Loading...
HomeMy WebLinkAboutDSD-2021-101 - B 2021-031 & B 2021-032 - 425 Bingemans Centre Dr (Easement) and (Severance)Staff Report ` De velo hent Services Departrnent www. kitchener. ca REPORT TO: Committee of Adjustment DATE OF MEETING: June 15, 021 SUBMITTED BY: von Westerholt, Juliane, Senior Planner, 519-741-2200 ext. 7157 PREPARED BY: Stevenson, Garett, Senior Planner, 519-741-2200 ext. 7070 WARD(S) INVOLVED: Ward 1 DATE OF REPORT: June 3, 2021 REPORT NO.: DSD -2021-101 SUBJECT: Consent Application B2021-031 — Access and Servicing Easement Consent Application B2021-032 — Creation of a Lot 355-425 Bingemans Centre Drive Owner— Bingemans Inc. Applicant — Leslie Boggs & Paul Britton, MHBC Planning RECOMMENDATION: That application B2021-031 requesting permission to create an access easement that is 0.839 hectares in size, and proposing to create a storm water easement that is 0.91 hectares in size, both on the retained lands in favour of the severed lands, and requesting permission to enter into a private maintenance agreement for the drainage outlet and access for a period of more than 21 years, be approved subject to the following conditions: 1. That the Owner shall provide a digital file of the deposited reference plan(s) prepared by an Ontario Land Surveyor in PDF and either .dwg (AutoCad) or .dgn (Microstation) format, as well as two full sized paper copies of the plan(s). The digital file needs to be submitted according to the City of Kitchener's Digital Submission Standards to the satisfaction of the City's Mapping Technologist. 2. That the Owner shall obtain a tax certificate from the City of Kitchener to verify that there are no outstanding taxes on the subject property(ies) to the satisfaction of the City's Revenue Division. 3. That the Transfer Easement document(s) required to create the Easement(s) being approved herein shall include the following and shall be approved by the City Solicitor in consultation with the City's Director of Planning: a. a clear and specific description of the purpose of the Easement(s) and of the rights and privileges being granted therein (including detailed terms and/or conditions of any required maintenance, liability and/or cost sharing provisions related thereto - or a separate private maintenance agreement); *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. b. a clause/statement/wording confirming that the Easement(s) being granted shall be maintained and registered on title in perpetuity and shall not be amended, released or otherwise dealt with without the express written consent of the City 4. That a satisfactory Solicitor's Undertaking to register the approved Transfer Easement(s) and to immediately thereafter provide copies thereof to the City Solicitor be provided to the City Solicitor. 5. That the Owner provides a servicing and profile plan showing the storm water servicing without the easement to the satisfaction of the Director of Engineering Services. II. That application B2021-033 requesting consent to sever a 7.81 ha parcel be approved subject to the following conditions: 1. That the owner shall provide a digital file of the deposited reference plan(s) prepared by an Ontario Land Surveyor in PDF and either .dwg (AutoCad) or .dgn (Microstation) format, as well as two full sized paper copies of the plan(s). The digital file needs to be submitted according to the City of Kitchener's Digital Submission Standards to the satisfaction of the City's Mapping Technologist. 2. That the Owner shall obtain a tax certificate from the City of Kitchener to verify that there are no outstanding taxes on the subject property(ies) to the satisfaction of the City's Revenue Division. REPORT HIGHLIGHTS: The consent application proposes to sever 355-425 Bingemans Centre Drive to create a 7.81 hectare parcel of land having frontage onto Bingemans Centre Drive. A severance application is also requesting a an access easement that is 0.839 hectares in size as well as a storm water easement that is 0.91 hectares in size, as well as a maintenance agreement for more than 21 years, over portions of the retained lands in favour of the severed lands. Location Map — 355-425 Bingemans Centre Drive BACKGROUND: The proposed severed lands are designated as Business Park Employment in the City's Official Plan and identified as Industrial Employment Area on the City's Urban Structure Map. The lands are zoned as Heavy Industrial Employment EMP -3 and Service Business Park Employment EMP - 4 with Special Regulation Provision (76) in Zoning By-law 2019-051. REPORT: Planning Comments: Lands within the Industrial Employment Area on the City's Urban Structure are planned to support and maintain economic activity in the city by providing an adequate supply of land for a range of industrial -related employment uses and appropriate accessory and ancillary uses. Lands designated as Business Park Employment are regarded as a prestigious location for certain industrial uses due to its access to major transportation corridors, high