HomeMy WebLinkAboutDSD-2023-176 - B 2023-018 - 299 Ottawa Street North
Development Services Department www.kitchener.ca
wnerÓs solicitor shall provide draft transfer documents and associated fees for
are no outstanding taxes on the subject property(ies) to the satisfaction of the CityÓs
CityÓs Mapping Technologist.
That the Owner obtains Demolition Control Approval, in accordance with the CityÓs
law, to the satisfaction of the CityÓs Director of Planning.
Page 239 of 278
satisfaction of the CityÓs Director of Engineering Services, prior to deed endorsement.
That any new driveways are to be built to City of Kitchener standards at the OwnerÓs
o the satisfaction of the CityÓs Director of
to the street sewers to the satisfaction of the CityÓs Director of Engineering Services.
satisfaction of the CityÓs Director of Engineering Services.
That at the sole option of the CityÓs Director of Planning, the Owner shall enter into an
of the City Solicitor and the CityÓs Director
lands, in accordance with the CityÓs Tree Management Policy, to be approved by
the CityÓs
CityÓs Supervisor, Site
CityÓs
of encumbrances and at owner/applicantÓs cost, along the entire property frontage of the
Page 240 of 278
CityÓs website with the agenda in advance of the Committee of Adjustment meeting.
Map 11 Î Integrated Transportation System
e subject property is identified as ÒÓ on Map 2 Î Urban Structure
designated ÒÓ on Map 3 Î Land Use in the CityÓs 2014 Official Plan.
Page 241 of 278
The property is zoned Ò)Ó in Zoning By
ÒÓduplexed Òas of rightÓ and to further
Î
Î
Page 242 of 278
Î
Î
Page 243 of 278
Î
Page 244 of 278
The subject lands are located within the CityÓs Map 1 Î City Urban Area
and Countryside
contribute towards achieving the CityÓs intensification
Urban Area policies of the ROP identify that the focus of the RegionÓs future growth will be within the
CityÓs Official Plan (2014)
The subject property is identified as ÒCommunity AreasÓ on Map 2 Î Urban Structure
designated ÒLow Rise ResidentialÓ on Map 3 Î Land Use in the CityÓs 2014 Official Plan.
Page 245 of 278
Section 4 of the Official Plan outlines the CityÓs
È
È
of the Official Plan outlines the CityÓs
Page 246 of 278
general
Supporting Materials and Approval Condition:
ÐCÑ and Appendix ÐDÑ Areas,
the RegionÓs
to the satisfaction of the CityÓs
Transportation Matters:
Page 247 of 278
the CityÓs Transportation Services and the Ministry of Transportation (Highway 7/8
Tree Management:
ÒLow Rise Residential Four Zone (RES4)Ó
Page 248 of 278
That at the sole option of the CityÓs Director of Planning, the Owner shall enter into an agreement
Solicitor and the CityÓs Director of
in accordance with the CityÓs Tree Management Policy, to be approved by the CityÓs
shall be granted except with the prior approval of the CityÓs Su
Î
hener standards. All works are at the ownerÓs
Page 249 of 278
All costs associated with the road widening would be the ownerÓs responsibility, and the
Page 250 of 278
WaterlooÓs Approved List of Noise
commencing any work within the RegionÓ s right of way.
to protect the RegionÓs long term municipal
Page 251 of 278
The Region has no objection to the proposed application, subject to the following conditions:
encumbrances and at owner/applicantÓs cost, along the entire property
Page 252 of 278
Page 253 of 278
Upon registration of the consent, and after registration of the parcels, the property owner shall make
an application for MTO Building and Land use permit(s).
Public Transportation and Highway Improvement Act
MTOÓs Highway Corridor Management Manual (HCMM) an
Controlled Access Highway A1 Freeway
Upon registration of the consent, and after registration of the parcels, the property owner shall make
an application for MTO Building and Land use permit(s).
o
Î
Î
ÎThis report has been posted to the CityÓs website with the agenda in advance of the
Page 254 of 278
additional information on the CityÓs website or by emailing the Planning Division. A notice of the
Planning Act
Provincial Policy Statement (PPS 2020)
A Place to Grow: Growth Plan for the Greater Golden Horseshoe, 2020
Regional Official Plan (ROP)
Official Plan (2014)
Zoning By-law 2019-051
Î
Î
Page 255 of 278
Page 256 of 278
Page 257 of 278
Page 258 of 278
Page 259 of 278
Page 260 of 278
Page 261 of 278
Page 262 of 278
Page 263 of 278
Page 264 of 278
Page 265 of 278
Page 266 of 278
Page 267 of 278
Page 268 of 278
Page 269 of 278
Page 270 of 278
Page 271 of 278
Page 272 of 278
Page 273 of 278
Page 274 of 278
Page 275 of 278
Page 276 of 278
Upon registration of the consent, and after registration of the parcels, the property
owner shall make an application for MTO Building and Land use permit(s).
Page 277 of 278
Page 278 of 278