Zoning,
(Hidden Valley(King
Major Remaining InitiativesRiver Road River Road Hidden Valley Studies Upper Hidden Sewage Facility EA Upper Hidden Sewage Facility Design & ConstLocationRelation to Built Boundary (In/Out)Complete
Community StatusGeneral Comments:
1 - 29
22
1 - 30
23
SUBPLAN
outside community
medium.
-
Existing TBDMedium
---
No new industrial providedPrimarily vehicular onlyMainly exist. Some new.Potentially highNoneLowUnder Devt, additional open space proposedN/AMain facilities out of commtyNoneC(schools
full)CVery low potentialExisting urbanCompleteComplete (private)New zoning through CRoZBy stage 1 and pending stage 2CompleteCompleteLow. New park devt budgetCNow primarily revenueMedium
GROWTH AREA
Doon South Greenspace Management Plan
(rev. 1996), the
Support Employment
Implementation Report
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing toBrownfield Redevelopment OpportunitiesImpact
on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering
PlansImpact on Cost of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
-(1991) and
+
species
some
Area Specific Priority Analysis
, BBB
planned
-
, updated
; known CHL
.
1 exist, 1 proposed City
guidelines anticipated
floodplain, slope hazards,
,
. Some private, some
new service location
-
2019
some exist, connection
Subject to Clean Water Act and ROP requirements.Subject to StrasburgDoon Cr. Master Watershed PlansIncludes ESPAs (#30, 34, 35), PSWswoodlands, creeks and at riskpublic ownership.Designated
and Known NonDesignatedNone proposedMed.Revised Fall Primarily singles/towns, nhbd. commercialSingle/semi/townsNew developmentbelow, some aboveLeast accessibleNoneExist, plannedproposedRegion
-completion proposedLow destination, Med. recr.Low
Vibrant Urban Places
Cycling Master Plan
Strasburg Creek Master Watershed Plan and Implementation Report
Denotes Critical Factor
and
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal 2: CreateStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow Numerical TargetsGoal
3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact onPedestrian Charter/WalkabilityContribution to TDM
BothPartial existing
Doon South Creek Subwatershed Master Plan (1994)
In addition to the
Doon South Phase I
is also a guiding document for natural heritage conservation.
LocationRelation to Built BoundaryComplete Community StatusGeneral Comments:(2003)
1 - 31
24
1 - 32
25
ver,
high
-
TBD
through CRoZBy
future parks
high
-
medium.
-
requires new, Unbuilt, site
-
Some lands currently zonedPrimarily vehicular onlyNew infrastructure requiredPotentially highNoneLowExisting. 3 TBDMain facilities out of commtyTBDCidentified; P TBDLow potentialCompleteCompleted
through OMBN/ANew zoning stage 1 and pending stage 2High level complete, detail reqdPotential high, TBDTBDMediumYes, infrastructure reqd.Potentially medium
GROWTH AREA SUBPLAN
Cost of Engineering infrastructure
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Redevelopment OpportunitiesImpact on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable
Housing ProvisionGoal 6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus
of Master Engineering Plans*Impact on Impact on Cost of Community FacilitiesImpact on Cost of School Provision*Development Charge Impacts*Maintenance Implications
-
portion of development could proceed prior to the completion of the Strasburg Road extension; howe
Area Specific Priority Analysis
planned
-
large
Primarily in
.
floodplain, slope
; under review; known
.
1 exist, 1 proposed City
PSWs wooded areas,
ESPAs (#33, 34, 37 39),
guidelines anticipated
2019
5 proposed
Subject to Clean Water Act and ROP requirements.BBB Creeks Subwatershed Study (1997), Functional Drainage Study (2009) Includes Blair Creek, hazards,species at riskprivate ownership.Designated
and Known NonDesignatedCHLLimited Requires significant extend.Revised Fall Primarily singles/towns, nhbd. commercialSingle/semi/townsNew developmentMany plans below the general targetLeast
accessibleNew Dundee upgrade pendingNew requiredRegion -Potentially MedLow
pumping station. A
II
the Doon South
utilizing
he remainder
Denotes Critical Factor
*
with t
Impact on Heating/Electric
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage Conservation
(Feature, Designation, Ownership) Cultural Heritage ConservationEnergy ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land
UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow Numerical TargetsGoal 3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity
StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
exst
2026)
-
20252025
.
--
)
2020
-
2023202315M
$
the Homer Watson pumping station
Proposed Timing
(Region
OutsideNew. Part of partial
cost is
ated
Hwy)
-
total estim
(South Section)
the road (
: A portion of the lands can utilize
s
Initiatives
Doon South Phase 2
require
build out
Major Remaining Strasburg Road ExtensionStrasburg Road Watermain (South Section)New Dundee Rd (Fisher HallmanLocationRelation to Built BoundaryTypeComplete Community StatusGeneral Commentsfull
1 - 33
26
1 - 34
27
1 - 35
28
2
high
-
outside community
TBDMedium
exist. outside commty(SF)
proposed Nhbd Park
---
None (empl. changed to comm.)Adjacent to major empl.Exist. Trunk sewer ext. reqd. for some devt.MediumLikely noneLow1Not in planning communityN/AAdj. to institutional. None in.CCPotential
low.Existing urbanApprovedN/A (except MU site)New zoning through CRoZBy stage 1 and pending stageCompleteMediumLow CYes, infrastructure reqd.Potentially medium.
GROWTH AREA SUBPLAN
Economy
Attraction of Talent
TimingTimingTiming
Goal 4: Foster a StrongProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield Redevelopment
OpportunitiesImpact on Goal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering
PlansImpact on Cost of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
-
EIS
, Doon
Area Specific Priority Analysis
woodlands, PSW,
; known CHL
.
low
guidelines anticipated
-
includes destination, adj.
3 proposed, 1 existing
-
2019
-
significant
Subject to Clean Water Act and ROP requirements.Strasburg Cr. Master PlanSouth and Blair subwatershed/drainage studiesIncludes ESPA (#30), Strasburg Cr.,floodplain, slope hazards,reqd,
mostly public ownership, some privateDesignated and Known NonDesignatedNone proposedMainly existing serviceRevised Fall Mainly single use, 1 MU siteSingles/semi/townsNew developmentdevt.Existing
(30 min)NoneExist, Strasburg extension reqd prior to some devt.City Med.to school, employmentMedium
Projects
Streets
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape Contribution to Places to Grow Numerical
TargetsGoal 3: Ensure Greater Transportation ChoiceTransit Status Regional City StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
20222025
--
2020
20212023
Proposed Timing
BothPartial existing
Brigadoon
arcels are dependent upon extension of roads and services.
P
Major Remaining InitiativesBiehn Drive Sanitary Sewer EABiehn Drive ExtensionStrasburg Road Extension (South Section)LocationRelation to Built BoundaryComplete Community StatusGeneral
Comments:
1 - 36
29
1 - 37
30
he
Stras. Rd
TBD
--
Nhbd Park
TBDMedium
Exist. outside commty (sf)
proposed
---
None proposedLimited, fut. Strasburg RdNew reqdTBDLikely noneTBD2TBDTBDTBDCCTBDDesignatedCompleteRequiredNew zoning pending CRoZBySubdivision level reqdPotential mediumTBDCYes, infrastructure
reqd.Potential medium
potential that are dependent upon t
GROWTH AREA SUBPLAN
Status
to Support Employment
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousingBrownfield Redevelopment OpportunitiesImpact
on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan Community/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering Plans*Impact
on Cost of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School Provision*Development Charge ImpactsMaintenance Implications
It primarily consists of two parcels that have subdivision
Area Specific Priority Analysis
private
Brigadoon Transportation Network Analysis and Alignment Study.
-
.
significant woodland,
guidelines anticipated
2 proposed
2019
-
Strasburg Rd. ext. reqd.
Subject to Clean Water Act and ROP requirements.Strasburg Cr. Master WPlanIncludes wetland, requirements of 3 watershed plans (Strasburg, Doon South, Blair),ownershipDesignated; known
CHLTBDTBDRevised Fall TBDTBDNewPlanned future routeNoneCity Potential lowPotential low
Likely requires a Community Plan amendment.
Sewer. Subject to the Doon South
Biehn Drive
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow
Numerical TargetsGoal 3: Ensure Greater Transportation ChoiceTransit Status Regional Streets*City StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
202220252021
---
and services through adjacent plans to the future
2020
202120232019
Proposed Timing
OutsideNew
, Robert Ferrie Drive extension
This growth area is essentially the southern portion of the approved Brigadoon Community Plan area.
Brigadoon South
Extension (South Section)
Boundary
Sanitary Sewer EA
iveive Extension
Major Remaining InitiativesBiehn DrBiehn DrStrasburg Road Southwest Kitchener Transportation StudyLocationRelation to BuiltComplete Community StatusGeneral Comments: extension of Strasburg
Road
1 - 38
31
1 - 39
32
ry
land use TBD in
TBDTBDNew requiredTBDLikely noneTBDTBDTBDTBDTBDTBDTBDTBDUrban Secondary PlanRequiredRequiredRequires amendmentRequiredTBDTBDTBDTBDTBD
GROWTH AREA SUBPLAN
Opportunities
Engineering infrastructure
Employment Lands
Status
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Effective Use of Existing InfrastructureHousing to Support EmploymentBrownfield Redevelopment
Impact on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan Community/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering Plans*Impact
on Cost of Impact on Cost of Community FacilitiesImpact on Cost of School Provision*Development Charge ImpactsMaintenance Implications
Area Specific Priority Analysis
lands will use the South Strasburg Trunk Sanitary Sewer with the remainder to use existing or planned sanita
BBB Creeks
nd secondary plan is being explored.
TBD
Subject to Clean Water Act and ROP requirements.Mostly Subwatershed Study (1997), Functional Drainage Study (2009)Additional study required. TBDTBDTBDTBDTBDTBDTBDTBDTBDTBDTBDTBD
A portion of the
collector road EAs a
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow
Numerical TargetsGoal 3: Ensure Greater Transportation ChoiceTransit Status Regional Streets*City StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
8
Timing
2021202220252022028
-----
7
20202022
2019202120232022027
Proposed
OutsideNone
Dundee North (Name TBD)
Creek Dr des. and const.
Major Remaining InitiativesNew Secondary Plan and supporting technical studies, Southwest Kitchener Transportation StudyBiehn Dr Extension EABiehn Dr Extension des. and const.Strasburg
Dr Extension (South Section)Blair Creek Dr EABlairDodge DriveLocationRelation to Built BoundaryComplete Community StatusGeneral Comments: infrastructure (Biehn Dr and Doon South). Final
limits to be determined. Transportation study required. Potential to combine
1 - 40
33
Huron
prop.
Middle
2
pending CRoZBy
TBD
-
mode access
-
high
-
Medium
-
2012+ P
-
Incl. Huron Business ParkIncl., multiPortion requires trunk sewer ext., existMediumUnknownLowexist nhbd park, TBDInstitutional withinPublic elementary schoolCLow. Aff. home ownership+Existing
urban designatedCompleteN/ANew zoningCompleteRemaining Middle Strasburg Sewer, Huron Rd., Flood C. Str. Potential low. Future South CC can accommodate MediumNow revenue onlyMedium
GROWTH AREA SUBPLAN
Infrastructure
Engineering infrastructure
Employment Lands
(rev. 1996), additional guiding documents for natural heritage include
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Effective Use of ExistingHousing to Support EmploymentBrownfield Redevelopment OpportunitiesImpact
on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering
PlansImpact on Cost of Impact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
,
,
-
Non
Area Specific Priority Analysis
Implementation Report
Medium
use pathway
-
; known CHL
.