visibility, and distinct identity. Manufacturing and the other employment uses that are typically found the General Industrial Employment land use designation are permitted, including warehousing, storage, distribution and wholesaling. A portion of the proposed severed lands is zoned as Heavy Industrial Employment EMP -3 with Special Regulation Provision (76) in Zoning By-law 2019-051. The purpose of this zone is to accommodate industrial uses, including noxious uses, on lands that are separated from sensitive land uses. This zone also accommodates uses that require larger tracts of land for large buildings, materials, and/or products. Another portion of the severed lands is zoned as Service Business Park Employment EMP -4 with Special Regulation Provision (76) in Zoning By-law 2019-051. The purpose of this zone is to accommodate industrial uses and limited complimentary uses that support adjacent employment lands. The proposed lot width and area exceed the minimum requirements in the zoning by-law. City Planning staff conducted a site walk of the property on April 7, 2021, as well as a site visit on May 31, 2021. Photo of Proposed Severed Lands— View from Bingemans Centre Drive With respect to the criteria for the subdivision of land listed in Section 51(24) of the Planning Act, R.S.O. 1990, c. P. 13, Planning staff is of the opinion that the proposed severance conforms to the City's Official Plan and will allow for orderly development that is compatible with the existing community. The severed lands front onto an established public street, and the severed lands can be serviced with municipal services. Appropriate storm water management provisions will be determined through the future site planning process and will be secured with the related easement. Staff is further of the opinion that the proposal is consistent with the Provincial Policy Statement and conforms to the Growth Plan for the Greater Golden Horseshoe. Building Comments: The Building Division has no objections to the proposed consent. Region of Waterloo and Area Municipalities' Design Guidelines and Supplemental Specifications for Municipal Services (DGSSMS) allows only one service per lot. Separate building permit(s) will be required for the construction of the industrial warehouse and associated office. Transportation Comments: Transportation Services does not have any concerns with the proposed application Heritage Comments: No heritage planning concerns. Engineering Comments: A servicing plan and profile will be required to the satisfaction of the Engineering Division prior to easement approval. This can be completed in conjunction with the development of the severed lands. Engineering needs to confirm that the easement width through the retained lands is appropriately sized. Parks/Operations Comments: The parkland dedication requirement for this application is deferred and will be assessed at a future site plan application. The proposed servicing / drainage easement crosses the existing trail easement for the Walter Bean Trail. The impacts of this proposed easement are unclear and addition details of the servicing/drainage easement are to be detailed and shown with civil engineering drawings with a future site plan application. Any impacts to the trail or users are to be minimized. If temporary trail closures are required, rerouting and signage will be required. Environmental Planning Comments: To assess the feasibility of the severance application in advance of reviewing a final Scoped Environmental Impact Study (EIS) and Tree Preservation / Enhancement Plan (TP/EP), a Preliminary EIS (425 Bingemans Centre Drive, Kitchener: Severance Application. June 2021. NRSI Inc.) was provided as a means to understand the anticipated natural feature constraints and development opportunities within the severed lands and easements. Staff has reviewed the Preliminary EIS and can support the recommended location of the lot lines. Staff has no objections to the proposed easement for stormwater management. Staff advises that a Final EIS and TP/EP will be required as part of a complete Site Plan Application. The Final EIS and TP/EP will assess natural features discussed in the Preliminary EIS in more detail, and will provide recommendations for mitigation strategies that can be implemented as conditions of Site Plan Approval. STRATEGIC PLAN ALIGNMENT: This report supports the delivery of core services. FINANCIAL IMPLICATIONS: Capital Budget — The recommendation has no impact on the Capital Budget. Operating Budget — The recommendation has no impact on the Operating Budget. COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the Committee of Adjustment meeting. A notice signed was placed on the property advising that a Committee of Adjustment application has been received. The sign advises interested parties to find additional information on the City's website or by emailing the Planning Division. A notice of the application was mailed to all property owners within 30 metres of the subject