Loading...
HomeMy WebLinkAboutDSD-2024-430 - Zoning By-law Amendment Application ZBA24/021/V/AP - 169-183 Victoria Street South - 1000002286 Ontario Ltd. - Legion Heights Victoria Inc - 2306975 Ontario Inc.Staff Report r JR Development Services Department www.kitchener.ca REPORT TO: Planning and Strategic Initiatives Committee DATE OF MEETING: October 28, 2024 SUBMITTED BY: Garett Stevenson, Director of Development and Housing Approvals, 519-741-2200 ext. 7070 PREPARED BY: Andrew Pinnell, Senior Planner, 519-741-2200 ext. 7668 WARD INVOLVED: Ward 9 DATE OF REPORT: October 17, 2024 REPORT NO.: DSD -2024-430 SUBJECT: Zoning By-law Amendment Application ZBA24/021/V/AP 169-183 Victoria Street South 1000002286 Ontario Ltd., Legion Heights Victoria Inc., 2306975 Ontario Inc. RECOMMENDATION: That Zoning By-law Amendment Application ZBA24/021/V/AP requesting to amend Zoning By-law 85-1, for 1000002286 Ontario Ltd., Legion Heights Victoria Inc., and 2306975 Ontario Inc., be approved in the form shown in the `Proposed By-law' and `Map No. 1' attached to Report DSD -2024-430 as Attachment `A', and That Zoning By-law Amendment Application ZBA24/021/V/AP requesting to amend Zoning By-law 2019-051, for 1000002286 Ontario Ltd., Legion Heights Victoria Inc., and 2306975 Ontario Inc., be approved in the form shown in the `Proposed By-law' and `Map No. 1' attached to Report DSD -2024-430 as Attachment `B'; and That the Proposed By-law to amend Zoning By-law 2019-051, as amended by By-law 2024-065, shall have no force and effect until By-law 2024-065 (Growing Together PMTSAs) is in full force and effect, and further That the Urban Design Brief prepared by GSP Group Inc., dated October 2024, attached as Attachment `C' to report DSD -2024-430, be endorsed, and that staff be directed to implement the Urban Design Brief through a future Site Plan Approval process, and at the discretion of the City's Director of Development and Housing Approvals, significant changes to the Urban Design Brief will be to the satisfaction of Council. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. Page 3 of 232 REPORT HIGHLIGHTS: • The purpose of this report is to evaluate and provide a planning recommendation regarding the Zoning By-law Amendment application for the subject lands, located at 169-183 Victoria Street South. It is Development and Housing Approvals staff's recommendation that the Zoning By-law Amendment be approved and the Urban Design Brief be endorsed. • The requested amendment supports the redevelopment of the lands with an 8 -storey multiple dwelling consisting of approximately 120 dwelling units (rental units), in the place of four single detached dwellings and one four-plex. Approximately 24 dwelling units are proposed to be provided as affordable housing. • Community engagement included: o Circulation of a preliminary notice letter to property owners and residents within 240 metres of the subject property; o Installation of three notice signs on the property; o Follow up one-on-one correspondence with members of the public; o Neighbourhood Meeting held on September 25, 2024; o Postcard advising of the statutory public meeting was circulated to all residents and property owners within 240 metres of the subject site and those who responded to the preliminary circulation; o Notice of the public meeting was published in The Record on October 4, 2024. • This report supports the delivery of core services. • This application was deemed complete on August 13, 2024. The Applicant can appeal this application for non -decision after November 11, 2024. EXECUTIVE SUMMARY: The owners of the subject property, addressed as 169-183 Victoria Street South, are requesting to change the zoning to allow the redevelopment of the subject property with an eight -storey, 28.8 metre high, mid -rise residential apartment building with a total of approximately 120 units. The building would contain two floors of underground parking, with eight above -grade storeys containing a mixture of 1-, 2-, and 3 -bedroom rental units as well as a ground -floor amenity room, private balconies, an outdoor common amenity area, and a play area abutting Henry Street. To facilitate the development concept, the applicant is requesting a Zoning By-law Amendment (ZBA) to change the zoning from 'Low Intensity Mixed Use Corridor Zone (MU - 1') to 'Medium Intensity Mixed Use Corridor Zone (MU -2') to in Zoning By-law 85-1 with a Special Regulation Provision. However, it