HomeMy WebLinkAboutDSD-2024-266 - Significant Planning Applications, Policy Projects, Affordable Housing Projects and Housing Pledge - Second Quarter UpdateStaff Report Development Services Department www.kitchener.ca REPORT TO: Committee of the Whole DATE OF MEETING: June 24, 2024 SUBMITTED BY: Rosa Bustamante, Director of Planning and Housing Policy / City Planner, 519-741-2200 ext. 7319 Garett Stevenson, Director of Development and Housing Approvals, 519-741-2200 ext. 7070 PREPARED BY: Rosa Bustamante, Director of Planning and Housing Policy / City Planner, 519-741-2200 ext. 7319 Natalie Goss, Manager Policy & Research, 519-741-2200 ext. 7648 Janine Oosterveld, Manager Customer Experience & Project Management, 519-741-2200 ext. 7076 Garett Stevenson, Director of Development and Housing Approvals, 519-741-2200 ext. 7070 WARD(S) INVOLVED: All DATE OF REPORT: May 29, 2024 REPORT NO.: DSD -2024-266 SUBJECT: Planning and Housing Policy Division & Development and Housing Approvals Division - Significant Planning Applications, Policy Projects, Affordable Housing Projects, and Housing Pledge - Second Quarter Update RECOMMENDATION: For Information. REPORT HIGHLIGHTS: The purpose of this report is to provide an update of significant development applications, policy projects, affordable housing projects and significant projects to streamline and remove barriers as well as the City's housing pledge update. Not all work that is currently being undertaken by the Planning and Housing Policy & Development and Housing Approvals Divisions is captured in this report, rather a snapshot of significant work is captured. Planning staff provide a quarterly update report every March, June, September, and December of each year of all current significant development applications. It is important to be providing greater transparency on significant development applications with the community and Council. The key findings of this report include: o Since signing the Housing Pledge in March 2023, Kitchener Council has approved Official Plan Amendment and/or Zoning By-law Amendment applications for projects which propose 13,704 dwelling units (39.1% of housing pledge), Planning staff have issued final site plan approval for 3,947 dwelling units and building staff have issued building permits for 3,558 dwelling units. o Five initiatives associated with the Housing Accelerator Fund (HAF) have received a Council decision: Growing Together, Inclusionary Zoning, Enabling 4 Units, the *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. Page 167 of 198 Affordable Rental and Co-op Housing Incentives Pilot Program, and endorsement of the land transaction to donate a City -owned parcel at River Road and Ottawa Street North to Habitat for Humanity. Three of the other five initiatives are also underway with various milestones anticipated later in 2024. One initiative is in the early stages and will see more progress over the coming months. o In this last quarter, significant work has advanced on Kitchener's Official Plan review with requests for qualifications (RFQs) issued for a range of consultant services. The Growing Together East project, the updates to the planning framework for Block Line, Fairway, and Sportsword Protected Major Transit Station Areas, will launch in mid- June. With Bill 162, the Get it Done Act, receiving Royal Assent, additional lands have been added to Kitchener's urban area in southwest Kitchener, allowing work to progress on the Dundee North Secondary Plan. o Kitchener's affordable housing incentives are currently supporting seven projects which will total 716 new affordable housing units in various stages of development from application to construction. o Extensive work continues to streamline development approvals, meet provincially mandated timelines and support excellent customer service with the current priority as site plan folder updates to prepare for the public portal. There are no financial implications with this report. Community engagement is undertaken for each development application and project, which varies for each. • This report supports the delivery of core services. REPORT: Since December of 2021, Planning staff have provided a quarterly update report every March, June, September, and December of all current significant development applications. This report also includes the following: • Progress and next steps for Kitchener's Housing Accelerator Fund initiatives; • Progress and next steps for major planning policy projects; • A summary of development applications that include affordable housing; • Updates on significant initiatives to remove barriers and streamline processes to support the development of housing; • Housing Pledge reporting - Development application data required to be reported under a new Provincial regulation — Ontario Regulation 73/23 — Municipal Planning Data Reporting. It is important to be providing greater transparency on significant development applications with the community and Council. Attached to this report, the Significant Planning Applications Quarterly Report (Q2 2024) provides a summary of the current Planning applications under review at the time of the preparation of this report (Attachment A). The current significant development applications section includes Subdivision, Official Plan Amendment, and Zoning By-law Amendments that have not received final approval. These are the bulk of the applications that Planning staff consult with the community on an application specific basis. Significant development applications include property specific proposals as well as new greenfield communities (subdivisions). Additional details on the development applications can be found using the online mapping tool available at www.kitchener.ca/planningapplications. Kitchener's Housing Accelerator Fund Initiatives In November 2023 Kitchener received $10.6 (first annual tranche of $42.4) million as part of the Federal government's