2 proposed
guidelines anticipated
(1991) and
Huron Rd reconstruction
1 existing, 3 proposed
2019
Subject to Clean Water Act and ROP requirements.Strasburg Cr. Master WPlanAlder/Upper Stras. Cr. StudyHuron Natural Area, PSW complex, small woodlands, floodplain, slope hazards, Strasburg
Creek, mostly public ownershipDesignated and KnownDesignatedLowExisting service Revised Fall Community includes residential, industrial, inst.Remainder single/semi/townMainly new devtemployment
proj. accomm.Exist., planned improvementFH Rd improvement pendingExist., completeRegion City Huron Rd multiIncl. or adj. to destinationsPotential medium
Places to Grow Numerical
(1998).
Denotes Critical Factor
2: Create Vibrant Urban Places
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal Status of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to TargetsGoal 3: Ensure Greater Transportation
ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
Strasburg Creek Master Watershed Plan and Implementation Report
. In addition to the
complete
BothNearing Completion
Huron
Middle Strasburg Cr. Trunk Sanitary Sewer: Environmental Study Report
Huron Road construction is
(1997),
LocationRelation to Built BoundaryComplete Community StatusGeneral Comments: Strasburg Cr. EIS
1 - 41
34
1 - 42
35
high
-
TBD
-
high
requires new, site
-
, P
TBD
-
No new industrial providedClose proximity to Bus. ParkUses recently contructed infrastructure Potential mediumNonePotential mediumSeveral propd. nhbd parksTBDTBD, Outside of commtyPotential
inside/outsideC & P identified, unbuiltCSome potential rentalExist urban designationCompleteCompleteNew zoning pending CRoZByDevt review remainingExistingNew CC plannedMediumYes, infrastructure
red.Potential medium
GROWTH AREA SUBPLAN
nd parks.
Attraction of Talent
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Redevelopment OpportunitiesImpact on Goal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing
ProvisionGoal 6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master
Engineering Plans*Impact on Cost of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
;
Area Specific Priority Analysis
, floodplain,
wetlands,
low
.
-
use pathway
and
-
Designated
-
.
1 proposed
guidelines anticipated
proposed
1
2019
on Rd EA reconstruction
imarily mixed residential
Subject to Clean Water Act and ROP requirements.Str. Cr. Master Watersh. Pl.Strasburg Creek, PSW complex, significant woodlandsslope hazards,private ownershipKnown Nondesignated; known
CHLNone proposedRequires ext. of serviceRevised Fall PrAll typesFischer Hallman Design StudyPotential Huron Rd., internalN/AHurcompleteRegion City Huron Rd multiPotential mediumPotential
medium
Enhance our Valued Natural and
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy ConservationGoal 2: Create
Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow Numerical TargetsGoal 3:
Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
and portion of Strasburg Road (South Section) and Huron Road construction is complete. Includes future schools, open space, a
Primarily Outside GreenfieldPartial existing
Huron South
South Strasburg Trunk Sanitary Sewer
LocationRelation to Built BoundaryComplete Community StatusGeneral Comments:
1 - 43
36
1 - 44
37
1 - 45
38
many
sed SW of
proposed
s
MSTSS
close
-Highhigh
--
d infrastructure
in place, most require
potential/proposed
potential/proposed
variety and close2024
-
1
3
Limited. AdjacentPrimarily efficient use ofplanneYes LimitedMedium5 proposed Nhbd Parks, urban greenTBDCC & Library2022Commty, Institutional, gathering spaces plannedCPTBDPotentialUrban
DesignationCompleteCompleteSome new zoningPrimary completeMedium MediumMediumYes, infrastructure reqd.Medium
GROWTH AREA SUBPLAN
Status
Master Engineering Plans
Parks and recreational facilities will be required. Future District Park propo
5: Strengthen Communities
.
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment LandsEffective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Redevelopment OpportunitiesImpact on Attraction of TalentGoalActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan Zoning StatusStatus of *Impact on Cost of Engineering
infrastructure*Impact on Cost of Community Facilities*Impact on Cost of School Provision*Development Charge Impacts*Maintenance Implications
,
-
*Area Specific Priority Analysis
to Core
adj.
density targets
Others required.
.
to exceed the minimum
guidelines anticipated
ownership. EIS and buffer
floodplain, slope hazards
requirements.
2019
Planned Transit Corridor,
-
min walk principle
-
Subject to Clean Water Act and ROP Alder/Upper Strasb. StudyContains and Environmental Features, Strasburg Cr., Huron Natural Area, privatereqd as in Alder/Upper Strasburg Watershed
PlanDesignated; known nondesignated; known CHLPotentially mediumPotentially mediumRevised Fall Mixed use, higher densityFull range of dwelling typesFH Road Streetscape Plan complete.
Planned greenfield FHhigh service plannedFuture FH widening5 major, 2 minor collectorFuture Rd widening Several routes proposed5Potentially medium
. Fischer Hallman Rd. widening is required.
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow
Numerical TargetsGoal 3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
2025 2
-
Trunk Sewer is required for development of the north portion of the area
20262026
2024
--
2020-
2020
Sanitary
20252024
2022
Proposed Timing
(Region)
OutsideGreenfieldPrimarily new
-
The Secondary Plan directs development to further utilize sustainability techniques.
osenberg
R
Plains)
-
Extension of the Middle Strasburg
Timing may be advanced via Credit Refund Agreement.
Road Watermain (Fischer Hallman
2
Middle Strasburg Sanitary Trunk Sewer
*Major Remaining InitiativesFischer Hallman (BleamsStrasburg Creek Flood Control Structure Huron Trussler)Amand DriveLocationRelation to Built BoundaryComplete Community StatusGeneral
Comments: Huron/Fischer Hallman Road.
1 - 46
39
1 - 47
40
1 - 48
41
large housing area
-
medium
-
Medium
-
No new industrial providedClose proximityExist. New water (Region)Med.Likely noneLowExisting N/AEx. temp. Commty CentreN/AEx temp. CC, private spaceExistingN/ALow. Affordable ownership+Existing
urban.Complete. Amendment reqd for remain. Phase 3A lands.Reqd for remaining lands.New zoning pending CRoZByBorden Sewer Cap. StudyLow.Estimated low.CNow primarily revenueMedium
GROWTH AREA SUBPLAN
Lands
the community which is a high priority.
Existing Infrastructure
TimingTimingTiming
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment Effective Use of Housing to Support EmploymentBrownfield Redevelopment OpportunitiesImpact
on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable Housing ProvisionGoal
6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus of Master Engineering
PlansImpact on Cost of Engineering infrastructureImpact on Cost of Community FacilitiesImpact on Cost of School ProvisionDevelopment Charge ImpactsMaintenance Implications
,
Area Specific Priority Analysis
Remaining parcels would help complete
low
-
k Sewer.
.
Ixpress
2 existing
guidelines anticipated
density target
4 proposed
Upper Shoemaker Cr.
2019
,
Subject to Clean Water Act and ROP requirements.Laurentian W. Master Drainage PlanstudyWetlands, woodlands, ESPAfloodplain, slope hazards,Laurentian W. Community Plan Environmental Review,
some public ownership and some privatedesignatedNone proposedExist service, medRevised Fall Community includes exist.Mix of residential typesNew developmentExist. FH Exist.Exist., newRegion
City MediumLow
Protection Area
Create Vibrant Urban Places
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy ConservationGoal
2:Status of Urban Design GuidelinesMixture of Land UsesType of Housing ProposedStatus of Streetscape ProjectsContribution to Places to Grow Numerical TargetsGoal 3: Ensure Greater Transportation
ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Charter/WalkabilityContribution to TDM
3a
-
BothMostly complete
Status
Portion of development includes temporary pumping station to be removed following extension of Middle Strasburg Sanitary Trun
Laurentian West Ph 1
LocationRelation to Built BoundaryComplete Community General Comments:
1 - 49
42
1 - 50
43
with the
proposed
urban designations
potential medium
1 proposed site
Nhbd park
None proposedAdj. to expresswayPumping Stn requiredPotential mediumNoneLow6TBDNoneUnknownPTBDLow. Aff. home ownership +Existing CompleteCompleteNew zoning pending CRoZByServicing scheme,
SWMYes, cost TBDTBDPotential, TBDYes, infrastructure reqdTBD
GROWTH AREA SUBPLAN
TimingTimingTiming
. Requires construction of sanitary servicing infrastructure in accordance
Impact on Cost of Engineering infrastructure
Goal 4: Foster a Strong EconomyProvision of Industrial/Employment LandsAccessibility to Employment Lands*Effective Use of Existing InfrastructureHousing to Support EmploymentBrownfield
Redevelopment OpportunitiesImpact on Attraction of TalentGoal 5: Strengthen CommunitiesActive Park ProvisionLeisure/Community FacilitiesProvision of Social/CulturalSchool AccommodationAffordable
Housing ProvisionGoal 6: Manage Change in an Effective and Coordinated MannerOfficial Plan StatusCommunity/Secondary Plan StatusNhbd. Concept Plan/Master Plan StatusZoning StatusStatus
of Master Engineering Plans*Impact on Cost of Community FacilitiesImpact on Cost of School Provision*Development Charge ImpactsMaintenance Implications
Official Plan
Area Specific Priority Analysis
oodlands,
upgrades TBD
.
2 proposed
guidelines anticipated
long dist to destinations
2019
-
Subject to Clean Water Act and ROP requirements.Alder/Upper Stras. Cr. StudySignificant wunevaluated wetlands, EIS reqd., Laurentian W. Community Plan Environmental Review, private ownershipUnder
reviewTBDServicing nearbyRevised Fall Primarily residential proposedMixed dwelling typeNew developmentNone exist., potential TBDExisting Requires newRegion LowLow
Charter/Walkability
Streetscape Projects
Denotes Critical Factor
*
Impact on Heating/Electric
(Feature, Designation, Ownership)
Goal 1: Enhance our Valued Natural and Cultural Heritage ResourcesSource Water Protection Area Subwatershed/Drainage Study Natural Heritage ConservationCultural Heritage ConservationEnergy
ConservationGoal 2: Create Vibrant Urban PlacesStatus of Urban Design GuidelinesMixture of Land Uses Type of Housing ProposedStatus of Contribution to Places to Grow Numerical TargetsGoal
3: Ensure Greater Transportation ChoiceTransit Status Regional StreetsCity StreetsImpact on Cycling Master PlanPedestrian Contribution to TDM
2024)
-
2
2025
2020
Proposed Timing
(Region 2020
Outside3A new, partial existing
main parcel of land received land use and subdivision approval by the OMB in 2015. These lands have urban land uses in the Ci
y)
Hw
-
The
Laurentian West Ph 3B
Trussler Area Sewage Facility
-
Remaining Initiatives
Charges Study/Capital Forecast via Credit Refund Agreement.
Indicates timing of infrastructure construction earlier than Development
2
Major OttawaBorden Greenway Trunk Trussler Road (BleamsLocationRelation to Built BoundaryComplete Community StatusGeneral Comments:approved EA. Two new parcels have been included (#145
and 146).
1 - 51
44
1 - 52
S
HU
B
1 - 53
Attachment to
Planning & Strategic
Initiatives Committee
Agenda
September 30, 2019
RE: DSD-19-206
Appendix B
1 - 54
!
Bvhvtu!7-!312:
Ujn!Epofhboj!
Tfojps!Qmboofs!)Qpmjdz*!
ETE!.!Qmboojoh!Ejwjtjpo!
Ljudifofs!Djuz!Ibmm-!7ui!Gmpps!
311!Ljoh!Tusffu!Xftu-!Q/P/!Cpy!2229!
Ljudifofs!PO!O3H!5H8!
!
Efbs!Ns/!Epofhboj;!
!
SF;!!ESBGU!DJUZ!PG!LJUDIFOFS!HSPXUI!NBOBHFNFOU!QMBO!)LHNQ*!3128.312:,!0!DFOUSF!
JDF!MQ0!TUBUJPO!QBSL!EFWFMPQNFOU!0!718.752!LJOH!TUSFFU!XFTU-!LJUDIFOFS!
!PVS!GJMF!26313I!
!
