HomeMy WebLinkAboutFCS Agenda - 2021-04-19Finance & Corporate Services Committee
Agenda
Monday, April 19, 2021
10:30 a.m. - 12:30 p.m.
Office of the City Clerk
Electronic Meeting
Kitchener City Hall
nd
200 King St.W. - 2 Floor
Kitchener ON N2G 4G7
Page 1 Chair - Councillor S. Davey Vice-Chair - Councillor K. Galloway-Sealock
Due to COVID-19 restrictions City Hall is not open except for very limited services by appointment only.
Members of public are invited to participate in this meeting electronically by accessing the meeting live-
stream video at kitchener.ca/watchnow.
While in-person delegation requests are not feasible at this time, members of the public are invited to
submit written comments or participate electronically in the meeting by contacting
delegation@kitchener.ca. Delegates must register by 8:30 a.m. on April 19, 2021, in order to participate
electronically. Written comments will be circulated prior to the meeting and will form part of the public
record.
Consent Items
The following matters are considered not to require debate and should be approved by one motion in accordance
with the recommendation contained in each staff report. A majority vote is required to discuss any report listed
as under this section.
None
Delegations
-law, delegations are permitted to address the Committee for a maximum of five
(5) minutes.
Item 1 - Iain Klugman, Communitech
- Atefeh Zarabadi, AIImSense Inc.
Discussion Items
1. DSD-2021-43 - Kitchener's Economic Recovery Framework (90 min)
(Staff will provide a 5-minute presentation on this matter)
Any recommendations from the Committee regarding the above matter will be considered at a special Council
meeting to be held immediately following this meeting.
2. FIN-2021-20 - Investment Policy Update (20 min)
Information Items
FIN-2021-12 - 2020 State of the Infrastructure Update
CAO-2021-2 - 2021 Business Plan April Progress Report
Jeff Bunn
Manager, Council & Committee Services/Deputy City Clerk
** Accessible formats and communication supports are available upon request. If you require assistance to
take part in a city meeting or event, please call 519-741-2345 or TTY 1-866-969-9994 **
REPORT TO: Finance and Corporate Services Committee
DATE OF MEETING: April 19, 2021
SUBMITTED BY: Cory Blum, Executive Director Economic Development, 519-741-
2200 ext 7065
PREPARED BY: Cory Bluhm, Executive Director, Economic Development,
519-741-2200 ext. 7065
Saleh Saleh, Director of Revenue, 519-741-2200 ext. 7346
Brian Bennett, Manager Business Development 517-741-2200 ext
7230
WARD(S) INVOLVED: All
DATE OF REPORT: April 8, 2021
REPORT NO.: DSD-2021-43
SUBJECT:
RECOMMENDATION:
That Economic Recovery Framework, as attached to report DSD-2021-43
as Appendix A, be approved; and,
That the following support measures
be approved, providing additional relief and support to businesses, as outlined in
report DSD-2021-43:
a)
suburban business areas to support customer development, including the
provision of $100,000 to provide up to $10,000 in grant funding per business
area, to engage in collaborative marketing efforts;
b) Develop an application-based property tax installment deferral program to
extend 2021 property tax installment due dates by 60 days for residents and
businesses;
c) In partnership with the Waterloo Region Tourism & Marketing Corporation,
provide $125,000 to be used towards the provision of additional grant funding
to the Tourism Adaptation & Recovery Program, specifically for Kitchener-
based businesses; and,
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
d) That the Mayor and Clerk be authorized to execute a partnership agreement
with Communitech to deliver business recovery supports over a 3-year period,
its Innovation Lab, at a cost of $500,000
per year, for a total contribution of $1,500,000; and further,
That staff be directed to return to Council with additional support measures and
Recovery Framework, as
outlined in report DSD-2021-43;
REPORT HIGHLIGHTS
The proposed Economic Recovery Framework is contained in Appendix A
In 2020, the City provided $2 million worth of financial supports to impacted businesses
and residents.
business recovery:
o Opportunity #1: Unleash Our Community Spirit & Spending Power
o Opportunity #2: Accelerate a New Wave of Entrepreneurship & Innovation
City Council allocated up to $5 million to support an agile approach to business recovery
(in 2021 and beyond).
Within the $5 million allocations, staff anticipate up to $1 million could be used to support
a new seed fund for providing grants/supports to impacted businesses and
organizations.
The initiatives proposed to be approved in this report total $2,300,000, including the
-day property tax deferral, grant funding
to support tourism adaptation and creative professionals, and a partnership with
Communitech. Where funding required exceeds Operating Budgets, funding will be
allocated from the Make It Kitchener 2.0 reserve.
Staff have undertaken significant business community engagement and industry
analysis leading up to the formulation of the proposed framework.
This report supports A Vibrant Economy by implementing Area of Focus #1 of the Make
it Kitchener 2.0 Strategy.
BACKGROUND:
For municipal supports provided during the pandemic to date, refer to reports DSD-20-064,
DSD-20-067 and DSD-21-020. Make It Kitchener 2.0 provides a framework for supporting
a full and comprehensive long-term economic recovery. The initiatives outlined in this report
focus on short and medium-term interventions. As part of report DSD-21-021, City Council
supported an agile approach to supporting business recovery, whereby staff will present
Council with a series of recommendations over time as clarity of needs emerge while
complementing other funding programs.
The Federal and Provincial governments continue to play the lead role in providing
substantial supports to businesses. Municipalities simply do not have the financial means
to provide supports at a scale tha
business. Rather, the City can play an effective support role by complementing and
leveraging these programs.
In 2020, the City provided approximately $2.0 million worth of economic supports to
impacted business and residents. In addition, new services have been created to support
the business community, such as the Digital Main Street services offered by the Small
Business Centre, and the Patio Expansion Program. As part of Make It Kitchener 2.0, City
Council allocated up to $5 million to support economic recovery in 2021 and beyond.
Engagement with Businesses & Organizations
Since the onset of the pandemic, the City of Kitchener has broadly engaged the business
community, stakeholders and industry representatives to understand how the City can
best support local economic recovery. This has included, but not limited to, the following:
More than 1,500 interactions with small businesses through the Digital Main Street
program;
More than 100 in-depth consultations with impacted small businesses during the
summer of 2020;
In-depth consultations with a wide range of businesses, including:
o Retail/restaurant/food/service industry operators
o Commercial landlords/property owners
o Performing arts organizations
o Festival and event organizations
o Professional artists/musicians
o Manufacturers
o Real estate professionals
E
Committee; and,
Engagement with the Downtown Action & Advisory Committee, Arts & Culture
Advisory Committee, Downtown Kitchener BIA and Belmont Village BIA.
Key Challenges & Opportunities
Based on the input gathered to date, staff offer the following observations:
The impacts of the pandemic have not been uniform across all sectors. Even within
specific sectors, such as retail, certain businesses have experienced growth while
others have experienced significant loss.
Those businesses, workforce and entrepreneurs who are most dependant on in-
person interaction have been disproportionately impacted. For many, the only
viable path to recovery is an end to the pandemic and return to social interactions.
Many businesses have pivoted (ex: e-commerce, virtual services, curbside pickup),
however, this is not viable for every business for a variety of reasons, such as
applicability, capabilities, etc.
High potential, late stage start-ups and early scaling businesses have also been
disrupted by the pandemic.
Downtown businesses have encountered additional impacts due to i) the
conversion to remote work by a large majority of downtown office companies; and,
ii) curbside pickup is less convenient compared to suburban locations surrounded
by easily accessible parking.
Office space leasing, particularly in Downtown Kitchener, has been impacted
significantly as companies re-evaluate their future space needs, including the
potential to scale back the size of space needed in favour of a more virtual
workforce.
While the Provincial and Federal Governments have the financial means to lead broad
economic recovery, municipalities can still play a key role. Small business owners have
consistently identified the following key opportunities for the City to support business
recovery:
Minimize and eliminate barriers when able to return to full operations;
Provide training and resources which support pivoting and the adoption of new
sales models (ex: curbside pickup, e-commerce, marketing);
Support businesses in re-engaging customers and attracting new customers; and,
Support commercial landlords in attracting new businesses to vacant space.
ent Advisory Committee (EDAC) has identified the
following opportunities for the City to support business recovery:
marketing and media reach to promote local businesses;
Support restaurants through an effective patio expansion program;
Support resident health and well-being by providing a one-stop online platform of
all programming and recreational opportunities; and,
Support community wide animation.
Through the EDAC discussions, City Councillor
media outlets) to appropriately promote local businesses. This concept aligns well with
feedback received by the committee and other discussions with impacted businesses.
Analysis of the Impacts of the Pandemic
Staff have reviewed numerous research and analytical reports on the economic impacts of
recovery path,
whereby the large majority of the economy experiences a gradual or steep downturn
followed up a gradual or steep recovery typically measured through indicators such as
gross domestic product (GDP), employment, sales, etc.
As demonstrated in the following graph, the initial lockdown in the Spring of 2020 produced
most businesses shuttered or halted production,
only to return to full or modified operations as society better understood how to implement
public health measures, like physical distancing.
Kitchener CMA -2000-2001 Employment Total (in 1,000s)
340
330
320
310
300
290
280
270
260
250
Source Stats Canada Labour Force Survey Data
winners (businesses experiencing upward growth) and losers (businesses experiencing
downward growth and/or significant revenue losses). Most notably, overall consumer
spending has not decreased to the levels most expect. Rather, consumers have shifted
their spending away from experiences (travel, concerts, etc.) to consumption of goods.
Analyzing Canadian retail transaction data, the following chart shows the comparative
impacts between sectors. Overall, retail sales have rebounded to exceed 2019 sales,
services have returned close to 2019 levels, while travel and entertainment remain well
below 2019 levels.
Year-Over-Year Canadian Sales Growth (2019 -2020)
40.00%
20.00%
0.00%
6-Jan6-Feb6-Mar6-Apr6-May6-Jun6-Jul6-Aug6-Sep6-Oct6-Nov
-20.00%
-40.00%
-60.00%
-80.00%
-100.00%
RetailTravel & EntertainmentService
Source Moneris Solutions Corporation, National Consumer Spending Trends
However,within specific sectors, impacts have not been uniform. For example, while casual
restaurants have experienced significant losses, quick serve restaurants serving comfort
foods (ex: pizza) have seen record growth. The following table shows significant differences
within the US retail sector:
US Retail Sales Growth 2020 vs 2019
Top Performers Growth
E-commerce businesses 25%
Beer, wine, and liquor stores 18%
Sporting goods stores 17%
Building & garden supplies 14%
Lowest Performers Growth
Used merchandise stores -28%
Book stores -28%
Gift, novelty and souvenir -29%
Clothing stores -30%
Shoe stores -31%
Department stores -46%
Source US Census, Estimates of Monthly Retail and Food Services Sales
As a direct result of ton businesses, employees of downward growth
businesses have experienced disproportionate losses. Economists suggest that these
businesses will experience a much slower return to pre-pandemic revenues.
-over-
year), an increase of approximately 7,400 unemployed residents. This does not capture
those who are still working but with significantly reduced hours. It is believed most of job
losses have been experienced within the food, beverage, hospitality, service and retail
sectors.
REPORT:
Without question, the pandemic has adversely impacted many businesses and residents.
A number of businesses
have been able to pivot and/or return to normal sales volumes, even thriving on altered
consumer behaviors. Many others, however, have experienced significant hardships in the
form of drastic revenue loss, layoffs, debt accumulation and even closure. For some
businesses and their employees, the only true path to recovery is a post-vaccination return
to in-person interactions. For others, their very business model may never return to pre-
pandemic forms.
As a result, recovery cannot be about returning to the old normal. Recovery needs to focus
on how our community can emerge better than when we entered the pandemic. To do this,
we need to help businesses become leaders of the new normal (ex: through innovation,
becoming more resilient, etc.). Likewise, the question for our community is not if we will
recover - the question is how fast can we all lead, embrace and support a new normal.
As outlined in Appendix A staff propose a
recovery framework centred around two major challenges with two key opportunities to
provide recovery support. For each, a set of actions and initiatives have been identified to
advance change:
Major Challenge #2
Major Challenge #1
The unknown future of office
Significant impacts to the in-
person service economy
Opportunity #2
Opportunity #1
Unleash our community spirit &
Accelerate a new wave of
spending power
Entrepreneurship & Innovation
Key Objectives
Key Objectives
1.
1. Support Startups, Scale-Ups,
Innovation & Workforce
Adaptation
2. When Able, Bring the City to
Life
2. City Wide Startup &
Entrepreneurial Network
3. Make Reopening Easy
4. Incubate New Food, Retail &
Service Businesses
NOTE for each Opportunity, a comprehensive listing of all initiatives are contained in
Appendix A. Detailed information on the initiative proposed for immediate Council approval
is contained in Appendix B.
Opportunity #1 Unleash Our Community Spirit & Spending Power
For those most deeply affected, the City of Kitchener simply does not have the financial
resources to make a meaningful direct difference in their ongoing viability. But the
community of Kitchener does! In fact, the ultimate source of economic recovery lies in the
spending potential of our residents. For many local residents, the pandemic has enabled
significant savings. Many now possess higher levels of discretionary income than prior to
the -war/post-
pandemic spending and prosperity, due in part to deferred spending, the 2020s could see a
similar post-pandemicresponse.
The City can play a role in supporting local businesses to ensure they are able to capture
this spending locally. This is, in fact, what staff have heard from businesses. Enable
operators to get back to business as efficiently as possible, support them as they pivot and
transition their business, help them develop the tools to attract and re-attract customers, and
To accomplish this,
staff recommend two areas of focus:
1.
Commence a series of initiatives that encourage residents to aggressively support local
businesses. This should include i) training for businesses to advance their marketing, brand
and audience development capabilities; and, ii) opportunities for the City to leverage its
reach to help promote local businesses.
The City has already implemented a series of programs to support impacted businesses,
such as the waiving of temporary sign permit fees and the implementation of services
through the Small Business Centre, such as Digital Main Street. The following new
initiatives are proposed as part of this report:
A) where the City would retain a marketing
expert on contract to work directly with suburban business areas to support customer
development. Business areas could collectively apply for seed funding to support
marketing efforts, similar to a BIA. The City would seek to find opportunities to utilize its
broad community reach (ex: social media) to support the promotion of our various
business areas.
Anticipated Cost = $225,000
B) Offer a 60-day Property Tax deferral in 2021, to support impacted businesses and
residents. A similar program was provided in 2020. The proposed deferral allows
businesses and commercial property owners added flexibility to manage their cash flow.
This will be of particular importance to businesses who are waiting to receive Provincial
or Federal funding supports.
Anticipated Cost = $375,000
As the pandemic continues, staff anticipate providing Council with additional initiatives.
2. When able, Bring the City to Life
Commence a series of initiatives that enable businesses, event organizers, cultural
producers, creative professionals, etc., to bring the city to life. Certain initiatives may be
launched during the pandemic, subject to Public Health requirements, while others will be
best suited when larger in-person interactions are permitted. The following new initiatives
are proposed as part of this report:
A) Support Tourism Adaptation and Restaurant Patio Expansions - In partnership with
Waterloo Region Tourism & Marketing Corporation (WRTMC), provide additional grant
funding to the Tourism Adaptation & Recovery Program specifically for Kitchener-based
businesses. In the Winter of 2021, WRTMC facilitated a grant stream to support tourism
industry businesses, where applications far exceeded available funding. WRTMC is
willing to facilitate a second intake if municipalities provide additional funding. Most
notably, a significant number of Kitchener restaurants applied for supports to help
expand their patios. By targeting grants to permanent restaurant patio expansions, for
example, the City can support the local restaurant industry while also stimulating an
elevated patio culture for residents. Grants given previously were typically under $5,000.
The proposed funding contribution could support as many as 25 restaurants.
Anticipated Cost = $125,000
B) Support Arts & Culture Professionals In partnership with organizations such as the
Kitchener-Waterloo Community Foundations or the Centre In The Square, provide
additional grant funding to support creative professionals. To date, the City has
partnered with both organizations to deliver successful grant-based recovery programs,
both of which were over-subscribed. Funding would either be dedicated to additional
rounds of funding for established programs, or could be allocated to new programs that
may arise from similar partner organizations. Grants would typically average $2,500.
The proposed contribution could support as many as 30 creative professionals.
Anticipated Cost = $75,000
3. Make Reopening Easy
Continue to actively support impacted businesses by providing efficient services, such as
the Patio Expansion Program, a flexible Business License Renewal Program, and free
evening and weekend parking in City-owned lots within the Downtown. As the pandemic
continues, staff anticipate identifying additional service enhancements to support impacted
businesses.
4. Incubate New Food, Retail & Service Businesses
Service-based business have been disproportionately impacted by the pandemic,
particularly businesses reliant on in-person interactions, casual restaurants and urban
locations not well served by surface parking. As a result, a number of businesses have
been forced to close, with more vacancies likely as the pandemic continues. To stimulate
new businesses to fill these vacancies, staff will develop a business case for Council
consideration, to launch a Food, Retail, Service & Hospitality incubation program utilizing
vacant City-owned commercial spaces and the Small Business Centres service delivery
model.
Opportunity #2 Accelerate a New Wave of Entrepreneurship & Innovation
One of the great biproducts of any major recession is accelerated innovation,
entrepreneurship and an emergence of new companies. For example, following the 2008
financial crisis, North America saw a dramatic increase in new start ups. The viability of our
local economy depends heavily on the creation of new jobs to replace those lost due to the
pandemic. Unfortunately, the pandemic has caused, and will continue to cause, increasing
commercial and office vacancies. However, our community has an opportunity to accelerate
pace but bring forward new and
innovative products and services.
collective office space, currently challenged by the impacts of the pandemic, as an epicentre
of post-pandemic innovation. If there is a community in Canada that can accelerate growth
Kitchener.
1. Support Startups, Scaleup, Innovation and Workforce Adaptation
is ideally positioned to
deliver a series of recovery programs to advance new companies, entrepreneurship and job
growth. Over the past 5 years, the City has maintained a funding partnership whereby
Communitech has delivered a series of critical programs
Lab. The following new initiatives are proposed as part of this report:
A) Partner with Communitech to Deliver Recovery Supports - staff propose entering
into a 3-year partnership agreement with Communitech to deliver a series of programs
aimed at providing additional supports to startups and scaling companies, expanding
Fierce Founders, supporting the Future of Work initiative, and continuing the Civic
Innovation Lab (note - a more fulsome description of each program is contained in
Appendix C).
Anticipated Cost = $1,500,000
Staff anticipate similar partnership opportunities may arise with other local organizations
who provide entrepreneurial services.
2. Expedite the Launch of a City-Wide Startup & Entrepreneurial Network (Make It Kitchener
2.0, Area of Focus #4)
programs in the region, the City has an opportunity to develop a range of services to support
their growth and success. In particular, focusing on entrepreneurs seeking to advance the
UN Sustainability Goals. Staff will develop a business case for Council consideration, to
launch an entrepreneurial network, including partnerships, the use of vacant City-owned
space, grant programs, training models, etc., that is open to all and eliminates barriers for
all entrepreneurs.
Continued Business Attraction Efforts
While the uncertainty of the future of office space and border restrictions have limited our
ability to attract foreign investment, significant interest remains. In particular,
interest remains high from US companies looking to establish Canadian headquarters. As
such, staff will continue to work in partnership with organizations like Waterloo EDC to attract
new companies to Kitchener.
Launch a Seed Fund to Support Business Recovery
For the above noted initiatives to be successful, and to provide direct supports to
businesses, staff recommend the creation of a seed fund. Local needs may emerge which
are not supported by the Provincial and Federal Government. Where possible, staff will look
for opportunities to leverage other non-municipal grant programs, including applying for
additional funding with other organizations and upper levels of government where possible.
ework, staff
estimate the up to $1,000,000 of the $5,000,000 allocation could be dedicated to seed
funding. As the pandemic continues, staff will provide recommendations on additional seed
funding/grant opportunities for Council to consider.
Proposed Seed Funding Allocations Up to $1,000,000
Current Initiatives Status/Timing Estimated
Cost
Digital Main Street Grants Underway (2021) Provincially
funded
Proposed Seed Funding/Grants Requiring Status/Timing Estimated
Council Approval Cost
-Proposed (2021) $100,000
market their area.
Grant funding to support the Tourism Adaptation & Proposed (2021) $125,000
Recovery Program specifically for Kitchener-based
businesses (ex: for permanent patio improvements)
Grant funding to support Creative Professionals Proposed (2021) $75,000
Future Seed Funding/Grants Status/Timing Estimated
Cost
Estimated funds remaining for future seed funding Future - based on Up to
determination of $700,000
need
STRATEGIC PLAN ALIGNMENT:
This report supports A Vibrant Economy by supporting businesses impacted by the
pandemic and accelerating new economic growth.
FINANCIAL IMPLICATIONS:
Based on the framework outlined in this report, approximately $5,000,000 would be
Operating and Capital budgets, funding would be allocated from the Make it Kitchener 2.0
Reserve. Funding is proposed to be allocated as follows:
Opportunity #1 Unleash Our Previously Proposed Proposed
Community Spirit & Spending Power Approved/ to be Total
Funded Approved Allocation
Through by this
Operating Report
$155,000 $600,000 $755,000
2. When able, Bring the City to Life $195,000 $200,000 $550,000
3. Make Reopening Easy $35,000 - $35,000
4.Develop & Launch an Incubation Program - - $750,000
for new Food, Retail, Service and
Hospitality Businesses
Total $385,000 $800,000 $2,090,000 (A)
Opportunity #2 Accelerate a New Wave
of Entrepreneurship & Innovation
1. Partner with Communitech to Support - $1,500,000 $1,500,000
Startup, Scaleup, Innovation and Workforce
Adaptation
2. Expedite the Launch of a City-Wide - - To be
Startup & Entrepreneurial Network determined
Total - $1,500,000 $1,500,000 (B)
Funding Remaining for Future Allocations $1,410,000 (C)
Total - Opportunity #1 & #2 $350,000 $2,300,000 $5,000,000
(A+B+C)
By allocating funding to the various opportunities, but not committing all funding until future
business cases/reports are presented, Council can maintain an agile approach to business
recovery. Should new, more pressing needs arise, Council would have the flexibility to
reallocate uncommitted funding accordingly.
