HomeMy WebLinkAboutDSD-2023-552 - Supplemental Report to DSD-2023-299 - OPA23/007/K/CD - ZBA23/011/K/CD - 417 King Street West - Vanmar Developments 417 King GP CorpStaff Report
r
JR
Development Services Department www.kitchener.ca
REPORT TO: Committee of the Whole
DATE OF MEETING: December 11, 2023
SUBMITTED BY: Rosa Bustamante, Director of Planning, 519-741-2200 ext.
7319
PREPARED BY: Craig Dumart, Senior Planner, 519-741-2200 ext. 7073
WARD(S) INVOLVED: Ward 9
DATE OF REPORT:
REPORT NO.:
December 7, 2023
DSD -2023-552
SUBJECT: Supplemental Report to DSD -2023-299 Official Plan
Amendment Application OPA23/007/K/CD
Zoning By-law Amendment Application ZBA23/011/K/CD
Address: 417 King Street West
Owner: Vanmar Developments 417 King GP Corp
RECOMMENDATION:
That Official Plan Amendment Application OPA/23/007/K/CD for Vanmar
Developments 417 King GP Corp requesting a land use designation change from
`Innovation District' to `Innovation District with Specific Policy Area No. 8' to permit
a 55 -storey mixed use development on the lands specified and illustrated on
Schedule `A', be adopted, in the form shown in the Official Plan Amendment
attached to Report DSD -2023-299 as Appendix `A', and accordingly forwarded to the
Region of Waterloo for approval; and
That Zoning By-law Amendment Application ZBA23/011/K/CD for Vanmar
Developments 417 King GP Corp be approved in the form shown in the `Proposed
By-law', and `Map No. 1, attached to Report DSD -2023-299 as Appendix `B'.
REPORT:
On October 30, 2023, Planning and Strategic Initiatives Committee considered report
DSD -2023-299 which sought the approval of the Committee for an Official Plan
Amendment and Zoning By-law Amendment for 417 King Street West. At this meeting the
Committee resolved:
"That the following motion be deferred to the November 6, 2023 Council meetin_g
(further deferred by Council to the December 11, 2023 Council meeting) to
allow an opportunity for staff to engage with NAV Canada to determine best
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
Page 16 of 99
measures to mitigate any potential impacts to the runway approach for Waterloo
Region International Airport.-
That
irport:
That Official Plan Amendment Application OPA/23/007/WCD for Vanmar
Developments 417 King GP Corp, for the property municipally addressed as 417
King Street West, requesting a land use designation change from `Innovation
District' to `Innovation District with Specific Policy Area No. 8' to permit a 55 -storey
mixed use development on the lands specified and illustrated on Schedule 'A', be
adopted, in the form shown in the Official Plan Amendment attached to
Development Services Department report DSD -2023-299 as Appendix `A', and
accordingly forwarded to the Region of Waterloo for approval; and further,
That Zoning By-law Amendment Application ZBA23/011/K/CD for Vanmar
Developments 417 King GP Corp be approved in the form shown in the `Proposed
By-law, and `Map No. 1, attached to Development Services Department report
DSD -2023-299 as Appendix `B'. "
On November 27, 2023, Nav Canada provided a land use evaluation letter (Attachment A)
advising that Nav Canada has evaluated the proposed development at 417 King Street
West and have no objections subject to the applicant adhering to conditions of the land
use evaluation letter. The applicant is agreeable to the conditions of Nav Canada's land
use evaluation letter which will be addressed prior to issuance of a building permit and
installation of a construction crane. Staff are not recommending any revisions to the
Zoning By-law Amendment or Official Plan amendments attached to Report DSD -2023-
299.
STRATEGIC PLAN ALIGNMENT:
This report supports the delivery of core services.
FINANCIAL IMPLICATIONS:
Capital Budget — The recommendation has no impact on the Capital Budget.
Operating Budget — The recommendation has no impact on the Operating Budget.
COMMUNITY ENGAGEMENT:
INFORM — This report has been posted to the City's website with the agenda in advance
of the council / committee meeting.