should be noted that the lands are also subject to the City -initiated ZBA that emerged from the City's Growing Together Study (i.e., By-law 2024-065). By-law 2024-065, which would apply the 'Mid Rise Growth Zone (SGA -2)' to the subject property, is under appeal with the Ontario Land Tribunal (OLT). Should the appeal for the City -initiated ZBA be resolved by the OLT between the submission of this report and the Planning and Strategic Initiatives Committee (PSIC) meeting, the SGA -2 Zone would be retained and the requested ZBA would add a Site Specific Provision, to facilitate the same development concept. Under either scenario, Development and Housing Approvals staff is recommending that the application be approved. Page 4 of 232 BACKGROUND: The City of Kitchener has received an owner -initiated Zoning By-law Amendment (ZBA) Application to facilitate redevelopment of the lands with an 8 -storey multiple dwelling consisting of approximately 120 dwelling units (rental units), including 24 affordable units. The ZBA would change the zoning under By-law 85-1 from MU -1 Zone to MU -2 Zone and add a site specific provision to, for example, allow a building height of 28.8 metres (8 storeys), regulate certain setbacks, allow a floor space ratio of 4.2, not require community or commercial use on the ground floor. The lands are also subject to a City -initiated ZBA that emerged from the City's Growing Together Study (By-law 2024-065). By-law 2024-065, which would apply the 'Mid Rise Growth Zone (SGA -2)' to the subject property, is under appeal with the Ontario Land Tribunal (OLT). Site Context The subject property is addressed as 169-183 Victoria Street South and owned by three companies: 1000002286 Ontario Ltd., Legion Heights Victoria Inc., and 2306975 Ontario Inc. The property is located at two intersections (1. Victoria Street South at Park Street, and 2. Victoria Street South at Henry Street) and is bounded by Victoria Street South to the northwest, Park Street to the northeast, and Henry Street to the southwest. The property is located diagonally across from the Downtown boundary. The subject property is a combination of five separate residential properties, none of which form part of the adjacent Victoria Park Heritage Conservation District to the southeast. The subject property has an approximate lot area of 0.2 hectares (0.5 acres) with a frontage of approximately 62.4 metres on Victoria Street, 25 metres of frontage on Park Street, and 30.5 metres of frontage on Henry Street. The subject lands are currently used and occupied as follows: Address Land Use Status (Vacant / Occupied) 169 Victoria Street South Single Detached Dwelling Occupied 173 Victoria Street South Single Detached Dwelling Occupied 177 Victoria Street South Single Detached Dwelling Occupied 179 Victoria Street South Single Detached Dwelling Occupied 183 Victoria Street South Four-plex Occupied All five of the properties (8 dwellings units) are collectively subject to the City's new Rental Replacement By-law, which protects rental units that are subject to a Planning Act application. Units in buildings subject to an application that have been vacant for less than six months are subject to the By -Law's obligation to provide an equal number of affordable rental units in the proposed development. Tenants are offered the choice of three forms of compensation: �. A rent payout equal to 10 times the monthly rent of the unit, and an agreement to vacate the unit thereafter. 2. A rent exemption for a period of one year, and an agreement to vacate the unit thereafter. Page 5 of 232 3. A temporary replacement unit provided by the applicant and rented at the same rate as their existing unit, and the first right of refusal to accept a permanent replacement unit in the proposed development once complete. The subject property is located within 730 metres walking distance to the Central Station ION stop. Additionally, the property is located on the 20 Victoria -Frederick local GRT route and is within walking distance to many other GRT transit routes (i.e., 204 iXpress, Routes 1, 3, 4, 7, 16, and 35). The property is located close to several City parks including, Victoria Park (190 metres) and Cherry Park (385 metres). The Iron Horse Trail is located 400 metres away. The surrounding lands contain a wide range of existing and proposed land uses, of various heights and densities. The lands immediately to the southeast, on Park