In 2020, the City provided $2 million worth of financial supports to impacted businesses
and residents.
COMMUNITY ENGAGEMENT:
INFORM
the council / committee meeting.
CONSULT Staff have engaged extensively with the business community, impacted
organizations and the Economic Development Advisory Committee. Staff have also
engaged the Downtown Action & Advisory Committee and the Arts & Culture Advisory
Committee.
PREVIOUS REPORTS/AUTHORITIES:
DSD-20-064, DSD-20-067, DSD-21-020
APPROVED BY: Justin Readman, General Manager Development Services
ATTACHMENTS:
Appendix A
Appendix B Detailed Information on the Initiatives Proposed for Approval
Appendix C Background on the Proposed Communitech Partnership
BQSJM!3132
BSFB!PG!GPDVT!$2!GSPN!
NBLF!JU!LJUDIFOFS!3/1!
LJUDIFOFSÉT!FDPOPNJD
SFDPWFSZ!GSBNFXPSL
SFDPWFSZ;
MJGU!VQ!UIF!NPTU
L
NJ
3
Dpvodjmmps!Ebwf!TdiojefsDpvodjmmps!Disjtujof!NjdibveDpvodjmmps!Qbvm!TjohiDpvodjmmps!Nbshbsfu!KpiotupoDpvodjmmps!Tbsbi!Nbsti
3/1
!Nbzps!Cfssz!Wscbopwjd
Dpvodjmmps!Tdpuu!EbwfzDpvodjmmps!Kpio!Hb{pmmbDpvodjmmps!Lfmmz!Hbmmpxbz.TfbmpdlDpvodjmmps!Cjm!JpboojejtDpvodjmmps!Efccjf!Dibqnbo
-!xf!bsf!dpnnjuufe!up!xpsljoh!dpmmbcpsbujwfmz!xjui!pvs!cvtjoftt!dpnnvojuz-!pvs!qbsuofst-!pvs!
B!nfttbhf!gspn!nbzps!Wscbopwjd!'!Nfncfst!pg!Ljudifofs!Djuz!Dpvodjm
Uif!tupsz!pg!Ljudifofs!pwfs!uif!qbtu!zfbs!pg!uif!Dpwje.2:!qboefnjd!ibt!cffo!pof!mjlf!op!puifs/!!Uif!tupsz!ibt!cffo!Ñmmfe!xjui!cpui!gsvtusbujpo!boe!gfbs-!cvu!bmtp!ipqf-!sftjmjfodf!boe!dsfbujwjuz/!!XfÉ
wf!cffo!uispvhi!b!mpu-!cpui!dpmmfdujwfmz!boe!joejwjevbmmz/!Pvs!cvtjofttft!ibwf!dpoujovbmmz!offefe!up!qjwpu!boe!bebqu!up!dibohjoh!djsdvntubodft/!!Eftqjuf!uiftf!dibmmfohft-!xf!bsf!npwjoh!gpsxbse!xjui!b
!ofx!tfotf!pg!pqqpsuvojuz!.!xjui!b!ofx!tupsz!sfbez!up!vogpme/!!Jo!Opwfncfs-!xf!mbvodife!Nblf!Ju!Ljudifofs!3/1!up!hvjef!pvs!qptu.qboefnjd!sfdpwfsz!boe!pvs!fdpopnjd!hspxui!gps!uif!ofyu!efdbef/!!Gjstu!b
oe!gpsfnptu-!xf!dpnnjuufe!%6!njmmjpo!up!qspwjef!jnnfejbuf!tvqqpsut!gps!jnqbdufe!cvtjofttft!boe!sftjefout/!!Uijt!gsbnfxpsl!xjmm!qspwjef!uif!gpvoebujpo!up!pvs!dpnnvojuzÉt!qptu.qboefnjd!fdpopnjd!sftqpot
f/!!Ju!bmtp!jodmveft!uif!ofyu!tfu!pg!jojujbujwft!xf!joufoe!up!mbvodi!jnnfejbufmz/Xf!dbsf!effqmz!bcpvu!fwfsz!cvtjoftt!boe!sftjefou!xip!ibt!cffo!jnqbdufe/!!Bt!b!Dpvodjm-!boe!uphfuifs!xjui!pvs!tubtublfi
pmefst!boe!pvs!sftjefout!bt!xf!xpsl!up!cvjme!cbdl!cfuufs-!uphfuifs/!!Djuz!Dpvodjm!boe!J!bsf!tuspoh!tvqqpsufst!pg!tnbmm-!mpdbm!cvtjofttft-!boe!cfmjfwf!uijt!fdpopnjd!sfdpwfsz!gsbnfxpsl!xjmm!cf!uif!tubs
u!pg!b!csjhiufs!upnpsspx/!
4
.!Ljudifofs!sftubvsbou!pqfsbups
fs!fttfoujbm!hppet!boe!tfswjdft/!Qfpqmf!xip!
#gps!fwfsz!9!ubcmft!xf!bee-!xf!csjoh!cbdl!8!kpctÇ!!
FJHIU!UBCMFT
UIF!JNQBDU!PG!!
Pvs!dpnnvojuz!jt!nbef!vq!pg!qfpqmf/!!Qfpqmf!xip!dbsf!gps!fbdi!puifs/!!Qfpqmf!xip!pefmjwfs!nfnpsbcmf!fyqfsjfodft/!!Tvqqpsujoh!mpdbm!cvtjoftt!boe!pshboj{bujpot!tvqqpsut!pvs!ofjhicpvst!.!uif!qfpqmf!xf!q
btt!po!uif!tjefxbml!fwfsz!ebz/!!Bt!opufe!cz!b!mpdbm!sftubvsbou!pqfsbups-!gps!fwfsz!fjhiu!ubcmft!uifz!bee-!uifz!csjoh!tfwfo!fnqmpzfft!cbdl/!!Tfwfo!ofjhicpvst!sfuvsojoh!up!uifjs!kpct/!Tfwfo!ofjhicpvst!
sfuvsojoh!up!uifjs!qvsqptf-!uifjs!qbttjpo-!uifjs!dpnnvojuz!boe!uifjs!xfmm.cfjoh/!!!
5
df!wbdbodjft-!xijdi!jo!
JT!UFMMJOH!VT
fsjoht!)fy;!gppe-!qfstpobm!tfswjdf*/!!!!
df!offet!xjmm!cf-!xijdi!dpvme!jodmvef!tdbmjoh!cbdl!uif!tj{f!pg!qiztjdbm!
.!cvtjofttft-!pshboj{bujpot-!fousfqsfofvst!boe!fnqmpzfft!efqfoebou!po!jo.
df!tqbdf-!qbsujdvmbsmz!jo!Epxoupxo!Ljudifofs-!ibt!cffo!jnqbdufe!tjhojÑdboumz!bt!
.!p
!
!ibwf!cffo!jo!dpotubou!dpoubdu!xjui!mpdbm!cvtjofttft-!cvtjoftt!bttpdjbujpot-!dpnnfsdjbm!
df!Tqbdf
XIBU!PVS!DPNNVOJUZ!!
Jnqbdut!up!uif!Jo.qfstpo!Tfswjdf!Fdpopnz!qfstpo!joufsbdujpot!)fy;!tju!epxo!sftubvsbout-!npwjf!uifbusft-!Ñuoftt!gbdjmjujft-!qfstpobm!tfswjdft-!upvsjtn-!iptqjubmjuz-!qfsgpsnbodf!wfovft-!qspgfttjpobm!bs
ujtut0nvtjdjbot-!fud/*!ibwf!cffo!jnqbdufe!uif!nptu/!!Nboz!cvtjofttft!ibwf!qjwpufe-!ipxfwfs!uijt!jt!opu!wjbcmf!gps!fwfsz!cvtjoftt/!!Gps!tpnf-!uif!pomz!usvf!qbui!up!sfdpwfsz!jt!b!qptu.wbddjobujpo!sfuvs
o!up!jo.qfstpo!joufsbdujpot/!!Gps!fnqmpzfft!pg!uiftf!cvtjofttft-!dmptvsft!boe!kpc!mptt!ibwf!mfbe!up!tjhojÑdbou!nfoubm!ifbmui!dibmmfohft/Uif!Volopxo!Gvuvsf!pg!P dpnqbojft!usbotjujpo!up!npsf!npcjmf!xps
ljoh!fowjsponfout/!!Evsjoh!uif!qboefnjd-!gfx!dpnqbojft!ibwf!cffo!mppljoh!up!mfbtf!ofx!tqbdf/!!Nboz!dpnqbojft!bsf!tujmm!efufsnjojoh!xibu!uifjs!gvuvsf!ptqbdf!uifz!sfrvjsf!jo!gbwpvs!pg!b!npsf!wjsuvbm!xp
slgpsdf/!!Tvdi!dibohft!ibwf!uif!qpufoujbm!up!dsfbuf!tjhojÑdbou!puvso-!xjmm!jnqbdu!uif!wjbcjmjuz!pg!uif!tfswjdf!joevtusz!xip!qspwjef!ebjmz!pNjojnj{f!boe!fmjnjobuf!cbssjfst!xifo!uifz!bsf!bcmf!up!sfuvso
!up!gvmm!pqfsbujpot<Dpoujovf!up!qspwjef!usbjojoh!boe!sftpvsdft!xijdi!tvqqpsu!qjwpujoh!boe!bebqubujpo<Tvqqpsu!cvtjofttft!jo!sf.fohbhjoh!dvtupnfst<!boe-Tvqqpsu!dpnnfsdjbm!mboempset!jo!buusbdujoh!ofx!cv
tjofttft!up!wbdbou!tqbdf/!!
Tjodf!uif!potfu!pg!uif!qboefnjd-!Djuz!tubmboempset-!dsfbujwf!qspgfttjpobmt-!bsujtut-!nvtjdjbot-!gftujwbm!pshboj{fst!boe!jnqbdufe!tublfipmefst/!!Uijt!joqvu!ibt!dpoujovpvtmz!cffo!tibsfe!xjui-!bobmz{fe!
boe!ejtdvttfe!cz!uif!DjuzÉt!Fdpopnjd!Efwfmpqnfou-!Bsut!'!Dvmuvsf!boe!Epxoupxo!Bewjtpsz!Dpnnjuufft/!!Uif!gpmmpxjoh!tvnnbsj{ft!uif!dibmmfohft!boe!pqqpsuvojujft!pvs!cvtjoftt!dpnnvojuz!boe!pshboj{bujpot!
ibwf!jefoujÑfe/UPQ!3!pwfsbsdijoh!dibmmfohftIpx!uif!djuz!dbo!ifmq Nptu!cvtjofttft!voefstuboe!uibu!uif!Qspwjodjbm!boe!Gfefsbm!Hpwfsonfout!bsf!uif!qsjnbsz!qspwjefst!pg!ejsfdu!Ñobodjbm!tvqqpsu-!boe!bsf!o
pu!mppljoh!gps!uif!Djuz!up!qspwjef!tjnjmbs!tvqqpsut/!!Sbuifs-!nboz!ibwf!jefoujÑfe!uif!gpmmpxjoh!xbzt!uif!Djuz!dbo!qspwjef!tvqqpsu;
CVTJOFTTFT
SFTJEFOUJBM!
FTUBCMJTIFE!!!!!!!!!!
F.DPNNFSDF!
EFWFMPQNFOU
MBCPVS!GPSDF
BSUT-!DVMUVSF!'!
TIPQQJOH!NBMMT
MJWF!QFSGPSNFST
TFSWJDF!JOEVTUSZ!
SFUBJM
JO.QFSTPO!NVTJDJBOT
TFSWJDFT!'!
DMPUIJOH!'!
FYQFSJFODFT
SFDSFBUJPOBM!!
BQQBSFM!!SFUBJM
NBOVGBDUVSJOH0!
EJTUSJCVUJPO!GPS!
JO!EFNBOE!HPPET
IPNF!
TJU!EPXO!
SFNPUFMZ
UPVSJTN!'!
IPTQJUBMJUZ
JNQSPWFNFOUVSCBO!PGGJDF
BCMF!UP!XPSL!
MBCPVS!GPSDF!
SFTUBVSBOUT!'!
ESJOLJOH!FTUBC/
E
E
F
F
VOEFSTUBOEJOH!UIF!
U
U
D
D
B
B
Q
Q
N
J
!
N
J
!
Z
M
Z
F
M
W
F
J
W
U
J
J
U
T
B
P
H
Q
F
O
JNQBDUT!PG!UIF!QBOEFNJD
Uif!qboefnjd!ibt!dbvtfe!tjhojÑdbou!jnqbdut!up!Ljudifofs!cvtjofttft!boe!sftjefout/!!Gps!nptu!cvtjofttft-!ju!ibt!gpsdfe!uifn!up!bebqu!uifjs!pqfsbujpobm!npefm/!!Gps!tpnf!cvtjofttft-!ju!gpsdfe!uifn!up!dm
ptf!uifjs!eppst!gps!hppe/!!Uiftf!jnqbdut-!ipxfwfs-!ibwf!opu!cffo!gfmu!vojgpsnmz/!!Gps!tpnf-!uif!qboefnjd!ibt!sftvmufe!jo!sbqje!hspxui!xijmf!puifst!ibwf!fyqfsjfodfe!effq!mpttft/!!Fdpopnjtut!eftdsjcf!u
ijt!jnqbdu!bt!uif!ÈLÉ!jnqbdu/!!Bt!tvdi-!uif!DjuzÉt!qsjpsjuz!xjmm!cf!up!gpdvt!tvqqpsut!gps!cvtjofttft!nptu!ofhbujwfmz!jnqbdufe!cz!uif!qboefnjd/
7
df!wbdbodjft!jo!uif!tipsu!ufsn/!!Dpmmfdujwfmz-!uiftf!
XJMM!MPPL!MJLF
XIBU!SFDPWFSZ!!
Cvtjofttft!xip!bsf!fyqfsjfodjoh!tubcmf!ps!bddfmfsbufe!hspxui!xjmm!esjwf!tipsu!ufsn!kpc!boe!xfbmui!dsfbujpo/!!Uiftf!dpnqbojft!bsf!nptu!mjlfmz!up!bctpsc!pkpct!dbo!qspwjef!nvdi!offefe!dpotvnfs!tqfoejoh!
up!tvqqpsu!cvtjofttft!xipÉwf!cffo!ofhbujwfmz!jnqbdufe!uif!nptu/!!Uif!Djuz!tipvme!dpoujovf!up!tvqqpsu!kpc!dsfbujpo!boe!cvtjoftt!buusbdujpo/Cvtjofttft!xip!ibwf!fyqfsjfodfe!tjhojÑdbou!ofhbujwf!jnqbdut!b
oe!sfwfovf!mpttft-!bsf!fyqfdufe!up!fyqfsjfodf!b!mpohfs!qbui!up!sfdpwfsz/!!Jo!qbsujdvmbs-!cvtjofttft!sfmjbou!po!jo.qfstpo!fyqfsjfodft!xjmm!mjlfmz!tff!b!npsf!hsbevbm!sfuvso!pg!uifjs!dvtupnfst!bt!uifz!s
fhbjo!dpngpsu!xjui!tpdjbm!joufsbdujpot/!!Uif!Djuz!tipvme!dpoujovf!up!tvqqpsu!uiftf!cvtjofttft!jo!xbzt!uibu!bddfmfsbuf!sf.fohbhfnfou!pg!dvtupnfst/!Uijt!nvtu!jodmvef!dpoujovfe!usbjojoh!boe!tvqqpsut!up!
fobcmf!cvtjofttft!up!qjwpu!up!sftqpoe!up!gvuvsf!dpotvnfs!cfibwjpvst/!!!!!
Fdpopnjtut!pgufo!eftdsjcf!fdpopnjd!sfdpwfsz!gspn!sfdfttjpot!vtjoh!mfuufst!xijdi!jmmvtusbuf!uif!boujdjqbufe!sbuf!pg!sfdpwfsz/!!Gps!fybnqmf-!b!ÈVÉ!tibqfe!sfdpwfsz!qbui!xpvme!tff!hsbevbm!fdpopnjd!mptt!g
pmmpxfe!cz!hsbevbm!fdpopnjd!hspxui/!!B!ÈWÉ!tibqfe!sfdpwfsz!xpvme!tff!sbqje!mptt!gpmmpxfe!cz!sbqje!hspxui/!!Nptu!fdpopnjtut!bhsff!uibu!uif!qptu.qboefnjd!sfdpwfsz!xjmm!cf!ÈLÉ!tibqfe-!nfbojoh!tpnf!xjmm!
)boe!bmsfbez!ibwf*!fyqfsjfodfe!tjhojÑdbou!sfdpwfsz!hspxui-!xijmf!puifst!xjmm!tff!nvdi!tmpxfs!sfdpwfsz/!!ÈLÉ!tibqfe!sfdpwfszXiz!b!gsbnfxpsl!'!bhjmf!bqqspbdi@ Bt!uif!qboefnjd!dpoujovft-!boujdjqbufe!pvu
dpnft!boe!mpoh.mbtujoh!dibohft!jo!cfibwjpvs!nbz!cfdpnf!npsf!qsfejdubcmf!boe!cfuufs!voefstuppe/!!Ipxfwfs-!hjwfo!uif!dvssfou!tubuf!pg!vodfsubjouz!bdsptt!nboz!fdpopnjd!tfdupst-!ju!jt!tujmm!upp!fbsmz!up!
bddvsbufmz!lopx!bmm!pg!uif!joufswfoujpot!offefe!up!tvqqpsu!sfdpwfsz/!!Bt!ofx!xbwft!pg!uif!qboefnjd!fnfshf-!ju!jt!mjlfmz!uibu!ofx!offet!xjmm!bsjtf!uibu!dboÉu!cf!boujdjqbufe!upebz/!!Bt!tvdi-!uif!nptu!q
svefou!bqqspbdi!gps!boz!Djuz!up!ublf!jt!pof!uibu!qspwjeft!ijhi.mfwfm!pqqpsuvojujft!boe!bsfbt!pg!gpdvt-!cvu!bmmpxt!gps!uif!sfejsfdujpo!pg!gvoet!boe!sftpvsdft!up!sftqpoe!up!ofx!dibmmfohft/!
8
dsfbujpo/!!
Bt!b!hmpcbm!mfbefs!jo!hspxjoh!cvtjofttft-!pvs!
cvtjofttft-!pshboj{bujpot!'!sftjefout
dpnnvojuz!dbo!Èepvcmf.epxoÉ!up!bddfmfsbuf!kpc!
ps!dmptf!boe!wbdbodz!sbuft!up!sjtf-!b!ofx!xbwf!pg!
fousfqsfofvst!boe!cvtjofttft!ibt!bmsfbez!cfhvo/!!
Xijmf!uif!qboefnjd!xjmm!dbvtf!cvtjofttft!up!bebqu!
3/!BDDFMFSBUF!B!OFX!XBWF!PG!!
FOUSFQSFOFVSTIJQ!'!JOOPWBUJPO!
3!PQQPSUVOJUJFT
Up!bhhsfttjwfmz!tvqqpsu!cvtjoftt!sfdpwfsz!cz!mjgujoh!vq!uif!nptu!
pg!pvs!dpnnvojuz/!!!!
DjuzÉt!bcjmjuz!up!qspwjef!ejsfdu!gvoejoh!up!
tpvsdf!pg!fdpopnjd!pqqpsuvojuz!mjft!opu!jo!uif!
ofjhicpvst!xifo!uifz!bsf!epxo/!!Uif!hsfbuftu!
Pvs!dpnnvojuz!ibt!b!mpoh!ijtupsz!pg!ifmqjoh!pvs!
cvtjofttft-!cvu!jo!uif!dpmmfdujwf!tqfoejoh!qpxfs!
TQJSjU!'!TQFOEJOH!QPXFS!
2/!VOMFBTI!PVS!DPNNVOJUZ!!
.!Lfz!pckfdujwft!.
cvtjofttft
XIFO!BCMF-!!!!!!!!!!!
Csjoh!uif!Djuz!up!Mjgf
xfmmoftt!boe!iptqjubmjuz!cvtjofttft/
Bt!sftusjdujpot!mjgu-!uif!Djuz!dbo!qmbz!b!lfz!spmf!jo!
gpdvtfe!po!ofx!gppe-!sftubvsbou-!sfubjm-!tfswjdf-!
cz!tvqqpsujoh!fwfout-!gftujwbmt-!pvuepps!ejojoh-!fud/!!!
!jodvcbuf!ofx!gPPE-!SFUBJM!'!Tfswjdf!
!
csfbuijoh!mjgf!cbdl!joup!pvs!tusffut!boe!cvtjoftt!bsfbt-!
Efwfmpq!b!cvtjoftt!dbtf!gps!b!ofx!jodvcbujpo!qsphsbn!