PREVIOUS REPORTS/AUTHORITIES:
• DSD -2023-299 —Official Plan Amendment Application & Zoning By-law
Amendment Application 417 King Street West.
APPROVED BY: Justin Readman, General Manager, Development Services
ATTACHMENTS:
Attachment A — Nav Canada Letter
Attachment B — Regional Updated Comments
Page 17 of 99
NAV CANADA Proprietary / Propriete exclusive
NAV
Serving a world in motion
Au service d'un
CANADA
monde enmouvement
navcanada.ca
November 27, 2023
Your file
CYKF - 417 King Revised (Building and Crane)
Our file
23-4258
Mr. Mauricio Miranda
VanMar Developments Inc
145 Goddard Crescent,
Cambridge, ON
N3E 0131
RE: Development Proposal/Plans: Building(s) and Crane(s) -Waterloo, ON
(See attached document(s))
Mr. Miranda,
NAV CANADA has evaluated the captioned proposal and we have no objection to the project as submitted provided the
following conditions are adhered to:
• No changes are to be made to the building location, dimensions and height.
• No changes are made to the construction crane location, swing radius and height.
o The design surfaces of our LNAV/VNAV instrument flight procedure that is currently being redesigned as a
result of your proposal are extremely close to both the building and crane and NAV CANADA will use the
proposed locations in you submission to ensure we clear both obstacles.
• No cranes or building can exceed the height of 1600 ASL until the new instrument flight procedure for runway 08 for
Kitchener / Waterloo Airport (CYKF) are published and in effect.
o NAV CANADA intends' on publishing the revised instrument flight procedures on July 11, 2024. The
procedures would become in effect on that verry same day at 09:01 Zulu or (05:01 local). This will be
confirmed on May 16, 2024. Please follow up with us on or after this date to ensure these procedures have
not encountered any production delays.
• The departure procedures for RWY 26 will be impacted as follows:
o While construction crane is up, runway 26 departure climb gradient, must be increased to 270 FT/NM
o After the crane is removed the climb gradient will remain and lowered to 220 FT/NM to clear the building
• Any additional cranes used to erect or remove the construction crane must also be submitted for review as
additional mitigations will be required with any additional height.
In the interest of aviation safety, it is incumbent on NAV CANADA to maintain up-to-date aeronautical publications and issue
NOTAM as required. To assist us in that end, we ask that you notify us at least 10 business days prior to the start of
construction. This notification requirement can be satisfactorily met by returning a completed, signed copy of the attached
form and an Excel copy of the attached spreadsheet by email at land useanavcanada.ca or fax at 613-248-4094. In the
event that you should decide not to proceed with this projector if the structure is dismantled, please advise us accordingly so
that we may formally close the file.
If you have any questions, contact the Land Use Department by email at land use(a.navcanada.ca.
NAV CANADA's land use evaluation is based on information known as of the date of this letter and is valid for a
period of 18 months, subject to any legislative changes impacting land use submissions. Our assessment is limited
to the impact of the proposed physical structure on the air navigation system and installations; it neither constitutes
nor replaces any approvals or permits required by Transport Canada, other Federal Government departments,
Provincial or Municipal land use authorities or any other agency from which approval is required. Innovation,
Science and Economic Development Canada addresses any spectrum management issues that may arise from your
proposal and consults with NAV CANADA engineering as deemed necessary.
1601 Tom Roberts Avenue, Ottawa, ON, K1V 1E5 1601 avenue Tom Roberts, Ottawa, Ontario, K1 1E5
Email: land use@navcanada.ca Courriel : utilisationdeterrain naVBctf 99
Z-LDU-105 Version 2.0 14 June 2022
NAV CANADA Proprietary / Propriete exclusive
NAV
Serving a world in motion
GNSS
Au service d'un
CANADA
monde enmouvement
RNP
navcanada.ca
This document contains information proprietary to NAV CANADA. Any disclosure or use of this information or any
reproduction of this document for other than the specific purpose for which it is intended is expressly prohibited except as
NAV CANADA may otherwise agree in writing.