Street, Henry Street, and Devon Street, are part of the Victoria Park Heritage Conservation District (VPHCD) and the prominent built form is currently low rise residential uses (mainly single detached dwellings). The property immediately to the southeast, on Park Street (i.e., 59 Park Street), is located within the VPHCD and is owned by one of the same companies that is requesting the subject ZBA. Lands to the southwest comprise a mix of low and medium rise residential uses as well as commercial uses. Lands to the northeast comprise a mix of low rise residential and commercial uses on the south side of Victoria Street and commercial uses on the north side of Victoria Street. It should be noted two large-scale redevelopments have been recently approved, in proximity to the subject property: • On June 26, 2023, Council approved Official Plan and Zoning By-law Amendments to permit a high-density, mixed-use development for 97-101 Park Street and 186 - 194 Victoria Street South. The amendments will facilitate the development of 436 residential units and 807 square metres of commercial space with a maximum FSR of 7.7 and maximum building height of 42 -storeys, and • On April 27, 2023, the Ontario Land Tribunal allowed Official Plan and Zoning By-law Amendments to permit a high-density mixed-use development for 146-162 Victoria Street South and 92-110 Park Street. The amendments will facilitate the development of a 3 -tower (38, 36, & 25 storeys), mixed use building containing 1,124 residential dwelling units and 1,750 square metres of commercial floor space on the ground floor, with a maximum FSR of 11.7. It should also be noted that Conditional Site Plan Approval was issued on June 16, 2023. Since the subject property fronts onto three streets, it is considered both a through lot and a corner lot under the Zoning By-law. For the purposes of lot orientation, Henry Street is considered the front yard, Victoria Street South is the side lot line abutting a street / exterior side yard, and Park Street is the rear yard. The other property line, abutting the low rise residential lands to the southeast, is the interior side lot line. Page 6 of 232 Figure 1 - Location Map: 169-183 Victoria Street South Al � Q� M co -i �L F REPORT: ✓OszA gRTti� ST R'O< MiOyq14 �o ST ���SUBJECT o s�s� AREA S 'SF,I,9Y0� �V6\SEE OR ST ��p� O STO�q^/O O�4 Proposed Development Concept: The applicant is proposing to redevelop the subject property with a mid -rise residential apartment building (Multiple Dwelling). The building is proposed to have a height of eight - storeys and 28.8 metres and contain a total of approximately 120 dwelling units (rental units). The building would contain two floors of underground parking, with eight above -grade storeys containing a mixture of 1-, 2-, and 3- bedroom units as well as a ground -floor amenity room, private balconies, an outdoor common amenity, and a play area abutting Henry Street (note the applicant advises that he is willing to adjust the floor plan, through future City processes, to integrate 3 to 5 three-bedroom units). A total of 120 Class A bicycle parking stalls are proposed, and 8 Class B stalls outside, at grade. No surface parking is proposed. Table 1, below, highlights the development concept statistics while Figures 2, 3 and 4 show the development concept site plan and building elevations. Page 7 of 232 M co -i �L F REPORT: ✓OszA gRTti� ST R'O< MiOyq14 �o ST ���SUBJECT o s�s� AREA S 'SF,I,9Y0� �V6\SEE OR ST ��p� O STO�q^/O O�4 Proposed Development Concept: The applicant is proposing to redevelop the subject property with a mid -rise residential apartment building (Multiple Dwelling). The building is proposed to have a height of eight - storeys and 28.8 metres and contain a total of approximately 120 dwelling units (rental units). The building would contain two floors of underground parking, with eight above -grade storeys containing a mixture of 1-, 2-, and 3- bedroom units as well as a ground -floor amenity room, private balconies, an outdoor common amenity, and a play area abutting Henry Street (note the applicant advises that he is willing to adjust the floor plan, through future City processes, to integrate 3 to 5 three-bedroom units). A total of 120 Class A bicycle parking stalls are proposed, and 8 Class B stalls outside, at grade. No surface parking is proposed. Table 1, below, highlights the development concept statistics while Figures 2, 3 and 4 show the development