Xf!bsf!xsjujoh!po!cfibmg!pg!pvs!dmjfou-!Dfousf!Jdf!MQ-!pxofst!pg!718.752!Ljoh!Tusffu!Xftu-!Ljudifofs/!!Xf!
ibwf!sfwjfxfe!uif!Esbgu!Ljudifofs!Hspxui!Nbobhfnfou!Qmbo!)LHNQ*!sfmbujwf!up!uiftf!mboet!boe!dpogjsn!
pvs!tvqqpsu!pg!uif!esbgu!sfqpsu/!!Tqfdjgjdbmmz!xf!bsf!xsjujoh!jo!tvqqpsu!uif!Qsjpsjuz!B!tubuvt!uibu!ibt!cffo!
jefoujgjfe!gps!uiftf!mboet/!!
!
Ju!jt!pvs!voefstuboejoh!uibu!uif!gjobm!LHNQ!xjmm!cf!dpotjefsfe!cz!Dpnnjuuff!pg!Dpvodjm!po!Npoebz-!
Tfqufncfs!41ui-!312:/!!Ljoemz!lffq!vt!jogpsnfe!pg!uijt!qspdftt!boe!djsdvmbuf!uif!gjobm!LHNQ!podf!
bwbjmbcmf/!!
!
Zpvst!usvmz-!
!
NICD
!
!!!!!!!
Dbspm!Xjfcf-!CFT!!!!!!Boesfb!Tjodmbjs-!NVET-!NDJQ-!SQQ!
Qbsuofs!!!!!!!!Bttpdjbuf!
!
Dd!Bsu!wbo!Nbsfo-!WboNbs!Dpotusvdupst!PO!Jod/!
!Nbvsjdjp!Njsboeb-!WboNbs!Dpotusvdupst!PO!Jod/!!
!Efmmb!Sptt-!Djuz!pg!Ljudifofs!
Kvmjbof!wpo!Xftufsipmu-!Djuz!pg!Ljudifofs!!!
!!
1 - 55
1 - 56
1 - 57
1 - 58
1 - 59
1 - 60
1 - 61
1 - 62
August 9, 2019
Tim Donegani
Senior Planner | City of Kitchener
Via email: tim.donegani@kitchener.ca
Re: Draft Kitchener Growth Management Plan Fall 2019-Fall 2021
Dear Mr. Donegani,
Grand River Conservation Authority (GRCA) staff have now had a chance to review the draft
Kitchener Growth Management Plan (KGMP) Fall 2019-Fall 2021, prepared by the City of
Kitchener, dated July 17, 2019. Further to ourpreliminary comments provided by email on
August 2, 2019, based on our reviewof the KGMP we have the following GRCA Property
comments:
1.We noticed that a Proposed District Park is shown on GRCA-owned lands in the Grand
River South area (maps on page 20 and page 43). We recommend removing this from
the map at this time, as no decisions have been made regarding these lands.
2.Please notethat as per GRCA motion CW136-10, the Board has not made a decision
regarding the southern portion of the lands east of Woolner Trail for the Grand River
South area. As such, please remove those lands from the high priority designation and
remove the se
immediately south of the Woolner Heritage Farm to the Grand River be conserved for
Wetrust this information is of assistance. If you have any questions, please do not hesitate to
contact the undersigned at 519-621-2763 ext. 2319 or thughes@grandriver.ca.
Sincerely,
Trisha Hughes
Resource Planner
Grand River Conservation Authority
c.c.Beth Brown, GRCA (via email)
1 - 63
1 - 64
Mr. Tim Donegani
Senior Planner
City of Kitchener
200 King Street West
Kitchener, ON N2G 4G7
August 6, 2019
RE: comments to DRAFT 2019-2021 Kitchener Growth Management Plan
Dear Mr. Donegani,
Pearl Valley Development Corporation (Pearl Valley) would like to comment Growth
Management Plan as proposed and published online in July, 2019.
As the Owner of the largest vacant parcel in Hidden Valley, we are working closely with City of
Kitchener staff to create a remarkable new neighbourhood. Having owned and worked to develop this
parcel for fifteen years, we have now started its development process. A start within the next 2 years
is achievable and anticipated an in line with actions taken by the City itself to support this timeline.
As per the Draft KPGM, our lands are proposed to have a Priority C designation. We strongly feel that
it should be at least a Priority B area for the numerous reasons outlined below.
1.First and foremost, only
approval of the Hidden Valley Land Use Masterplan and initiation of its Secondary Plan, and
initiatives, as well as
A priority
B designation will ensure the City assigns the necessary resources for the completion of required
studies, the Secondary Plan preparation and coordination of the development process between all
parties in a timely way.
2.Secondly,
Strategy, its vision and supporting goals in an effective manner that contributes to not only
achieving the required density and intensification targets but it does this within an existing built-
up area that has a significant number of assets, a desirable location and context to deliver sought-
after housing choice and amenities. This area can contribute to our healthy community like few
other parcels available in Kitchener today.
3.
infrastructure construction within its right-of-way is of utmost importance to effectively manage
capital/staff resources without future doubling of efforts and increases in costs. The 2019-2021
timeframe is critical for this as phase 1 of RRE will be constructed during this period. Furthermore,
my former conversations with City staff and official comments to a previous KGMP priority
designation to revisit the timing for Hidden
Valley infrastructure and planning processes once the River Road EA was completed. It is worth
1 - 65
noting that at that point, part of our parcel (with a draft approved plan) was already given the
highest priority.
4.Contribution to goals as per Area Subplan:
a) Goal 1 given the importance of the existing natural feature within the area, and its significant
size (larger than many other within or near proposed KGMP developments), Hidden Valley
contributes fully to achieving this goal.
b) Goal 2 with its marvelous context, features and topography, this area can significantly
contribute to the creation of vibrant urban places. As it i
key city corridor, the new development with its design considerations will enhance the area
greatly. Moreover, as stated in the Hidden Valley LUMP process, it can provide for the missing
typology of buildings and spaces, greatly sought after in Kitchener. For all these reasons, this
area, like no other, can create unique vibrant urban places. Its contribution to this goal should be
significantly increased.
c) Goal 3 with the imminent construction of River Road Extension (designed for all types of
transportation modes), the planned Phase 2 of the ION and wide range of mixed uses proposed
within this area as well as potential on- and off-road connections (as envisioned for example in
walkability and TDM.
Because of its proximity to the light rail transit and urban corridor, and ability to expand existing
bus network, this area has the most versatile transportation network of all greenfield sites and
value
assigned to it.
d) Goal 4 . In
a
8 interchanges, and a variety of housing choices, this area can foster a strong economy.
e) Goal 5 as Hidden Valley itself currently has few amenities and also adjoins a large, older
neighbourhood, the considerable potential for new community uses and social interaction as well
as affordable housing provision, can significantly strengthen its surrounding community. Building
new, attractive facilities and spaces within and around marvelous open areas, can not only
enhance but leave a lasting positive impact on the entire area, exceeding the average scale of
contribution currently assigned to it.
f) Goal 6 for all of the above reasons, those identified in points 1-3 and described under goals
1-5, prioritizing the development of Hidden Valley will be an example of utmost effective and
coordinated change management. Furthermore, n
should be taken into account. Future residents and employees of this area will reap direct benefits
from its development Hidden Valley will be the most versatile, well-linked and urban greenfield
site available. Travelling to and from it, having the most diverse amenities, mixed-uses and
densities right within and next to it, will minimize daily expenditures, but also social and
environmental impacts. Hidden Valley will be a community healthier than most currently planned.
Therefore, the level of contribution to goal 6 should be increased as well.
In summary, Pearl Valley would like the City of Kitchener to re-evaluate the proposed designation
and give our lands a B priority in the Kitchener Growth Management Plan 2019-2021+. In relation
to other available development sites and achieving the goals of the KGMS and provincial policies,
Hidden Valley lands ought to be prioritized for development within the horizon of this KGMP.
land use planning and ensure timely execution of its Secondary Plan.
We would be pleased to discuss the above comments in more detail or answer any questions you may
have. Please do not hesitate to contact me to further discuss the above.
1 - 66
Sincerely,
Peter Benninger
Owner & President
CC:
1.Members of Kitchener Council
2.Alain Pinard, Director of Planning, City of Kitchener
3.Brandon Sloan, Manager, Long Range & Policy Planning, City of Kitchener
1 - 67
!
!
LJUDIFOFS!
XPPECSJEHF!
MPOEPO!
LJOHTUPO!
CBSSJF!
CVSMJOHUPO!
Bvhvtu!7-!312:!
!
Ujn!Epofhboj!
Tfojps!Qmboofs!)Qpmjdz*!
ETE!.!Qmboojoh!Ejwjtjpo!
Ljudifofs!Djuz!Ibmm-!7ui!Gmpps!
311!Ljoh!Tusffu!Xftu-!Q/P/!Cpy!2229!
Ljudifofs!PO!O3H!5H8!
!
Efbs!Ns/!Epofhboj;!
!
SF;!!ESBGU!DJUZ!PG!LJUDIFOFS!HSPXUI!NBOBHFNFOU!QMBO!)LHNQ*!3128.312:,!0!IJEEFO!
WBMMFZ!LJUDIFOFS!MUE/!)QFUFS!LSVTF*!0!IJEEFO!WBMMFZ!SPBE-!LJUDIFOFS!
!PVS!GJMF!:948!D!
!
Xf!bsf!xsjujoh!po!cfibmg!pg!pvs!dmjfou-!Ijeefo!Wbmmfz!Ljudifofs!Mue/!)Qfufs!Lsvtf*-!xip!pxo!mboe!po!uif!
tpvui!tjef!pg!Ijeefo!Wbmmfz!Spbe/!!!Uijt!qspqfsuz!nfbtvsft!bqqspyjnbufmz!3/15!ifdubsft!jo!bsfb!boe!jt!
tjuvbufe!cfuxffo!uif!Ijeefo!Wbmmfz!Ftubuft!tvcejwjtjpo!boe!uif!Csjemf!Qbui!tvcejwjtjpo/!Ju!jt!jefoujgjfe!bt!
Qbsdfm!226!po!qbhf!33!pg!uif!Esbgu!Ljudifofs!Hspxui!Nbobhfnfou!Qmbo!)LHNQ*/!!Uif!tvckfdu!mboet!bsf!
jefoujgjfe!bt!ibwjoh!Qsjpsjuz!C!tubuvt/!!!
!
Xf!bsf!xsjujoh!jo!tvqqpsu!uif!Qsjpsjuz!C!tubuvt!boe!opuf!uibu!uif!tvckfdu!mboet!ibwf!qsfwjpvtmz!cffo!
jefoujgjfe!gps!gvuvsf!efwfmpqnfou!boe!bddpvoufe!gps!jo!uif!eftjho!sfrvjsfnfout!pg!uif!tbojubsz!qvnqjoh!
tubujpo!mpdbufe!po!Sjwfs!Cjsdi!Spbe!up!uif!tpvui/!!!Uif!tvckfdu!mboet!bmtp!ibwf!gspoubhf!po!b!nvojdjqbm!
tusffu!boe!xjmm!cf!tvjubcmf!gps!sftjefoujbm!efwfmpqnfou!bt!fowjtjpofe!jo!uif!Esbgu!Ijeefo!Wbmmfz!Tfdpoebsz!
Qmbo/!!!
Ju!jt!pvs!voefstuboejoh!uibu!uif!gjobm!LHNQ!xjmm!cf!dpotjefsfe!cz!Dpnnjuuff!pg!Dpvodjm!po!Npoebz-!
Tfqufncfs!41ui-!312:/!!Ljoemz!lffq!vt!jogpsnfe!pg!uijt!qspdftt!boe!djsdvmbuf!uif!gjobm!LHNQ!podf!
bwbjmbcmf/!!
Zpvst!usvmz-!
NICD!
!
!!!!!!!
Dbspm!Xjfcf-!CFT!!!!!!!
Qbsuofs!!
!!!!!!!!
Dd!Qfufs!Lsvtf-!Svtt!Mbxtpo-!Ijeefo!Wbmmfz!Ljudifofs!Mue/!!!
!