Cvtjoftt!Dfousf!boe!tvqqpsujoh!bsut-!dvmuvsf!boe!gftujwbm!pshboj{bujpot/
EFWFMPQ!'!MBVoDI!B!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
Nblf!sfpqfojoh!fbtz
!
Dpoujovf!up!bdujwfmz!tvqqpsu!!jnqbdufe!
ÈMPWF!NZ!CVTJOFTTÉ!QSPHSBN!
bo!fyqfejujpvt!Qbujp!Fyqbotjpo!Qsphsbn/!
Tvqqpsu!mpdbm!cvtjofttft!jo!sf.fohbhjoh!uifjs!
TQJSJU!'!TQFOEJOH!QPXFS!
dvtupnfst!boe!buusbdujoh!ofx!dvtupnfst/!!Xifsf!
cvtjofttft!cz!qspwjejoh!fgÑdjfou!tfswjdft!tvdi!bt!
Opuf!.!jo!beejujpo-!uif!Djuz!xjmm!dpoujovf!up!efejdbuf!tjhojgjdbou!sftpvsdft!up!tvqqpsujoh!cvtjofttft!uispvhi!uif!Tnbmm!
bqqspqsjbuf-!mfwfsbhf!uif!DjuzÉt!cspbe!bvejfodf!sfbdi/!!!!
2/VOMFBTI!PVS!DPNNVOJUZ!
TUBUVT
Gvuvsf!)3132,*
Qmboofe!)3132*
Qspqptfe!)3132*Qspqptfe!)3132*Qspqptfe!)3132*Qspqptfe!)3132*
Mbvodife!)3132*Mbvodife!)3132*Mbvodife!)3132*
Voefsxbz!)3132*Voefsxbz!)3132*Voefsxbz!)3132*
Jo!Efwfmpqnfou!)3132*Jo!Efwfmpqnfou!)3132*Jo!Efwfmpqnfou!)3132*
JOJUJBUJWFT
BOUJDJQBUFE!SFDPWFSZ!
JOJUJBUJWF Pqqpsuvojuz!$2!.!Vomfbti!pvs!Dpnnvojuz!Tqjsju!'!Tqfoejoh!Qpxfs Mbvodi!bo!pomjof!tnbmm!cvtjoftt!usbjojoh!qmbugpsnXbjwf!qpsubcmf!tjho!qfsnju!gfftFyufoe!Ejhjubm!Nbjo!Tusffu!boe!uif!Ejhjubm!Tf
swjdf!TrvbeMbvodi!b!ÈMpwf!Nz!CvtjofttÉ!Dbnqbjho!up!tvqqpsu!tvcvscbo!cvtjoftt!bsfbtPggfs!b!71.ebz!Qspqfsuz!Uby!efgfssbmTvqqpsu!Epxoupxo!Ljudifofs!CJB!'!Cfmnpou!CJB!Qbujp!FyqbotjpotDpoujovf!up!pggfs!bo
!fyqfejujpvt!Qbujp!Fyqbotjpo!QsphsbnFtubcmjti!ofx!qfsgpsnbodf!tqbdft!uibu!dpnqmz!xjui!Qvcmjd!Ifbmui!SfrvjsfnfoutQbsuofs!xjui!mpdbm!tublfipmefst!up!tvqqpsu!mjwf!nvtjdjbot!'!up!efmjwfs!njdsp!fyqfsjfodf
t!jo!3132Mbvodi!bo!pomjof!qpsubm!xjui!bmm!Djuz.bttpdjbufe!qsphsbnnjoh-!fwfout-!sfdsfbujpo-!fud/!Qspwjef!beejujpobm!gvoejoh!gps!uif!Upvsjtn!Bebqubujpo!'!Sfdpwfsz!Qsphsbn!up!tvqqpsu!fyqboefe!qbujptQbsu
ofs!xjui!pshboj{bujpot!up!qspwjef!hsbout!up!tvqqpsu!bsut-!dvmuvsf!boe!dsfbujwf!qspgfttjpobmtQspwjef!b!gmfyjcmf!Cvtjoftt!Mjdfotjoh!Sfofxbm!QsphsbnEfwfmpq!b!cvtjoftt!dbtf!gps!b!Gppe-!Sfubjm-!Tfswjdf!Jo
dvcbujpo!Qsphsbn!Qspwjef!gsff!qbsljoh!jo!Djuz.pxofe!qbsljoh!mput!jo!EUL-!po!fwfojoht!boe!xfflfoet
Uif!gpmmpxjoh!jt!bo!jojujbm!mjtu!pg!dvssfou!boe!qmboofe!jojujbujwft!uibu!xpvme!ifmq!tfj{f!uif!pqqpsuvojujft!boe!pckfdujwft!pg!uif!DjuzÉt!sfdpwfsz!gsbnfxpsl/!!Bt!uif!sfdpwfsz!qspdftt!dpoujovft-!uif!mj
tu!pg!jojujbujwft!xjmm!dpoujovf!up!hspx/
21
.!Lfz!pckfdujwft!.
DJUZ.XJEF!TUBSUVQ!'!!!!!!!!!!!!!!!!!
FOUSFQSFOFVSJBM!OFUXPSL
JOOPWBUJPO
)Bsfb!pg!Gpdvt!$5!pg!Nblf!Ju!Ljudifofs*/!!Qspwjef!
Fyqfejuf!uif!mbvodi!pg!bo!fousfqsfofvsjbm!ofuxpsl!
beesftt!cbssjfst!sfmbufe!up!frvjuz!boe!bouj.sbdjtn/!!
gvoejoh!up!tvqqpsu!ofx!fousfqsfofvsjbm!qsphsbnt!uibu!
dpnqbojft!up!Ljudifofs/
PG!FOUSFQSFOFVSTIJQ!'!
TVQQPSU!TUBSUVQT-!TDBMF.VQT-!
boe!up!fyqboe!uif!Gjfsdf!Gpvoefst!qsphsbn/!!
Qbsuofs!xjui!jodvcbupst!boe!bddfmfsbupst!mjlf!
Dpnnvojufdi!up!bhhsfttjwfmz!tvqqpsu!tubsuvqt-!
tdbmf.vqt-!joopwbujpo!boe!xpslgpsdf!bebqubujpo-!
Opuf!.!jo!beejujpo-!uif!Djuz!xjmm!dpoujovf!up!xpsl!jo!qbsuofstijq!xjui!pshboj{bujpot!mjlf!Xbufsmpp!FED!up!buusbdu!ofx!
JOOPWBUJPO!'!XPSLGPSF!BEBQUBUJPO
3/BDDFMFSBUF!B!OFX!XBWF!
22
Voefsxbz
TUBUVT
Gvuvsf!)3132,*Gvuvsf!)3132,*
Qspqptfe!)3132.3135*Qspqptfe!)3132.3135*Qspqptfe!)3132.3135*Qspqptfe!)3132.3135*Qspqptfe!)3132.3135*
JOJUJBUJWFT
BOUJDJQBUFE!SFDPWFSZ!
JOJUJBUJWF Pqqpsuvojuz!$3!.!Bddfmfsbuf!b!Ofx!Xbwf!Fousfqsfofvstijq!'!Joopwbujpo Qbsuofs!xjui!Dpnnvojufdi!up!efmjwfs!jodsfbtfe!tubsuvq!tfswjdftQbsuofs!xjui!Dpnnvojufdi!up!tvqqpsu!tdbmjoh!dpnqbojftQbsu
ofs!xjui!Dpnnvojufdi!up!fyqboe!Gjfsdf!Gpvoefst!Tvqqpsu!DpnnvojufdiÉt!Gvuvsf!pg!Xpsl!Jojujbujwf!up!bttjtu!dpnqbojft0fnqmpzfft!obwjhbuf!npcjmf!xpsl!Dpoujovf!uif!DjuzÉt!Joopwbujpo!MbcEfwfmpq!b!cvtjoftt!
dbtf!up!mbvodi!b!djuz.xjef!fousfqsfofvsjbm!ofuxpslQspwjef!gvoejoh!up!tvqqpsu!ofx!fousfqsfofvsjbm!qsphsbnt!uibu!beesftt!cbssjfst!sfmbufe!up!frvjuz!boe!bouj.sbdjtnDpoujovf!up!qbsuofs!xjui!pshboj{bujpot
!mjlf!Xbufsmpp!FED!up!buusbdu!ofx!dpnqbojft!up!Ljudifofs
Uif!gpmmpxjoh!jt!bo!jojujbm!tbnqmf!mjtu!pg!dvssfou!boe!qmboofe!jojujbujwft!uibu!xpvme!ifmq!tfj{f!uif!pqqpsuvojujft!boe!pckfdujwft!pg!uif!DjuzÉt!sfdpwfsz!gsbnfxpsl/!!Bt!uif!sfdpwfsz!qspdftt!dpoujovft-
!uif!mjtu!pg!jojujbujwft!xjmm!dpoujovf!up!hspx/
23
BNPVOU%35-111+%211-111%236-111%86-111Vq!up!%811-111%2-111-111
$!TVQQPSUFE 2121!bsfbt3641!
JODSFNFOU%3-611Vq!up!%21-111Vq!up!%6-111%3-611
TFFE!GVOE
OFX!%2!NJMMPO!
TFFE!GVOE!DPNQPOFOU Ejhjubm!Nbjo!Tusffu!HsboutMpwf!Nz!CvtjofttÉ!Nbslfujoh!Hsbout!gps!Cvtjoftt!BsfbtUpvsjtn!Bebqubujpo!HsboutHsbout!up!Tvqqpsu!Bsut!'!Dvmuvsf!QspgfttjpobmtGvuvsf!Hsbout!.!up!cf!jefoujg
jfe!boe!bqqspwfe!cz!DpvodjmUPUBM
+!Gvoejoh!qspwjefe!cz!uif!Qspwjodjbm!Hpwfsonfou
Up!tvqqpsu!cvtjoftt!sfdpwfsz-!uif!Djuz!xjmm!dpotjefs!mbvodijoh!b!ofx!Tffe!Gvoe!up!tujnvmbuf!hspxui!boe!pqqpsuvojuz!xjuijo!fbdi!pg!uif!pqqpsuvojujft!jefoujÑfe!jo!uijt!gsbnfxpsl/!!Bmm!hsbout!boe!gvoejo
h!xpvme!cf!ubshfufe!bu!qspwjejoh!cvtjofttft!xjui!uppmt!up!bebqu!up!dibohjoh!dpotvnfs!ibcjut!boe!up!jodsfbtf!uifjs!sftjmjfodz!boe!mjlfmjippe!pg!mpoh.ufsn!tvtubjobcjmjuz/!!Xifsf!qpttjcmf-!hsbout!xjmm!q
sjpsjuj{f!pvudpnft!xijdi!dbo!cf!fyqfsjfodfe!cz!uif!hfofsbm!qvcmjd/!!Gvoejoh!gps!uif!%2!njmmjpo!Tffe!Gvoe!jt!dpoubjofe!xjuijo!uif!pwfsbmm!bmmpdbujpo!pg!%6!njmmjpo!up!tvqqpsu/Uijt!Tffe!Gvoe!xjmm!jofwju
bcmz!gbmm!tipsu!jo!nffujoh!bmm!pg!uif!efnboet!boe!offet!pg!pvs!dpnnvojuz/!!Uif!Djuz!xjmm!bdujwfmz!xpsl!xjui!puifs!mfwfmt!pg!hpwfsonfou!boe!qbsuofs!pshboj{bujpot!up!tffl!nbudijoh!ps!dpnqmjnfoubsz!tffe
!gvoejoh/!!
%46-111
%866-111
%861-111
%661-111
%2-611-111
%2-111-111
%2-521-111
%2-611-111
%3-1:1-111
%6-111-111
Up!cf!efufsnjofe
oh!sftpvsdft!up!tvqqpsu!
QSPQPTFE!BMMPDBUJPO
.!jo!beejujpo!up!uijt!gvoejoh-!uif!Djuz!xjmm!dpoujovf!up!npcjmj{f!tjhojÑdbou!tub
!Tvqqpsu!
TVQQPSUJOH!SFDPWFSZ
TUSBUFHZ!DPNQPOFOU Pqqpsuvojuz!$2!.!Vomfbti!pvs!Dpnnvojuz!Tqjsju!'!Tqfoejoh!Qpxfs Efwfmpq!'!Mbvodi!ÈMpwf!Nz!CvtjofttÉ!QsphsbnXifo!Bcmf-!Csjoh!uif!Djuz!up!MjgfEfwfmpq!'!Mbvodi!bo!Jodvcbujpo!Qsphsbn!gp
s!ofx!Gppe-!Sfubjm-!Tfswjdf!'!Iptqjubmjuz!Cvtjofttft!Nblf!Sfpqfojoh!Fbtz UPUBMPqqpsuvojuz!$3!.!Bddfmfsbuf!b!Ofx!Xbwf!pg!Fousfqsfofvstijq!'!Joopwbujpo Qbsuofs!xjui!Dpnnvojufdi!up!Tvqqpsu!Tubsuvqt-!Tdb
mf.vqt-!Joopwbujpo!'!Xpslgpsdf!Bebqubujpo!Fyqfejuf!uif!Mbvodi!pg!b!Djuz.Xjef!Tubsuvq!'!Fousfqsfofvsjbm!Ofuxpsl!UPUBM%2!Njmmjpo!Tffe!Gvoe!)opuf;!gvoejoh!bmmpunfout!bsf!dpoubjofe!xjuijo!uif!bmmpdbujpot
!mjtufe!bcpwf*!Bwbjmbcmf!gps!gvuvsf!bmmpdbujpot UPUBM!JOWFTUNFOU!JO!FDPOPNJD!SFDPWFSZ
Efejdbufe!Djuz!Tub jnqbdufe!cvtjofttft!boe!bttjtu!jo!mfbejoh!cvtjoftt!sfdpwfsz/!!Uif!nbkpsjuz!pg!uiftf!sftpvsdft!xjmm!cf!gpdvtfe!po!Pqqpsuvojuz!$2/
Bt!qbsu!pg!Nblf!Ju!Ljudifofs!3/1-!Djuz!Dpvodjm!bmmpdbufe!vq!up!%6!njmmjpo!up!tvqqpsu!jnnfejbuf!cvtjoftt!sfdpwfsz/!!Cbtfe!po!uif!boujdjqbufe!dptut!up!efmjwfs!jnqbdugvm!sfdpwfsz!jojujbujwft-!uif!gpmmpx
joh!qspqptfe!gvoejoh!bmmpdbujpot!ibwf!cffo!sfdpnnfoefe/!!
25
Bqsjm!3132
Uif!gjobm!tusbufhz-!jodmvejoh!dpoufou-!jnbhfsz-!mbzpvu-!fud/!nbz!ejggfs/
Opuf!.!uijt!gsbnfxpsl!jt!ÈesbguÉ!pomz!boe!tvckfdu!up!Djuz!Dpvodjm!joqvu!boe!bqqspwbm/!!
BMM!XSJUF!UPHFUIFS!
XIBU!TUPSZ!XJMM!XF!
Ljudifofs!ibt!cffo!uispvhi!b!mpu!evsjoh!uijt!qboefnjd!boe!cvtjofttft!ibwf!dbssjfe!b!ifbwz!cvsefo/!!Cvu!xf!bsf!cfhjoojoh!up!tff!b!ofx!tupsz!vogpme/!Xf!bsf!npwjoh!gpsxbse!uphfuifs!xjui!b!sfofxfe!tfotf!
pg!ipqf!boe!pqujnjtn/!!Ljudifofs!jt!Ñoejoh!mjhiu!jo!uif!ebsloftt½sftibqjoh!uif!obssbujwf!pg!pvs!pxo!tupsz/!Uif!qboefnjd!ibt!cffo!b!efÑojoh!npnfou!jo!uif!dpmmfdujwf!ijtupsz!pg!Ljudifofs/!!Ju!ibt!cffo!
ibse!gps!nboz-!cvu!ibt!sfnjoefe!vt!xibu!nblft!Ljudifofs!tp!tqfdjbm!.!jo!ujnft!pg!dibmmfohf-!xf!dpnf!uphfuifs!up!mjgu!fbdi!puifs!vq/!!Xf!bmxbzt!ibwf-!boe!xf!bmxbzt!xjmm/!!Xf!bsf!b!djuz!xjui!bo!vocsfbl
bcmf!tqjsju!boe!sfmfoumftt!sftjmjfodf!jo!uif!gbdf!pg!bewfstjuz/Uif!qboefnjd!ibt!sfnjoefe!vt!pg!xibu!xf!uppl!gps!hsboufe!boe!xibu!xf!usvmz!difsjti/!!Ju!ibt!sfnjoefe!vt!pg!uif!jnqpsubodf!pg!uif!qfpqmf!
xip!lffq!pvs!mpdbm!cvtjofttft!bmjwf!.!cvtjoftt!pxofst-!fnqmpzfft!boe!qbuspot/!!Uifz!csfbui!mjgf!boe!wjcsbodz!joup!pvs!dpnnvojuz!fwfsz!ebz/!!Uif!Djuz!pg!Ljudifofs!xjmm!mjgu!vq!cvtjofttft!jo!fwfsz!xbz!
xf!dbo/!!Cvu!jo!usvui-!uif!sfbm!tpvsdf!pg!pvs!sfdpwfsz!mjft!xjuijo!fbdi!pg!vt/!!Bt!b!dpnnvojuz-!ipx!xf!dipptf!up!tqfoe!pvs!npofz!boe!xip!xf!dipptf!up!tvqqpsu!xjmm!efÑof!pvs!qbui!gpsxbse/!!XfÉwf!hpu!u
ijt-!Ljudifofs"
Appendix B Detailed Information on Each Proposed Initiative
Opportunity #1 Unleash Our Community Spirit & Spending Power
Initiative
Owner: City of Kitchener Economic Development Timing: Commence Q2/3 of 2021
Description:
The City would hire a contract marketing professional to work with suburban business
areas to develop promotional campaigns to support impacted businesses. Where
possible and appropriate, the City would utilize its audience reach (ex: social media) to
provide added exposure. Each business area could apply for up to $10,000 worth of
funding to put towards their campaign.
Rationale:
Impacted businesses have identified the need for supports reaching and re-engaging
their customer
would aid in recovery. While the City cannot directly promote the products and
services of individual businesses, it can support the promotion of business areas.
Estimated Cost: Source of funding:
$125,000 in contracted salary costs and
marketing/development expenses Kitchener 2.0 Reserve
$100,000 in grant/seed funding to support business
area campaigns. Operating Budget (Economic
Development)
Initiative Offer a 60-day Property Tax Deferral in 2021
Owner: City of Kitchener, Revenue Timing: Commence Q2/3 of 2021
for approximately 12 months
Description:
Property taxes are billed twice a year (interim and final) with four installment due dates.
The Interim tax bills with due dates of March 1, 2021 and May 3, 2021 have previously
been mailed out to residents and businesses. Final tax bills are expected to be sent
out in mid June with due dates of July 2, 2021 and September 1, 2021 for residential
customers and September 1, 2021 and October 1, 2021 for non-residential customers.
Staff are recommending that a simple application-based property tax installment
deferral program be developed to extend 2021 property tax installment due dates by
60 days as follows:
CƚƩ ƩĻƭźķĻƓƷźğƌ ƦƩƚƦĻƩƷźĻƭʹ
hƩźŭźƓğƌ 5ǒĻ 5ğƷĻ wĻǝźƭĻķ 5ǒĻ 5ğƷĻ
ağǤ ЌͲ ЋЉЋЊ WǒƌǤ ЋͲ ЋЉЋЊ
WǒƌǤ ЋͲ ЋЉЋЊ {ĻƦƷĻƒĬĻƩ ЊͲ ЋЉЋЊ
{ĻƦƷĻƒĬĻƩ ЊͲ ЋЉЋЊ bƚǝĻƒĬĻƩ ЊͲ ЋЉЋЊ
CƚƩ ĭƚƒƒĻƩĭźğƌͲ źƓķǒƭƷƩźğƌͲ ğƓķ ƒǒƌƷźΏƩĻƭźķĻƓƷźğƌ ƦƩƚƦĻƩƷźĻƭʹ
hƩźŭźƓğƌ 5ǒĻ 5ğƷĻ wĻǝźƭĻķ 5ǒĻ 5ğƷĻ
ağǤ ЌͲ ЋЉЋЊ WǒƌǤ ЋͲ ЋЉЋЊ
{ĻƦƷĻƒĬĻƩ ЊͲ ЋЉЋЊ bƚǝĻƒĬĻƩ ЊͲ ЋЉЋЊ
hĭƷƚĬĻƩ ЊͲ ЋЉЋЊ 5ĻĭĻƒĬĻƩ ЊͲ ЋЉЋЊ
The proposed eligibility criteria is outlined below:
Must have experienced financial hardship directly related to the COVID-
19 pandemic due to one of the following reasons: loss of employment,
temporary suspension/reduction of pay, business loss revenue or
temporary business closure.
All property taxes must have been paid in full up to and including the
March 2021 Interim Installment.
The proposed property tax installment deferral program has been discussed with the
area municipalities. Only the City of Waterloo will be implementing a similar program at
this time.
Residents can continue to make payments through a Pre-Authorized Payment Plan,
online banking, by mail or by the payment box located at the Young St. entrance at City
Hall.
Rationale:
The recommended program has a number of benefits for residents, businesses and the
City. These benefits include:
Provides relief that is targeted to the current economic challenges related
to COVID-19.
Provides valuable statistics at the local level to help develop future
economic recovery plans.
The application form will be relatively simple for customers to understand
and complete. Further, the processing of applications by the City can be
managed efficiently by staff.