Regards,
Land Use Office
NAV CANADA
cc ONTR - Ontario Region, Transport Canada
garett.stevenson@kitchener.ca
akutle r@reg ionofwaterloo.ca
craig.dumart@kitchener.ca
asinclair@mhbcplan.com
jvonwesterholt@mhbcplan.com
pleveck@urbanlegendgroup.com
Acronyms:
RNAV
- Area Navigation
GNSS
- Global Navigation Satellite System
RWY
-Runway
RNP
- Required Navigation Performance
LNAV/VNAV
- Barometric Vertical Navigation
1601 Tom Roberts Avenue, Ottawa, ON, K1V 1E5 1601 avenue Tom Roberts, Ottawa, Ontario, K1 1E5
Email: land use@navcanada.ca Courriel : utilisationdeterrainnapgctf 99
Z-LDU-105 Version 2.0 14 June 2022
Craig Dumart
Senior Planner
City of Kitchener
200 King Street West, 6t" Floor
P.O. Box 1118, Kitchener, ON
N2G 4G7
Dear Mr. Dumart,
PLANNING, DEVELOPMENT
AND LEGISLATIVE SEPVICES
Community Planning
150 Frederick Street 8th Floor
Kitchener Ontario N20 4A Canada
Telephone: 519-575-4400
TTY: 519-575-4608
Fax: 519-575-4466
www.regionofwaterloo.ca
File: D17/2/23007
C14/2/23011
December 7, 2023
Re: Updated Regional Comments
Proposed Official Plan Amendment OPA 23/07 and Zoning By-law
Amendment ZBA 23/011
417 King Street West
MHBC Planning (C/O Andrea Sinclair and Juliane von Westerholt) on behalf
of Vanmar Developments 417 King GP Corp.
CITY OF KITCHENER
MHBC Planning has submitted a site-specific Official Plan Amendment and Zoning By-
law Amendment Application for a development proposal at 417 King Street West
(referred to as subject lands) in the City of Kitchener.
The applicant has proposed the redevelopment of the site with a 55 storey mixed use
building containing 622 residential units with ground floor commercial uses. A total of 184
vehicular parking spaces with 311 Bicycle parking spaces are proposed within the
underground parking structure and within the podium of the building. Access to the
structured parking is located from Halls Lane West with pedestrian access proposed from
King Street West. A separate loading access is proposed from Halls Lane West. An
amenity terrace is located on the roof of Level 7.
The subject lands are located in the Urban Area and designated Urban Growth Centre in
the Regional Official Plan. The site is designated Innovation District in the City of
Document Number: 4541766
Page 20 of 99
Kitchener Official Plan and zoned Warehouse District -Six (D-6) Zone in Zoning By-law
85-1. The Owner has requested an Official Plan Amendment to add a special policy
permitting an FSR of 21. The Applicant has requested a Zoning By-law Amendment to
add special regulations to the existing zoning to permit a floor space ratio of 21; to allow
for residential uses; to allow for a reduction in the parking to 0.29 parking spaces per
dwelling units and 0 spaces for non-residential uses; to permit a rear and side yard
setback of 0 metres and to permit a 1.1 m west side yard setback.
Further to our comments dated June 29, 2023, the Region has had the opportunity to
review the proposal and offers the following updated comments:
Regional Comments
Region of Waterloo International Airport
In accordance with Regional Official Plan Policy 5.A.20, the Region will ensure that
proposed developments do not negatively affect the usability, accessibility or safe
operations of the airport either on a temporary or permanent basis. In the June 29,
2023 comments, Regional staff identified a concern with this development as the
development (building and proposed crane) would exceed the maximum elevation
permitted of 487m ASL. It would therefore impact YKF instrument flight procedures,
particularly the Runway 08 RNP approach and Runway 26 departures. The Region is
currently working with Nav Canada to redesign the Runway 08 approaches, to mitigate
impacts to the airport and development community within the Region.
Given the height of this proposed development and proximity to the airport, the Region
initiated a Nav Canada Land Use assessment on behalf of the Owner/Developer. The
developer submitted information to Nav Canada, including building and crane
coordinates and elevations.