Housing Accelerator Fund to help deliver more affordable housing in the City of Kitchener. Nine action plan initiatives are part of Kitchener's Housing Accelerator Fund and they include the delivery of: Page 168 of 198 • Growing Together West: planning framework updates in Kitchener's western protected major transit station areas; • Growing Together East: planning framework updates in Kitchener's eastern protected major transit station areas: • Growing Together West Inclusionary Zoning; • Affordable Housing Construction Offset on City -Owned Lands Incentive • Not -for -Profit Affordable Rental and Co-op Housing Incentive Pilot; • Enabling 4 Units — additional dwelling unit implementation; • Strategic land acquisition and supporting infrastructure; • A climate adaptation plan as an input into Kitchener's new Official Plan; and, • A housing needs assessment Attachment B provides a description of each initiative, current status, next steps and target completion. Major Planning Projects There are currently 14 planning projects underway or that have been recently completed spanning a wide range of topics. These include: • Comprehensive Zoning By-law Review • High Performance Development Standards • Housing for All implementation • New Official Plan • Review of Provincial legislation, policies and plans • Rental Housing, Eviction and Displacement Study • Tree Conservation Tools Review • Urban Design Manual Review • Hidden Valley Secondary Plan • Growing Together (Major Transit Station Area) Planning Framework review — West PMTSAs and East PMTSAs • Dundee North Secondary Plan • Inclusionary Zoning • District Energy Business Case Attachment C provides a description of each project, status, next steps, and target completion. Development Applications — Affordable Housing With a strong focus on the housing crisis, this report also includes a summary of 2024 current projects that include affordable housing that are either under review, received approvals this year to start construction or are under construction. To address Provincial directives, streamline development approvals and support excellent customer service, the report also provides an update on significant process improvements underway in 2024 (Attachment D). Housing Pledge Reporting As part of the More Homes for Everyone Act, 2022 (Bill 109), the Planning Act was amended to give the Minister of Municipal Affairs and Housing the authority to require municipalities to report information on planning matters (Section 64). On April 6 2023, the Province implemented Ontario Regulation 73/23 -Municipal Planning Data Reporting requiring Ontario's largest and fastest- growing municipalities, which includes the City of Kitchener to report development application information on a quarterly basis (as per Schedule 2 of the regulation) and additional information on an annual basis (as per Schedule 3 of the regulation). The City's quarterly report data includes the following development application types: • Official Plan Amendments, Page 169 of 198 • Zoning By-law Amendments, • Site Plan Applications, • Minor Variances, • Land Severances (Consents), • Plan of Subdivisions, • Plan of Condominiums, • Community Infrastructure and Housing Accelerator Orders, and • Minister's Zoning Orders The report data must include the following: • application identifiers (application ID and address); • application details, as applicable (date application submitted, date application deemed complete, application status, date of decision, date of adoption/passing, date of registration, number of new residential units if registered); • heritage information for the subject property as applicable (listed under section 27 (3) of the Ontario Heritage Act, designated to be of cultural heritage value or interest, subject to easement or covenant under section 37 of the Ontario Heritage Act, within a heritage conservation district area); and, • appeal information if applicable (third party appeal, type of appeal, date of appeal, date of appeal decision). The data gathered by the Province is being used to measure progress towards various Housing Supply Action Plan commitments and will also provide the information needed to support informed, evidence -based decisions around housing and planning policy. The regulation also complements the Province's initiative of developing standards and achieving consistency for exchange of data required for development applications. The City of Kitchener has submitted quarterly development application data to the Province since June 2023. The Q1 2024 quarterly planning data reports to the Province are attached to this report (Attachment E). STRATEGIC PLAN ALIGNMENT: This report supports the delivery of core services. FINANCIAL IMPLICATIONS: Capital Budget — The recommendation has no impact on the Capital Budget. Operating Budget — The recommendation has no impact on the Operating Budget. COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the Council / Committee meeting. CONSULT — Significant development application specific engagements are undertaken for Official Plan Amendment, Zoning By-law, and Subdivision applications. Engagement includes mailing postcards to property owners and occupants of all buildings within 240 metres of the subject lands, publishing a newspaper notice when the application is first circulated and when the statutory public meeting is scheduled, as well as informal community meetings including Neighbourhood Meetings and/or site walks. A large plain language sign is also posted on the property. Page 170 of 198 For planning policy projects, community engagement plans are developed and implemented to ensure fulsome, tailored engagement occurs early and throughout each project at a level commensurate with the scope of the project. PREVIOUS REPORTS/AUTHORITIES: There are no previous reports/authorities related to this matter. APPROVED BY: Justin Readman — General Manager, Development Services