property. PREVIOUS REPORTS/AUTHORITIES: There are no previous reports/authorities related to this matter PLANNING, DEVELOPMENT AND LEGISLATIVE SERVICES N * Community Planning 150 Frederick Street 8th Floor Region of Waterloo Kitchener Ontario N2G 4A Canada Telephone: 519-575-440D TTY: 519-575-4608 Fax: 519-575-4466 www. reg ionofwate rloo.ca Matthew Colley 575-4757 ext. 3210 D20-20/21 KIT June 3, 2021 Dianna Saunderson Committee of Adjustment City of Kitchener P.O. Box 1118 200 King Street East Kitchener, ON N2G 4G7 Re: Comments for Consent Applications B2021-029 to 62021- 035 Committee of Adjustment Hearing June 15, 2021 CITY OF KITCHENER B2021-029 196 Sydney Street South Azim and Toba Anwar The owner/applicant is proposing a severance to facilitate the construction of a semi- detached dwelling. Regional Fee: The owner/applicant is required to submit the Regional consent review fee of $350.00 per new lot created prior to final approval of the consent. Airport Zoning (Advisory Comments): There are no airport specific concerns for the above application. However, the applicants must be advised that the subject lands are located within airport zoning regulated area and specifically under the runway take -off approach surface. Therefore, the lands and the proposed development are subject to all provisions and restrictions of Airport Zoning regulations and Nav Canada. For further information in this regard please contact: Kevin B. Campbell, Project Manager, Airport Construction and Development 519.648.2256 ext. 8511 Email: KCampbeIl(c-reg ion ofwaterloo.ca The Region has no objection to the proposed application, subject to the following conditions: 1) That prior to final approval, the owner/applicant submit the Regional consent review fee of $350.00 per new lot created. 001IN 1511111 509 Mill Street 1154461 Ontario Limited The owner/applicant is proposing a lot adjustment of the property line between the industrial uses at 485 and 509 Mill Street Airport Zoning (Advisory Comments): There are no airport specific concerns for the above application. However, the applicants must be advised that the subject lands are located within airport zoning regulated area and specifically under the runway take -off approach surface. Therefore, the lands and the proposed development are subject to all provisions and restrictions of Airport Zoning regulations and Nav Canada. For further information in this regard please contact: Kevin B. Campbell, Project Manager, Airport Construction and Development 519.648.2256 ext. 8511 Email: KCampbell(a-)-regionofwaterloo.ca The Region has no objection to the proposed application. B2021-031 and B2021-032 425 Bingemans Centre Drive Bingemans Inc. The owner/applicant is proposing a severance to create a new industrial lot on the western portion of the subject lands. The owner/applicant also requires an easement/right-of-way over the existing driveway located to the east in favour of the new lot. The storm sewer easement and drainage outlet extending from the northern limits of the new lot northerly and to the Grand River. The retained lands will continue to facilitate the existing Bingemans Facility. Regional Fee: The owner/applicant is required to submit the Regional consent review fee of $350.00 prior to final approval of the consent. Environmental Planning: Regional staff understand that an Environmental Impact Statement (EIS) is being undertaken in support of the development of the subject lands, and any recommendations from the EIS are intended to be implemented through the site plan process. As such, Regional Staff have no requirements related to the consent application. The subject lands include, and are adjacent to Significant Valleyland and a Core Environmental Feature (Significant Woodland) as designated by the Regional Official Plan (ROP) Regional Staff note that the EIS will address ROP policies relevant to the adjacent Core Environmental Features and be undertaken in accordance with the Region's Greenlands Network Implementation Guideline. Regional Staff request inclusion in the circulation and review of the EIS once it is available The Region has no objection to the proposed application, subject to the following conditions: 1) That prior to final approval, the owner/applicant submit the Regional consent review fee of $350.00 per new lot created. B2021-033 269-271 Madison Avenue and 184 Mill Street 389160 Ontario Limited c/o Vive Development Corporation The owner/applicant is proposing a severance to create an additional residential lot. Regional Fee: The owner/applicant is required to submit the Regional consent review fee of $350.00 prior to final approval of the consent. Environmental Noise: Regional Staff acknowledge the dwellings on both the severed and retained lands may have impacts from road noise from the municipal street system and rail noise from CN Railway mainline (within 200 metres) in the vicinity. Regional Staff assumes that all dwellings on these lots have air -ducted heating and ventilation