This program would be available as an additional measure for those who may still be
struggling financially as a result of COVID-19. It is intended to give residents and
businesses extra time to pay their tax bills if needed by extending installment due
dates by 60 days. The program is available to both residential and non-residential
customers.
Although it is recognized that there are residents and businesses who will need this
level of support, there are many customers who are able to pay their property taxes by
the original due dates. The City continues to encourage residents and businesses who
have the ability to do so, to make payments for their property taxes as this is also the
main source of revenue to the City to fund operations, including critical services for the
community.
Estimated Cost: Source of funding:
$375,000 in lost interest revenue. $375,000 from COVID relief
funding
Initiative Provide Additional Grant Funding to the Tourism Adaptation &
Recovery Program
Owner: City of Kitchener Economic Development in Timing: Spring & Summer 2021
partnership with Waterloo Region Tourism
Marketing Corporation (WRTMC)
Description:
In the Winter of 2021, WRTMC facilitated a Tourism Adaptation & Recovery grant
program, whereby any business associated with the tourism industry could apply for
funding to support adaptations to the pandemic (ex: personal protective equipment,
etc.). The program received more applications than what the funding could support. A
large majority of applications were from restaurants seeking capital funding to expand
their patios. Given the ongoing importance of expanded patios, there is a clear need
and opportunity to support local restaurants with such improvements.
While the first round of funding was provided by FedDev Ontario, the Cities of
Cambridge, Waterloo and Kitchener, the Township of Woolwich, and the Region of
Waterloo are all considering providing additional funding to establish a second round
of funding. Most Cities are considering the use of their Municipal Accommodation Tax
funding to support the initiative. Any funding provided by the City of Kitchener would
be used to support Kitchener-based businesses.
Businesses are required to match a minimum of 20% of the cost of improvements.
While businesses can apply for up to $20,000, the majority of grants provided in round
1 were less than $5,000 each.
Rationale:
The sit-down restaurant industry has been significantly impacted by physical
distancing requirements. Utilizing expanded outdoor patios has been a key measure
for expanding their seating capacity. Increasing seating capacity enables the return
of more restaurant staff.
Kitchener residents have long aspired to see a stronger patio culture in our
community. By prioritizing applications which seek permanent patio improvements,
staff believe this initiative will support a patio culture beyond the pandemic.
Estimated Cost: Source of funding:
$125,000 in grant funding Make It Kitchener 2.0 Reserve
Initiative Additional Grant Funding to support Arts & Culture Professionals
Owner: City of Kitchener Economic Development in Timing: Summer 2021
partnership with organizations such as the
Kitchener Waterloo Community Foundation
(KWCF) and Centre In The Square
Description:
In the fall of 2020, KWCF established the COVID-19 Arts & Sustainability Recovery
Fund. The purpose and criteria were established by a volunteer committee comprised
of local representatives from the arts and culture sector. Small and medium-sized arts
and culture organizations and collectives were invited to apply for funding to support
their ongoing adaptations to the pandemic (e.g. PPE, virtual programming etc.). The
program received more applications than the funding could support. The first round of
funding ($250,000) was provided by KWCF through a partnership with Community
Foundations of Canada, the Government of Canada and individual fund holders.
In the winter of 2021, the City and Centre In the Square piloted Create + Connect Grant
program, specifically for musicians creating music and connecting with their audience
through producing a song, creating a livestream, creating a music video, etc.
Performers, artists and arts organizations continue to be among the hardest hit entities
in the creative arts sector by the pandemic. Funds would be awarded to projects and
initiatives that support organizations to connect with their audiences, creating tangible
community benefits. Staff would work with partner organizations to establish new grant
programs or second streams of grant funding for the previously successful programs.
Rationale:
Performers and performance-based organizations continue to be among the hardest
hit entities in the creative arts sector by the pandemic. As public gatherings in the
near future are once again in doubt, these entities are in dire need of resources to
develop new ways of serving the community with art. Not only have established
revenue streams been fully disrupted (ticketed performances, teaching, paid
performances), new capital-intensive approaches are needed to connect with
audiences and deliver art to the community (e.g. equipment and expertise for digital
programming, increased staffing and equipment to ensure public safety, new
platforms for audience engagement).
Kitchener residents have long aspired to see more local arts programming. By
prioritizing application which seek to connect with local audiences in new ways, staff
hope this initiative will support live performance and arts and culture beyond the
pandemic.
Estimated Cost: Source of funding:
$75,000 in grant funding Make It Kitchener 2.0 Reserve
Appendix C Background on Proposed Communitech Partnership
BACKGROUND:
The City of Kitchener has had a long-
inception in 1997. In 2010 the City invested $500K in the Communitech Hub to assist
with its relocation to the Tannery located at 151 Charles St W, Kitchener. In 2016, the
City invested $1.5M in Communitech over 5 years to assist with their expansion,
leasehold improvements and expanded programming. This investment enabled
Communitech to significantly increase their economic impact in the community, based on
a study completed by Deloitte. For every $1 of
economic impact is as follows:
Fiscal Year 2011 2018 2020
Economic Impact $12.90 $22.12 $28.23
Communitech was entrusted during the pandemic as a lead organization, to help form the
Business and Economic Support Team (BESTWR) to reduce barriers, accelerate
coordination and engagement for all businesses across Waterloo Region.
As Communitech expects the need for increased collaboration space creating client rental
opportunities, they have renewed their lease at the Tannery for an additional 5 years with
Allied Reit.
The pandemic has had an adverse impact across the business and technology
community in Kitchener and Waterloo Region, including in the founder, startup and
scaleup sectors. Given
areas, supporting their increased service delivery provides a proven path to new company
and job creation.
As office-based companies reimagine their post-pandemic work space, it is expected that
vacancies could persist in the office sector. Downtown Kitchener, for example, currently
has one of the highest office vacancy rates in the region. Stimulating startup and scaleup
growth would provide a prospectus of future office tenants.
PROPOSED PARTNERSHIP:
Staff propose the following partnership with Communitech to support business recovery:
1) $500K per annum from 2021-2023: Provide programming to accelerate the growth
of startups and scaleups, talent attraction and retention, while supporting diversity,
equity and inclusion through the expansion of the Fierce Founders Program. The
City would continue to maintain and operate a Digital Kitchener Innovation Lab.
This investment will be re-evaluated at the end of year 3.
This investment is designed to preserve and grow our technology ecosystem, provide
coaching, mentorship, collaboration, networking and advocacy.
Proposed Programs
i) Increased Startup Services:
History has demonstrated that economic disruptions and challenges result in new
companies entering the ecosystem. During the 2010 economic recession and Blackberry
layoffs, startup intake grew by 230%. Communitech will be supporting and nurturing this
sector through programming and advisory services both virtually and in-person at the
appropriate time.
Activities will include:
Virtual advisory services which include mentorship, peer learning as well as market
intelligence for respective sectors
Access to digital learning through on-demand, scalable and customized learning
with a focus on customer, market and investment readiness.
Collaboration with the Waterloo Region Small Business Centre to support and
Communitech onboarded 300 new startups in 2020 with the average increasing from 25
per month in 2020 to 36 per month in Q1, 2021.
ii) Support Scaling Companies
The pandemic has significantly impacted the growth of many scaling firms especially
those within the initial stage. Impacts to their sales, marketing, and research and
development has necessitated companies to re-evaluate their current path and explore
new opportunities and markets. Supports would target scaling companies that have been
interrupted by the pandemic to restore their growth prospects over the next 18-36 months,
recognizing that scaling takes more initiative and time.
The intent is to create more local jobs while expanding the local ecosystem, attracting
both domestic and foreign investor capital and reinvigorating the Downtown office market.
Activities include:
Digital and in person delivery of roundtables, workshops, tailored programs and
advisory services. These will include managing remote and hybrid teams, while
maintaining culture, onboarding, enhancing digital marketing and workplace
health, including supporting mental health initiatives
investment and partnership with the University of Waterloo in the Health Innovation
Strengthening partnerships with Velocity, Accelerator Centre, Laurier Launchpad
and MaRS
Reviewing and strengthening the local supply chain
Attract more late stage capital investment with both domestic and global capital
which includes more direct consultation with investors regarding Waterloo Region
and specific investment opportunities
iii) Expand Fierce Founders
The Fierce Founders Program was established in 2014 to help women-led companies
grow their businesses. Since its inception, 240 companies have graduated from this
program. Communitech proposes to expand Fierce Founders by providing additional
programming through the Fierce Founders Uplift Program to women founders who have
faced barriers due to equity and anti-racism. Ongoing support will be provided through
the addition of 4 new advisors/growth coaches from underrepresented groups to provide
hands on support to new founders. Included in the programming could be grants for early
stage businesses.
iv) Support Co Future of Work Initiative
Companies have been required to pivot to a virtual or hybrid work environment.
Communitech has moved its talent recruitment, development and training services to a
digital delivery model, resulting in adapting the programs to support the new requirements
of startup and scaleup firms. New content and services are required to support
companies in a new mobile, global talent landscape. Programming is to be established
to manage borderless talent attraction and recruiting, while migrating to remote and hybrid
work.
Activities include:
Enhance training through the Communitech Academy, preparing teams for an
increasing virtual and remote work environment
Through the Future of Work, review the strengths, weaknesses, and gaps that exist
between workforce skills and employer needs including the responsiveness to
private and public workplace dynamics
Support local talent acquisition through Communitech as a referral partner for the
v) Digital Kitchener Innovation Lab
The Kitchener Innovation
an innovative and visionary community.
presence in the Communitech hub offers the City the opportunity to actively engage with
other corporate innovation labs sharing learnings, problem-solving and identifying
opportunities for collaboration. Connecting with startups enables the lab to explore how
their early stage technologies could be applied to the City.
Through direct engagement in the Communitech ecosystem the City is able to attract
top co-
-op onboarding programs, academic
partnerships, and exposure to new trends in technology and innovation. The highly
visible space allows the City to showcase lab initiatives and City priorities, facilitate
vision and
achievements as an agile, forward-thinking municipality.
Economic Impact:
In 2020 Deloitte conducted an economic impact assessment based on the following
factors:
Financial: Wages created, taxes owed, capital raised
Human Capital: Jobs Created, employees at Communitech companies
Brand: Social Media following, event attendance, mentoring
from $250M in 2018, or $28.23 for every dollar of public funding an increase from $22.12
in 2018.
Communitech clients raised $1.4 Billion in venture capital in 2020.
Reporting
Annual reporting is to be provided to Council by Communitech, sharing outcomes of the
initiatives outlined in this report as well as their Annual General Meeting report.
Finance and Corporate Services Committee
REPORT TO:
DATE OF MEETING: 4/19/2021
SUBMITTED BY: Ryan Hagey, Director of Financial Planning
PREPARED BY: Ryan Hagey, Director of Financial Planning
WARD(S) INVOLVED: All Wards
DATE OF REPORT: March 30, 2021
REPORT NO.: FIN -2021-20
SUBJECT: Investment Policy Update
RECOMMENDATION:
That the City investment policy FIN-PLA-605, attached as Appendix A to staff report
FCS-17-095, be approved as amended.
REPORT HIGHLIGHTS:
The purpose of this report is to amend the Investment Policy based on content
presented through the Long Term Financial Plan (LTFP)
The main changes involve better role definitions, updating the standards for eligible
investments, and exclusion from the Prudent Investor standard
This report supports the delivery of core services.
BACKGROUND:
The City of Kitchener Investment Policy is governed by the Municipal Act and related
regulations. The policy was last updated in 2017.
The goal of the Investment Policy is to set out the guiding principles for the purpose of
investing public funds. The policy applies to all financial assets of the City of Kitchener
including Operating, Capital, Reserve, and Trust Funds. The income resulting from the
investment of City funds is one of the revenue sources available to reduce the financial
burden on ratepayers. The objectives of the policy, in order of importance include:
Adherence to statutory requirements
with the Municipal Act and related regulations.
Preservation of capital
that the possibility of losing the invested funds is extremely unlikely.
Liquidity
sufficient funds availa
they are due.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
Return on Investment - The investments will be managed to attain the
maximum rate of return while meeting the other objectives.
The policy also governs the quality of securities the City can accept from others, for example,
Letters of Credit.
As part of the comprehensive content presented during the Long Term Financial Plan
change to using a multi-year average to budget for investment income, as well as content
changes to the Investment Policy which would be approved at a later date. The attached
Investment Policy is largely consistent with the version presented to Council during the LTFP
discussions.
REPORT:
The proposed Investment Policy is in a revised format and includes changes to the way it is
presented. The primary content changes include:
Better role definitions (Section 3 Scope Responsibilities)
Updated standards for eligible investments (Section 4 Eligible Investments a)
Exclusion from the Prudent Investor Standard (Section 4 Eligible Investments b)
Each of these is briefly discussed below.
Better role definitions (Section 3 Scope Responsibilities)
The previous policy did not include any role definitions. The updated version includes clear
definitions from Council, the Chief Administrative Officer, the Chief Financial Officer, and the
Director of Financial Planning. Having better role definitions in financial policies was one of
the recommendations from the LTFP.
Updated standards for eligible investments (Section 4 Eligible Investments a)
The City is limited by the Municipal Act and associated regulation in terms of the kinds
of/quality of instruments in which it can invest. Under the updated policy, the City will be
Schedule A of the policy. Under the previous policy only investments
quality were considered.
preserving capital, but should also better meet the policy goal of improving return on
investment. During the historically low interest rate environment caused by COVID-19,
investment returns for items like GICs, and bonds have been significantly lower than normal.
The change to the quality of investment options will also apply to letters of credit accepted
by the City as financial security. This will help development within the City, as some
a letter
of credit from their preferred financial institution instead of a different institution that would
require a higher premium for their services. The change
investments in add represents little risk to the City and is consistent
with policies in other municipalities.
Exclusion from the Prudent Investor Standard (Section 4 Eligible Investments b)
As noted above, the City is limited by the Municipal Act and associated regulation in terms
of the kinds of/quality of instruments in which it can invest. In 2018, a new section (Prudent
Investment, 418.1) was added to the Municipal Act. Under the Prudent Investor Standard,
ould choose to invest in more volatile
products that could potentially provide higher returns, but also have a greater degree of risk,
such as investing in stocks traded on the open market. Staff are not recommending this
option at this time for a number of reasons including:
It is more risky, because investment options are unlimited
o While the Municipal Act is quite restrictive and limits returns, it also almost
guarantees that invested funds will not be lost due to bankruptcy
It relinquishes all control to an investment board
o A municipality must either establish or participate through an investment
board, which cannot include members of council or municipal staff, with the
exception of a municipal treasurer. This would significantly limit the
ypes of investments being entered into and
would represent a risk to the municipality
It is permanent
o Once a municipality opts into Prudent Investment it cannot opt back out
If Council is interested in pursuing Prudent Investment, the policy decision recommended
as part of this report could be revisited at some point in the future.
STRATEGIC PLAN ALIGNMENT:
This report supports the delivery of core services.
FINANCIAL IMPLICATIONS:
There are no immediate financial implications of the changes recommended in this report.
; however they would increase
ult in
improved investment yields.
COMMUNITY ENGAGEMENT:
INFORM
the council / committee meeting.
PREVIOUS REPORTS/AUTHORITIES:
Investment Policy FIN-PLA-605
APPROVED BY: Jonathan Lautenbach, Chief Financial Officer
ATTACHMENTS:
1. Investment Policy
POLICY Policy No: FIN-PLA-605
Approval Date: Click here to enter a
Policy Title: INVESTMENT
date.
Policy Type: COUNCIL
Reviewed Date: August 2019
Category: Finance
Next Review Date: August 2024
Reviewed Date: Click here to enter text.
Sub-Category: Financial Planning
Author: Senior Financial Analyst
Last Amended: Click here to enter a
date.
Dept/Div: Finance/Financial Planning
Replaces: Click here to enter text.
Repealed: Click here to enter a date.
Replaced by: Click here to enter text.
Related Policies, Procedures and/or Guidelines:
Municipal Act, 2001, S.O. 2001, c. 25, Part XIII, Section 418(1)
Municipal Act, 2001, Ontario Regulation 438/97
1. POLICY PURPOSE:
It is the policy of the City of Kitchener to invest public funds in a manner that will
provide the highest investment return while protecting and preserving capital,
maintaining liquidity, meeting the daily cash flow demands of the City and
conforming to all legislation governing the investment of public funds.
The purpose of the policy is to establish guidelines and controls related to the
investment and holding of public funds to ensure funds are available when
needed, while maximizing return.
2. DEFINITIONS:
Asset-backed Securities short- or long-term debt instruments, which are
backed by high quality assets (such as loans or mortgages) of the issuer, issued
under Reg. 733(50)(1) of the Loans and Trust Corporations Act
Commercial Paper short-term notes or drafts issued by a corporation,
incorporated under the laws of Canada or a province of Canada
1 of 10
Policy No:
Policy Title:
Credit Risk risk to an investor that the issuer of an investment will default interest
or principal payments
Credit Union - community based financial co-operatives owned and controlled
by members
Diversification process of investing in a range of security types by class, sector,
maturity, and quality rating
Dominion Bond Rating Service (DBRS) a service that assesses the credit rating of
institutions
Forward Rate Agreement (FRA) contract with a qualified financial institution
allowing an investor to fix the interest rate to be received on an investment for a
specified term beginning at an agreed to future date
Interest rate risk risk of an increase or decrease in the value of a fixed income
security caused by declining or rising interest rates
Long-term investment investment whose term to maturity is greater than one
year
Liquidity
ONE Fund Public Sector Group of Funds pooled investment fund meeting the
eligibility criteria defined by the regulations under the Municipal Act. It is
operated by the Local Authorities Service Limited and CHUMS Financing
Corporation
Regulation Ontario Regulation 438/97 related to section 418 and 418.1 of the
Schedule I Bank a chartered bank operating under the Bank Act. The voting
shares must be widely held with no investor holding more than10% and foreign
ownership limited to 25%
Schedule II Bank a chartered bank operating under the Bank Act. It may be
wholly owned by non-residents
Schedule III Bank a foreign bank branch of foreign institutions operating under
the Bank Act under certain restrictions
Short-term Investment investment whose term to maturity is two years or less
2 of 10
Policy No:
Policy Title:
Supranational Institutions an agency sponsored by highly rated foreign bank(s)
or Governments issuing debt to fund loans in developing countries for large
infrastructure projects. They may be owned or guaranteed by a consortium of
national governments
Trust Company financial institution which acts as a fiduciary, trustee or agent in
the administration of trust funds, estates and custodial arrangements
3. SCOPE:
POLICY APPLIES TO THE FOLLOWING:
All Employees
All Full-Time Employees All Union
Management C.U.P.E. 68 Civic
Non Union C.U.P.E. 68 Mechanics
Temporary C.U.P.E. 791
Student I.B.E.W. 636
Part-Time Employees K.P.F.F.A.
Specified Positions only:! Other:!
Council Local Boards & Advisory Committees
The investment policy applies to all financial assets of the City of Kitchener held
within the general fund, capital fund, reserve funds, enterprise funds, and trust
funds.
R esponsibilities
Council
Under section 224(e) of the Municipal Act 2001, Council is responsible for
ouncil is required to
make decisions that adhere to the financial policies and procedures that have
been put in place to provide investment income for the municipality.
Chief Administrative Officer
Under section 229(a) of the Municipal Act 2001, the Chief Administrative Officer is
responsible
municipality for the purpose of ensuring the efficient and effective operation of
in place that support
the effective administration related to investment of City funds.
3 of 10
Policy No:
Policy Title:
Chief Financial Officer (Treasurer)
Under section 286(1) of the Municipal Act 2001, the treasurer is responsible for
nicipality on behalf of and in the
Monitoring adherence to statutory requirements
Ensuring preservation of capital
Monitoring interest rate risk
Ensuring liquidity of investments
Maximizing return on investments
Director of Financial Planning
As part of their role the Director of Financial Planning has been delegated
authority and is responsible for:
Establishing investment procedures aligned with this policy
Monitoring cash flow to make effective investment decisions
Ensuring proper controls are in place related to investments
Delegating specific investment related tasks to staff where appropriate
4. POLICY CONTENT:
Objectives
be:
a) Adherence to statutory requirements
Investment activity will be governed by the Municipal Act as amended and
limited to eligible investments under the Act and associated provincial
regulations
b) Preservation of capital
Safety of principal is a key objective of the investment program. Investments
of the City shall be undertaken in a manner that seeks to ensure the
preservation of capital including:
Utilizing credit ratings to assess the overall credit risk related to a
particular investment
4 of 10
Policy No:
Policy Title:
Diversifying the overall investment portfolio in accordance with this
policy
Properly assessing and mitigating risk associated with fluctuating
interest rates for short- and long-term investments
c) Liquidity
to meet all operating and capital requirements that might be reasonably
anticipated and to limit temporary borrowing requirements.
d) Return on Investments
The investment portfolio shall be designed to attain the maximum rate of
return while meeting the above three objectives
Eligible investments
a) Section 418 of Ontario Regulation 438/97 provides a list of eligible securities
that the municipality may invest in. The regulation includes securities such as
bonds, debentures, promissory notes, and other evidence of indebtedness.
The City of Kitchener will consider potential investment opportunities related
to all eligible securities types included in the regulation provided that:
comply with all other aspects of this policy
Schedule A and meet the minimum credit rating requirements and
conditions as outlined in the regulation
They have not been specifically restricted or excluded in this policy
b) Exclusions Prudent Investor Standard (Section 418.1)
Part of Ontario Regulation 438/97 includes new prudent investor standards
that allow municipalities that meet certain eligibility criteria the option to
invest in a broader range of securities. The City of Kitchener has not opted-in
to this new standard and as such, is only authorized to invest in securities
described under section 418 and not section 418.1 of the regulation.