ATTACHMENTS: Attachment A — Significant Planning Applications Quarterly Report (Q2 2024) Attachment B — Housing Accelerator Fund Projects (Q2 2024) Attachment C — Significant Planning Projects (Q2 2024) Attachment D — Affordable Housing and Significant Streamlining Projects (Q2 2024) Attachment E — Provincial O.Reg. 73/23 Q1 2024 Quarterly Planning Data Report Page 171 of 198 Attachment A — Significant Planning Applications Quarterly Report (Q2 2024) Current Significant Development Applications Subdivision (SA), Official Plan Amendment (OPA), Zoning By-law Amendment (ZBA) WARD 1 104 WOOLWICH ST Proposal: Two 3.5 -storey multiple dwellings (stacked townhouses) with 24 dwelling units each (total of 48 dwelling units). File Number: OP18/007/W/AP Description: The owner is requesting a Site -Specific Policy to allow an FSR of up to 0.9. Application Type: OPA Status: This application has been circulated and Planning staff are accepting and reviewing comments. File Number: ZBA18/009/W/AP Description: The owner is requesting to change the zoning from Agricultural (A-1) to Residential Six Zone (R-6) along with a Site Specific Provisions to: a) reduce the minimum front yard from 4.5 metres to 1.0 metres, b) eliminate the requirement for Private Patio Areas for at -grade dwelling units, c) increase the maximum Floor Space Ratio from 0.6 to 0.9, and d) reduce the required parking from 1.75 spaces per unit to 1.2 spaces per unit. Application Type: ZBA Status: This application has been circulated and Planning staff are accepting and reviewing comments. Staff Contact: Andrew Pinnell Neighbourhood Meeting Date: TBD Owner: 1238455 ONTARIO LIMITED Applicant: GSP GROUP INC Update Since Last Quarterly Report: No Update. Planning Staff and the Applicant are considering input provided through the initial circulation. 26 STANLEY AVENUE & 31 SCHWEITZER STREET Proposal: The Site is proposed to be developed with a residential subdivision consisting of 42 single detached dwelling lots, 12 semi-detached dwelling lots (total of 24 dwellings) and a 5 -unit street -townhouse block totaling 71 residential units. The Proposed Development will be accessed by a future municipal road connecting to Stanley Avenue. File Number: 30T-21201 Description: A residential plan of subdivision consisting of single detached dwellings, semi-detached dwellings, and townhouse dwellings, totaling 72 units. Application Type: SA Status: This application has been circulated and Planning staff are accepting and reviewing comments. File Number: ZBA21/19/S/BB Description: To rezone the Site from Residential Four (R-4) and Residential Five (R-5) to the Low Rise Residential Five (RES -5) Zone with a Site -Specific Provision to permit a maximum building height of 12.5 metres. Application Type: ZBA Status: This application has been circulated and Planning staff are accepting and reviewing comments. Staff Contact: Brian Bateman Neighbourhood Meeting Date: May 31, 2022. Owner: Newo Holdings Limited Applicant: GSP Group Inc. Update Since Last Quarterly Report: No Update. A Neighbourhood Meeting was held on May 31, 2022 and Planning Staff and the Applicant are considering input provided at the Neighbourhood Meeting. Page 172 of 198 WARD 3 — NEW APPLICATION 1082-1094 WILSON AVENUE Proposal: The Site is proposed to be further developed to permit the expansion of a manufacturing facility and add additional parking. multiple dwellings. Parkland open space & stormwater management facilities are also proposed. File Number: OPA24/006/W/TS Description: The owner is requesting an Official Plan Amendment to redesignate a portion of the properties from Low Rise Residential to Business Park Employment. Application Type: OPA Status: This application has been circulated and Planning staff are accepting and reviewing comments. File Number: ZBA24/011/W/TS Description: The owner is requesting a Zoning By-law amendment to change the zoning from RES -1 to EMP -2 to permit the expansion of Application Type: ZBA a manufacturing facility and associated parking. Application Type: ZBA Status: This application has been circulated and Planning staff are File Number: 30T-16201 accepting and reviewing comments. Staff Contact: Tim Se ler Neighbourhood Meeting Date: July 10, 2024 Owner: Colt Canada Corporation Applicant: GSP Group Inc. Update Since Last Quarterly Report: No update. New application. WARD 5 ROCKCLIFFE DR (FREURE SOUTH) Proposal: A new community with 471 new residential units including single detached, street townhouses & multiple dwellings. Parkland open space & stormwater management facilities are also proposed. File Number: OP16/001/R/KA Description: To change the designation of the easterly portion of land to high rise residential, designate a future park area as open space, and to adjust the limits of wooded areas designated as open sace. Application Type: OPA Status: This application has been circulated and Planning staff are accepting and reviewing comments. File Number: ZC16/009/R/KA Description: To change the zoning from Restricted Business Park (B- 2) to residential and natural heritage conservation zones. Application Type: ZBA Status: This application has been circulated and Planning staff are accepting and reviewing comments. File Number: 30T-16201 Description: The plan of subdivision includes single detached, street townhouses & multiple dwellings along with parkland open space & stormwater management facilities. Application Type: SA Status: This application has been circulated and Planning staff are accepting and reviewing comments. Staff Contact: Katie Anderl Neighbourhood Meeting Date: TBD Owner: FREURE DEVELOPMENTS Applicant: MHBC PLANNING LTD LIMITED Update Since Last Quarterly Report: No update. Archeological assessment work continues. Page 173 of 198 WARD 8 400 WESTWOOD DR Proposal: To demolish the existing house and create four new lots for single detached dwellings. File Number: ZBA21/012/W/ES Description: To