311.651!CJOHFNBOT!DFOUSF!ESJWF!0!LJUDIFOFS!0!POUBSJP!0!O3C!4Y:!0!U!62:!687!4761!0!G!62:!687!1232!0!XXX/NICDQMBO/DPN
1 - 68
1 - 69
1 - 70
1 - 71
1 - 72
1 - 73
1 - 74
1 - 75
1 - 76
1 - 77
1 - 78
1 - 79
1 - 80
1 - 81
1 - 82
1 - 83
1 - 84
1 - 85
1 - 86
1 - 87
August 7, 2019File No: 19107
City of Kitchener
th
Planning Division, 6Floor
200 King Street West
Kitchener, Ontario
N2G 4G7
Attention:Mr. Tim Donegani
Senior Planner
Dear Mr. Donegani:
Re:Growth Management Plan 2019-2021+
Draft Plan of Subdivision 30T-08206
South EstatesLimited
KGMP Plan ID #120
On behalf of our client, South Estates Limited,please accept the following commentary regarding
the final draft of the Growth Management Plan 2019-2021+ (June 2019) as it relates to Draft Plan
of Subdivision 30T-08206.
The property is located on the south side of Bleams Road and is part of the Rosenburg Secondary
Plan. The property is subject to Draft Plan of Subdivision 30T-08206, which allows for a maximum
of 433 residential dwelling units along with a future school and park block.
The property is currently designated as Low Density Residential One and Two, Neighbourhood
Park, and Neighbourhood Institutional in the Rosenberg Secondary Plan, and zoned for
residential, institutional and park purposes.
The property is identified as ID#120 as part of the Growth Management Plan 2019-2021+and is
currently listedasstatus. According to the Growth Management Plan 2019-2021+,
actively worked on within the coming 2-
given the highest priorities with respect to development applications and initiatives.
1 - 88
We respectfully request that consideration be given to changing the future development status of
the subject property
considered as justification for this request.
The Growth Management Plan 2019-2021+ identifies criteria that areused to determine the
priority of growth and development. The following provides a summary of thesecriteria as well as
brief commentary as to how we believe each consideration has been addressed with respect to
the subject property and future development.
Achievement of Provincial, Regional and City Growth Plan and Official Plan Objectives:
The existing planning policy and regulatory framework indicatesthat the property is
intended to be developed as a residential community. The approval of the Rosenburg
Secondary Plan and associated zoning regulations by the Ontario Municipal Board in July
2012 indicates that the proposed development was consistent with the Provincial,
Regional and City policy and regulatory framework in effect at the time of approval.
Annual Monitoring Report:The Kitchener Growth Management Strategy 2018 Annual
Monitoring Report (DSD-18-077) noted that the number of overall new dwellings created
in 2017 had decreased from 2016 with an overall decrease in the supply of dwelling units
in both the built-up and designed greenfield area from June 2017 to June 2018. The 2019
Annual Monitoring Report notes that the City issued its highest number of building permits
for multiple dwellings within the designated greenfield area since 2010. The identification
statuswould increase the short to medium term
supply of dwelling units and provide opportunities for low density residential development
that will balance the recent influx of multiple residential dwellings within the greenfield
area.
Balanced Growth (Intensification and Greenfield):The property is located within the
Roseburg Community and is considered greenfield development. The intent of the Growth
Management Plan 2019-2021+ is to balance growth between
intensification/redevelopment in existing built-up areas, and greenfield development. It is
intensification/redevelopment within the existing built-up area, and that the few properties
ng constructed.
status will broaden the
opportunities for growth and development within the greenfield area and balance it with
lated within the
existing build-up area.
Timing of Municipal Infrastructure:The development oftheDraft Plan of Subdivision
requires the extension of the Middle Strasburg Sanitary Trunk Sewer, which is scheduled
1 - 89
in the City of Kitchener 2019Capital Budget and 10-Year Forecast for 2022-2023.
However, as noted on Page 36 of the Growth Management Plan 2019-2021+, the timing
of the sanitary truck sewer may be advanced prior to 2022-2023.The Middle Strasburg
Sanitary Sewer is now 100% designed and shovel ready for the 2020 construction
season.
and expansion project which includesthe Bleams and Fischer Hallman Road intersection
improvement works which are also scheduled for 2020. These two projects represent over
25million dollars in municipal upgrades planned for in 2020. This investment in
Municipal Resources and Agency Input:Municipal and agency departments would have
been closely involved with the approval of the Rosenburg Secondary Plan in 2012and
the subsequent approval of Draft Plan of Subdivision 20T-08206. Additional municipal and
agency input would be required to facilitate the future registration and development of the
subject property.
Capital Budget/Forecast:The required extension of the Middle Strasburg Sanitary Trunk
Sewer has been identified asaDevelopment Credit (DC) item for 2022-2023. RBJ
SchlegelPark at the corner of Huron Road and Fisher Hallman Road is currently under
construction, and the City of Kitchener 2019 Capital Budget and 10-Year Forecast for
2022-2023 identifies further park additions and enhancements between 2019 and 2023
(community centre, indoor pool and outdoor fields). Finally, the Region of Waterloo 2019
Operating Budget and Capital Program 2019-2028 identifies various road and intersection
improvements for Fisher Hallman Road and Bleams Road between 2019 and 2022. It is
our opinion that the City of Kitchener and Region of Waterloo 2019 capital budget/forecast
provides for imminent infrastructure, roads and community improvements that would
In summary, it is our opinion that the future development of the property and its identification
objectives. The priority development of the property will provide for an additional supply of
dwelling units and broaden the opportunities for low density growth and development within the
greenfield area that will balance planned intensification and redevelopment within the existing
built-up area. The future development of the property will be serviced by municipal
infrastructure, roads and community services contemplated for by both the City and Region.
TheGrowth Management Plan 2019-2021+identifies the subject property
to be actively worked on with
high priority over the next two years,astatus would allow South Estates to proceed
with development and construction in the immediate to near future.
1 - 90
I trust the above-noted commentary provides adequate commentary and justification for our
Please donot hesitate to contact me if you have any questions or wish to discuss further.
Yours truly,
GSP Group
Sarah Code, MCIP, RPP
Senior Planner
1 - 91
1 - 92
2658!Cmpps!Tusffu!Xftu!
Upspoup-!Poubsjp!N7Q!2B6!
!)527*!:34.7741!
!xxx/thmqmboojoh/db
jogpAthmqmboojoh/db!
Bvhvtu!8-!312:!Pvs!gjmf;!NH/LJ
Ujn!Epofhboj!
Qmboojoh!Ejwjtjpo!
Djuz!pg!Ljudifofs!
311!Ljoh!Tusffu!Xftu!
Ljudifofs-!PO!!O3H!5H8!
Efbs!Ns/!Epofhboj;!
Sf;!Esbgu!Ljudifofs!Hspxui!Nbobhfnfou!Qmbo!)LHNQ*!Gbmm!312:!Ä!Gbmm!3132!
!Ljudifofs!Hsffo!Efwfmpqnfout!Jod/!Ä!LHNQ!Qbsdfm!JE!244!'!245!
Xf!bsf!xsjujoh!po!cfibmg!pg!Ljudifofs!Hsffo!Efwfmpqnfout!Jod/!xjui!sftqfdu!up!qspqfsujft!
jefoujgjfe!bt!Qbsdfm!$244!'!245!jo!uif!Esbgu!Ljudifofs!Hspxui!Nbobhfnfofu!Qmbo!)LHNQ*!
Gbmm!312:!Ä!Gbmm!3132/!!Uiftf!mboet!bsf!bmtp!mpdbufe!xjuijo!uif!Sptfocfsh!Tfdpoebsz!Qmbo!Bsfb!
pg!Ljudifofs/!!
!
Xf!bsf!qmfbtfe!up!tff!uibu!uif!bcpwf!opufe!qspqfsujft!ibwf!cffo!jefoujgjfe!bt!Qsjpsjuz!C!mboet-!
xjui!uif!joufou!pg!uif!LHNQ!cfjoh!uibu!mboet!xjui!uijt!qsjpsjuz!mfwfm!Æ cf!bdujwfmz!xpslfe!po!xjui!
ijhi!qsjpsjuz!jo!uif!dpnjoh!3.zfbs!ujnfgsbnf Ç/!!Hjwfo!uibu!efwfmpqnfou!bqqmjdbujpot!ibwf!cffo!
tvcnjuufe!gps!uiftf!mboet!boe!bsf!dvssfoumz!voefs!sfwjfx-!xf!fyqfdu!uibu!uiftf!mboet!tipvme!cf!
npwfe!up!b!Qsjpsjuz!B!eftjhobujpo!jo!uif!ofyu!sfqpsu!)3132!Ä!3134,*/
Qmfbtf!opuf!uibu!pxofsÉt!obnf!gps!cpui!qbsdfm!$244!'!245!tipvme!cf!dibohfe!up!Æ Ljudifofs!
Hsffo!Efwfmpqnfout!Jod/Ç/!
!
Pwfsbmm-!xf!bsf!tvqqpsujwf!pg!uif!Esbgu!LHNQ!Gbmm!312:!Ä!Gbmm!3132/!!Uibol!zpv!gps!uif!
pqqpsuvojuz!up!dpnnfou/!!Qmfbtf!ep!opu!iftjubuf!up!dpoubdu!vt!jg!zpv!ibwf!boz!dpnnfout!ps!
rvftujpot/!
!
Zpvst!wfsz!usvmz-!
THM!QMBOOJOH!'!EFTJHO!JOD/!
!
!
!
Ebwje!Sjmfz-!SQQ-!NDJQ!
Qsjodjqbm!
!
Dd;!Csbe!Usvttmfs-!Ljudifofs!Hsffo!Efwfmpqnfout!Jod/!
1 - 93
1 - 94
1 - 95
379 Queen Street South
Kitchener, ON
N2G 1W8
Tel. 519.745.3249
www.polocorpinc.com
August 7, 2019
Planning Department
City of Kitchener
200 King Street West
Kitchener, ONN2G 4G7
Via E-mail
Attention: Tim Donegani(Senior Planner)
Reference:KGMP 2019-2021+
2219and 2159Ottawa Street
Kitchener, ON
N2E 0C8
Dear Mr. Donegani,
On behalf of Kitchener Trussler Holdings Inc. (“KTHI”), Polocorp Inc.would like to formally provide
comments on the draft Kitchener Growth Management Plan 2019-2021+ (KGMP). KTHI is the owner
of the lands municipally addressed as 2219 and 2159 Ottawa Street (subject lands) and is in the
process ofpreparing an Official Plan Amendment, Zoning By-Law Amendment, and Draft Plan of
Subdivision application to facilitate the residential development of the lands.
Subject Lands
The landsmunicipally addressed as 2219 Ottawa Street consists of approximately 8.94 hectares
(22.08 acres). The lands are bordered by Ottawa Street to the north, Trussler Road to the west, the
Taylor Lands to the south, and the Mannheim Water Treatment Plant to the east.Thesingle-
detachedresidential propertyaddressed as 2159 Ottawa Street (approximately 0.82 hectares)
was recently acquired by KTHI,which has been incorporated into the proposed Draft Plan.
The City-owned lands (old Ottawa Street alignment) consists of approximately 0.95 hectares (2.3
acres) located between the lands owned by KTHI.KTHI is in the process of acquiring this parcel
from the City of Kitchener to be integrated into the Draft Plan.The Region of Waterloo is currently
undertaking a removal of the existing pipewithin this parcel in advance of the acquisition of the
lands by KTHI.
Consultation
On August 22, 2017, a Pre-Submission Consultation was held with City staff, Regional staff, Mr.
Moxey (previous owner of 2219 Ottawa Street), Mr. Taylor, and ourselves to discuss the
development proposal for808 Trussler Road and the subject lands. Since the Pre-Submission
1 - 96
Consultation, KTHI has acquired the property located at 2159 Ottawa Street and has begun the
process of acquiring the old Ottawa Street alignment from the City.