5 of 10
Policy No:
Policy Title:
c) The City may enter Forward Rate Agreements (FRA) to reduce the risk of
future interest rate changes associated with known cash inflows provided
that:
The FRA is only executed with Schedule I, II, or III Banks whose minimum
The term of any FRA must be less than 12 months
An agreement must specify the forward amount, settlement date,
forward interest rate, reference interest rate, as well as other pertinent
details as prescribed in the regulation
The agreement must be reviewed and approved by the Treasurer and
comply with all other requirements of the regulation
d)
funds. Unrated municipalities are only permitted to invest in the following
securities if made through the ONE Fund Program:
Commercial paper
Corporate debt and shares
Asset-backed securities
A Council approved bylaw is required prior to entering into any such agreement.
Diversification
The City of Kitchener will diversify its investments by security type and institution
according to Schedule B. These restrictions apply at the time an investment is
made. At specific times, portfolio limitations may be exceeded as a result of
timing of individual instrument maturities.
Safekeeping and custody
Investments and letters of credit are stored
physically on site or electronically on City servers.
Term of investments
To the extent possible, the City will attempt to match its investments with
anticipated cash flow requirements. Unless matched to a specific cash flow, the
6 of 10
Policy No:
Policy Title:
City will not directly invest in securities maturing more than two years from the
date of purchase. Reserve and Trust Funds may be invested in securities
exceeding two years if the maturity of such investments is made to coincide as
nearly as possible with the expected use of the funds.
Performance standards
The investment portfolio shall be designed with the objective of obtaining a rate
of return throughout budgetary and economic cycles commensurate with the
investment risk constraints and the cash flow needs. Yields on the short-term
general bank account.
Standard of care
a) Prudence
Investments shall be made with judgment and care under circumstances
then prevailing, which persons of prudence, discretion and intelligence
exercise in the management of their own affairs, not for speculation, but for
investment, considering the probable safety of their capital as well as the
probable income to be derived.
Investment officers and employees exercising due diligence and acting in
accordance with written procedures and this Policy shall be relieved of
changes, provided deviations from expectations are reported in a timely
fashion and the liquidation or the sale of securities are carried out in
accordance with the terms of the Policy.
b) Ethics and Conflicts of Interest
Officers and employees involved in the investment process shall refrain from
personal business activity that could conflict with the proper execution and
management of the investment program, or that could impair their ability to
make impartial decisions. Employees and investment officials shall disclose
any material interests in financial institutions with which they conduct
business. They shall further disclose any personal financial/investment positions
that could be related to the performance of the investment portfolio. Officers
and employees shall not undertake personal transactions with the same
individuals with whom business is conducted on behalf of the Corporation.
7 of 10
Policy No:
Policy Title:
c) Internal Control
The Treasurer shall ensure adequate internal controls over investment policies
and procedures. The Treasurer shall establish a process of independent
review by an internal or external auditor.
d) Reporting
The Treasurer shall provide an investment report to Council at least twice per
year.
Authorized investment dealers
Authorized investment dealers must be registered as Investment Dealers with the
Ontario Securities Commission and be members of the Investment Dealers
Association of Canada, and be approved by the Treasurer.
Securities for subdivision and Development Servicing
The objective of the securities policy is to ensure that monies to guarantee the
installation of services will be available to the City when required.
The City of Kitchener shall accept only the following approved securities:
a) Letter of Credit (in prescribed form acceptable to the City Solicitor) issued by
a Schedule I bank, Schedule II bank, Schedule III bank or Trust Company with
a minimum DBRS rating A (low) (or equivalent).
b) Letter of Credit (in prescribed form acceptable to the City Solicitor) issued by
a Credit Union provided that:
The Credit Union is verified as a member of the Central 1 Credit Union
The Central 1 Credit Union is rated A (low) (or equivalent) or higher
The Credit Union has its Head Office in Ontario
The cumulative Letters of Credit do not exceed 1% of the Credit
financial statements.
8 of 10
Policy No:
Policy Title:
5. HISTORY OF POLICY CHANGES
Administrative Updates
2016-07-01 - I-605 policy template re-formatted to new numbering system and given
number FIN-PLA-605.
Formal Amendments
2008-04-07 - Resolution passed by Council
2012-12-03 - Resolution passed by Council, see report FCS-12-189
2016-06-01 - I-605 policy template was re-formatted to new numbering system and given
number FIN-PLA-605
2017-06-05 - Resolution passed by Council, see report FCS-17-095.
SCHEDULE A:
LONG-TERM CREDIT RATINGS
The following chart compares the different scales for long-term securities used by four
rating agencies recognized in Ontario Regulation 438/97.
Credit Quality DBRS S&P Fitch
Superior: extremely strong capacity AAA AAA Aaa AAA
to repay principal and interest AA (high) AA+ Aa1 AA+
AA AA Aa2 AA
AA (low) AA- Aa3 AA-
Good: strong capacity to repay A (high) A+ A1 A+
principal and interest A A A2 A
A (low) A- A3 A-
SHORT-TERM CREDIT RATINGS
The following chart compares the different scales for short-term securities used by three
rating agencies recognized in Ontario Regulation 438/97.
Credit Quality DBRS S&P Fitch
Superior: extremely strong capacity to repay R-1 (high) A-1+ F-1+
principal and interest R-1 (middle)
Good: strong capacity to repay principal and R-1 (low) A-1 F-1
interest
9 of 10
Policy No:
Policy Title:
Schedule B:
INVESTMENT POLICY DIVERSIFICATION SUMMARY SHORT-TERM PORTFOLIO
Sector Maximum Limits**
Portfolio
Share
Government of Canada 100% None
Provinces 100% 25%/issuer
Municipalities 20% 10%/issuer
Schedule I Banks 100% Top 5 major chartered banks: 75%/issuer*;
Other Schedule I banks: 25%/issuer
Schedule II Banks and 30% HSBC Canada: 25%;
Schedule III Banks Other Schedule II and III banks: 10%/issuer
Credit Unions and Trust 20% 10%/issuer
Companies
Pooled Investment Funds 100% None
* The minimum primary bank account balance required to obtain a preferred rate is
excluded from the limit per issuer.
** Compliance with limits is required within 30 days of non-compliance.
INVESTMENT POLICY DIVERSIFICATION SUMMARY LONG-TERM PORTFOLIO
Sector Maximum Limits
Portfolio
Share
Government of Canada 100% None
Governments of other 10% 5%/issuer
countries and supranationals
Provinces 50% 25%/issuer
Municipalities 35% total 10%/issuer
Region of Waterloo 35%
Other municipalities 25%
College, University, Housing 10%
Corp., Hospital
Incorporated Municipal 100% Common Shares Total issued to City at
Electrical Utilities incorporation; Preferred Shares None
Financial 75% total Top 5 - 25%/issuer
Schedule I banks top 5 75%
major chartered banks Other 10%/issuer
Other Schedule I, II, III 20%
banks, Trust Companies,
Credit Unions
Pooled Investment Funds 75% 10% limit on equity portfolio
10 of 10
REPORT TO: Finance and Corporate Services
DATE OF MEETING: April 19, 2021
SUBMITTED BY: Jason Winter, Director Asset Management & Business Solutions
PREPARED BY: Jason Winter, Director Asset Management & Business Solutions
WARD(S) INVOLVED: All Wards
DATE OF REPORT: March 30, 2021
REPORT NO.: FIN-2021-12
SUBJECT: 2020 State of the Infrastructure Report
RECOMMENDATION:
For Information
REPORT HIGHLIGHTS:
The overall
Grade B. As compared to other
municipalities, the City remains in the middle in the pack in terms of overall condition
of our core assets.
Asset valuations have changed due to improved asset data made available.
those assets.
Long term investments in funding strategies for infrastructure replacement programs
like the Water Infrastructure Program (WIP) are crucial to keep up with the pace of
our aging infrastructure.
The ability to effectively maintain infrastructure based on growth and
intensification is putting strain on operational capacity.
BACKGROUND:
The City is legislated by the Province of
2015 and Ontario Regulation 588/17: Asset Management Planning for Municipal
Infrastructure to create and maintain thorough asset management plans (AMPs) for all core
asset categories within our municipality. The most consistent and cost-effective asset
management strategies include a data-driven, risk-based approach that combines long-
range financial planning and effective maintenance activities. The goal is to sustain an
organized approach that optimi
and in the most cost-effective way.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
REPORT:
The 2020 update for the State of the Infrastructure report provides detail as to both the
overall condition of all 13 asset categories as well as the financial 10-year gap across the
board.
Although there are several assumptions that are required to illustrate the current state of our
infrastructure, over time and with the introduction of additional data-driven asset
management plans, comprehensive assessments will be more readily be possible.
Some changes from the first report from 2019 include:
The valuation has increased from $7.5B to $9.2B based on additional inventory
information as well as updated valuations of much more of our core infrastructure.
Facility valuation increased by $314M (28.3%) based on work underway on the
Building Condition Assessment (BCA) program
Stormwater asset valuations increased by $479M (66.6%) based on current inventory
and updated asset management plans.
Roads & sidewalks valuation increased by $800M (88.6%) due to including sidewalk
and multi-use pathways inventories and valuation.
Based on the 2020 capital budget update, the gap has changed from $341.7M to
$442M
The overall grade of asset categories remains relatively the same at a Grade B.
While some attention is needed for some asset categories, the City is more advanced
in other categories thus making us on average, the same as most other similar
municipalities.
For several\\asset categories, a calculation of useful life was used to identify those assets
that are near or at the end of their lifecycle. A replacement value is used to calculate the
required investment for each of those assets. This required investment is then compared
to a current rolling 10-yr capital budget for that category. The only variation from this
approach was for categories for which a formal replacement strategy is in place. An
example of this is the Water Infrastructure Program, where in addition to useful life, factors
such as condition and risk are also included to determine the replacement need (and costs)
over the useful life of those assets.
Continued adoption of the asset management framework supports the ability to minimize
categories. The
collaborative approach between operational teams and the Asset Management Division will
increase resiliency against changes in our environment.
STRATEGIC PLAN ALIGNMENT:
This report supports the delivery of core services.
FINANCIAL IMPLICATIONS:
There is no direct cost impact, however asset management plans influence long-term
financial forecasting for assets under City management.
COMMUNITY ENGAGEMENT:
INFORM
the council / committee meeting.
PREVIOUS REPORTS/AUTHORITIES:
FCS-19-078 - 2019 State of the Infrastructure Report
INS-18-017 Corporate Asset Management Policy
Ontario Regulation 588/17: Asset Management Planning for Municipal
Infrastructure
APPROVED BY: Jonathan Lautenbach, CFO & General Manager Financial Services
ATTACHMENTS:
Attachment A 2020 State of the Infrastructure Report
CITY OF KITCHENER
2020 STATE OF THE
INFRASTRUCTURE REPORT
30 March 2021
This page left intentionally blank
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | ii
Table of Contents
Introduction .......................................................................................................................................... 1
............................................................................................. 4
Asset Components .............................................................................................................................. 5
........................................................................................................ 6
Summary of Key Findings .................................................................................................................... 8
Asset Category Report Cards ............................................................................................................ 9
Water Utility ..................................................................................................................................... 10
Sanitary Utility .................................................................................................................................. 11
Stormwater Utility ............................................................................................................................ 12
Gas Utility ......................................................................................................................................... 13
Roads & Bridges ............................................................................................................................. 14
Facilities ........................................................................................................................................... 15
Other Asset Categories ................................................................................................................. 16
Future Outlook ........................................................................................ 17
Appendix A Explaining the Scorecard ......................................................................................... 19
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | iii
Introduction
It is undeniable that the City of Kitchener (similar to all other municipalities) experienced an
unprecedented year in 2020. Along with the changes the world felt as an impact of the
COVID-19 pandemic, the Calso was affected in ways not forecasted in
previous models. Whether it was less traffic on city streets, or increased use of the active
seen an overall impact affecting its
condition and lifecycle.
Use of the Iron Horse Trail saw on average 126%
more traffic compared to last 3 years.
On-going, long-term investments in infrastructure is essential to maintain the growing
expectations of our community and to ensure we sustain the expected levels of services
provided by As well, the City is developing at a significant rate resulting in
an overall increase in asset inventories needing to be maintained.
In addition to safeguarding
continuing to influence necessary investments to maintain our infrastructure. The
widespread scale and complexity of climate change poses considerable environmental,
economic, and social risks to the City. The effects of climate change are creating more
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 1
extreme variations in local weather patterns and longer-term changes to local climatic
conditions. As seen in the graph below from the National Oceanic and Atmospheric
1
Administration (NOAA), the temperature in February 2020 was the warmest month on
record since tracking began.
Infrastructure fails to perform as it should under these conditions in the following ways:
increased pressure on the energy grid, facility heating and cooling systems which in turn
create higher costs and potential outages; road and walkway damage along with liability
from increased freeze/thaw cycles; invasive species migrate to new habitat and decimate
local urban forests (e.g. Emerald Ash Borer); frequent heat waves putting vulnerable
populations at risk; etc. Climate change is expected to affect a broad range of municipal
assets and government services. Specifically for Waterloo Region, local impacts include
more intense rainfall events resulting in negatively affecting the ability to control and treat
stormwater with our existing infrastructure. Preparing for climate change is a matter of risk
management, good governance, and development of effective asset management
practices. The implementation of the Corporate Climate Action Plan (CORCAP) is a vital
step in having an integrated approach to achieve climate related targets and minimize risk
to our infrastructure investments. This too can significantly improve community resilience and
2
reduce the severity of these effects over time.
The need for continued focus on detailed asset management planning is now more
important than ever given the ; the age and changing
1
NOAA National Centers for Environmental information, Climate at a Glance: Global Time Series, published February
2021, retrieved on February 16, 2021 from https://www.ncdc.noaa.gov/cag/
2
INS-18-017 Corporate Asset Management Policy
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 2
condition of our assets; and the impacts of factors such as climate change in the coming
years. Further effort is needed to analyze the growing amount of data related to our asset
categories so as to understand the cause and effect of the variables related to maximizing
the lifecycle of our most important infrastructure. The robustness of our detailed asset
management plans become so vitally important for the successful management of these
new (and existing) assets.
The 2020 State of the Infrastructure Report provides an updated
infrastructure groups and highlights key aspects of each category. For each core asset
3
category, is given to illustrate the current state of that category. This
grade is an overall assessment of the asset category and is based on a number of factors.
These factors include:
A thorough financial strategy to maintain the expected levels of service
throughout the lifecycle of the asset.
Condition information that leads to understanding the health of the asset
throughout its useful life.
The existence of preventative maintenance and/or rehabilitation programs to
ensure the assets meet their expected lifecycle.
The availability of complete and reliable data for which to create and sustain
asset management plans focusing on optimizing the management of the assets.
As mentioned above, an evaluation of data reliability is provided to illustrate the quality of
information available to inform a detailed lifecycle management plan.
Little or no reliable Reliable data, but Quality data, but High quality and
information available historical information gaps in detail and/or lacking some detail reliable detailed
found currency data
When assessing the overall condition of an asset category, data reliability is only one factor
in a number of components. Although there might be gaps in detail and/or currency of
information, evaluating work activities, maintenance programs, achieving service levels
and other capital projects, the overall condition is formulated.
3
A further explanation of grading is outlined in Appendix A Explaining the Scorecard
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 3
4
ASSET VALUATION
Facilities
15%
Roads & Bridges
Total Replacement
21%
Value - $9.2 Billion
Other
4%
Stormwater Utility
13%
Sanitary Utility
11%
Water Utility
Gas Utility
19%
17%
Please note that changes from previous totals are due to newly available and updated data leading
to revised valuations across asset categories.
1,600 (lane-km) | Paved Local Streets 1,095 km | Gas mains 14 | Community centres
1,180 km| Sidewalks 75,246| Gas meters 7 | Fire Stations
95 | Roadway Bridges 823 | Horticulture beds 8 | Community pools
900 km | Water mains 220| Playgrounds 9 | Splash pads
4,566 | Hydrants 257 km | Trails 2 | Golf Courses
5
838 km | Sanitary sewer mains 126 | Sports fields 7 | Arenas
23 | Pumping Stations 69,619 | Trees 24 | Parking structures & paid lots
643 km | Stormwater mains 28,766 | Traffic Signs 67 | Community parking lots
152 | Stormwater facilities 19,443 | Street Lights 6 | Cemeteries
4
Golf, Transportation Services and Fleet.
5
Budd Park Indoor facility is in addition to the 7 arenas identified.
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 4
Asset Components
Within each asset category, there are a number of major components that make up the
total valuation and lifecycle management strategy. The table below outlines the major
asset components within each asset category across the City. As asset management plans
are developed and updated, additional asset components may be added in order to
Water Utility Sanitary Utility Stormwater Utility
water main pipes sanitary main pipes stormwater pipes
water service pipes stormwater manholes
forcemains
valves catchbasins
sanitary service pipes
hydrants stormwater management ponds
sanitary manholes
water meters oil & grit separators
pumping stations
stream reaches & creeks
stormwater facilities
Gas Utility Roads & Bridges Facilities
gas mains road pavement critical facilities & structures
gas service pipes curbs community facilities & structures
gas valves sidewalks other facilities & structures
gas meters multi-use pathways
gas regulator pits & stations bridges (greater than 3m span)
rental water heaters culverts
Parks & Open Spaces Forestry Parking
sports fields street trees revenue generating surface lots
hard surface sports facilities wood lots community surface lots
parks & turf parks & open spaces trees underground parking structures
playgrounds parking garages
trails on-street parking
pedestrian bridges & boardwalks parking equipment
horticulture parking sundry/misc. items
Cemeteries Golf Transportation Services
cemetery infrastructure (roads, course features bike racks & bollards
horticulture, water services, etc.)
buildings pedestrian railings and guiderails
cemetery buildings (including
course infrastructure streetlights & poles
mausoleum, crematorium,
utilities road & pedestrian islands
storage structures, etc.)
golf course vehicles & equipment traffic calming features
traffic signs & poles
Fleet
arena equipment
dump/fire trucks
fire equipment
lawn/turf equipment
licensed equipment
miscellaneous small equipment
off road equipment
two-way radios
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 5
Asset Management is an integrated and data-driven approach to effectively manage
existing and new assets. The intent is to maximize benefits, reduce risk and provide
expected levels of service to the community in a sustainable manner. Effective asset
management practices are fundamental to achieving a sustainable and resilient
community.
The City is legislated by the Infrastructure for Jobs and Prosperity Act,
2015 and Ontario Regulation 588/17: Asset Management Planning for Municipal
Infrastructure to create and maintain thorough asset management plans (AMPs) for all asset
categories. The most consistent and cost-effective asset management strategies include a
data-driven, risk-based approach that combines long-range financial planning and
effective maintenance activities. These activities outlined in the AMP would limit reactive
maintenance by emphasizing a move toward planned/routine/proactive maintenance
ensuring the lifecycle of assets and their ability to deliver services can be achieved. The
with minimal risk and in the most cost-effective way. Asset management planning is
cyclical to ensure that growth, new technologies and the introduction of new services are
added to the framework. This process ultimately ensures that sustainable and resilient
infrastructure is provided for through a process of continuous improvement. Through this
lens, the goals would include efficiency gains which by improving proactive/scheduled
maintenance will potentially reduce the number of reactive maintenance activities that are
performed annually.
When the Corporate Asset Management Program Policy and Framework (INS-11-082) was
adopted in January 2012, it defined specific asset groups that shape the physical assets
which make up the large and complex estimation of value. Since that time, the number of
groups have expanded to 13 categories to best reflect the distinct types of assets across
the city. The value of these assets are either derived through an Enterprise or Tax base
(Figure 2).
VALUATION SOURCE
Tax
38%
Enterprise
62%
Figure 2 - Valuation Source
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 6
As asset management plans are developed for the 13 asset categories, collaborative
support from cross functional teams and dedicated asset management leads provides new
insights into the balance between optimizing the health of the asset while meeting
expected level of service for which the asset supports.
Through the development of asset management related replacement and rehabilitation
e.g., Water Infrastructure Program (WIP), Facility
Infrastructure Program (FIP), etc.), long term funding strategies continue to be proposed
and adopted year after year. The 2020 capital budget included approximately $98M for
asset rehabilitation and replacement and $978.8M over a ten-year timeframe. Although
additional focus has been put towards increased spending for our infrastructure, the City still
has a significant overall gap between investment and need. This need will be further
underscored nership through increased
development over the past several years.
The infrastructure gap analysis (Figure 3) provides a point-in-time assessment of the current
need across categories for those assets that are at the end or nearing the end of their useful
lifespan. This financial requirement is compared to the available capital budget over a 10-
year period. As asset management plans are completed, this gap analysis will be
combined with level of service and condition data to round out a current state of the asset
category.
Overall Gap
10-Year Infrastructure Gap
$442M
$0
($20,000,000)
($40,000,000)
($60,000,000)
($80,000,000)
($100,000,000)
($120,000,000)
($140,000,000)
($160,000,000)
($180,000,000)
($200,000,000)
FacilitiesOtherRoads &StormwaterGas UtilitySanitaryWater Utility
BridgesUtilityUtility
Gap
($186,841,915($90,696,820)($59,189,734)($44,554,000)($42,501,800)($11,055,641)($7,565,241)
Figure 3 - Infrastructure Gap
(*)
Please note:
1. The Stormwater Utility gap is reflective of the recent Disaster Mitigation & Adaptation Fund
announcement for the City in 2019.