system. Therefore, in absence of an environmental noise study, Regional Staff require the following noise warning clauses be included in all offers of purchase, deeds and rental agreements through a registered agreement with the City of Kitchener for all dwellings on the severed and retained lands: "The purchasers / tenants are advised that sound levels due to increasing road traffic on Ottawa Street South and rail noise from CN Railway may occasionally interfere with some activities of the dwelling occupants as the sound levels may exceed the sound level limits of the Waterloo Region and the Ministry of the Environment Conservation and Parks (MECP)". ii. "This unit has been installed with air -ducted heating and ventilation system suitably sized and designed for adding a central air conditioning at the occupant's discretion. Installation of central air conditioning will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Region of Waterloo and the Ministry of the Environment Conservation & Parks (MOECP)." iii. "Warning. Canadian National Railway Company or its assigns or successors in interest has or have a rights-of-way within 300 metres from the land the subject thereof. There may be alterations to or expansions of the railway facilities on such rights-of-way in the future including the possibility that the railway or its assigns or successors as aforesaid may expand its operations, which expansion may affect the living environment of the residents in the vicinity, notwithstanding the inclusion of any noise and vibration attenuating measures in the design of the development and individual dwelling(s). CNR will not be responsible for any complaints or claims arising from use of such facilities and/or operations on, over or under the aforesaid rights-of-way." The Region has no objection to the proposed application, subject to the following conditions: 1) That prior to final approval, the owner/applicant submit the Regional consent review fee of $350.00 per new lot created. 2) That prior to final approval, the owner/applicant enter into an agreement with the City of Kitchener to include the following noise mitigation/warning clauses in all Offers of Purchase and Sale, lease/rental agreements and condominium declarations for all dwellings on the severed and retained lands: a. The following noise warning clauses be included in all offers of purchase, deeds and rental agreements "The purchasers / tenants are advised that sound levels due to increasing road traffic on Ottawa Street South and rail noise from CN Railway may occasionally interfere with some activities of the dwelling occupants as the sound levels may exceed the sound level limits of the Waterloo Region and the Ministry of the Environment Conservation and Parks (MECP)". ii. "This unit has been installed with air -ducted heating and ventilation system suitably sized and designed for adding a central air conditioning at the occupant's discretion. Installation of central air conditioning will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Region of Waterloo and the Ministry of the Environment Conservation & Parks (MOECP)." iii. "Warning. Canadian National Railway Company or its assigns or successors in interest has or have a rights-of-way within 300 metres from the land the subject thereof. There may be alterations to or expansions of the railway facilities on such rights-of-way in the future including the possibility that the railway or its assigns or successors as aforesaid may expand its operations, which expansion may affect the living environment of the residents in the vicinity, notwithstanding the inclusion of any noise and vibration attenuating measures in the design of the development and individual dwelling(s). CNR will not be responsible for any complaints or claims arising from use of such facilities and/or operations on, over or under the aforesaid rights-of-way." b. That prior to the issuance of any building permits, the City of Kitchener's Building Inspector certify that the noise attenuation measures are incorporated in the building plans and the dwelling units have been constructed accordingly. B2021-034 and B2021-035 297 Ottawa Street South Jeremy Krygsman and Andrew Steinbach The owner/applicant is proposing a severance to facilitate a semi-detached dwelling being on separate lots. In addition, maintenance easements are required in favour of the opposite properties along the common lot line. Regional Fee: The owner/applicant is required to submit the Regional consent review fee of $350.00 prior to final approval of the consent. Road Widening: A dedicated road widening of approximately 5.2 metres along Ottawa Street South (Regional Road #04) and a daylight triangle of 7.62 metres along the new property line(s) of Ottawa Street South and Acacia Street, if applicable, would be required to be conveyed to the Region at the owner's cost. This is required to comply with a 30.48 metre designated road width identified in the Regional Official Plan (ROP) for Ottawa Street South. An