concept site plan and building elevations. Page 7 of 232 Table 1 — Proposed Development Concept Statistics Figure 2 — Conceptual Site Plan xt _ Development Concept Number of Dwelling Units 120 (subject to adjustment to integrate 3 to 5 three- PROPERTY LINE P07 ROAD WIDENING ss-nmxo snascx bedroom units through minor building refinement) Parking Spaces 53 (2 levels of underground parking-, no surface parking) Building Height 28.8 metres / 8 storeys Class A Bicycle Parking 120 stalls (62 stalls in dedicated ground floor bicycle (within an enclosed, rooms-, and 58 in a dedicated P2 level bicycle room) secure area with controlled access) - Class B Bicycle Parking 8 stalls (outdoor-, at -grade) (short-term) 8 STOREY, 120 UNITS Floor Space Ratio 4.2 Unit Types Subject to adjustment to integrate 3 to 5 three-bedroom 8,564 sq. m. --—— — — — — —— _Tt137,oweBlJ _-----------h10—V units through minor building refinement: • 92 - one -bedroom units (76.7%) • 28 - two-bedroom units 23.3% Landscaped Area 364.4 square metres (20%) Figure 2 — Conceptual Site Plan xt _ (PRE ROA = _ G: SGh2) of uF eEu P 45m DR SIDE YARD SEIbhCK /� EASEMEM 6 o (PRE ROAD WIDENING; lBL 85-T 1' PROPERTY LINE P07 ROAD WIDENING ss-nmxo snascx O l7 L I� <m PROPOSED MULTI -UNIT RESIDENTIAL BUILDING - pa o 8 STOREY, 120 UNITS 8,564 sq. m. --—— — — — — —— _Tt137,oweBlJ _-----------h10—V A,. ILOTPI.I,C-TE_G HT_1­�SGT.S i92,181 sq. ft. Z -,IT a LU rc wIn Ph'C: IN'N.!sSTE ELEC. BIKES EnLCONY PROJEC110N5 LEVEL52L EXTENT OFIP✓ELS S -d - -r 'YAWING iHOAI,"I I f l i WDLL\ "N�_-__J w IT P ""E PR PERTti L".= 21. /, DOUBL GAIEINFENCEllI r - -7 L. - �_ -� _ -OACCESSW SWRMERz a ew�axc NENWMIF0&MERTO - SERVICE 169-163 VI=IAST w l L - -1 o O lezx;6 HrD-'�I L- WALL To facilitate the proposed development concept, a Zoning By-law Amendment (ZBA) is required to change the zoning of the subject property since, for example, the current zoning Page 8 of 232 permits a maximum building height of 13.5 metres and a maximum floor space ratio of 2.0. The current zoning would not allow the proposed redevelopment. The details of the ZBA are discussed in detail in the Requested Zoning By-law Amendment section of this report. Figure 3 — Conceptual Rendering showing the proposed building from the Figure 4 — Conceptual Rendering showing the proposed building from the intersection of Park Street at Victoria Street South, looking West. Page 9 of 232 Figure 5 — Conceptual Rendering showing the proposed building from Henry Street, Planning Analysis: Planning Act, R.S.O. 1990, c. P.13 25: Section 2 of the Planning Act establishes matters of provincial interest and states that the Minister, the council of a municipality, a local board, a planning board and the Tribunal, in carrying out their responsibilities under this Act, shall have regard to, among other matters, matters of provincial interest such as, f) The adequate provision and efficient use of communication, transportation, sewage and water services and waste management systems; g) The minimization of waste; h) The orderly development of safe and healthy communities; j) The adequate provision of a full range of housing, including affordable housing; k) The adequate provision of employment opportunities; p) The appropriate location of growth and development; q) The promotion of development that is designed to be sustainable, to support public transit and to be oriented to pedestrians; r) The promotion of built form that, (i) Is well-designed, (ii) Encourages a sense of place, and (iii) Provides for public spaces that are of high quality, safe, accessible, attractive and vibrant; s) The mitigation of greenhouse gas emissions and adaptation to a changing climate. These matters of provincial interest are addressed and are implemented through the Provincial Policy Statement, 2024, as it directs how and where development is to occur. The Page 10 of 232 City's Official Plan is the most important vehicle for the implementation of the Provincial Policy Statement, 2024 and to ensure Provincial policy is adhered to. Provincial Policy Statement, 2024: The Provincial Planning Statement (PPS), 2024 is a streamlined province -wide land use planning policy framework that replaces both the Provincial Policy Statement, 2020 and A Place to Grow: Growth Plan for the Greater Golden Horseshoe, 2019 while building upon housing -supportive policies from both documents. The PPS 2024 would come into force on October 20, 2024. According to the