2. The Water and Sanitary gap are reflective of the financial model used for the Water Infrastructure
program over the next 10 years.
3. Additional external funding sources such as the Federal Gas Tax has assisted somewhat in reducing the
overall gap.
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 7
Summary of Key Findings
The gap analysis and associated forecasts are for a rolling 10-year period. This is a
relatively short timeline for assets that have a typical lifespan of more than 80 years.
Each year, the financial information will continue to improve and be updated
accordingly.
The overall total of the infrastructure gap for 2020 is $442M. For most asset
categories, a calculation of useful life was used to identify those assets that are near
or at the end of their lifecycle. A replacement value is used to calculate the
required investment for each of those assets. This required investment is then
compared to a current rolling 10-yr capital budget for that category. The only
variation from this approach was for categories for which a formal replacement
strategy is in place. An example of this is the Water Infrastructure Program, where in
addition to useful life, factors such as condition and risk are also included to
determine the replacement need (and costs) over the useful life of those assets.
A comprehensive model has been developed as part of the Water Infrastructure
Program (WIP) which combines multiple factors as mentioned above to assess the
overall need for water, sanitary and stormwater infrastructure replacement. Overall,
WIP is forecasting to close the gap of needed infrastructure replacement funding by
2044 as outlined in the report to Council (INS-17-070). On-going commitment post
2044 will be required as a significant number of assets will be reaching the end of the
lifecycle based on significant growth in the 1960 In addition,
considerations around the ability to support best practices for maintenance activities
have not adequately been undertaken and needs to be an area of attention. This
focus will need to continue to be examined as part of the WIP program to both close
the existing infrastructure gap, and also to ensure that the gap doesn't widen as new
infrastructure comes online and resources need to cover a larger number of assets.
As mentioned under Figure 3, the gap information for the Stormwater Utility category
now reflects the recent funding received through the Disaster Mitigation and
Adaptation Fund in 2019. Additional funding through other sources such as the
Federal Gas Tax also supports the ability to close the gap on an annual basis.
With the development of asset management plans for the 13 categories, emphasis
will continue to be placed on developing inspection programs that introduce
condition information. This is a vital component to an overall comprehensive
assessment of those assets. A recent example of this kind of program is the
development of a comprehensive Building Condition Assessment (BCA) program for
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 8
Asset Category Report Cards
Overall, in 2020 B, a slight increase from
the previous report card.
This grade is an overall average of the individual category evaluations and as such will
continue to be re-evaluated as new information becomes available. Changes year-by-
year can be attributed to adding or updating detailed asset management plans along with
increasing the reliability of information used to analyze the overall condition of the asset
category.
In the following pages, a summarized
component will summarize the relevant information leading up to the 2020 State of The
Infrastructure.
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 9
Data Reliability
Water Utility
The role of the water utility is to deliver water safely and efficiently to Kitchener residents. As
part of that, the utility is responsible to maintain the infrastructure of pipes and valves that
ucture Program (WIP), an approved
rate model was established to address the overall gap related to its underground
infrastructure by 2044.
Overall, the water utility assets category is graded at an B.
This past year in 2020, saw fewer watermain breaks than the previous 5-year average.
Implementation of a mobile valve inspection program allowed for more efficient real-time
follow-up work to be scheduled. Focus on the Water Infrastructure Program and associated
funding continues to be a crucial component to improve the grade of this asset category
and close the gap of infrastructure replacement by 2044.
CAST IRON
Total Length (Kms) by Material
Average Expected Life
50YRS
Average Average
68 0
ST - STEEL 0.2
Age Remaining Life
YRS YRS
DUCTILE IRON
PVC - POLYVINYL CHLORIDE 335.7
Average Expected Life
Average
80 YRS
Age
DI - DUCTILE IRON 327.4
Average
41 39
Remaining Life
YRS YRS
CPP - CONCRETE PRESSURE PIPE 42.7
PVC
Average Expected Life
Average
COP - COPPER 0.6
100 YRS
Age
Average
14 86
CI - CAST IRON 183.0
Remaining Life
YRS YRS
OTHER
AC - ASBESTOS CEMENT 7.7
Average Expected Life
Average
80 YRS
Age
- 50 100 150 200 250 300 350
Average
47 33
Remaining Life
YRS YRS
% Asset Consumed
140%
(4)
120%
10-Year Forecast
100%
Required Current Gap
80%
Investment Investment
60%
υЊЎЋͲВЌЋͲЋЍЊ υЊЍЎͲЌЏАͲЉЉЉ ΛυАͲЎЏЎͲЋЍЊΜ
40%
20%
(4)
Current and Required investment based on WIP
0%
AC -CI - CASTCOP -CPP -DI - DUCTILEPVC -ST - STEEL
projections to 2029
ASBESTOSIRONCOPPERCONCRETEIRONPOLYVINYL
CEMENTPRESSURECHLORIDE
PIPE
% Consumed
63%135%68%44%51%14%61%
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 10
Data Reliability
SanitaryUtility
The Sanitary Utility is responsible for the installation and disposal of the variety of sanitary
network assets, which include the likes of wastewater pipes, manholes, syphons, forcemains,
and pumping stations. Similar to the Water Utility, through the Water Infrastructure Program
(WIP), an approved rate model was established to address the overall gap related to its
underground infrastructure by 2044.
Overall, the sanitary utility assets category is graded at a B.
While the Sanitary Utility has a relatively good grade, the overall category can be improved
with greater emphasis on preventative maintenance measures, which are currently limited
in the Utility. As well, effort is underway to complete a detailed capital evaluation for
pumping stations for which data is currently needing to be updated.
Sanitary Main Material Type -Average Age
OtherAsbestos
14%Cement
19%
Plastic
Ductile Iron
8%
17%
Cement
16%
Vitrified Clay
26%
(5)
10-Year Forecast
% Consumed Compared to Expected Life
Required Current Gap
97.7%2.3%
Investment Investment
18.5%
υЋЋЋͲЉЊВͲЏЍЊ υЋЊЉͲВЏЍͲЉЉЉ ΛυЊЊͲЉЎЎͲЏЍЊΜ
160
140
14.7%
14.5%
(5)
Current and Required investment based on WIP
14.0%
)
m12.6%
120
k
projections to 2029. Required investments for
11.6%
(
s
10.2%
100
n
i
pumping stations currently under review.
a
80
M
y
r
60
a
t
PLEASE NOTE
i
n
40
a
S
1.7%
1.3%
0.8%
More than 25% of sanitary infrastructure is more than
20
0.2%
50 years old. 40% of is beyond half the average life
-
expectancy. This speaks to the need for a strong
routine/preventative maintenance program to
Age
ensure no additional premature aging.
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 11
Data Reliability
Stormwater Utility
-of-the-
across the city. The Stormwater Utility provides critical infrastructure to prevent flooding and
protect the natural environment by removing pollutants from runoff. Stormwater
management infrastructure and approaches are rapidly evolving, and the City is
incorporating green infrastructure and low impact development stormwater design to
minimize the impact of urban land use to the natural environment.
With the recent Federal funding (DMAF), the Utility has had the opportunity to advance
several key aspects of its master plan.
Overall, the stormwater utility asset category is graded at a B. The ability to further improve
the grade level for this asset category might be a function of applying more preventative
maintenance programs, which are currently limited.
Installations of Storm Ponds STEEL
Average Expected Life
30
80YRS
Average
Average
44 36
Remaining Life
Age
25
YRS YRS
CONCRETE
Average Expected Life
20
80 YRS
Average
38 42
15 Remaining Life
Average
YRS YRS
Age
PVC
Average Expected Life
10
100 YRS
Average
Average
13 87
5
Remaining Life
Age
YRS YRS
0
Era
STREAM REACHES IN KMS
REHABILITATED
CHANNELIZED
6.74
10.65
CONCRETE
10-Year Forecast
4.44
Required Current Gap
Investment Investment
υЋАЋͲБЍЊͲЉЉЉ υЋЋБͲЋБАͲЉЉЉ ΛυЍЍͲЎЎЍͲЉЉЉΜ
NATURAL/MIXED
44.67
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 12
Data Reliability
Gas Utility
Kitchener Utilities provides a safe natural gas delivery service for over 74,000 customers
across Kitchener. Through a heavily regulated set of processes, Kitchener Utilities provides a
heat source to homes and businesses through the installation and maintenance of key
infrastructure such as gas mains, valves, meter sets, regulator stations, water heaters, etc.
Overall, the gas utility category is graded at an B.
With the completion of a detailed asset management plan, the condition of the asset
category is based on the assets age compared to expected useful life. Approximately 60%
of gas utility assets are currently in very good or good condition. The current annual spend
is approximately $10M for gas pipeline & capacity projects however, spending will need to
increase to reduce the future infrastructure gap.
DISTRIBUTION OF PIPE BY MATERIAL
PLASTIC
Average Expected Life
(KMs)
60YRS
Average
19 Average 41
Remaining Life
Age
YRS YRS
39%
STEEL
Average Expected Life
60 YRS
61%
Average
46 Average 14
Remaining Life
Age
YRS YRS
PLASTICSTEEL
GAS METERS BY INSTALL YEAR
(6)
10-Year Forecast
34,735
Required Current Gap
35,000
Investment Investment
υЊЏЊͲВЊЊͲБЉЉ υЊЊВͲЍЊЉͲЉЉЉ ΛυЍЋͲЎЉЊͲБЉЉΜ
30,000
(6)
Note: The required investment is only for asset
25,000
replacement at the end of useful life. This constitutes
20,000
only 11% of the overall requirement as outlined in the
key findings.
15,000
9,223
8,587
10,000
PLEASE NOTE
5,428
4,969
4,259
4,210
2,749
5,000
Gas meters on average have an expected useful life
-
of between 10-15 years. A significant number of
20132014201520162017201820192020
meters will need to be replaced over the next several
years due to the high number installed in 2013 and
earlier.
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 13
Data Reliability Data Reliability
(pavement) (bridge/culvert)
Roads & Bridges
Roads and bridges are among the most valuable infrastructure assets and need frequent
maintenance and rehabilitation. Roads and bridges are widely used and highly visible to
residents therefore the planning and execution of rehabilitation and reconstruction projects
need a data-driven approach to ensure the expected level of support at a reasonable
cost. Specific to pavement, City Council set a level of service Pavement Quality Index
(PQI) of 70 (based on a scale of 0-100).
Through heavily regulated legislation, city-owned bridges are defined to be more than 3.0m
in span and are inspected on a 2-year cycle.
Pavement assets portion of this category is graded as an A.
Bridge assets are graded as a B.
PAVEMENT QUALITY -2020
Unknown
Poor
BRIDGE/CULVERT CONDITION
1%
2%
25
20
s
t
Excellent
e
15
s
39%
s
A
f
10
o
#
5
Good
0
49%
Very GoodGoodFairPoorVery Poor
Vehicle BridgesConcrete CulvertsCorrugated Stee Pipes
Pedestrian BridgesRailway Bridges
Fair
9%
10-Year Forecast Pavement/Sidewalks
PAVEMENT QUALITY DISTRUBTION
Required Current Gap
(By # of Segments)
Investment Investment
υЊЉЌͲЌЏЋͲАЌЍ υЎЉͲЉЉВͲЉЉЉ ΛυЎЌͲЌЎЌͲАЌЍΜ
1600
PQI
1400 Note: the required investment for sidewalk replacement
s
t Tartget
n
1200
included in the financial analysis has resulted in larger
-70
e
1000
m
gap in 2020
g
800
e
S
600
f
o
400
10-Year Forecast Bridges & Culverts
#
200
Required Current Gap
0
Investment Investment
υЊЊͲЉЉЉͲЉЉЉ υЎͲЊЏЍͲЉЉЉ ΛυЎͲБЌЏͲЉЉЉΜ
Pavement Quality Index
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 14
Data Reliability
Facilities
The City of Kitchener owns and maintains 255 active facilities varying in function and age.
Facilities and structures are categorized as Critical (39 facilities/structures); Community (160
facilities/structures); and Other (56 facilities/structures). A year since the Strategic Council
Session on the Long-Term Financial Plan, additional funding has been allocated to address
the on-going gap, now at $186M over 10 years. A thorough building condition assessment
program has been started to effectively evaluate the overall condition of the facility as well
as
associated for those investments within the 10-year capital budget process.
Overall, the facility asset category is graded at a C.
FACILITY AGE BY CATEGORY
FACILITY CATEGORY
Critical
70
Other
Facilities
Facilities
15%
25%
60
50
40
30
20
10
0
Greater than 5030-50 years10-30 yearsLess than 10
Yearsyears
Community
Facilities
60%
CriticalCommunityOther
LIFECYCLE COSTS
Upfront Design &
Construction
Major Repairs &
Costs
Maintenance
20%
30%
10-Year Forecast Facilities
Required Current Gap
Investment Investment
υЋВЋͲЊЊЌͲВЊЎ υЊЉЎͲЋАЋͲЉЉЉ ΛυЊБЏͲБЍЊͲВЊЎΜ
Operational
Costs
50%
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 15
Other Asset Categories
Transportation Services and Fleet. Due to limited condition information or detailed lifecycle
management plans, these asset categories are currently in the process of developing asset
management plans (AMPs) which include a data-driven approach to assessing the health
of the asset and measuring the expected levels of service.
As we move ahead on developing AMPs, the remaining asset categories will have full plans
that monitor the current condition of their assets, as well as determine a long-term estimate
and lifecycle management plan. This information will rank resources across the groups and
6
identify how to develop proactive maintenance actions.
PARKS & OPEN SPACESFORESTRY
5ğƷğ wĻƌźğĬźƌźƷǤ5ğƷğ wĻƌźğĬźƌźƷǤ
ЊЉΏĻğƩ CƚƩĻĭğƭƷЊЉΏĻğƩ CƚƩĻĭğƭƷ
wĻƨǒźƩĻķ /ǒƩƩĻƓƷ wĻƨǒźƩĻķ /ǒƩƩĻƓƷ
DğƦDğƦ
LƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷ
υЍЉͲББЌͲЊБАυЊЊͲЉББͲЉЉЉΛυЋВͲАВЎͲЊБАΜυЊЊͲЉБЊͲЊЉЎυЎͲЉЍВͲЉЉЉΛυЏͲЉЌЋͲЊЉЎΜ
PARKING ENTERPRISECEMETERIES
5ğƷğ wĻƌźğĬźƌźƷǤ5ğƷğ wĻƌźğĬźƌźƷǤ
ЊЉΏĻğƩ CƚƩĻĭğƭƷЊЉΏĻğƩ CƚƩĻĭğƭƷ
wĻƨǒźƩĻķ /ǒƩƩĻƓƷ wĻƨǒźƩĻķ /ǒƩƩĻƓƷ
DğƦDğƦ
LƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷ
υЊЋͲЊЌЍͲЍЏЉυЊЋͲЌЎАͲЉЉЉυЋЋЋͲЎЍЉυЊЏͲЉЊЉͲЋЋЉυЌͲЋЋВͲЉЉЉΛυЊЋͲАБЊͲЋЋЉΜ
GOLFTRANSPORTATION SERVICES
5ğƷğ wĻƌźğĬźƌźƷǤ5ğƷğ wĻƌźğĬźƌźƷǤ
ЊЉΏĻğƩ CƚƩĻĭğƭƷЊЉΏĻğƩ CƚƩĻĭğƭƷ
wĻƨǒźƩĻķ /ǒƩƩĻƓƷ wĻƨǒźƩĻķ /ǒƩƩĻƓƷ
DğƦDğƦ
LƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷ
υЊЊͲАЋЎͲЋВЏυЊͲЉАЌͲЉЉЉΛυЊЉͲЏЎЋͲЋВЏΜυЋͲВВЍͲЏЊЌυАͲЋЎЊͲЉЉЉυЍͲЋЎЏͲЌБА
FLEET
5ğƷğ wĻƌźğĬźƌźƷǤ
ЊЉΏĻğƩ CƚƩĻĭğƭƷ
wĻƨǒźƩĻķ /ǒƩƩĻƓƷ
DğƦ
LƓǝĻƭƷƒĻƓƷLƓǝĻƭƷƒĻƓƷ
υВЎͲЉВАͲАЏЎυЏЋͲЌЌЌͲЉЉЉΛυЌЋͲАЏЍͲАЏЎΜ
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 16
Future Outlook Improving the Grade
This State of the Infrastructure -
On an annual
basis, an analysis of new and/or changed information will be completed to update each
. This analysis will better determine the overall health of the asset category
while balancing the need to maintain an expected level of service. Specific examples of
activities and programs that influence the annual grade of an asset category include:
A continued commitment towards formalized replacement & rehabilitation
programs such as the Water Infrastructure Program or Facility Infrastructure Program
will ensure appropriate funding to address the aging infrastructure in such a way to
meet the expectations of stakeholders.
Continued support of the Building Condition Assessment & State of Good Repair
programs across City facilities.
Continue to implement low impact development (LID) options to further enhance
the stormwater mitigation strategies across Kitchener.
Continue to enhance inspection programs across asset categories not currently part
of formalized programs to better assess the on-going condition of those assets.
Although these are but a few specific improvement opportunities, there are some common
elements that can be applied across all asset categories:
Detailed asset management plans (AMPs) provide long term strategies to ensure we
optimize the management of our infrastructure. Creating, updating, and integrating
these AMPs into annual workplans will ensure that long term financial and lifecycle
management strategies are maintained. Several asset categories have yet to
complete asset management plans, while other categories require updating based
on new information or changes in service levels.
Understanding the health of an asset is a crucial component in assessing the overall
condition and useful life of that asset. This information influences preventative
maintenance and rehabilitation programs which identify those priority assets
requiring the most care and maintenance. Several asset categories have yet to
develop inspection programs which if implemented could improve
that category. In other cases, the creation of inspection programs are in the initial
stages which require critical analysis and follow up from the results to determine
effective maintenance levels, prioritization, and actions. This is the only way to start
to develop an appropriate preventative maintenance and rehabilitation plan.
Quality data is the cornerstone of understanding and influencing decisions
surrounding the lifecycle of all assets. A data-driven approach allows decision
makers to understand the cause and effect of maintenance activities to the overall
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 17
health of the asset as well as needed in designing/implementing an effective
maintenance program. The total cost of ownership helps to inform strategies that
s assets while minimizing the risk of failure or
degraded services.
Continued adoption of the asset management framework supports the ability to minimize
collaborative approach between operational teams and the Asset Management Division
and increase resiliency against changes in our environment.
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 18
Appendix A Explaining the Scorecard
In order to consis
used in the four factors outlined below (also included the Introduction section on Page 2 of
this report).
A thorough financial strategy to maintain the expected levels of service
throughout the lifecycle of the asset.
Condition information that leads to understanding the health of the asset
throughout its useful life.
The existence of preventative maintenance and/or rehabilitation programs to
ensure the assets meet their expected lifecycle.
The availability of complete and reliable data for which to create and sustain
asset management plans focusing on optimizing the management of the assets.
In essence, if a category had met all four factors, they would be assigned a total of 4 points.
If they had three factors, 3 points would be assigned, etc.
Those points, then would be associated to a grade, as shown below.
Grade Factor Points
A 4
B 3
C 2
D 1
The overall grade for the city is an overall average of each category combined. As we
continue to evolve our asset management program and include more condition related
data, a further quantitative evaluation will be included.
CITY OF KITCHENER | STATE OF INFRASTRUCTURE REPORT PAGE | 19
REPORT TO: Finance and Corporate Services Committee
DATE OF MEETING: April 19, 2021
SUBMITTED BY: Karen Cooper, Manager, Strategic and Business Planning,
519-741-2200 ext. 7817
PREPARED BY: Lauren Burr, Corporate Planning Analyst, 519-741-2200 ext. 7059
WARD(S) INVOLVED: All Ward(s)
DATE OF REPORT: April 8, 2021
REPORT NO.: CAO-2021-2
SUBJECT: 2021 Business Plan - April Progress Report
RECOMMENDATION:
For information
REPORT HIGHLIGHTS:
This report presents the 2021 Business Plan April Progress Report (Appendix A).
The 2021 Business Plan comprises 40 strategic and business plan projects, with 24 to be
completed this year.
Progress has been made on 28 projects in the first quarter of 2021. The 3 projects completed
as of April 30, 2021 include the Online Customer Service Portal Development, Transformation
and Relaunch of Kitchener.ca, and Electronic Agenda Management.
and vibrant Kitchener.
BACKGROUND:
As the World Health Organization declared COVID-19 a global pandemic on March 11, 2020, the
lives of Kitchener residents and citizens throughout Waterloo Region and around the world
dramatically changed. Over the past year, the City placed the safety of citizens and staff as a top
priority throughout its pandemic response and recovery efforts, while also supporting the economic
sustainability of businesses and employers in the municipality. To achieve these priorities, staff took
complementary and innovative approaches to modernize service delivery and improve efficiencies.
This included enabling staff to work from home, providing more services online, offering existing
programs in new virtual formats, providing training and supports to local businesses and establishing
centralized service counters at city hall. While some of the service delivery changes are only
temporary to address the pandemic restrictions, many will remain post-pandemic and provide long-
term benefits.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
REPORT:
2021 Business Plan - Overall Status
In the context of the continuing pandemic, the 2021 Business Plan comprises 40 strategic and
business plan projects, with 24 to be completed this year. Three projects have been completed in
the first quarter of 2021. As of April 30, 2021, 25 projects are on track to meet their end dates as
scheduled in the 2021 Business Plan. 5 projects are delayed, and 7 projects have not started yet.