Encroachment agreement would also be required for the existing building that would be encroaching into the Regional right-of-way, after the dedication of lands. However, keeping in view the building lines for the existing residence a reduced road dedication of 4.0 metres along Ottawa Street and reduced daylight triangle 4.25 metres along the new property line(s) would be supported to avoid the need for an Encroachment Agreement. An Ontario land Surveyor (OLS) is required to determine the exact amount of the road widening. A draft reference plan must be provided for review prior to depositing the reference plan to the Land Registry Office. An Environmental Site Assessment report will not be required for the purpose of the road dedication to the Region. Environmental Noise: Regional Staff acknowledge that the dwellings on the severed and retained residential lots may have impacts from road noise from the traffic on Ottawa Street South (Regional Road #04) and rail noise from CN Railway mainline (within 200 metres) in the vicinity. Regional Staff assume that all dwellings on these lots have air -ducted heating and ventilation system. Therefore, in absence of an environmental noise study, Regional IStaff require the following noise warning clauses be included in all offers of purchase, deeds and rental agreements through a registered agreement with the City of Kitchener for all dwellings on the severed and retained lands "The purchasers / tenants are advised that sound levels due to increasing road traffic on Ottawa Street South and rail noise from CN Railway may occasionally interfere with some activities of the dwelling occupants as the sound levels may exceed the sound level limits of the Waterloo Region and the Ministry of the Environment Conservation and Parks (MECP)". "This unit has been installed with air -ducted heating and ventilation system suitably sized and designed for adding a central air conditioning at the occupant's discretion. Installation of central air conditioning will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Region of Waterloo and the Ministry of the Environment Conservation & Parks (MOECP)." iii. "Warning. Canadian National Railway Company or its assigns or successors in interest has or have a rights-of-way within 300 metres from the land the subject thereof. There may be alterations to or expansions of the railway facilities on such rights-of-way in the future including the possibility that the railway or its assigns or successors as aforesaid may expand its operations, which expansion may affect the living environment of the residents in the vicinity, notwithstanding the inclusion of any noise and vibration attenuating measures in the design of the development and individual dwelling(s). CNR will not be responsible for any complaints or claims arising from use of such facilities and/or operations on, over or under the aforesaid rights-of-way." Regional Staff note that the City of Kitchener's Building Inspector must certify that the noise attenuation measures are incorporated in the building plans and the dwelling units have been constructed accordingly. The Region has no objection to the proposed application, subject to the following conditions: 1) That prior to final approval, the owner/applicant submit the Regional consent review fee of $350.00 per new lot created. 2) That the owner/applicant complete the required road widening dedication to the satisfaction of the Region of Waterloo. 3) That prior to final approval, the owner/applicant enter into an agreement with the City of Kitchener to include the following noise mitigation/warning clauses in all Offers of Purchase and Sale, lease/rental agreements and condominium declarations for all dwellings on the severed and retained lands: a. The following noise warning clauses be included in all offers of purchase, deeds and rental agreements "The purchasers /tenants are advised that sound levels due to increasing road traffic on Ottawa Street South and rail noise from CN Railway may occasionally interfere with some activities of the dwelling occupants as the sound levels may exceed the sound level limits of the Waterloo Region and the Ministry of the Environment Conservation and Parks (MECP)". "This unit has been installed with air -ducted heating and ventilation system suitably sized and designed for adding a central air conditioning at the occupant's discretion. Installation of central air conditioning will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Region of Waterloo and the Ministry of the Environment Conservation & Parks (MOECP)." iii. "Warning: Canadian National Railway Company or its assigns or successors in interest has or have a rights-of-way within 300 metres from the land the subject thereof. There may be alterations to or expansions of the railway facilities on such rights-of-way in the future including the possibility that the railway or its assigns or successors as aforesaid may expand its operations, which expansion may affect the living environment