rezone the developable portion of the lands to site Description: Site-specific regulations propose a Floor Space Ratio specific Residential Four (R-4). Application Type: ZBA Status: This application has been circulated and Planning staff are to permit 618 parking spaces accepting and reviewing comments. Staff Contact: Eric Schneider Neighbourhood Meeting Date: January 13, 2022 Owner: NASIR BROMAND, ZAKIA Applicant: IBI GROUP BROMAND Update Since Last Quarterly Report: No update. A Neighbourhood Meeting was held with the community on January 13, 2022. Planning Staff and the Applicant are considering input provided at the Neighbourhood Meeting. Status: This application has been circulated and Planning staff are WARD 9 50 BORDEN AVE S Proposal: a mixed-use development consisting of two towers (57 storeys and 51 storeys in height) having 1,224 dwelling units and 7,240 m2 of commercial and institutional space. File Number: OPA23/004/B/KA Description: Site-specific regulations propose a Floor Space Ratio (FSR) of 16.1, a reduced rear yard setback, and a parking reduction to permit 618 parking spaces Application Type: OPA Status: This application has been circulated and Planning staff are accepting and reviewing comments. File Number: ZBA22/008/B/KA Description: Site-specific regulations propose a Floor Space Ratio (FSR) of 16.1, a reduced rear yard setback, and a parking reduction to permit 618 parking spaces Application Type: ZBA Status: This application has been circulated and Planning staff are accepting and reviewing comments. Staff Contact: Katie Anderl Neighbourhood Meeting Date: June 6, 2023 Owner: Woodhouse Investments Inc Applicant: IBI Group Update Since Last Quarterly Report: No update. This application has been circulated and Planning staff are accepting and reviewing comments. Page 174 of 198 WARD 10 22 WEBER ST W Proposal: A 19 -storey multiple residential building with 162 units, including 25 barrier free units. A total of 24 parking spaces are proposed at grade. File Number: OPA20/005/W/JVW Description: The applicant is now proposing to amend the designation to High Density Commercial Residential with a Special Policy Area in order to permit a floor space ratio (FSR) of 7.8. Application Type: OPA Status: Under appeal File Number: ZBA20/013/W/JVW Description: The subject lands are currently zoned Commercial Residential Three (CR -3) in Zoning By-law 85-1. The applicant is proposing the same base zone with site specific special regulations to permit; an increase in height to 19 storeys, an increase in Floor Space Ratio to 7.8, To require a minimum ground floor fagade height of 4.5m, to reduce the required minimum landscaped area required from 10% to 8%, to reduce front and rear yard setbacks, and to reduce the required on-site parking to 24 spaces, including 8 visitor parking spaces. Application Type: ZBA Status: Under appeal Staff Contact: Garett Stevenson Neighbourhood Meeting Date: Sept. 8, 2021 & March 3, 2022. Owner: 30 DUKE STREET LIMITED Applicant: MHBC PLANNING LTD Update Since Last Quarterly Report: Council refused the related Heritage Permit Application on August 22, 2022. This appeal was adjourned. This application has been appealed to the Ontario Land Tribunal (formerly LPAT) which was suspended. The Owner has requested the OLT now schedule another Case Management Conference to resume this appeal. Page 175 of 198 Attachment B — Housing Accelerator Fund Projects Current Housing Accelerator Fund Projects Quarter 2, 2024 Update CITY-WIDE Affordable Housing Construction Offset on City -owned Lands Description: This initiative involves looking for new opportunities to provide lands for below-market rental and ownership housing and working directly with affordable housing providers to access the lands and collaborate on the delivery of affordable or supportive housing projects. Current Status: In April 2024, Council agreed to donate a property at 1035 Ottawa St IN PROGRESS to Habitat for Humanity to be used as part of the Build Now Initiative and achieve at least 63 units for affordable home ownership. Staff are reviewing the City's land inventory to determine additional viable opportunities to support this initiative. Next Steps. Staff plan to bring a report to Council on potential options in Q2 2024. Project Lead: Target Completion: 2026 Rosa Bustamante — Director of Planning and Housing Policy Affordable Rental & Co-op Housing Incentive Pilot Program Description: With the support of Kitchener's Housing Accelerator Fund, this project aims to establish a financial incentives pilot program to assist with the predevelopment costs of building new not-for-profit affordable rental and co-op housing units. Current Status: In April 2024, Council approved this grant program which will formally IN PROGRESS launch on May 31, 2024. Next Steps: With the program launch, staff will prepare for receiving submissions including an information session for potential applicants. Once applications are received, they will be evaluated and grant funding awarded to projects that meet the program criteria subject to the funding allocation. Project Lead: Target Completion: Tanya Roberts — Project Manager Q3 2026 Conclusion of the pilot program Enabling 4 Units Description: In response to Council's motion at the October 16, 2023 Council meeting, staff are undertaking a review of zoning bylaw amendments that would enable up to four units on a lot which currently permit a single detached, semi-detached or street fronting townhouse dwelling for a Council decision in Q1 2024. Current Status: On March 25, 2024, Council approved an Official Plan amendment COMPLETE and Zoning By-law amendment to enable 4 units as -of -right city-wide. The Official Plan and Zoning Bylaw amendments are now fully in effect. Next Steps: With the support of the Housing Accelerator Fund, a staff working team will support implementation by streamlining processes and creating simplified resources to