While this would be a commendable start to any year, the progress made in the first quarter of 2021
is especially noteworthy after a year of living with COVID-19.
Figure 1: Status of the 2021 Business Plan as of April 30, 2021
Completed On Track Delayed / Not Started
Ќ ƦƩƚƆĻĭƷƭ
ЋЎ ƦƩƚƆĻĭƷƭЊЋ ƦƩƚƆĻĭƷƭ
ΛБіΜ
ΛЏЋіΜ ΛЌЉіΜ
Figure 2: Status of Projects Scheduled for Completion in 2021 as of April 30, 2021
Completed On Track Delayed / Not Started
Ќ ƦƩƚƆĻĭƷƭ
ЊЍ ƦƩƚƆĻĭƷƭА ƦƩƚƆĻĭƷƭ
ΛЊЌіΜ
ΛЎБіΜ ΛЋВіΜ
Strategic Plan Projects
Overall Status of Strategic Plan Actions
2021 Completed Projects: Online Customer Service Portal Development
On March 1, 2021, the City of Kitchener
unveiled its new corporate website along with a
leading-edge customer service portal called
MyKitchener. Citizen input was the driving force
and guiding principle in developing the new
online experience. The portal offers a
personalized user experience through a secure
login. With its ability to create a customized
d
individual interests, My Kitchener is the first city
portal of its kind in North America.
With a MyKitchener account, users can:
Customize their dashboard with content that is relevant to them
View information about multiple properties in one place
Receive notifications when new information is available like new skating and swimming events,
road closures and school bus delays
View and pay property tax and utility bills
View news and upcoming events
Watch council meetings and download meeting minutes and agendas
On Track Projects
18 strategic plan projects are on track for completion by their scheduled end dates, including:
2021 Scheduled End Date Projects
Pedestrian-First Street Plan for Gaukel Street
Community Climate Action Plan
Tree Canopy Target
Incubator, Accelerator and Co-Working Space Network
City-Owned Property Review
Equity, Diversity and Inclusion Strategy
Mill Courtland Community Centre Expansion Business Case
Multi-Language Interpretation Support
Customer Satisfaction Program
2022 Scheduled End Date Projects
Bikeshare Program
Connectivity and Year-Round Maintenance of Multi-Use Trails and Pathways
Pedestrian-First Street Plan for Kitchener Market
Leverage the Energy Efficiency Reserve Fund
Tree Planting Elimination Backlog
Huron Brigadoon Area School / Community Centre Construction
Open Space Strategy
Arts and Culture Plan
2023 Scheduled End Date Projects
Protected Cycling Network Connected to the Downtown
Delayed Projects
Two strategic plan projects are delayed. The New Rosenberg Community Centre/School Business
Case is now planned to start in 2023. Work on the Waste Diversion Strategy: Increase Waste
Diversion in Our Public Spaces and Events commenced in 2019 but is postponed due to the
continuing pandemic.
Projects to Start
Five strategic plan projects are due to start in 2021:
City-Owned Property Brought to Market
Innovation District (Bramm Yards) Master Plan
Civic District Master Plan
Set and Communicate Service Levels
Customer Experience Program
Status of the Business Plan Projects
Completed Projects
The following two business plan projects were completed in the first quarter of 2021:
Transformation and Relaunch of Kitchener.ca
On March 1, 2021, Kitchener launched its comprehensive
new online experience for residents, including a completely
transformed website and new customer service portal
called MyKitchener. The integration between the new
website, portal and services reimagines how municipalities
offer services online. Staff redeveloped the online
presence from the ground up, incorporating best-in-class
web design practices to give Kitchener residents easy
access to the information they are looking for. The new
website is more accessible and easier to understand
because it uses language at a Grade 7 reading level.
Electronic Agenda Management
-wide, fully
automated application for submitting agenda items and
managing meetings for Council, Standing Committees, and
quasi-judicial committee meetings, such as the Committee
of Adjustment. Through engagement in 2019, stakeholders
identified opportunities to improve the report development
and submission process. Agenda.NET creates a number of
enhancements and efficiencies, including automatically
assigning report numbers, document versioning, cross-
departmental collaboration, and automated approval
workflows.
On Track Projects
7 business plan projects are on track for their scheduled end date in the 2021 Business Plan, including:
Budd Park Strategy (2021)
Cameron Heights Pool Feasibility Study (2021)
Southwest District Pool Business Case (2021)
Mobile Time Entry (2021)
Rehabilitation of City Hall Outdoor Spaces Construction Phase 1 (2021)
Facilities Infrastructure Program (2022)
Implementation of Federal Disaster Mitigation & Adaptation Fund (2028)
Delayed Projects
5 business plan projects are delayed with completion now planned for 2022 as follows:
Ice Demand Study
Development Charge (DC) and Community Benefits Charge (CBC) Studies
Long Term Financial Plan Implementation
Point of Sale and Expansion of Payment Options
Implementation of Significant Parks Projects
STRATEGIC PLAN ALIGNMENT:
innovative, caring and vibrant Kitchener.
FINANCIAL IMPLICATIONS:
None
COMMUNITY ENGAGEMENT:
INFORM This report has
council / committee meeting.
CONSULT In 2018, Compass Kitchener consulted the public on developing community priorities
for the 2019-2022 Strategic Plan, which informed preparation of the 2021 Business Plan project list.
PREVIOUS REPORTS/AUTHORITIES:
CAO-20-008 2020 Business Plan Year-End Progress Report and Recommended 2021 Business
Plan Project List
APPROVED BY: Dan Chapman, Chief Administrative Officer
ATTACHMENTS:
Appendix A: 2021 Business Plan Progress Report April 30, 2021
1
334778892
10101315182225252626272729
.
....
......
..............................
.................
................
...................
..................
.....................
....................
.........................
........................
................................................................................
............................
.............................
................................................................
................................
................................................................
................................
................................................................
................................
................................
................................
................................
................................
................................
................................
................................
................................................................................................
................................
................................
................................................................
................................
................................................................
................................
................................................................
................................
................................
................................
................................
................................
................................
................................
................................
................................................................................................
................................
................................
................................................................
................................
................................................................
................................
................................................................
................................
................................
................................
................................
................................
................................
................................
................................
................................................................................................
................................
................................
................................................................
................................
................................................................
................................
................................................................
................................
................................
................................
................................
................................
................................
................................
................................
................................................................................................
................................
................................
................................................................
................................
................................................................
................................
................................
................................
................................
................................
................................
................................
................................
rategic Plan Actions................................................................
................................
19: One Year Later
................................
-
Transportation
................................................................
Friendly
-
................................
................................
Impact of COVIDOverall Status of StStrategic Plan Completions and AchievementsPeopleEnvironmental LeadershipVibrant EconomyCaring CommunityGreat Customer ServiceBusiness Plan Project
CompletionsCommunity ServicesCorporate ServicesFinancial ServicesInfrastructure Services
2022 Strategic Plan Evaluation Criteria2022 Strategic Plan Actions
--
Contents IntroductionOverall Status of the 2021 Business Plan Projects2019Strategic Plan2019Business Plan ProjectsBusiness Plan Projects
3
d
an To
nly
staff
s made
include
how
is described
of
This
g training and
t the year.
, with 10 projects
project
This report contains
as a top priority through
Each
efficiencies.
staff
and
improve
n the Strategic Plan.
term benefits.
-
business plan projects.
lan and other key priorities. These projects form
outlined i
p
14
Council and the community can be proud
strategic and business plan projects
trategic
egion and around the world changed as the World Health
s
19.
R
-
placed the safety of citizens
modernize service delivery and
has
to
he City
pandemic and provide long
While this would be a commendable start to any year, the progres
-
.
the economic sustainability of businesses and employers in the municipality.
.
2022 Strategic Plan, as well as
ing
-
Over the past year, t
and April 30, 2021
mentary and innovative approaches
le
all 25 actions from the 2019
19 a global pandemic.
-
recovery efforts, while also support
lan, which is developed alongside the budget to ensure resources are aligned to complete the work.
including anticipated timing for completion. Regular progress is reported to Council and the public throughou
City Council approves a list of projects that implement the current
p: One Year Later
19
-
allenging time, staff demonstrated resiliency and made progress on
local businesses and establishing centralized service counters at city hall. While some of the service delivery changes are o
usiness
in 2020, and 3 more completed in the first quarter of 2021
b
Business Plan includes
1
business plan,
March 11, 2020, the lives of Kitchener residents and citizens throughout Waterloo
Introduction Each year, Kitchener the annualin the The 202update on progress made between January 1 Impact of COVID OnOrganization declared COVIDits pandemic response andachieve these
priorities, staff took compenabling staff to work from home, providing more services online, offering existing programs in new virtual formats, providinsupports to temporary to address
the pandemic restrictions, many will remain postThrough this chcompletedin the first quarter of 2021 is especially noteworthy after a year of living with COVIDadapted to the challenges
of the pandemic and continued to deliver on the community priorities
4
projects (10%) are delayed, and
5
.
Not Started
end dates
(30%) (29%)
7 projects
12 projects
are expected to be completed in 2022, 2 in 2023 and
planned
3
1
Delayed or Delayed or Not Started
.
their
this year
.
(62%) (58%)
Projects
21
-
On TrackOn Track
25 projects14 projects
10
to be completed
%) are on track to meet
62
pages
projects
4
ness Plan
projects (
as of April 30, 2021
i
5
2
, with 2
Bus
1
(8%)
(13%)
projects
.
3 projects3 projects
40 CompletedCompleted
Business Plan
1
started
yet
have been completed.
comprises
of the 202of Projects Scheduled for Completion in 2021 as of April 30, 2021
projects and their status is included on
have not
projects
3
,
Status of the 202
StatusStatus
(20%)
Business Plan
:
1:2
1
scription of
April 30
de
projects
Overall The 2021 in 2028. As of 7The FigureFigure
5
ment
Transformation and Relaunch of Kitchener.caElectronic Agenda Manage
business plan projects
2
1
Construction Phase
(2021)
:
Disaster Mitigation & Adaptation Fund
include
projects
Online Customer Service Portal Development
completed
Budd Park Strategy (2021)Cameron Heights Pool Feasibility Study (2021)Southwest District Pool Business CaseMobile Time Entry (2021)Rehabilitation of City Hall Outdoor Spaces (2021)Facilities
Infrastructure Program (2022)Implementation of Federal (2028)
rack
3
T
strategic plan project
7 business plan projects
1
Complete The On 25 projects are on track for their scheduled end date in the 2021 Business Plan, including:
6
Implementation
on of Payment Options
Ice Demand StudyDevelopment Charge (DC) and Community Benefits Charge (CBC) StudiesLong Term Financial Plan Point of Sale and ExpansiImplementation of Significant Parks Projects
business plan projects are delayed into 2022, including:
5
(2023)
:
, including:
scheduled to 2022)
re
(postponed,
Community Centre/School Business Case
Communicate Service Levels
Owned Property Brought to Market
-
plan projects will begin in 2021
CityInnovation District (Bramm Yards) Master PlanCivic District Master PlanSet and Customer Experience Program
Waste Diversion Strategy: Increase Waste Diversion in Our Public Spaces and EventsNew Rosenberg
strategic
2 Strategic Plan projects are delayed, including To Start 5
Delayed
7
Plan.
, staff
Citizen
0
he Strategic
As of April 30, 2021,
the fall of 202
In
.
provide a roadmap for the
s adopted the 2030 Agenda
e implementation of the SDGs
will
ject
he public through an online
inning in 2021.
004.
-
20
-
serve as a model regionally, nationally, and globally.
will
nequality, confront injustice and tackle climate change by 2030.
and
Appendix B of report CAO
p
the SDGs for the Kitchener context. This pro
2022 strategic plan connect to at least one of the SDGs
-
ing
2022 Strategic Plan:
-
and adapt
ment Goals
ing
localiz
within the strategic planning process
c benchmarks and measure progress towards achieving the SDGs within current and future strategic plans.
provides advice to Council on
2022 Strategic Plan can be found in
-
completed (28%).
als
, begin work on
of the 25 action statements within the 2019
Each
Green Beacon
,
Citizen Advisory Committee
identifies community priorities for action, and monitors progress toward achieving the community vision and in implementing t
er has 4 levels of evaluation criteria/measures for the 2019
2022 Strategic Plan Evaluation Criteria
-
Overall Implementation of the Strategic PlanOverall Implementation of the Sustainable Development Goals (SDGs) through the Strategic PlanImplementation of Strategic Plan GoImplementation
of Strategic Plan Actions
Compass Kitchener
to fully integrate, implement, and operationalize SDGs
2019 The Compass KitchenerCompass KitchenOne evaluation metric has been proposed for each of the 25 Strategic Plan actions. These metrics will be tracked by staff beg7 out of the 25
strategic plan actions have been At the United Nations (UN) Sustainable Development Summit in September 2015, world leaders from Canada and other member stateThe City of Kitchener is
committed to working with the Government of Canada in embracing the 2030 Agenda and to supporting thin Canada and internationally.worked with local consultantCity This localized project
has enabled the City to set specifiOnce the localized SDG targets and indicators are finalized and benchmark data has been collected, they will be shared with tDashboard.
8
Strategic Plan Overall Status of Strategic Plan Actions
9
Citizen
the new
strategic plan project
and school bus
ity portal of its kind
developing
c
itchener account users can customize their
, with additional rollout to follow by summer.
DI strategy by end of June 2021.
customer service portal, called MyKitchener.
services
edge
-
begin in 2021.
With a MyK
The portal offers a personalized user experience through a
.
the five goals of the Strategic Plan. The following
leading
its
ith work to
each of
On March 1, 2021, the City of Kitchener unveiled its new corporate website along with input was the driving force and guiding principle behind online experience. address and individual
interests, My Kitchener is the first in North Americadashboard with content that is relevant to them; view information about multiple properties in one place; receive notifications
when new information is available like new skating and swimming events, road closuresdelays; view and pay property tax and utility bills; view news and upcoming events; watch a council
meeting and download meeting minutes and agendas, and so much more.
being prepared for public input.
is
projects under
committed
:
Language Interpretation Support with key frontline
-
:
s
progress in
include
construction of the Protected Cycling Network, w
considerable
progress
in the first quarter of 2021
in
implementation of Multi
Completions and Achievements
is making
Online Customer Service Portal Development A tender posted for A complete draft of the Community Climate Action Plan Starting Data set on tree canopy
completed
1.
as
Strategic Plan The City w Other strategic plan
10
.
here
ooters as part
sc
-
Update
bikes and e
-
Progress
wide bikeshare feasibility study
-
.
a wider range of transportation
Completed in 2019.Read Complete Streets Kitchener A regionwas approved that recommends a collaborative approach to a bikeshare program throughout the region. A regionwide project team
is investigating the use of eof the future program and note that traditional private bikeshare providers have changed their business model to reflect options
2022
-
to
2019
Timeline
Complete
Completedin 2020
Cronkite
Project
Manager
Barry Cronkite Transportation Services Barry Transportation Services
ch bicycles
Project
ikeshare service in whi
b
Actions
hare Program
made available for shared use to the public
Complete StreetsƚƩƉ ĭƚƒƦƌĻƷĻķ źƓ ЋЉЊВ͵Bikes Implement aare a feasibility study to determine the most appropriate system.
Transform how people move through the city by making the transportation network safe, convenient, comfortable and connected.
y 2021.
Statement
2022 Strategic Plan
-
GOAL:
Friendly Transportation
-
Strategic Plan Action
Develop a set of Complete Encourage and incentivize
1.1 Streets (safe and comfortable) guidelines and an associated evaluation scorecard by 2020 to apply to roadway construction projects.1.2 alternative modes of transportation by developing
and subsidizing a bikeshare program b
2019 People
11
Valley
Update
Progress
.
A tender has posted for construction, which will begin in spring 2021.Completed in 2020.Read the Cycling and Trails Master Plan hereTrail improvements are being planned on several community
trails and bridges including: Traynor to Wilson, Kingsway to Vanier, sections of the Laurentian Trail, bridges in Vanier, Rothsay, Lynn and Victoria Park.
3
2022022
--
to
2020
Timeline
Complete
2020 Completedin 2020
Project
Christensen
Manager
Darren Kropf Transportation Services Liz Christensen Transportation Services Liz Parks & Open Space Design & Development
with
,
round
-
athways
and the
Round
, in one
-
Connected to the
cent neighbourhoods Trails and P
3 km of existing trails
.
se
round access to a
U
-
use trails and pathways
-
-
Project
connectivity and year
wayfinding.
road cycling facilities, as well as
-
town by 2022
Use Trails and Pathways Master Plan
-
the 2010 Cycling Master Plan
e actions,
Cycling and Trails Master Plan UpdateConnectivity and Year
road trails infrastructure
nclude on
-
i
Protected Cycling NetworkDowntown Install a continuous and protected cycling network that connects adjato the down 1.4.1 Update2012 Multito offcomprehensive plan that also addresses
education and 1.4.2 Maintenance of Multi Prioritizmaintenance to multithrough the Cycling and Trails Master Planan initial target of yearminimum of an additional by 2022.
.
.
cent
round access
-
Statement
use trails and pathways
town by 2022
-
round maintenance to
-minimum of an additional
Strategic Plan Action
Install a continuous and Improve connectivity and
1.3 protected cycling network that connects adjaneighbourhoods to the down 1.4 yearmultias prioritized through the Cycling and Trails Master Planwith an initial target of providing yearto
a 3 km of existing trails by 2022
12
Update
interventions.
Progress
cost street
-
pace in late spring 2021, subject to
Gaukel Street was closed to traffic during the pandemic and will continue to remain closed as a passive pedestrian space. The block between King St and Charles St will be turned into
passive sdevelopment construction completing, and additional formal seating will be added to the Joseph St/Charles St block in summer 2021.A project charter has been approved. Staff
is investigating programming and low
20212022
--
to
Timeline
Complete
20202021
Project
Manager
Darren Kropf Transportation Services Darren Kropf Transportation Services
.
destrians over
et Plan for Gaukel et Plan for Kitchener
Gaukel Street.
Project
First StreFirst Stre
--
PedestrianPedestrian
1.5.1 Street Develop plans to prioritize pedestrians over other travel modes on 1.5.2 Market Develop plans to prioritize peother travel modes between the Kitchener Market ION station
and Kitchener Market
first streets
-
Statement
Strategic Plan Action
Develop a plan to create
1.5 pedestrianbetween Victoria Park and City Hall and between the ION and Kitchener Market by 2022.
13
.
here
sources.
2021.
-
h projects are underway.
capital energy reserve project
Progress Update
19 safety concerns the project was
-
Project completed in 2019. Read the Corporate Climate Action Plan Originally the 2020 was to retrofit the remaining administrative office lighting at the Kitchener Operations Facility
(KOF). Due to COVIDswitched to outfitting Civic District Garage and KOF Shops & Stores. BotThe KOF administrative lighting project is on hold and will be reassessed in 2021 if it or
another project with similar payback will take its place.A draft of the Community Climate Action Plan is complete and is being prepared for final public input. The community climate
action plan will be presented to Council by mid
20222021
--
2019
Complete
Timeline to Completed in 20202020
---
Project
Manager
Claire Bennett AdministrationDevelopment Services Claire Bennett AdministrationDevelopment Services Claire Bennett AdministrationDevelopment Services
Reporting
Project
nually on greenhouse gas emission
ommunity Climate Action Plan
Corporate Climate Action PlanƚƩƉ ĭƚƒƦƌĻƷĻķ źƓ ЋЉЊВ͵anreduction will continue until 2026.Leverage the Energy Efficiency Reserve Fund Leverage the fund to undertake energy efficiency
retrofit projects on City of Kitchener assets and capture and reinvest the operating savings to pay for capital costs.C Complete the 80x50 Community Climate Action Plan.
.
ciency Reserve
i
Statement
ergy Eff
arting in 2019, leverage
Achieve a healthy and livable community by proactively mitigating and adapting to climate change and by conserving natural re
.
Launch and implement a StDevelop a Community
Strategic Plan Action
2.1 Corporate Climate Action Plan by 2019 to achieve an absolute greenhouse gas emission reduction of at least 8% by 2026.2.2 the EnFund and other resources to reduce consumption and
emission at our facilities and in our operations 2.3 Climate Action Plan with partner organizations by 2020
Environmental Leadership Goal:
14
learning
or
with visual
Community and Council
Progress Update
emic, large public events were
The final tree canopy dataset has been received from the consultant.engagement regarding Kitchener's tree canopy and the setting of a tree canopy target will occur in the spring/early
summer of 2021, followed by Council consideration of a tree canopy target.Approximately 630 trees will be planted in 2021. All suitable tree replacement locations identified as of December
31, 2018 will have been planted by the end of 2021, eliminating the 2018 tree planting backlog.Due to the pandcancelled, and this project is postponed until events restart. Recycling
and organics diversion has also increased across public facilities and spaces, including a pilot project to improve waste station wayfinding for people impairments as well as English
as a second language (ESL) visitors.
22
2021202220
---
Complete
Timeline to 202020202020
-
Project
Manager
Dave Schmitt Forestry & Natural Areas Management Adam Buitendyk Forestry & Natural Areas Management Claire Bennett AdministrationDevelopment Services
acklog
B
Project
vailability, quality of
lanting
P
run events with large
-
ion
Tree Canopy TargetTree
iminat
2.4.1 Review the current canopy cover and set an achievable target based on best practices as well as constraints such as land asoil, etc. in order to guide ongoing and future investment
in tree planting, protection and maintenance.2.4.2 El Plant at least 750 trees in 2020, with the goal of reaching 2,500 trees and eliminating the current backlog by the end of 2022.Waste
Diversion Strategy: Increase Waste Diversion in Our Public Spaces and Events Expand the Waste Diversion Station to all Cityvolunteer involvement, and evaluate expanded waste diversion
stations at events, parks and public facilities.
nd events by
Statement
.