In addition to the acquisitions, the following modifications to the Draft Plan have been undertaken
to reflect meetings with the City/Region:
Access to the dwelling located on the 2219 Ottawa Street lands has been revised to reflect
City of Kitchener heritage planning staff comments;
Visual access to the existing dwelling from Trussler Road has been provided through the
relocation of the stormwater management pond;
The location and size of the parkland blocks have been revised to reflect City of Kitchener
park staff comments; and
The vehicular accesses to the proposed subdivision have been relocated to Ottawa Street
to reflect grading challenges within the site.
The revised Draft Plan illustrates the progress that KTHI has made towards the development of the
lands.
Proposed Land Use
The subject lands are includedwithin the urban boundaryof the Region, as identified within Map
3A of the Region of Waterloo Official Plan. Within the City’s Official Plan, the subject lands are
identified as Residential,Natural Heritage, and Mixed-Use. The conceptual Draft Plan of
Subdivision identifies municipal roads with two connections to Ottawa Street. Within the
subdivision, a variety of residential dwellings types have been identified, including single-
detached, townhouse dwellings, and multiple block units. A preliminary analysis of the lands
undertaken by Stantec has determined that servicing capacity is available to service the
development.
Rationale for Inclusion
At this time, we are preparing the formal applications to the City, and would request that the 2019-
2021+ KGMP reflect the status of the development. The draft KGMP identifiesthe subject lands as
a ‘Priority B’. We would request that the KGMP be updated to designate the lands as ‘Priority A’,
for the following reasons:
The subject lands are situated within the Built Up Area for the City of Kitchener;
The subject lands are developable with servicing available along both Ottawa Street and
Trussler Road;
The subject lands will be serviced by a pumping station that is under construction on the
Activa Lands. The required infrastructure to service the lands will be availablewithin the
next year; and
The subjectlands will be included in a formal Official PlanAmendment, Zoning By-law
Amendment, and Draft Plan of Subdivision application in winter 2019/2020.
At the current time, there are several planning, engineering, and landuse justification/rationale
for the inclusion of the subject lands within the 2019-2021+ KGMP. These rationale for inclusion are:
Ottawa Street hasbeenreconstructed which will provide servicing, vehicular, and active
transportation connections tothe subject lands;
New watermainshave beenincluded within the reconstruction of Ottawa Street which
can service the subject lands;
1 - 97
In 2018, the new pumping station and Activa subdivision at Ottawa Street and Trussler
Roadbegan grading andconstruction and the proponentshave beencoordinatingto
ensure that sufficient capacity and depths have been included for the pumping of the
subject lands; and
The proponentswould like to coordinate with the Laurentian West Plan, currently under
review by the City and Region.
We appreciate the opportunity to provide comments and request that any further
correspondence with stakeholders include ourselves.
Regards,
Paul Puopolo, RPP, MCIP Amanda Stellings, Planner
CC: Brian Bateman, City of Kitchener
Joe Valela, Tercot Communities
David Cogliano, Tercot Communities
Filipe Dias, Tercot Communities
1 - 98
APPENDIX A: SUBJECT LANDS
1 - 99
379 Queen Street South
Kitchener, ON
N2G 1W8
Tel. 519.745.3249
www.polocorpinc.com
August 7, 2019
Planning Department
City of Kitchener
200 King Street West
Kitchener, ONN2G 4G7
Via E-mail
Attention: Tim Donegani(Senior Planner)
Reference:KGMP 2019-2021+
808 Trussler Road
Kitchener, ON
N2E 0C8
Dear Mr. Donegani,
On behalf of Dr. Steven Taylor,Polocorp Inc.would like to formally provide comments on the draft
Kitchener Growth Management Plan 2019-2021+ (KGMP). Dr. Tayloris the owner of the lands
municipally addressed as 808 Trussler Road(subject lands) and is in the process ofpreparing an
Official Plan AmendmentandZoning By-Law Amendmentapplication to facilitate the residential
development of the lands.
Subject Lands
The subject lands are municipally addressed as 808 Trussler Road andconsistof approximately
2.69hectares (6.65acres). The lands are bordered by 2219 Ottawa Street to the north, Trussler
Road to the west, Bleams Roadto the south, and the Mannheim Water Treatment Plantto the
east.The proposed development is intended to be coordinated with the 2219 and 2159 Ottawa
Street lands, which will provide servicing and road connections to the subject lands.
Consultation
On August 22, 2017, a Pre-Submission Consultation was held with City staff, Regional staff, Mr.
Moxey (previous owner of 2219 Ottawa Street), Mr. Taylor,and ourselves to discuss the
development proposal for 2219 Ottawa Street and the subject lands.
Since the Pre-Submission Consultation, ongoing discussions with Regional and City staff have been
undertakento discuss the development of the subject lands, as well as thedesign of the2219 and
2159 Ottawa Street lands. A Draft Plan has now been prepared, which will be provided as part of
the formal applications for the lands in winter 2019/2020. The revised Draft Plan illustrates the
progress that Mr. Taylor has made towards the development of the lands.
1 - 100
Proposed Land Use
The subject lands are included within the urban boundary of the Region, as identified within Map
3A of the Region of Waterloo Official Plan. Within the City’s Official Plan, the subject lands are
identified as Residential. The conceptual Draft Plan identifies municipal roads on the 2219 Ottawa
Street lands with two connections to Ottawa Street. Within the Taylor lands, a multiple block has
been shown which would be developed as townhouses and/or stacked townhouses as part ofa
future Site Plan/Plan of Condominium application.A preliminary analysis of the lands undertaken
by Stantec has determined that servicing capacity is available to service the development.
Rationale for Inclusion
At this time, we are preparing the formal applications to the City, and would request that the
KGMP reflect the status of the development. The draft KGMP 2019-2021+ identifiesthe subject
lands as a ‘Priority B’. We would request that the KGMP be updated to designate the lands as
‘Priority A’, for the following reasons:
The subject lands are situated within the Built Up Area for the City of Kitchener;
The subject lands are developable with servicing along Ottawa Street and Trussler Road;
The subject lands will be serviced by a pumping station that is under construction on the
Activa Lands. The required infrastructure to service the lands will be availablewithin the
next year; and
The subjectlands will be included in a formal Official Plan AmendmentandZoning By-law
Amendmentapplication in winter 2019/2020.
At the current time, there are several planning, engineering, and land use justification/rationale
for the inclusion of the subject lands within the KGMP. These rationale for inclusion are:
Ottawa Street has been reconstructed which will provide servicing, vehicular, and active
transportation connections to the subject lands;
New watermains have been included within the reconstruction of Ottawa Street which
can service the subject lands;
In 2018, the new pumping station and Activa subdivision at Ottawa Street and Trussler
Road began grading and construction and the proponents have been coordinating to
ensure that sufficient capacity and depths have been included for the pumping of the
subject lands; and
The proponents would like to coordinate with the Laurentian West Plan, currently under
review by the City and Region.
We appreciate the opportunity to provide comments and request that any further
correspondence with stakeholders include ourselves.
Regards,
Paul Puopolo, RPP, MCIP Amanda Stellings, Planner
CC: Brian Bateman, City of Kitchener
Dr. Steven Taylor
1 - 101
APPENDIX A: SUBJECT LANDS
1 - 102
EPORT TO:Planning & Strategic Initiatives Committee
DATE OF MEETING:September 30,2019
SUBMITTED BY:Alain Pinard, Director of Planning, 519-741-2200 x 7319
PREPARED BY:Craig Dumart,Planner,519-741-2200 x 7073
WARDINVOLVED:Ward 1
DATE OF REPORT:August 28,2019
REPORT NO.:DSD-19-188
SUBJECT:Draft Plan of Condominium (Vacant Land) 30CDM-19204
800 Fairway Road North
Waterloo Region District School Board
Figure 1: Location map
RECOMMENDATION:
That the City of Kitchener, pursuant to Section 51(31) of the Planning Act R.S.O. 1990,
c.P.13, as amended, and By-law 2002-164of the City of Kitchener, as amended, hereby
grants draft approval to Condominium Application 30CDM-19204for 800 Fairway Road
Northin the City of Kitchener, subj
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
2 - 1
REPORT:
The owner of the subject lands, Waterloo Region District School Boardis proposing a vacant
land condominium which will consist of 9 units and common element areas. A vacant land
condominium is like a plan of subdivision except the road is privately-owned rather than
publically-. Units 1
through 4 will create future development blocks. Unit 5 containsan elementary school with
landscaped areas and surface parking. Units 6 through 9 will contain ground supported signs.
An internal private roadway, walkways, landscaped areas and a stormwater management pond
will make up the common element areas. 800 Fairway Road North has received Site Plan
Approvalin Principle(SP15/089/F/APMaster Site Plan)and the owner is activelyclearing
conditions for full Master Site Plan Approval.
The Master Site Plan layout contains the existing elementary school site (fully approved through
site plan SP15/090/F/AP) the private street and outlines development blocks for future mixed
use developments. Each future development block will require individual site plan approval.
The property islocated at the intersection of Fairway Road Northand Lackner Boulevard. The
property is designated Mixed UseandzonedMixed Use Corridor Zone
(MU-2)with Special Regulation Provisions 1R, and662R, Special Use Provision 443U, and
Holding Provisions 1HSR and 74H in the City Zoning By-law 85-1.
Themixed usedevelopment consisting of an elementary school, private street and future mixed
use development landsis
-law 85-1.Acopy of the approved Site Plans areattached as
EThe proposed Vacant Land CondominiumPlanis consistent with
the approved Site Plans.The purpose of the vacant land condominiumapplicationis topermit
the individual ownership(tenure)of each of the units.
Provincial Policy Statement
The Provincial Policy Statement (PPS) sets the policy foundation for regulating the development
and use of land. The PPS promotes building healthy, liveable and safe communities, the
efficient development of lands and provision of a range of housing types and densities. The
proposed development is consistent with the PPS.
A Place to Grow: Growth Plan for the Greater Golden Horseshoe
9Growth
Plan for the Greater Golden Horseshoe. The Growth Plan promotes development that
contributes to complete communities, creates street configurations that support walking, cycling
and sustained viability of transit services and which creates high quality public open spaces.
The proposal complies with the policies of the Growth Plan.
Regional Official Policies Plan (ROPP) & Regional Official Plan (ROP)
Regional Official Plan. The proposal conforms to the policies of this plan. Through the review of
the application, the Region of Waterloo has no objections to draft approval of Plan of
Official Plan
The subject property is
within the Mixed Use designation in the Official Plan are intended to achieve an appropriate mix
of commercial, residential and institutional uses on lands designated Mixed Use. Lands
2 - 2
designated Mixed Use are transit-supportive, walkable, and integrated and interconnected with
other areas of the city.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
through the delivery of core service.
AGENCY COMMENTS:
Commenting agencies and City departments have no concerns with the proposed Vacant Land
Condominium. The comments received have either been addressed or included as conditions of
draft approval as recommended in the report. Allcomments are provided in
COMMUNITY ENGAGEMENT:
INFORM and CONSULT The Application was circulatedto property owners within 120 metres
of the subject lands June 19, 2019 as per Planning Act requirements. This report will be posted
enda in advance of the committee meeting.
resident had concerns that the proposed plan of condominium would result in more people and
more traffic.
Planning staff responded to the resident and explained the proposed application is for the
change of tenure (creation of units) and that the application is to create vacant units similar to
creating lots in a plan of subdivision.
FINANCIAL IMPLICATIONS:
No new or additional capital budget requests are expected with this recommendation.
COMMUNICATIONS:
Notice of the September 30,2019public meeting of the Planning & Strategic Initiatives
Committee will be advertised in The Record on September 6, 2019. The newspaper notice is
The notice will also be posted on the City of Kitchener website at
www.kitchener.ca.
CONCLUSION:
The recommendations contained within this report will permit the individual ownership ofeach of
theunits within thesubject lands. The proposed development conforms to Provincial, Regional,
and City plans, it is compatible with surrounding land uses,and represents good planning. As
such, staff recommend that draft plan of condominium 30CDM-19204, be approved subject to
the conditions outlined in this report.