On November 27, 2023, Nav Canada issued correspondence stating no objection to the
proposed building height at 417 King Street West subject to a number of conditions. A
copy of the Nav Canada letter is attached as Attachment 1. These conditions
specifically require that:
No changes are made to the building location, dimensions and height;
No changes are made to the construction crane location, swing radius
and height; and,
No crane or building exceeds the 487m ASL elevation before the revised
instrument flight procedures are published and in effect, which is
expected July 11, 2024.
Document Number: 4541766
Page 21 of 99
In accordance with the Nav Canada correspondence, the Region requires that the
Zoning By-law Amendment for the subject lands includes the precise building
coordinates, including a maximum height for the building and any associated
construction crane as submitted and reviewed by Nav Canada. Through the future Site
Plan application should any changes be proposed to the location or height of the
building or crane, the Region and Nav Canada would need to review these proposed
changes to ensure no impact on airport operations.
Obstacle ID
Ground
Elevation (m)
Structure
Height (m)
Total
Height (m)
2162.5001
463.0001
2625.5002
Building NW
330
205
535
Building NE
330
205
� 535
Building SW
330
205'
535
Building SE
330
205
535
Crane (Hammerhead)
330
235.135
565.135
Obstacle ID
LAT
dd mm ss.ss
LONG
Add mm ss.ss
Ground
Elevation (Feet)
Structure
Height (Feet)
Total
Height (Feet)
Example 1
60 39 16.59
-110 36 14.01
2162.5x01
453.0001
2625.5002
Building NW
4327 9.1224
-80 29 56.9604
1082.6772
672.5722
1755.2493
Building NE
43 27 8.4132
-80 29 48.5952
1082.6772
672.5722
1755.2493
Building SW
43 27 7.7976
-80 29 51.6624
1082.6772
672.5722
17552493
Building SE
43 27 6.9948
-80 29 49.3728
1082.6772
672.5722
1755.2493
Crane {Hammerhead}
43 27 8.1036
-80 29 49.9848
1082.6772
771.4403
1854.1175
Conclusions:
In summary, the Region has no objections to Official Plan Amendment
Application OPA 23/07 and Zoning By-law Amendment Application ZBA 23/11
subject to the following:
1. That the Zoning By-law Amendment for the subject lands includes the precise
building coordinates, including a maximum height for the building and any associated
construction crane as submitted and reviewed by Nav Canada.
2. That a Holding Provision apply to the entirety of the subject lands until a
transportation, rail and stationary noise study is acceptance of the study and related
implementation measures to the satisfaction of the Regional Municipality of Waterloo.
The required wording for the holding provision is:
Document Number: 4541766
Page 22 of 99
That a holding provision shall apply to the entirety of the subject lands until a
satisfactory detailed transportation (road) and stationary noise study has been
completed and implementation measures addressed to the satisfaction of the
Regional Municipality of Waterloo. The detailed stationary noise study shall review
the potential impacts of noise (e.g. HVAC systems) on the sensitive points of
reception and the impacts of the development on adjacent noise sensitive uses.
3. Inclusion of a geothermal prohibition in the zoning by-law amendment. The required
wording for the prohibition is:
Geothermal Wells are prohibited on site. A geothermal well is defined as a vertical
well, borehole or pipe installation used for geothermal systems, ground -source heat
pump systems, geo-exchange systems or earth energy systems for heating or cooling,-
including
ooling,including open -loop and closed-loop vertical borehole systems. A geothermal well
does not include a horizontal system where construction or excavation occurs to
depths less than five meters unless the protective geologic layers overlaying a
vulnerable aquifer have been removed through construction or excavation.
Next Steps:
Please be advised that any future development on the lands subject to the above -noted
application will be subject to the provisions of Regional Development Charge By-law 19-
037 or any successor thereof.
Further, please accept this letter as our request for a copy of the draft by-law and
decision pertaining to this application. Should you have any questions, please do not
hesitate to contact me.
Yours truly,
Alyssa Bridge, MAES, MCIP, RPP
Supervisor, Development Planning
C. MHBC Planning Inc. C/O Andrea Sinclair and Juliane vonWesterholt (Applicant), Vanmar Developments 417
King GP Corp. C/O Mauricio Miranda (Owner)
Document Number: 4541766
Page 23 of 99