.
Implement the Reduce waste diverted to
Strategic Plan Action
2.4 Sustainable Urban Forest Strategy with a focus on establishing a tree canopy target by 2020 and eliminating the current (2018) tree planting backlog by 2022 2.5 landfills by implementing
new diversion programs at our facilities a2021
15
here.
and great places
.
here
Progress Update
2019.2019.
in in
about this project
Completed Read the Urban Design Manual Completed Learn
20192019
Complete
Timeline to
Completed in Completed in
Project
Manager
Dayna Edwards Planning Cory Bluhm Economic Development
Project
Buildout of 44 Gaukel
Urban Design ManualƚƩƉ ĭƚƒƦƌĻƷĻķ źƓ ЋЉЊВ͵3.2.1 ƚƩƉ ĭƚƒƦƌĻƷĻķ źƓ ЋЉЊВ͵
-
wide
-
tech industries.
-
working spaces by completing
Build a vibrant city by making strategic investments to support job creation, economic prosperity, thriving arts and culture,
-
h/med
Complete a new Urban Design Foster the creation of a city
Strategic Plan Action Statement
3.1 Manual by 2019 that expresses city building and design expectations to ensure vibrant new development throughout Kitchener.3.2 network of incubators, accelerators and cothe buildout
of 44 Gaukel in 2019, advancing work on a Creative Hub and undertaking business cases in 20192021 for the food manufacturing and healt
Vibrant Economy GOAL:to live.
16
.
here
is
in late
A
Because of the
to Council
owned space and with
-
ke It Kitchener, components of
Progress Update
. Due to the pandemic, finalization of the
omprehensive review and completion
Staff is investigating opportunities for incubators within Citypotential partners. Business cases will be prepared and presented 2021. Completed in 2020.Read the Make It Kitchener
2.0 Strategy Initial focus has been on supportive housingsitesreview is delayed until 2021.pandemic and urgent need around affordable housing and Mathe review commenced in 2020.canticipated
in 2021.
2021
-
1
2020
Complete
Timeline to
2020 Completed in 202
msky &
u
Project
Manager
Cory Bluhm Economic Development Lauren Chlumsky Economic Development Lauren ChlRob Morgan Economic Development
tech
-
eview
to ensure the
Accelerator and
ives.
Project
comprehensive review
ubators.
owned properties by 2020 to
-
Owned Property R
-
Working Space Network
-
3.2.2 Incubator, Co Lease all spaces in the Creative Hub, explore the potential to facilitate a Food Incubator with a business case pending, and explore partnerships for the development
of manufacturing and health/medindustry inc Make It Kitchener 2.0 Strategy Develop the Make it Kitchener 2.0 Strategy by 2020 with a focus on transformative actionsattraction, success
and retention of diverse businesses, talent, and arts/culture across the city.City Complete aof citydetermine how they could be effectively used to advance city strategic object
owned properties by 2020 to
-
Develop the Make it Kitchener 2.0 Complete a comprehensive review
Strategic Plan Action Statement
3.3 Strategy by 2020 with a focus on transformative actions to ensure the attraction, success and retention of diverse businesses, talent, and arts/culture across the city.3.4 of citydetermine
how they could be effectively used to advance city strategic objectives.
17
working with University of
Progress Update
ght to market in late 2021 after
This will occur once the City owned property review has been completed by September 2021. It is expected that the first property will be broucomprehensive community engagement.The
current focus is Waterloo to build out the Health Innovation Arena on the Health Sciences Campus. Work on the Master Plan will commence in late 2021.Preliminary project planning has
started. A visioning exercise will be completed before the Master Plan commences.
1
20232022022
---
10
Complete
Timeline to
2022022021
Bluhm
Project
Manager
Brian Bennett Economic Development Cory Bluhm Economic Development Cory Economic Development
th at least one new
Project
Owned Property Brought
-
Innovation District (Bramm Civic District Master Plan
arket
owned property brought to
-
3.5.1 Cityto M Develop a vision for downtown Kitchener and continue to position downtown Kitchener as a leading destination for redevelopment opportunities, wicitymarket by 2020.3.5.2
Yards) Master Plan Finalize the Innovation District (Bramm Yards) Master Plan by 2022.3.5.3 Finalize the Civic District Master Plan by 2022.
s)
owned property brought to
Develop a vision for downtown
-
Strategic Plan Action Statement
3.5 Kitchener and continue to position downtown Kitchener as a leading destination for redevelopment opportunities, with at least one new citymarket by 2020. Finalize the Innovation
District (Bramm YardMaster Plan by 2021 and the Civic District Master Plan by 2022.
18
-
-
&
here
task force
ty, Anti
by the end
income youth
informed
-
-
working groups will be
to complete work
the
Progress Update
entorship program for low
ommunity grant for racialized groups
Policy Training Demographic Data CollectionHiring & Recruitment Communications CM
The Mayor's Task Force on Equity, Diversity & Inclusion is on track of June 2021. There are currently seven working groups developing equitystrategies and recommendations in the following
areas: The deliverables of compiled into a comprehensive Equity & AntiRacism Strategy for the City of Kitchener, to be implemented by the newly formed EquiRacism & Indigenous Initiatives
staff team.Completed in 2020.
2021
-
to
2020
Timeline
Complete
2020 Completed in
-
Project
Manager
ervices
Elin Moorlag Silk AdministrationCommunity S Andrew Ramsaroop Planning
f
o
.
focused on better
nity groups and the
and Inclusion
able Housing
Project
industry
represented people, as
-
Strategy
reate an Equity, Diversity and
Equity, DiversityStrategy CInclusion engaging and serving marginalized and underwell as creating a more inclusive City workplace.Affordable Housing Strategy Create an AffordStrategy
for Kitchener by 2020 in collaboration with the Region Waterloo, commudevelopment
.
.
nclusion
I
industry
f Waterloo,
o
Statement
nity groups and the
Diversity and
,
Strategic Plan Action
Create a comprehensive Create an Affordable
Caring Community
4.1 EquityStrategy by 2020 to combat systemic barriers to full economic and social participation in the city 4.2 Housing Strategy for Kitchener by 2020 in collaboration with the Region
commudevelopment
4. GOAL:supporting our diverse populations & helping to make housing affordable.
19
to
of 2021.
2
Q
.
in
here
Progress Update
2019.
in
nticipate starting
A
stigma training will now become a core
-
Completed in 2020.Antilearning program with ongoing evaluation and customization as required to meet the diversity of staff needs throughout the organization andensure the content is
relevant to evolving community needs. Completed Learn about this project Staff resource supporting this project has been redeployed to run summer programs and services.
2021
-
to
20202019
Timeline
Complete
Completed in Completed in 2020
Project
Manager
Paula Dunn Human Resources Mark Hildebrand Neighbourhood Programs & Services
tigma through
S
aphics.
Business Case
Project
ocial
S
needs assessment and
Courtland Community
raining
Reduce Support for Safe Consumption Mill
T
taff
4.3.1 S Provide staff with the resources torespond effectively to changing community demogr 4.3.2 and Treatment FacilitiesƚƩƉ ĭƚƒƦƌĻƷĻķ źƓ ЋЉЊВ͵4.4.1 Centre Expansion Complete a business
case to determine the requirements for an addition to the Mill Courtland Community Centre.
resources across
Statement
.
and support the
and an Open Space
ers,
Strategic Plan Action
Reduce social stigmas Better utilize existing
4.3 experienced by those living with mental illness and addiction in our community through staff training and supporting the creation of appropriate safe consumption and treatment facilities
in Kitchener 4.4 facilities, provide relevant programming at community centequitable distribution of leisureprograms and neighbourhoods. Start work on the Mill Courtland Community Centre
expansion by 2020 and the Rosenberg Community Centre by 2021. Complete the Huron Brigadoon Community CentreStrategy by 2021.
20
.
roject has been sent
Progress Update
awaiting final costing and approvals
-
have been approved. P
.
Project pushed out to 2023 to 2026 by the school boardDetailed design has been completed. Building permits have been approved. Application to the Province for approval of design and
budget submitted by Waterloo Region District School Boardto tender Project initiation is ongoing with project manager identified, scope and charter being developed.
2
2022022
--
to
23
Timeline
Complete
2021 New date: 20 2020 2020
Lobley
Project
Manager
Mark Hildebrand Neighbourhood Programs & Services Mark Hildebrand Neighbourhood Programs & Services Niall Parks & Cemeteries
/
assessment and
Business Case
Project
New Rosenberg Community Huron Brigadoon Area School Open Space Strategy
4.4.2 Centre/School With the Catholic School board, complete a needs business case to determine the requirements for a joint community centre/school in the Rosenberg area.4.4.3 Community
Centre Construction Construct a joint school/community centre in the Huron Brigadoon area, in partnership with the Waterloo Region District School Board.4.4.4 Develop an open space
strategy to explore the value of open spaces, how they function, are planned, maintained, and managed, and including a review of permitted uses in parks.
Statement
Strategic Plan Action
21
terloo for
ime to commence
Progress Update
on these initiatives in underway.
pandemic, and therefore engagement has
-
The City developed a partnership with the Region of Waterloo and the City of Wastakeholder consultation, research and analysis. A Terms of Reference and plan for stakeholder consultation
are under development. Consultation was anticipated for late 2020, however this has been postponed until later in 2021. The appropriate tcommunity engagement for the Culture Plan is
postbeen postponed. Support for professional artists and cultural organizations will be considered as part of the COVID recovery plan. Specific engagement
2
202
-
to
Timeline
Complete
2020
Project
Manager
Emily Robson Economic Development
cultural
-
Project
by engaging a broad
section of the community
-
Arts and Culture Plan Develop a new and inclusive Arts and Culture Plan crossincluding the arts and creative industry sector and multicommunities.
-
-
Statement
Strategic Plan Action
Engage a broad cross
4.5 section of the community including the arts and creative industry sector and multicultural communities to develop an inclusive arts and culture Plan by 2021.
22
open.
-
re
based feedback collection
-
nal service channels will be
mail
Progress Update
call surveys at our contact centres, as well
-
Contract for service has been finalized with the vendor. Work with community centres to determine top languages (by neighbourhood) to advertise the new service is complete. A more limited
implementation of this service, with key frontline users including Bylaw, Revenue, Corporate Contact Centre and Community Centres, is scheduled to be complete by the end of the April
with additional roll out to more staff to follow by summer.Postas online and ebegan in late 2020 for City Hall appointment and Book Your Bubble bookings, and overnight parking exemptions.
The program has expanded to include the new MyKitchener portal and website beta launch feedback collection. Additioincorporated into the program as they
20212021
--
Complete
Timeline to 20202020
Project
Manager
Jana Miller Corporate Customer Service Christine Baker Corporate Customer Service
ience
-
wide
-
demand multi
-
person inquiries to
Project
-
7 on
-
24
time feedback, monitoring
-
and engagement with the city by providing friendly, easy and convenient services.
an organization
Language Interpretation Support
-
stomer Satisfaction Program that
ulti
M Implement a language interpretation support for telephone and inenable staff in all facilities to ensure a more consistent and equitable experfor all customers.Customer Satisfaction
Program Implement Cuenables realand reporting of satisfaction data to drive service improvements.
wide
-
collection
demand
-
Statement
.
Strategic Plan Action
Provide onIntroduce a corporate
5.1 customer service support in many languages through the Corporate Contact Centre by 2020 5.2 Customer Satisfaction Program that will allow for the of real time feedback from customers
accessing city facilities, programs, and services by 2020.
Great Customer Service GOAL:
23
rtal:
k and
portal
.
Progress Update
MyKitchener customer service
Completed in 2021.The launched in beta (an almost finished version the public can provide feedback on) to the public on March 1, 2021. The public is testing the functionality of the
portal during the beta test and staff are monitoring feedbacmaking improvements based on what we learn. Later in 2021, the project team will regroup to review the scope of Phase 2
of the portal's development, which will include additional new functionality for residents.See the new website and access the powww.kitchener.ca Project to start in late 2021
2022
-
Complete
Timeline to Completed in 2021 2021
Project
Manager
Jana Miller Corporate Customer Service Jana Miller Corporate Customer Service
services
-
nd grass
e Portal
Project
ugh a personalized, single
a centralized online service portal
on account.
-
aunch
Online Customer ServicDevelopment Lwhere citizens can access their ein one place throsign Set and Communicate Service Levels Set clearly communicated and specific service levels for
frequently asked about or accessed City services, including: tree maintenance, parking, property standards complaints, snow clearing acutting by 2022.
ng and
.
by 2022
Statement
and allowing financial
,
Strategic Plan Action
Enhance customer Set clearly communicated
5.3 experience online by delivering customized information, providing easy access to servicestransactions by 2021.5.4 and specific service levels for frequently asked about or accessed
City services, including: tree maintenance, parking, property standards complaints, snow clearigrass cutting
24
.
Progress Update
Project to start in 2021
2022
-
Complete
Timeline to 2021
ce
Project
Manager
Jana Miller Corporate Customer Servi
Project
Customer Experience Program Implement a comprehensive CustomerExperience Review Program to help ensure services are easy and convenient by 2022.
Statement
Strategic Plan Action
Implement a
5.5 comprehensive Customer Experience Review Program to help ensure services are easy and convenient to access from the 2022.
25
ner
new website,
Council, Standing
the
its comprehensive new
ed
wide, fully automated application
MyKitchener portal will empower -
edge online customer service portal
-
eedback made it clear that the City is
judicial committee meetings, such as the
-
reimagines how municipalities offer services online.
class web design practices to give Kitchener residents
-
the City of Kitchener launch
in
-
departmental collaboration, and automated approval
-
serve on their schedule.
-
ss
On March 1, 2021, online experience for Kitchener residents, including a completely transformed website and new, cuttingcalled MyKitchener. The seamless integration between portal and
City servicesThe City has redeveloped its online presence from the ground up, incorporating bestexperience includes a new website with plain language content. By lowering the reading
level of the website from college to grade seven, the City is making their website more accessible and easier to understand. The City hopes that the new website and residents to self
for submitting agenda items and managing meetings for Committees, and quasiCommittee of Adjustment. Through engagement across the City in 2019, stakeholders identified opportunities
to improve our report development and submission process. Valuable fready for an enhanced and efficient report writing and meeting management software solution. Agenda.NET creates enhancements
and efficiencies, including automatically assigning report numbers, document versioning, croworkflows. For report writers and approvers, it is time to make creating and submitting items
to Council and Committee meetings easy!
s
Transformation and Relaunch of Kitchener.caElectronic Agenda Management
1.2.
Business Plan Project Business Plan Project Completions
26
term impacts of
-
g
own.
n
p the terms of reference for
o
School Board contacted by the
pandemic on ice users is unk
Progress Update A condition report has been completed for the facilities on the site. The work to evaluate the benefits of the Budd Lands for employment and for recreation is underway.Waterloo
Region District end of March 2021 to confirm support to release the Terms of reference for consultant services.Planning is underway to develthe pool business case.Work was paused to
avoid putting additional pressures on the user groups during the pandemic. Speculation on future ice demands is challenging when the lonthe
to
2021202120212021
----
0
22
TimelineComplete 202202020202020 New date: 20
Project Manager Kim Kugler Sport Kim Kugler Sport Kim Kugler Sport Jeremy Dueck Sport
e
ermine the elements
Feasibility Study
Waterloo Region District School
Pool Business Cas
timing of a new arena.
Community ServicesBudd Park Strategy Identify potential sites and estimated costs to relocate the recreational assets at Budd Park and compare the costs to the economic benefits of using
the Budd Park for employment lands.Cameron Heights Pool Collaborate with the Board to determine the renovations and estimated costs to isolate the pool operation from the school operation
to preserve a recreational asset in the downtown.Southwest District Engage community residents/stakeholders in a needs assessment and business case to detto be included in the new pool.Ice
Demand Study Evaluate ice user needs and trends for ice time to determine the
1234
BP0BP0BP0BP0
Business Plan Projects
27
taff
,
s
for council and members of the
launch rollout will continue within the
-
governance, training, documenting
ated rules are being considered and built into the
. Post
launch administrative work will be ongoing
-
rel
-
Progress Update The website and portal launched March 1, 2021. Postincludingprocesses, early improvements, etc.Agenda.Net was launched February 5, 2021 for City and on February 19, 2021publicorganiza
tion as more Committees are added to the platform.
Progress Update Project team currently completing requirements workshops and beginning design phase of the solution. Close collaboration with divisions that will become early adopters
has been effective in ensuring all business processes and unionfinal solution.
2021
-
Timeline to Complete 2020
Timeline to Complete Completed in 2021Completed in 2021
Communications
Services
Project Manager Jason Winter Asset Management & Business Solutions
Project Manager Nicole Amaral Corporate & Marketing Jeff Bunn Legislated
first
-
based timesheets.
-
the
have
to
Implement mobile time entry for operations,
Corporate ServicesTransformation and Relaunch of Kitchener.ca Relaunch Kitchener.ca as a userdesigned site that is easy for residents to quickly find any information they are looking
for, as well as delivered to them.Electronic Agenda Management Create, prepare, approve and publish meeting agenda packages and minutes in a more efficient, collaborative, streamlined
manner.Financial ServicesMobile Time Entry eliminating the need for paper
5
06
BP0BP BP07
28
consider the expansion of payment
determination on Community Benefits Charge to be
Progress Update Provincial legislation proclaimed in Fall 2020. Consultant has been retained and work will be launching in Q1 2021. Planning to complete Development Charges study in
2021, with completed in 2022.Capital Variance report and some policy updates planned for 2021. Other policy updates will occur in a future year.Expansion of Payment Options for Utility
and Property Tax customers went live on February 24, 2021. The next phase of the project will options for Business Licensing, Building Permit, Planning and Miscellaneous Receivable
services.The Point of Sale part of the project will be delayed until 2022.
202120212021
---
2
22222
Timeline to Complete 2020 New date: 20 2020 New date: 20 2020 New date: 20
Project Manager Ryan Hagey Financial Planning Ryan Hagey Financial Planning Saleh Saleh Revenue
Term
-
.
Implementation
ge study
life cycle, and expand payment options
Financial ServicesDevelopment Charge (DC) & Community Benefits Charge (CBC) Studies investigate whether the City should prepare a community benefits char Long Term Financial Plan Implement/consider
recommended actions identified as 2020 items in the LongFinancial Plan.Point of Sale and Expansion of Payment Options Replace the existing Point of Sale system, which is past its for
various services.
080910
BPBPBP
29
and development of a
,
preparations will be taking
background research on
e,
ongoing, and a series of stakeholder
Progress Update Several project activities have been completed: a capital budget restructuring exercismunicipal and industry comparatorscapital planning framework and processes. Financial
modelling and projection work areworkshops will be conducted starting in May 2021.Construction activities continued in Winter 2020/2021. It is expected that underground work will be
completed in Carl Zehr Square in the Spring 2021 and final place for surface concrete placement. Mechanical installations for the ice rink and water feature are underway. The demolition
of the upper terrace will also be a focus area of work.
2
lete
2022021
--
Timeline to Comp 20202020
Project Manager Beatrice Powell Facilities Management Lynda Stewart Facilities Management
on Carl Zehr
r Spaces
ing
ss the infrastructure
focus
,
term maintenance and capital
-
comprehensive review of facility
construction associated with the rehabilitation
Infrastructure ServicesFacilities Infrastructure Program Conduct ainfrastructure needs that will incorporate building condition assessments, sustainability opportunities, and accessibility
needs to identify current gaps and inform longimprovement strategies to addredeficit.Rehabilitation of City Hall OutdooConstruction Phase 1 Begin of City Hall Outdoor spacesSquare and
College Street.
BP11BP12
30
rand River
rk to track Community
Assessment report, First
ently resumed with the donor and
and REEP (DMAF funding recipients)
Greenhouse Gas
consultation, and a framewo
-
k for RBJ Schlegel Phase 2 is nearing completion
WIP (Water Infrastructure Program) is completed to
-
wood Park will have design and engagement completed in
Progress Update Design worwith construction tenders being issued and prepared through spring. Construction is scheduled for summer and fall 2021. Survivor Garden was deferred in 2020
due to the impacts of COVID; discussions have recit is anticipated that this will move forward in 2021, with a tentatively completion of end of 2021. Westwood Park is part of a bundle
of parks projects that has been awarded for design, engagement and implementation; West2021, and it is anticipated a tender for work will be issued and awarded in 2021. Construction
may need to be deferred to 2022. Currently finalizing reporting and financial claim templates for the program. Preceding conditions of the DMAF agreement are complete, including Nations
preEmployment Benefits. Agreements with GConservation Authorityhave been executed. Approximately 9% of construction for the DMAFdate.
lete
2028
2021
-
-
2
2
Timeline to Comp 2020 New date: 20 2020
Project Manager Niall Lobley Parks & Cemeteries Nick Gollan Sanitary & Stormwater Utilities
Park;
; and
RBJ Schlegel
urvivor Garden
Adaptation Fund (DMAF)
Infrastructure ServicesImplementation of Significant Parks Projects Complete Phase 2 design work for plan, design and construct the Scomplete the upgrade to Westwood Park.Implementation
of the Federal Disaster Mitigation and Plan and execute stormwater management infrastructure projects across the city to leverage the DMAF grant funding and advance the implementation
of the 2016 Integrated Stormwater Management Master Plan.
1314
BPBP