REVIEWED BY:Della Ross, Manager, Development Review
ACKNOWLEDGED BY: Justin Readman, General Manager, Development Services Department
Attachments
Draft Approval Conditions andDraft Plan of Condominium 30CDM-19204
Newspaper Notice
AppendiDepartment and Agency Comments
AppendiAdjacent Landowner Comment
Approved Site Plans
2 - 3
DSD-19-188
DRAFT PLAN OF CONDOMINIUM 30CDM-19204
800 Fairway Road North
Waterloo Region District School Board
RECOMMENDED CONDITIONS OF DRAFT APPROVAL
That the City of Kitchener, pursuant to Section 51(31) of the Planning Act R.S.O. 1990, c.P.13,
as amended, and By-law 2002-164 as amended, of the City of Kitchener,hereby grants draft
approval to CondominiumApplication 30CDM-19204for 800 Fairway Road Northin the City of
Kitchener, subject to the following conditions:
1.That this approval applies to Draft Condominium 30CDM-19204owned byWaterloo
Region District School Board,dated April 16, 2018proposing a Vacant Land
Condominium Planfor5.68hectares of land comprised of 9units and commonelements.
Units1-4future development blocks.
Unit 5:contains an elementary school with landscaped areas and surface parking.
Units 6 through 9: ground supported signs.
Common Elements: Internal private roadway, walkways, landscaped areas and a
stormwater management pond
2.That the final plan shall be prepared in general accordance with the above noted plan,
Review.
3.Thatprior to registration, the Ownerobtain
of the following:
A.An addressing plan showing the proposed units with Condominium Unit
Numbering; and;
B.A summary table containing the proposed Condominium Unit Numbering and
assigned municipal addresses.
4.The Owner shall submit a draft Condominium
of Planning, Development and Legislative Services. The said Declaration shall contain:
i)provisions, to the satisfaction of the Region
Commissioner of Planning, Development and Legislative Services, regarding
ownership details and rights and obligations for common elements including, but
not limited to, access lanes, sanitary, storm and water services, and open
space/amenity areas, if any.
In addition, the Declaration shall contain specific provisions4 ii) through 4viii), as
2 - 4
ii)That private sidewalks, driveways and parking areas be maintained in a snow
free condition and void of any obstructions 12 months of the year.
iii)That the condominium corporation agrees to develop and maintain the subject
lands in compliance with approved Site Plan.
iv)That access rights to Kitchener-Wilmot Hydro Inc. facilities on the subject
property will be maintained.
v)That the home mail delivery will be from a designated Centralized Mail Box.
vi)That easements, as may be required, for servicing and/or access across the
condominium lands are to be conveyed to: City of Kitchener, Regional
Municipality of Waterloo, Kitchener-Wilmot Hydro, Bell Canada and any
communication/telecommunication company.
vii)That the Condominium Corporation and Unit Owners, would at their expense, be
obligated to implement andmaintain the approved Salt Management Plan related
to winter snow and ice clearing.
viii)Include the following noise warning clausesfor in any agreements or offers of
purchase and sale, lease/rental agreements and/or condominium declarations:
Units 1 to 5:
vacant land condominium are located within or in close proximity to one of the
flight paths leading into and out of the Region of Waterloo International Airport,
and that aircraft noise and directional lighting along this flight path may cause
5.That the Owner covenant and agree in writing to the City's Manager of Development
Review to register a Condominium Declaration which shall include the approved
provisions as required in condition 4 hereof.
6.That the Owner shall obtain a tax certificate from the City of Kitchener to verify that there
Division.
7.That the Owner shall make arrangements for the granting of any easements for utilities
and municipal services. The Owner agrees to comply with the following easement
procedure:
(a)to provide reference plan(s) showing the easements to Hydro, communication/
Manager of Development Review;
(b)to ensure that there are no conflicts between the desired locations for utility
easements and those easement locations required by the Ci
Engineering Services for municipal services;
2 - 5
(c)to ensure that there are no conflicts between utility or municipal service
easement locations and any approved Tree Preservation/Enhancement Plan;
(c)if utility easement locations are proposed within lands to be conveyed to, or
presently owned by the City, the Owner shall obtain prior written approval from
Manager of Development Review
General Manager of Development Services; and
(d)Manager of Development Review, a clearance letter from
each of Hydro, Bell Canada and other pertaining
communication/telecommunication companies. Such letter shall state that the
respective utility company has received all required grants of easements, or
alternatively, no easements are required.
8.That the Owner shall submit to the City of Kitchener a Letter(s) of Credit to cover 100
percent of the remaining cost of all outstanding and/or uncertifiedsite development
Manager of Development Review.
i)The Letter(s) of Credit shall be kept in force until the completion and certification
of the required site development works in conformity with their approved designs.
If a Letter(s) of Credit is about to expire without renewal thereof and the works
have not been completed and certified in conformity with the approved designs,
the City may draw all of the funds so secured and hold them as security to
guarantee completion and/or certification, unless the City Solicitor is provided
with a renewal of the Letter(s) of Credit forthwith.
ii)In the event that the Owner fails to complete the required site development
agreed by the owner that the City, its employees, agents or contractors may
enter on the lands and so complete and/or certify the required site development
works to the extent of the monies received under the Letter(s) of Credit. The cost
of completion of such works shall be deducted from the monies obtained from the
Letter(s) of Credit. In the event that there are required site development works
remaining to be completed, the City may by by-law exercise its authority under
Section 326 of the Municipal Act to have such works completed and to recover
the expense incurred in doing so in like manner as municipal taxes.
iii)Other forms of performance security may be substituted for a Letter(s) of Credit,
at the request of the owner, provided that approval is obtained from the City
Treasurer and City Solicitor.
9.That the Owner confirms that sufficient wire-line communication/telecommunication
infrastructure is currently available within the proposed development to provide
communication/telecommunication service to the proposed development to the
satisfaction of Bell Canada orother communication/telecommunication company.
10That prior to final approval of all or any part of this plan of condominium, the Owner enter
into an agreement with the Regional Municipality of Waterloo to prepare a Salt
Management Plan prior to site plan approval for Units 1 to 4, all inclusive, to the
2 - 6
Services. The salt management plan must indicate to the Region winter maintenance
procedures such as the quantity and type of snow/ice melting materials used, the
storage and handling of these materials, and the storage of snow cleared from the
parking areas,
11.That prior to final approval of all or any part of this plan of condominium, the Owner enter
into an agreement with the Regional Municipality of Waterloo to complete a detailed road
traffic noise study prior to site plan approval for Units 1 to 4, all inclusive; and
furthermore, provision be included to amend the agreement if necessary to provide for
implementation of such future noise study, to the satisfaction of the Regional
Commissioner of Planning, Development and Legislative Services.
12.That prior to final approval of all or any part of this plan of condominium, the Owner enter
into an agreement with the Regional Municipality of Waterloo to include the following
warning clause in all agreements of purchase and sale and/or rental agreements for
Units 1 to 5:
nd
condominium are located within or in close proximity to one of the flight paths leading
into and out of the Region of Waterloo International Airport, and that aircraft noise and
directional lighting along this flight path may cause concern to some indiv
13.That prior to final approval of all or any part of this plan of condominium, the Owner enter
into an agreement with the Regional Municipality of Waterloo to include the warning
clause in Condition 12above, in any sign content posted for information on the
Commissioner of Planning,
Development and Legislative Services.
14.That the Owner makes provision in the Condominium Declaration for the following, to the
Commissioner of Planning, Development and Legislative
Services:
a)that the Unit owner be responsible for implementation of the accepted road salt
management plan identified in Condition 10above related to outdoor winter
maintenance procedures for the subject development; and
b)that the warning clause in Condition 12be included in the declaration.
15.That the Owner provides the Regional Municipality of Waterloo with a draft of the final
Condominium Declaration for registration.
16.That prior to final approval of all or any part of this plan of condominium, the Owner
provides the Region with a copy of the agreement registered by the City of Kitchener
against the lands to which it applies, to the satisfaction of the Regional Commissioner of
Planning, Development and Legislative Services;
17.That prior to final approval of all or any part of this plan of condominium, the Owner
provide the Region with compliance and performance monitoring results to date as
Chicopee Hills, Kitchener (Fairway Rd. / Lackner Blvd.)
Environmental Impact Study(Stantec, February 26, 2014), to the satisfaction of the
Regional Commissioner of Planning, Development and Legislative Services.
2 - 7
18a)That the owner enter into an Agreement for Servicing with the Regional Municipality of
Waterloo to preserve access to municipal water supply and municipal wastewater
treatment services prior to final approval or any agreement for the installationof
underground services, whichever comes first. Where the owner has already entered into
an agreement for the installation of underground servicing with the area municipality,
such agreement shall be amended to provide for a Regional Agreement for Servicing
prior to registration of any part of the plan. The Regional Commissioner of
Transportation and Environmental Services shall advise prior to an Agreement for
Servicing that sufficient water supplies and wastewater treatment capacity is available
for this plan, or the portion of the plan to be registered;
18b)That the owner include the following statement in all agreements of lease or purchase
and sale that may be entered into pursuant to Section 52 of the Planning Act, prior to the
registration of this plan:
purchase and sale are not yet registered as a plan of subdivision. The fulfillment of all
conditions of draft plan approval, including the commitment of water supply and sewage
treatment services thereto by the Region and other authorities, has not yet been
completed to permit registration of the plan. Accordingly, the purchaser should be aware
that the vendor is making no representation or warranty that the lot, lots, block or blocks
which are the subject of this agreement or lease or purchase and sale will have all
conditions of draft plan approval satisfied, including the availability of servicing until the
CLEARANCES:
1.Manager of Development Review,
the Owner shall submit a detailed written submission outlining and documenting how
conditions 3 through 18inclusive have been met. The submission shall include a brief
but complete statement detailing how and when each condition has been satisfied.
2.Manager of Development Review, the
Regional MunicipalManager of Development
Reviewthat Conditions 4i), vii),viii)and 11 through 18have been satisfied.
NOTES:
1.The owner is advised that the provisions of the Development Charge By-laws of the City
of Kitchener and the Regional Municipality will apply to any future development on the
site.
2.The condominium plan for Registration must be in conformity with Ontario Regulation
43/96 as amended, under the Registry Act.
3.Draft approval will be reviewed by the Manager of Development Review from time to
time to determine whether draft approval should be maintained.
4.It is the responsibility of the owner of this draft plan to advise the Regional Municipality of
Waterloo Department of Planning, Development and Legislative Services and the City of
2 - 8
Kitchener Development Services Department of any changes in ownership, agent,
address and phone number.
5.The owner is advised that the Regional Municipality of Waterloo has adopted By-law 96-
025, pursuant to Section 69 of the Planning Act, R.S.O. 1990, c.P. 13, to prescribe a
tariff of fees for application, recirculation, draft approval, modification to draft approval
and registration release of plans of condominium.
6.This draft plan was received on July20April 1, 20198and deemed complete on July
25April 1,20198and shall be processed and finally disposed of under the Planning Act,
R.S.O. 1990, c.P. 13, as amended as of that date.
7.
Development and Legislative Services to the City of Kitchener prior to year end, it is the
responsibility of the owner to ensure that all fees have been paid, that all Regional
conditions have been satisfied and the required clearance letters, agreements, prints of
plan to be registered, and any other required information or approvals have been
deposited with the Regional Planner responsible for the file, no later than December
15th. Regional staff cannot ensure that a Regional Release would be issued priorto year
end where the owner has failed to submit the appropriate documentation by this date.