support uptake of additional units. Project Lead: Target Completion: Q3 2024 (including post -decision Katie Anderl — Project Manager implementation) Page 176 of 198 Strategic Land Acquisition and Supporting Infrastructure Description: This initiative will involve acquiring lands for the purposes of affordable housing development with a focus on lands within the major transit station areas and working with affordable housing provides to collaborate on the delivery of affordable housing and necessary related community infrastructure. Current Status: Staff are reviewing potential opportunity sites that would be satisfy IN PROGRESS the criteria for affordable housing projects. Next Steps: Staff will bring a report to Council on potential land acquisition opportunities in Q3 2024. Project Lead: Target Completion: Q4 2024 Rosa Bustamante — Director of Planning and Housing Policy Climate Adaptation Plan Description: This initiative includes the development of a climate adaptation plan that will be used in the short term to inform land use policy updates for the next Official Plan. Current Status: The project team has been established as part of the Official Plan IN PROGRESS project and a Request for Qualifications (RFQ) for consultant support is currently underway. Next Steps: The project team will work closely throughout 2024 and 2025 to advance work on this initiative. Project Lead: Target Completion: Q2 2026 Janine Oosterveld — Manager, Customer Experience and Project Management Housing Needs Assessment Description: This initiative includes the preparation of a Housing Needs Assessment for the City of Kitchener which will be used to inform housing -related initiatives and land use policy updates for the next Official Plan. Current Status: The project team has been established as part of the Official Plan IN PROGRESS project and a Request for Qualifications (RFQ) for consultant support is currently underway. Next Steps: The project team will work closely throughout 2024 and 2025 to advance work on this initiative. Project Lead: Target Completion: Q4 2025 Lucas Van Meer -Mass — Senior Planner (Housing) WARD 1 — There are no Ward 1 specific projects at this time. WARD 2 — There are no Ward 2 specific projects at this time. WARD 3 Growing Together (Major Transit Station Area) Planning Framework Review Description: Comprehensive review and update of land use, zoning, and urban design guidelines for the Block Line, Fairway, and Sportsworld Major Transit Station Areas. Current Status: The project team has been established and is developing a project IN PROGRESS charter, project milestones and key deliverables. Next Steps: The project team will conduct public engagement and engage consultant support through 2024. Project Lead: Target Completion: 2025 Adam Clark — Senior Urban Designer (Architecture & Urban Form) Page 177 of 198 WARD 4 — There are no Ward 1 specific projects at this time. WARD 5 — There are no Ward 2 specific projects at this time. WARD 6 — There are no Ward 1 specific projects at this time. WARD 7 — There are no Ward 2 specific projects at this time. WARD 8 — There are no Ward 1 specific projects at this time. WARDS 9 & 10 Growing Together (Protected Major Transit Station Area) Planning Framework Review Description: Comprehensive review and update of land use, zoning, and urban design guidelines for the 7 Major Transit Station Areas west of the Conestoga Expressway. Current Status: A report was considered by Committee of Council at a statutory COMPLETE public meeting on January 29, 2024 where staff recommended a new planning framework for these 7 protected major transit station areas. This matter was deferred to the March 18th Council meeting with a direction to staff to have further dialogue with those that delegated at the statutory public meeting. Throughout February and early March meetings were held with landowners and their consultants as well as the community to better understand concerns and share information. A supplemental report was considered by Council on March 18th and Growing Together was unanimously approved by Council. Next Steps: N/A Project Lead: Target Completion: Q1 2024 Adam Clark — Senior Urban Designer (Architecture & Urban Form) Inclusionary Zoning Description: Inclusionary Zoning can be used to require new, multi -unit housing developments to include affordable units. The Region, Kitchener, Waterloo, and Cambridge are coordinating their approach to implementing inclusionary zoning within MTSAs. A portion of this work is being funded through the Provincial Streamline Development Approvals Funding. This work is being coordinated with Growing Together. Current Status: A report was considered by Committee of Council at a statutory COMPLETE public meeting on January 29, 2024 where staff recommended an inclusionary zoning framework for Kitchener's protected major transit station areas. This matter was deferred to the March 18 Council meeting with a direction to staff to have further dialogue with those that delegated at the statutory public meeting. Throughout February and early March meetings were held with those that delegated which were members of the Waterloo Region Homebuilders Association and members of Build Urban. A supplemental report was considered by Council on March 18th and Inclusionary Zoning was approved by Council. Next Steps: Staff will undertake an economic conditions assessment and report back to Council by Q4 2024. Project Lead: Target Completion: Q4 2024 Tim Donegani — Senior Planner Page 178 of 198 Attachment C — Significant Policy Projects (Q2 2024) Current Significant Policy Projects Quarter 2, 2024 Update CITY WIDE Comprehensive Zoning By-law Review Description: Review of Kitchener's Zoning By-law 85-1. Approved in phases with the latest phase (residential zones) being approved in 2022. Final phase includes specific properties previously deferred. Current Status: ONGOING Zoning updates in 2023 and 2024 