of the residents in the vicinity, notwithstanding the inclusion of any noise and vibration attenuating measures in the design of the development and individual dwelling(s). CNR will not be responsible for any complaints or claims arising from use of such facilities and/or operations on, over or under the aforesaid rights-of-way." b. That prior to the issuance of any building permits, the City of Kitchener's Building Inspector certify that the noise attenuation measures are incorporated in the building plans and the dwelling units have been constructed accordingly. General Comments Any future development on the lands subject to the above -noted consent application(s) will be subject to the provisions of Regional Development Charge By-law 19-037 or any successor thereof. Please accept this letter as our request for a copy of the staff reports, decisions and minutes pertaining to each of the consent applications noted above. Should you require Regional Staff to be in attendance at the meeting or have any questions, please do not hesitate to contact the undersigned. Yours truly, Matthew Colley, Principal Planner, MCIP, RPP Mand n �ation Administration Centre: 400 Clyde Road, P.Q. Box 729 Cambridge, ON N1 R 5W6 Phone: 519-621-2761 Toll free: 1-866-900-4722 Fax: 519-621-4844 www.grandriver.ca PLAN REVIEW REPORT: Dianna Saunderson F qN City of Kitchener DATE: FILE: June 4, 2021 Severence — 425 Bingemans Centre Drive RE: Consent Applications B2021-031 and B2021-032 425 Bingemans Centre Drive Bingemans Inc. GRCA COMMENT*: The Grand River Conservation Authority (GRCA) has no concerns with the consent applications. Additional study is required through the site plan process. BACKGROUND: 1. Resource Issues: Information currently available at our office indicates that the retained lands contain a valley slope. Field investigations by the applicant have also confirmed the presence of wetlands on the retained lands, and lands adjacent to the west. 2. Legislative/Policy Requirements and Implications: Due to the presence of the resource features listed above, the GRCA regulates a portion of the property under Ontario Regulation 150/06 (Development, Interference with Wetlands and Alterations to Shorelines and Watercourses Regulation). Any future development within a regulated area will require a permit from the GRCA pursuant to Ontario Regulation 150/06. The proposed severed parcel is mostly outside of a 15 metre buffer around the wetlands as recommended through a preliminary environmental impact study (EIS; NRSI, June 2021). We have no concerns with the lot lines proposed in the severance. During the subsequent site plan process, a final EIS will be required to set the ultimate limit of development, and propose any additional mitigation measures as required. We also have no objections to the proposed easement for stormwater management (SWM). Similarly, the final SWM strategy for the site must be proposed in a Page 1 of 2 Member of Conservation Ontario, representing Ontario's 36 Conservation Authorities I The Grand — A Canadian Heritage River complete SWM report, and be supported by the final EIS and a geotechnical report to confirm potential impacts to wetlands and other valleylands are mitigated. 3. Review Fees: This application is considered a major consent application, and in accordance with the GRCA's 2021 Plan Review Fee Schedule, the applicable fee is $1,105. We will send an invoice to the applicant. Additional fees will be required for a subsequent site plan application, and a separate fee will be required for a GRCA permit. We trust this information is of assistance. If you have any questions or require additional information, please contact me at 519-621-2763 ext. 2292 or theywoodQgrandriver. ca. Sincerely, Trevor Heywood Resource Planner Grand River Conservation Authority * These comments are respectfully submitted as advice and reflect resource concerns within the scope and mandate of the Grand River Conservation Authority C. C. Domenic Natale, Cooper Construction Paul Britton, MHBC Page 2 of 2 LL U Z o N 0 N o o� L i o -r- C,4 7 OM E n O < a� N> c E G �i 0 Q- - w o N U > o U cu V N N cu C: E 0 U N rn m E ry � CJ M W E LO m m T.Qmm N m= n a� I J� Z 3� N a� o� N OM E n O o OF Or E Q Q- - w o N U o m n= _w 3 C) z m w - .0 12 - C) Q u o m n m E ry CJ ano- H Vis_. q EO E N m m T.Qmm m= n a� O u m n . 2 v o UEi Us.=_vFyr G Z Q `o E Z O Q E 0 In SJ� NC) U d N � Y Y E2Q I C)CD K� LL!! O Vy C cje ° N 0 Q Q N L� Q O r' C n _ E O E O y 6 6 C� 6 O Q U Q 0 Cr Q O O O L C 0 w N N N O E Q N J J> > Q � E d N N CJ O N W U) W W w CJ (� f`1 O (r .0 C ` ' D- N N N N Q (6 (6 (6 m m m m Q N C f - Q W W Q U) �, N O (n 0 N O (n O O O O F W N W N W W N N U 2 -o N O Q ®®®® W �, J J J J O N N 1 Y. F I J� Z 3� N a� o� N OM E n O o OF Or E Q- - w o N U o m n= _w 3 w - .0 12 - u o m n m E ry ano- H Vis_. q EO N m m T.Qmm m= n a� O u m n . 2 v o UEi Us.=_vFyr G Z if� Z O E 0 In SJ� o K� LL!! O Vy C O B N L� Q O r' C n E "., aa) i 7U� t3 P _- CL ti i •. 4. - A _ a ' " G r` 73,