8.When the survey has been completed and the final plan prepared to satisfy the
requirements of the Registry Act, they should be forwarded to the City of Kitchener. If
the plans comply with the terms of the approval, and we have received assurance from
the Regional Municipality of Waterloo and applicable clearance agencies that the
necessary arrangements have been made, the Manager of Development Review
signature will be endorsed on the plan and it will be forwarded to the Registry Office for
registration
9.The Owner is advised that the lands, or a portion of the lands, are subject to the Region
of Waterloo International Airport Zoning Regulationsissued under the federal
Aeronautics Act. The purpose of the Regulations is two-fold: 1) to prevent lands
adjacent to or in the vicinity of the Region of Waterloo International Airport site from
being used or developed in a manner that is incompatible with the safe operation of the
airport or an aircraft; and 2) to prevent lands adjacent to or in the vicinity of facilities used
to provide services relating to aeronautics from being used or developed in a manner
that would cause interference with signals or communications to and from aircraft or to
and from those facilities.
of the restrictions under these Regulations which may include but not limited to height
restrictions on buildings or structures, height of natural growth, interference with
communications, and activities or uses that attract birds.
10.The Owner is advised that the lands, or a portion of the lands, may be subject to
Canadian Aviation Regulations Standard 621.19 issued under the federal Aeronautics
Act. This Standard allows aviation officials to assess individual obstructions, namely
buildings, structures or objects, to determine if they are likely to constitute a hazard to air
navigation and consequently require marking and/or lighting in accordance with the
Standards. Persons planning to erect an obstruction, namely a building, structure or
object, including a moored balloon, either permanently or temporarily, should contact the
2 - 9
Regional Manager, Aerodrome Safety (Ontario Region), Transport Canada at (416) 952-
0248 as early as possible and provide the necessary information on the planned
obstruction using the Aeronautical Obstruction Clearance Form (#26-0427) issued by
Transport Canada.
The following is required for registration and under The Registry Act and for our use:
Two(2)original mylar
Five(5)white paper prints
One(1)digital copy
2 - 10
2 - 11
DSD-19-188
Appendix B
PROPERTY OWNERS AND INTERESTED PARTIES ARE INVITED
TO ATTEND A PUBLIC MEETING TO DISCUSS
A PROPOSED VACANT LAND CONDOMINIUM
UNDER SECTION 51 OF THE PLANNING ACT
800 Fairway Road North
The City of Kitchener has received an application for a vacant land condominium consistingof 9unitsand
common elementareas. Units 1 through 4 will create future development blocks. Unit 5 contains an elementary
school with landscaped areas and surface parking. Units 6 through 9 will contain ground supported signs. An
internal private roadway, walkways,landscaped areas and a stormwater management pond will make up the
commonelement areas.
The public meeting will be held by the Planning & Strategic Initiatives Committee, a Committee of Council
which deals with planning matters on:
MONDAY, September 30, 2019at 7:00 P.M.
nd
COUNCIL CHAMBERS, 2FLOOR, CITY HALL
200 KING STREET WEST, KITCHENER.
Any person may attend the public meeting and make written and/or verbal representation either in support of,
or in opposition to, the above noted proposal. If a person or public body would otherwise have an ability to
appeal the decision of the City of Kitchener to the Local Planning Appeal Tribunal, but the person or
public body does not make oral submissions at a public meeting or make written submissions to the
City of Kitchener prior to approval/refusal of this proposal, the person or public body is not entitled to
appeal the decision.
ADDITIONAL INFORMATIONis available by contacting the staff person noted below, viewing the report
contained in the meeting agenda (posted 10 days before the meeting at www.kitchener.ca-click on the date in the
th
Calendar of Events and select the appropriate committee), or in person at the Planning Division, 6Floor, City
Hall, 200 King Street West, Kitchener between 8:30 a.m. -5:00 p.m. (Monday to Friday).
Craig Dumart, Planner -519-741-2200 x 7073(TTY: 1-866-969-9994);craig.dumart@kitchener.ca
2 - 12
2 - 13
2 - 14
2 - 15
2 - 16
2 - 17
2 - 18
2 - 19
2 - 20
2 - 21
2 - 22
2 - 23
2 - 24
2 - 25
2 - 26
2 - 27
2 - 28
2 - 29
2 - 30
2 - 31
2 - 32
2 - 33
REPORT TO:Planning and Strategic Initiative Committee
DATE OF MEETING:September 30, 2019
SUBMITTED BY:Alain Pinard,Director of Planning,519-741-2200 ext. 7319
PREPARED BY:Craig Dumart,Planner,519-741-2200 ext. 7073
WARD(S) INVOLVED:Ward 10
DATE OF REPORT:August 28, 2019
REPORT NO.:DSD-19-190
SUBJECT:ZONING BY-LAW AMENDMENTAPPLICATION (Renewalof
Temporary Use By-law) ZBA19/007/V/CD
87 Victoria Street North
The KW WorkingCentre of the Unemployed
_____________________________________________________________________________
Subject Property: 87 Victoria Street North
RECOMMENDATION:
That application ZBA19/007/V/CD (The KW Working Centre of the Unemployed), for the
purpose of renewing temporary use provision 13T, for a maximum of threeadditional
years, to permit the habitation of two existing structures which are accessory to the
residential care facility located on the subject property (87 Victoria Street North), be
approved in the form shown in -August 28, 2019, attachedto
Report DSD-19-
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
3 - 1
REPORT:
The subject property is municipally addressed as87 Victoria Street North and is currently
developed with a residential care facility with surface parking and two accessory structures.The
subject property has an Official Plan designation of InnovationDistrict inthe Urban Growth
Centre (Downtown)Plan and is currently zoned Warehouse District Zone (D-6) with Special
Regulation 105R, Special Uses 116U and 403U Holding Provision 10Hand 13T. Special Use
403U permits a residential care facility on the subject property and Temporary Use Provision
13T permits habitation of twoexisting 7.5m² (8
period of three yearswhich is set to expire in Decemberof 2019.
The purpose of this application is to renew the Temporary Use Provision 13T for three additional
years. Three years is the maximum duration of Temporary Use By-laws passed under Section
39 of the Planning Act. Council may grant further extensions by By-lawupon expiry of the
temporary use provisions.
Over the past three years the existing structures have beenused to house homeless people
who are unable to stay in traditional shelters. Funding for the project hadbeen provided by the
Region of Waterloo whoassistedwith developing the accessory units as a pilot projectin 2016.
In 2016 Fire staff inspected the units and met with the applicant, and were satisfied that all fire
safety requirements hadbeen met.
The Provincial Policy Statement (PPS)
The Provincial Policy Statement sets the policy foundation for regulating the development and
use of land. The policies regarding housing are contained in a section called Building Healthy
and Strong Communities. Providing an appropriate range and mix of residential uses is listed as
one way to sustain healthy, liveable and safe communities.
Policy 1.4.3 requires planning authorities to provide for an appropriate range and mix of housing
types and densities by permitting and facilitating all forms of housing required to meet the social,
health, and wellbeing requirements of residents, including special needs requirements. Special
is used by people who have specific needs beyond economic needs, including but not limited to,
habitation in the accessory structures will add to the range and mix of housing for those who
have special needs which do not allow them to benefit from traditional forms of emergency
shelter. Planning staff is of the opinion that theproposed zone change will continue to allowthe
subject site to accommodate additional compatible housingopportunities to meet long-term
needs of the surrounding community. As such,Planning staff is of opinion that the proposed
zone change is consistent with the policies and intent of the PPS.
A Place to Grow: Growth Plan for the Greater Golden Horseshoe
The Growth Plan for the Greater Golden Horseshoeprovidesframework for implementing the
managing growth in this region. In its references to housing, the Growth Plan requires
municipalities to plan for a range and mix of housing, taking into account affordable housing
needs. Allowing habitation in the accessory structures is an attempt to add to the mix of
temporary shelter options for those with affordable housing needs or those that cannot find
housing.
3 - 2
Official Plan
The subject property is locatedin the Urban Growth Centre and designated as Innovation
in the Official Plan are intended to achieve an appropriate mix of office, residential, institutional,
and commercial uses on lands designated Mixed Use.
Section(4) of the Official Plan contains policies (4.C.1.25-
for special needs housing which is appropriately scaled, retained, located near services, and
compatible with other land uses. Allowing habitationin the two accessory structures is
consistent with these policies.
Regional Official Policies Plan
The Regional Official Plan (ROP) was adopted by Regional Council in 2009, approved by the
Province with modifications in 2010 and approved by the Ontario Municipal Board in June 2015.
rural communities one of the elements of which is a range and mix of housing options for all
income groups.
form, tenure, density and affordability to satisfy the various physical, social, economic and
g habitation in the accessory
structureswill increase the range of temporary shelteroptions for those who are homeless and
for various reasons are not able to use a local shelter.
Policy 3.A.10 speaks of the requirement for municipalities to permit special needs housing
within the community as defined by policies in Area Municipal official plans. Allowing habitation
in the accessory structures meets this policy as they serve a population that has support needs
beyond economic needs.
Planning Analysis
Planning staff is of the opinion that the renewal of thetemporary use tocontinue to allow
habitation of two accessory structuresfor a maximum of three moreyearsis a sound approach
for addressing the needs of the homeless on the subject property. The accessory structures will
continue to be monitored 24 hours by the existing residential care facility staff. It is Planning
that renewing the Temporary Use By-law will continue to provide, safe temporary
accommodation to Kitchener residents who are not able to sleep in traditional temporary
shelters. Staff also notes that there have beenno concerns identified over the past three years
where habitation of these accessory structures has been permitted.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
through the delivery of core service.
AGENCY COMMENTS:
The Region of Waterloo was circulated to provide comments onrenewal of the Temporary Use
By-law.The Region of Waterloocomments areprovided in Ap
COMMUNITY ENGAGEMENT:
INFORM and CONSULT The Application was exempted from circulation to property owners
within 120 metres of the subject lands as the application met the Planning Process Council
Policy which does not requirecirculation in circumstances where, in the opinion of the Director
3 - 3
of Planning, in consultation with the Ward Councillor, the circulation is seen to have little
purpose or benefit.
FINANCIAL IMPLICATIONS:
No new or additional capital budget requests are expected with this recommendation.
CONCLUSION:
Planning staff is of the opinion that the proposed zone change demonstrates good planning
principlesandcontinues to offera unique type of housing.Stafftherefore recommends approval
of the zone change as outlined in the Recommendationsection of this report.
REVIEWED BY:Della Ross, Manager, Development Review
ACKNOWLEDGED BY: Justin Readman, General Manager, Development Services Department
Attachments
Appendix A -Proposed Zoning By-law
Appendix B -Map No.1
Appendix C -Newspaper Notice
Appendix D -Region of WaterlooComments
3 - 4
DTE.2:.2:1
Bqqfoejy!B
PROPOSED BY LAW
August 28, 2019
BY-LAW NUMBER ___
OF THE
CORPORATION OF THE CITY OF KITCHENER
(Being a by-law to amend By-law 85-1, as amended, known
as the Zoning By-law for the City of Kitchener
K-W Working Centrefor the Unemployed
87 Victoria Street North)
WHEREAS it is deemed expedient to amend By-law 85-1for the lands specified
above;
NOW THEREFORE the Council of the Corporation of the City of Kitchener enacts
as follows:
1.Schedule Number84-law Number 85-1 is hereby amended by
changing the zoning applicable to the parcel of land specified and illustrated as the
Subject Area on Map No. 1, in the City of Kitchener, attached hereto, from Warehouse
District Zone (D-6) with Special Regulation Provision 105R and Special Use
Provisions 116U and 403U and Holding Provision 10H to Warehouse District Zone (D-
6)with Special Regulation Provision 105R and Special Use Provisions 116U and
403U and Holding Provision 10H and Temporary Use Provision 14T.
2.-law 85-1 is hereby further amended by
incorporating additional zone boundaries as shown on Map No. 1 attached hereto.
3.EBy-law 85-1 is hereby amended by adding Section 14as follows:
14.Notwithstanding Section17of this By-law, within the lands zoned Warehouse
District Zone (D-6)on Schedule 84habitation of two existing
accessory structureswithout plumbing services,ancillary to theresidential
3 - 5
care facilityshallalso be permitted,fora time period of 3 years effective from
December 12, 2019.