have focused on Major Transit Station Areas which is occurring through Growing Together. Next Steps: Final phase includes specific properties previously deferred and specific geographies. Project Lead: TBD Target Completion: 2024/25 High Performance Development Standards Description: Establishing a harmonized high performance development standard (green development standard) across local area municipalities in Waterloo Region. Current Status: ONGOING Initial community, development industry and staff engagement sessions launched this spring to scope theme areas for the first draft of the standards. Next Steps: Initial engagement sessions and research will be used to prepare a first draft expected later this year coupled with engagement. Project Lead: Target Completion: 2025 Janine Oosterveld, Manager Customer Experience & Project Management Housing for All Implementation Description: Kitchener Housing for All Strategy was approved in 2020 and identifies actions for the City to address homelessness and housing issues in Kitchener. Current Status: ONGOING An update was provided to Council on the progress of Housing for All action items in March 2022. Lived Expertise Working Group A report is being considered by Committee of Council on June 17th on the next steps for the Lived Expertise Working Group. Lodging Homes Committee of Council considered reports on updates to the Official Plan and Zoning By-law as well as updates to the Lodging House Licensing By-law on June 3. Next Steps: At this time, pending resource capacity, a second update on Housing for All actions items is anticipated in 2024. Lived Expertise Working Group Pending Council's consideration of the recommendations within the June 17th report, staff will commence with the administration of the next iteration of the Lived Expertise Working Group. Lodging Homes Pending Council's consideration of the recommendations for updates to the Official Plan, Zoning By-law, and Lodging House Licensing By- law, an education and implementation plan will commence in Fall 2024. Project Lead: Target Completion: 2024 for Lodging Homes; 2024 for LEWG pilot Natalie Goss, Manager Policy & program; 2025+ for Housing for All implementation. Research Garett Stevenson, Director Development and Housing Approvals Page 179 of 198 Housing for All Implementation Partial Housing Accelerator Fund Initiative - New Official Plan Description: A comprehensive review of Kitchener's Official Plan to, among other things, align with changes in Provincial legislation, policies, and plans and the Region of Waterloo's Official Plan Amendment No. 6. Current Status: A series of RFQs were issued in May for consultant services for a ONGOING variety of background studies and community engagement that will inform Kitchener's new Official Plan. Next Steps: A community working group is expected to be established in the next quarter with an initial meeting in early Fall. Also in the fall will be the community launch of the New Official Plan project with in person and online opportunities for discussion. Project Lead: Target Completion: 2026 Tim Donegani — Senior Planner John Zunic — Senior Planner Provincial legislation, policies, plans review Description: A significant number of Provincial legislative and policy changes have occurred throughout 2022 and 2023. The Planning Division has formally added this review to their workplan due to the significant time and resources that have been required to review changes and provide comments. Current Status: ONGOING Since the March 2024 quarterly report the following Provincial legislative and policy changes were posted: • Bill 185, Cutting Red Tape to Build More Homes Act, 2024 • Proposed Provincial Planning Policy Statement • Bill 200, Homeowner Protection Act, 2024 Project Lead: Target Completion: N/A Planning Management Team Rental Housing, Eviction and Displacement Study Description: In January 2023 Council directed that staff look at tools that are within Kitchener's jurisdiction with respect to rental replacement and other tools and advocacy opportunities for the transitioning of displaced residents. Current Status: ONGOING A report is being considered by Committee of Council on June 17th that includes a proposed Rental Replacement By-law and necessary amendments to Kitchener's Official Plan and Demolition Control By- law. Next Steps: Pending Council's consideration of the June 17th report, implementation of Kitchener's Rental Replacement By-law will occur. Project Lead: Target Completion: Q2 2024 Lucas Van Meer -Mass — Senior Planner (Housing) Tree Conservation Tools Review — Phase 2 1 Description: With Council's approval of Kitchener's tree canopy target in January 2022, Council directed staff to review existing tree conversation processes within the City to explore opportunities for strengthened measures. This work includes a review of Kitchener's Tree Bylaw and Tree Conservation Bylaw, tree planting requirements within the Development Manual, and Tree Management Policy. Current Status: In April 2023, Council authorized a second phase work to further ONGOING evaluate specific enhancement opportunities to existing tools and processes. The project team has initiated work on some of the identified specific enhancement opportunities, including creating a notification procedure for planned tree removals on private properties, updating tree protection standards to align with best practices, and targeted refresher and education of tools through an initial webpage update. Page 180 of 198 Tree Conservation Tools Review — Phase 2 Next Steps: Development of a comprehensive work plan for phase 2 is underway including a community and stakeholder engagement plan. Additionally implementing updated tree protection standards and notification procedures for private tree removal, and further developing a strategy for other identified enhancement opportunities. Project Lead: Target Completion: 2024 Gaurang Khandelwal — Planner (Policy) Urban Design Manual Review — Part C Description: A comprehensive review of Kitchener's Urban Design Manual which has been occurring in phases. The last phase was approved in 2019. Final phase includes the urban design standards Part C). Current Status: ONGOING Internal review of existing standards to understand opportunities for improvement. Next Steps: Draft updates to urban design standards and stakeholder engagement. Project Lead: Target Completion: 2024 Gaurang Khandelwal — Planner Target Completion: Q3 2024 (Policy) WARD 1 — There are no Ward 1 specific projects at this time. WARD 2 — There are no Ward 2 specific projects at this time. WARD 3 Hidden Valley Secondary Plan Description: Development of updated land uses and Official Plan policies, including technical studies to inform them to implement the land use master plan approved by Council in 2019. Current Status: IN PROGRESS Technical studies are being finalized. A community open house was held on May 30 to share and obtain input on draft land use. Next Steps: At this time, Council consideration of Official Plan and Zoning By-law amendments to implement land use and zoning changes as a result of the land use review are expected in August 2024 Project Lead: Target Completion: Q3 2024 Carrie Musselman — Senior Environmental Planner Housing Accelerator Fund Initiative - Growing Together East (Major Transit Station Area) Planning Framework Review Description: Comprehensive review and update of land use, zoning, and urban design guidelines for the Block Line, Fairway, and S ortsworld Major Transit Station Areas. Current Status: An information report was provided to Committee of Council on June TO COMMENCE Q2 2024 17, 2024 to launch Growing Together East. Next Steps: An initial phase of community engagement will occur mid June through July. Project Lead: Target Completion: 2025 Adam Clark — Senior Urban Designer (Architecture & Urban Form) Page 181 of 198 WARD 4 and WARD 5 Dundee North Secondary Plan Planning Framework Review Description: Development of a new secondary plan (land use, transportation, natural heritage system, complete community) for lands in south-west Kitchener. The project will also fulfill the requirements for an environmental assessment and will recommend infrastructure to service the area. Current Status: ONGOING Bill 162, Get It Done Act, received royal assent in May 2024. Bill 162 Growing Together West in March 2024. The Official Plan included additional lands within southwest Kitchener in its urban amendments are with the Region of Waterloo for their approval. The area. City staff have been working with the landowners in the Dundee Zoning By-law amendment for the Protected Major Transit Station North and southwest Kitchener area on advancing work on this areas is under appeal. Secondary Plan. An updated project charter has been prepared that Work with the Region on the approval of the Official Plan includes the additional lands that will now form part of the Dundee amendments. North Secondary Plan. A report to Committee of Council on June 17 With Council's approval in March 2024, city of Kitchener's portion of is seeking Council authorization to sole source additional work to the work on Growing Together West is complete. consultant retained for the Dundee North Secondary Plan. Next Steps: City staff will continue to work with landowners to advance work for lands within southwest Kitchener. A full community, stakeholder, and Indigenous engagement process will occur Project Leads: Target Completion: Q2/Q3 2025 Carrie Musselman — Senior Environmental Planner Gaurang Khandelwal — Planner (Policy) WARD 6 — There are no Ward 6 specific projects at this time. WARD 7 — There are no Ward 7 specific projects at this time. WARD 8 — There are no Ward 8 specific projects at this time. WARDS 9 & 10 Housing Accelerator Fund Initiative - Growing Together West (Protected Major Transit Station Area) Planning Framework Review Description: Comprehensive review and update of land use, zoning, and urban design guidelines for the 7 Major Transit Station Areas west of the Conestoga Expressway. Current Status: Council approved Official Plan and Zoning By-law amendments for ONGONG Growing Together West in March 2024. The Official Plan amendments are with the Region of Waterloo for their approval. The Zoning By-law amendment for the Protected Major Transit Station areas is under appeal. Next Steps: Work with the Region on the approval of the Official Plan amendments. Project Lead: With Council's approval in March 2024, city of Kitchener's portion of Adam Clark — Senior Urban Designer work on Growing Together West is complete. (Architecture & Urban Form) Housing Accelerator Fund Initiative - Inclusionary Zoning Description: Inclusionary Zoning can be used to require new, multi -unit housing developments to include affordable units. The Region, Kitchener, Waterloo, and Cambridge are coordinating their approach to implementing inclusionary zoning within MTSAs. A portion of this work is being funded through the Provincial Streamline Development Approvals Funding. This work is being coordinated with Growing Together. Current Status: Council approved Official Plan and Zoning By-law amendments ONGOING creating an inclusionary zoning framework for Kitchener's Protected Major Transit Station Areas. The Official Plan amendment is with the Region of Waterloo for their approval. As part of Council's approval, Council directed that staff report back by December 2024 with Page 182 of 198 Housing Accelerator Fund Initiative - Inclusionary Zoning recommendations on whether inclusionary zoning requirements should continue to be advanced in the timeframe, with the Market Area categorizations, and in the manner that was approved in March. Next Steps: Staff are working to retain a consultant to assist with the report back to Council by December 2024. Additionally, staff are working with the Region on the