PASSED at the Council Chambers in the City of Kitchener this______day of
___________,2019.
______________________________
Mayor
_____________________________
Clerk
3 - 6
R
E
G
P 3
L T
A
R
51 2
4
8N0 A
7
R
4 9
-
P4
- R
4
N T80
44 51
R
4A
AT
2
20L P
3 R
A
3PO
P
1
8
G 5
N
8
E
9
-
RS
T R
8
5
AO
R
SU
OI
T
9
O
34
UH
8
T S
T
9
O
-
R
HT
1
0
AR F 9
R
63
81
P0-
O
R
8 E
5-W 8
25
F R
T E
8
E
R5
AT
A
B
P
H
A
E
3
R6 T
N
R
A R
P
E
D
1
6
6 0 S
N
5
1 Y
-T
S
R
8 O
R
5
1
T
S R
A
P UE
T
NE
R 2
T
R T
G
A 1
P
E 0
B
T6
E
S
0
E
T R
T
T 3
AR 8
P
T
A-
R
P W
R
E
8
EE
5
1
T
1R
6 TE
0A
5P
1
-
R
8 N
5
0
1
7
5 6
7 1
6-
3
R
4
7 8
9 5
0
-
6
-R
1
8
R
0
5
8
4
5
4 7N
9
A
1
L
T
T
P R
R
A
7 P
G
A
E
P
R
1
5
3T 6
3S
9
4
T
G 8
1E
-6
EN 1
R 1 2-
RU
T
8
R T 9
O R
5
A S
P T Y 8
8
E
GF 11
1 5
E
N-
S0O 8
R
U 1
4
T T 9R
O0
O
S
YNS4 78
RAE
F 15
1U PART 8 LN
E-
OW
9A
B P
L
T R
TE
6
S GP
4 8
W T
EE
H RT
G 5
FR
W AR
E
O PA
7
&P R
OH
&
T
6
U
1 PART 5
F
8
O
7
S
A
H
582
6
8R
3
T
E
R
N
EE2
8
A
9
RL
-2
T
N
21P
S
T 1
-
7EG
SGR
EE
N8
6R5R
U
R 2
T
SO
E6 T
S
R Y
G 6Y
T A R
P F8E
PE4
OL
7
LRB 7L
T6-
AE1A
S0R
2N
EW
2 E48
3
4F5
W
7E N
O
4 8&A
1
H
T L
T R
A T
P P
U
6
5G
O
S
E
2
R
2
3 1
1
8
T
R
T
A
O P
5
L
T
5
E
8
E
R
R
T
2
-S
1
8
T
G
1
R
71
7 A N
0 P
5 U
94 1
R4O
9 T
E1N R Y
&
A
1GA
P F
L3
6
4
6P 1 O
P
T
L9 R
A T
T P
AG
SS
NE
E
R4
3E
W
7G&
3
6 PART 9
E3
1
L
1 T
0L R
2
4 A
O P T
7
C
9 NE
3
1 AE
2 F
1T LR
-O
R P T
R
A
8 T
P S
5 G
S
EE2
4A1
E7
REG
G3
4 E
N
5L
N
9AL
A
3R
O
1L
G
-1
PC
3
R T F
R 1F
8G
A O
5
P EO1
RS
RT
ER
S
G9E
8HA
P
3TE
L
O
A
N9
N D
A&
N
3
L8A
7
P
6F
O
G
2
S
E
1T
RR
A
1
P
T
6
R 1
4
4A 0
3P
4
1
-C
R N
4
8
A
5 6
L
1
P
G
1 E
T
R
R
9 A
P
8
2
6
31
3
3
6
N T 1
2 R
TA
A RP
A
P
L
P
51
3
2
T 6
4
RT 1
G A
R
P
A
P
E
7
2
R
8 5
7
8
1
-
R
R
4
4
8
T-7
6
R 5
A 5 38
P
4
2
5N
7
3-
A
8
R
L
8
6
P5
1
T
R
G
A
P
E
R
5
8
R
-
3
7
6
9
8
9
2
T
R
1
A
2 P
9
2
-7R
3
R
E
8
G
1
5
1 T
P
7
T R
2
R A
L
A
P
P
A
5
1N
8
2
4
-
3
R
8
7
5
4
4
1
1
4
N
A
3
L
1
P
G
M
E
R
U
N
3
2
9
P
1
L
8A
3
N
6
O
1
F
5
1
L
81
OR
T-
6
37
5
8G
3
2
C0
1
7
T
1
1
T
R
A
P
R
E
G
2
P
6
L
T
2
A
R
8
N
7 A
3 P
1
7
-
6
R
8
5
R
E
G
P
L
A
N
3
7
6
1
T
1
R
T
R A
A
P P
9
2
9
1
8
2
1
R
1
-
2 E
R
T
8G
R
51
A
P0
P
8 L
0
A
N
3
2
7
2
T
5
TR
RA
P
A
P
1
P
A
R
7
T
1 1
7
1
9
2
4
5
8 8
R
T 5
1-
1
5R
9 1 6
3
4-
A
P
8
R
1
8-
5 AP
R
T R
1
8
5
1
2
R
E AP
TR
1
G
5
P
RA
P 2 T 7
2
L
11
A P
TRATT
3 T
N RR
AA
R1
PP
5 P
A 3 RA
T4 T
8
P 7
R
R 4 3
AP
TR
-A25
2
1
P
2
TAP T
1 TR
6
R
7 R
A
P
ARAAP P
1 TTR 1
757
P
3
AP
TRAP
4 1PTR
8RA8 1
1 1T
94
TAPT
TR
9
5
RR
1
A 8
A
4
P
P
P
RA
1T
05
5 P
RA
T
8 89 5
P
R RA
1T
74APP 9
RRA
-9 T T
8 979
P
RA
3 1TP
64RAAP
74 1 TR
009 T
6
50 P9
RA
1 TP
54RAAP
1 1TTR
109 T
25
5 AP
R TR 8
241 R
4APAPAP 2
E TRTRTR
0 19 1 A 4
240-
G TP
RAP R
1 TP
34RAAPAP 8
R 1TTRTR 5
P 30 91
31
P
L ARA
1TPP
24RARA
A P1 T T
4021
7N
4 1P
APPRA
3 TRRA T
26 3 T31
1 5103
7 1
T
64 RP
TAPPRA
PRARA T 8
T T41
2392 2
R R 4
4
P-
E 0PPRA
ARARA T R
AP T T51
G 2R 8 3382 8
P9 T 5
2
PPAP
P TPRARATR
RAAP 8 T T1
1TTR43726
L P509
RRA1
1 TP
A 74 5 PPRA
PRARA T
ARAP T T71
N P1 TRA5362
RA60 T
P 1T09
64 1 P
3 APPRA
RRA T
APP- 3T T81
7 TRRA652
9P01 T
6 RA798
1 TP
154APPRA
TRRA T
0 APP R 3 T91
TRRA742
AP0 1 T
TTR888
4 1P
4RAP
2 R 8 TRA
APP83 T
APTRRA32
5 TRP01 T
A41 RA978
84 11 T 5
P34APP
PRRA
R RAP 3T T
P1 TRA922
RAAP01 T
-5 1 TTR68
044 1P
2 2RAAP
P TTR
2 RAP04 2
1 TRA1
AP111 T
1 TR58 8
3 1P
-9RAP 2
7 TRA
2 APAP14 T 4
TRTR02-
P1 1 8
2 RA24 R
1TP
0R 83RAP 8
P TRA 5
RAAP36 T
1TTR05
AP318
8 TR3
31 1
7AP
PTRAP
RAAP 6TR5
1 TTR2 4
5 P418 9
RA26 T
1TP 4
63RAPTT
P TRAR
RAAP16 TA
1 TTR84P R
51 8R
AP16
R TRAP
2 31 APTR
5PTR4 PPA A
RAAP 67RARA
E1 1TTR0 T TT
618 4454P P
9 AP0
G TR
31 PR
4PPRA
RARA T
1 T T95A
P 7197
APP
TRRAP
L 31 P T
3APRA34AP
A TRAP TTR
1 1TR854
87 2
N P8AP
RATR
1TP5
23PRA6P
RA TRA
3 T75 T
7755
7 AP
TR
31
6 1
AP
TR
7
6APAP
APTRTR
TR 55
31 P42
0RAAPAP
TTRTR
57 5 5
31
AP
TRAP
2 1TRAP
97 TR
47
3P4
PRA
RA1 T
1 T55
82
PT
RA
T
27AP
TRAPR
7 TR
15 1
P4
RAA
1 T
07
4 7P
P
RA
8 T
96P
RAT
TAP
86TR
P6
RA7R
P T
RA66
1 T
25A
P
RA
TP
56P
RA
T8
46
P
RAT
1 1 T
35
4 R
7 7 R
A
P
1RA
1TP
72 E
T
AP
TR
21 G
R6
AAP
TR
5 1
P1 P
L
7 3
A
3
6
T
1 N
R
4 6
7 1A
1 3
P
T
7
R
5
A
P
7
2
5
1
T
5
R
4 A
5
P
8
1
R
-
03
0
1
7
R
8
E
1
G
T
2 P
R1
1
4 TL
A
R
AA
P
P
4
4
5N
0R
2
4-
RE
83
1
25
7G
2
9
1 T5
3
6 P
R
L
5 PA
A
8 RPA
R T
4
N
-
7
5
0
9
6
1
83
1
0
-
2 7
5 R
T 8
TR
R R 55
APA
P
3E
G
4
P
1R
L
1
EA0
47
8GN
2
8
7
6P3
1
L 2 7-
A4
R
N 6 8
5
3 6
7
2
6 8
1
1
4
T
1
-
5
R1
R
AT
8
PR
5
A
7
4
P
T
6
R
7 2
A
6
P
0
9
6
11
21
1
8
4
6T
4T 8
4T
14
R 9
-1R
4R 8
-
6 TA 3
A7A
6 P 1
RR
P-
1P
R
8-R
8
5 8
AR
5 5
8
P
5
3 - 7
DSD-19-190
Appendix C
PROPERTY OWNERS AND INTERESTED PARTIES ARE INVITED
TO ATTEND A PUBLIC MEETING TO DISCUSS
A PROPOSED AMDNEMDNT TO THE KITCHENER ZONING BY-LAW
UNDER SECTION 34OF THE PLANNING ACT
87 Victoria Street North
The City of Kitchener has received an application for the renewal of atemporary use by-law for a maximum of
three years to permit habitation of two structures, which are accessory to the existing residential care facility
located on the subject property.
The public meeting will be held by the Planning & Strategic Initiatives Committee, a Committee of Council
which deals with planning matters on:
MONDAY, September 30, 2019at 7:00 P.M.
nd
COUNCIL CHAMBERS, 2FLOOR, CITY HALL
200 KING STREET WEST, KITCHENER.
Any person may attend the public meeting and make written and/or verbal representation either in support of,
or in opposition to, the above noted proposal. If a person or public body would otherwise have an ability to
appeal the decision of the City of Kitchener to the Local Planning Appeal Tribunal, but the person or
public body does not make oral submissions at a public meeting or make written submissions to the
City of Kitchener prior to approval/refusal of this proposal, the person or public body is not entitled to
appeal the decision.
ADDITIONAL INFORMATIONis available by contacting the staff person noted below, viewing the report
contained in the meeting agenda (posted 10 days before the meeting at www.kitchener.ca-click on the date in the
th
Calendar of Events and select the appropriate committee), or in person at the Planning Division, 6Floor, City
Hall, 200 King Street West, Kitchener between 8:30 a.m. -5:00 p.m. (Monday to Friday).
Craig Dumart, Planner -519-741-2200 x 7073(TTY: 1-866-969-9994);craig.dumart@kitchener.ca
3 - 8
3 - 9
3 - 10
PLANNING & STRATEGIC INITIATIVES COMMITTEE
Page 1UNFINISHED BUSINESS2019-09-30
SUBJECT (INITIATOR)DATE TARGETSTAFF
INITIALLYDATE/STATUSASSIGNED
CONSIDERED
Financial implications analysis of enhanced 2012-06-18Future PSI B.Sloan