approval of the Official Plan amendment. Staff are also working on an inclusionary zoning implementation guide and a memorandum of understanding with the Region to coordinate administrative roles and responsibilities. Project Leads: With Council's approval in March 2024, the City of Kitchener's portion Tim Donegani — Senior Planner of work on Inclusionary Zoning is complete. Elyssa Pompa - Planner Target Completion of Council report back — Q4 2024 District Energy Business Case Description: Pre -feasibility study endorsed by Council in 2020. Current phase of work includes conducting detailed technical and financial feasibility to connect new/existing public and private buildings in downtown to a system primarily powered by geothermal energy. Current Status: Consultant work on pre -feasibility has been completed. In November ONGOING 2023 Council directed work on the next steps for district energy. Next Steps: Consultant terms of reference are being prepared for the next phase of work. Project Lead: Target Completion: Q3 2024 Tim Donegani — Senior Planner Page 183 of 198 Attachment D — Affordable Housing and Projects to Streamline Approvals (Q2 2024) 2024 Active Affordable Housing Development Status Address and Total Units Affordable Status City incentives applicant Units 83-97 Victoria St N, 44 44 Site plan approval Project manager The Working Centre granted, building permit Affordable rental housing issued incentives (planning and building application fees waived 82 Wilson Ave, 123 32 (net Under construction Affordable rental housing Region of Waterloo (existing) increase) incentives (planning and building application fees waived 49 Queen St N, 41 41 Under construction Affordable rental housing Indwell Community incentives (planning and Homes and St. Peter's building application fees Lutheran Church waived 137 Queen St S, 57 21 Clearing conditions of Project manager St Paul's Lutheran site plan approval, Affordable rental housing Church shoring permit issued, incentives (planning and Committee of building application fees Adjustment application waived) approved 210 Duke St E, 100 40 Final site plan approval Project manager Knossos Housing issued, foundation Affordable rental housing permit issued, full incentives (planning and building permit under building application fees review waived) 47 Charles St. E 160 160 Conditional site plan Project manager House of Friendship approval granted Affordable rental housing incentives (planning and building application fees waived) 15-105 Mooregate 378 378 Conditional site plan Project manager Cres approval granted Affordable rental housing incentives (planning and building application fees waived Total New Units: 780 716 Projects to Streamline Development Approvals Site Plan folder updates Description: Updating the file management software (AMANDA) for site plan applications to continue process improvements and prepare for the public portal which will allow applicants to submit applications, make payment and monitor progress. Current Status: Underway A multi -disciplinary team of development review staff are working with the technology project manager to identify workflow improvements to integrate into folder updates. Next Steps: Page 184 of 198 The working team will be testing folder updates once complete later this summer. Once testing is complete, the updated folders will go live for use on site plan applications with updated procedures and training to support staff. Project Lead: Tanya Roberts, Project Manager (Planning) Completion date: Q4 2024 Page 185 of 198 co rn 4- 0 m co (1) 0) cU a w a o= aaa _ g co rn 4- 0 ti co (1) 0) cU a m m 0 m m ¢ 2 n 0- / \ \ \ \ ) \ ) \ ) \ \ ( \ \ ( \ \ \ \ \ * ( ` \ \\ ; \ < \ 7 ) / - - 0 10 \ ( \ §\ § ; _ \ \ \ ) \ ) ` :� _ - E_ } ( § [ § \ § § § ƒ § } §\: j § \ \ ) § § W. ( ( ( W. \ \ ) ) \mm I 1 § / \ \ E \ ( _ 4 ( \ j k \ [ § § / i ) ) @ $ ) \ ) ( ) § o o o o o o o o o o o o o o o o o o o o ZZZZZZZZZZZZZZZZZZZ O112 O O O O O (000000000000 N N N CS CS N N N CS CS CS CS CS CS O O O O O O O O O O O O O O O O O O O N N N N N N N N N N N N N N N N N N N ................... N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N r r r r r r r r r r r r r r r r r r r N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Nm0 o0 LL�-Q IQ V mO M: ;:O�0�0F,r M2 vmo mmovm O O O O � O O � c O O M O O O N O 0 0 0 0 0 0 0 0 dddNNNNNNd� �NNNNNNCSN CS CS CS CS CS CS o 0 0 0 o ....... O 0 0 0 0 0 0 m m m m m m m m m m v v v v v v v v v v v v v v v v v v v N N N N N N N N N N N N N N N N N N N N N N N N N N N N N ....................... 000000 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N OmO�M V 000 - W 0(p Mu�0ru�00 V V �ON� UUm�aa� ZNXLL'N .U` =U` NLLZMZ yl,5 U>y� N N N O N NN M LL� LL� O a a a m a S M w S m Y� m m m w m O U N�� w NN N NN NN N NN NN N N N N N N N HNN N N Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Of W o U o Un Of w of a w Z Of Z Z W Z00�[Y W Z W> W oQ �a [YU W [Y [Y 00 a�Zof Z=ww Q>��Qmo �_ow aw 0U)Q0 a wao,w0 cl Z, of of 0aU) m Rzaw llU uwmww:lowaa0=OUn�az -wZ ZyaU)UoD C7 C7O z U D w D � >U'wmQZ,_ ooZa>-�OWWaWODW�<Oaoodu)�,>araowof W W YLL> O� LL Z���C�mmLLLLO LL W ULL W mn> LL* Z Y F NNM V 01�LL�oJONON��00NrM�ru� OvrnrnNLL� LL�LL�I� V O LL�N V Muco Mu�u�O McoNom �LL�LL�OI�LL� M m 0 0 0 u� ro 0 O 0 LL� O N M 0 0 N M O r W 0 999999999999- 0 0 0 NNN N .... M M V V V V V V V V V V V V V V V V '4444 NNN NNNNNNNNNNNNNNNNNNN N O O O .............. O O O O O O N N N N N N N N N N N N N N N N N N N N N N N N N N M M M 0000 0 0 dddddd N N N N N N 0 0 0 0 0 0 N N N N N N a a a a a a a a a a a a a a a a a a a a a a a <<<<<< co rn 4- 0 rn co (1) 0) cU 0- rvuZi uZiMmN� a22 W m�(7 Z Z Z Z Z Z Z hhhhhhh co rn 4- 0 0 rn (1) 0) cU a co rn 4- 0 rn (1) 0) cU a uS cS uSo--O-oc CLCL CL Z Z Z ZZZZZZZ F W �W W U GZJNOF= Z Z ❑O Q Q O>�Z¢QWH O ¢ ¢ ❑¢�2r�O � 2U�UO�N �UUU U UUUUUUU co rn 4- 0 N N 0) (6 0— co rn 4- 0 (Y) rn (1) 0) cU a N L L r•1 LJ co rn 4- 0 rn (1) 0) cU 0- r_ C m