Province, the PPS 2024 provides municipalities with the tools and flexibility they need to build more homes. It enables municipalities to: • plan for and support development, and increase the housing supply across the province • align development with infrastructure to build a strong and competitive economy that is investment -ready • foster the long-term viability of rural areas • protect agricultural lands, the environment, public health and safety Sections 2.1.6 and 2.3.1.3 of the PPS 2024 promote planning for people and homes and supports planning authorities to support general intensification and redevelopment while achieving complete communities by, accommodating an appropriate range and mix of land uses, housing options, transportation options with multimodal access, employment, public service facilities and other institutional uses, recreation, parks and open space, and other uses to meet long-term needs. Regional Official Plan (ROP): The subject property is located in the Urban Area, Delineated Built Up Area, and Central Station Major Transit Station Area (MTSA) in the Regional Official Plan (ROP). Urban Area policies of the ROP identify that the focus of the Region's future growth will be within the Urban Area. Growth is directed to the Built Up Area of the Region to make better use of infrastructure that can assist in transitioning the Region into an energy efficient, low carbon community. Furthermore, intensification within the Built Up Area assists the gradual transition of existing neighbourhoods within the Region into 15 -minute neighbourhoods that are compact, well connected places that allow all people of all ages and abilities to access the needs for daily living within 15 minutes by walking, cycling or rolling. Regional policies require Area Municipalities to plan for a range of housing in terms of form, tenure, density and affordability to satisfy the various physical, social, economic and personal support needs of current and future residents. Section 2.D.2 of Regional Official Plan Amendment 6 (ROPA 6) establishes policies for development within Major Transit Station Areas (MTSAs). The policies within this section support the provision of increased mixed-use densities that are transit supportive. The minimum density target established for the Central Station MTSA is 160 people and jobs/hectare. Page 11 of 232 The proposed development conforms the ROP, since the proposed development helps to achieve the planned intensification target. Moreover, the proposed built form provides a mix of unit types and is appropriately located along a corridor in which growth can be located close to transit and active transportation services and infrastructure. In addition, Chapter 3 of ROPA 6 establishes policies for housing in the Region. The proposed development meets the intent of these policies. Regional staff has advised that it has no objections to the proposal, subject to: 1. Implementation of a holding provision requiring the completion of a detailed noise study prior to site plan approval, and 2. Implementation of a site specific provision to prohibit geothermal energy systems. In this regard, the recommended Zoning By-law Amendment implements the Region's requests. City of Kitchener Official Plan (OP): The City of Kitchener OP provides the long-term land use vision for Kitchener. The vision is further articulated and implemented through the guiding principles, goals, objectives, and policies which are set out in the Plan. The Vision and Goals of the OP strive to build an innovative, vibrant, attractive, safe, complete, and healthy community. Urban Structure The Official Plan establishes an Urban Structure for the City of Kitchener and provides policies for directing growth and development within this structure. Intensification Areas are targeted throughout the Built Up Area as key locations to accommodate and receive the majority of development or redevelopment for a variety of land uses. Primary Intensification Areas include the Urban Growth Centre (Downtown), Protected Major Transit Station Areas (PMTSAs), City Nodes, Community Nodes, and Urban Corridors, in this hierarchy, according to Section 3.C.2.3 of the Official Plan. The subject lands are located within the Central Station PMTSA, being located only 730 metres walking distance to the station stop. Per Policy 3.C.2.17, the planned function of PMTSAs, in order to support transit and rapid transit, is to: a) provide a focus for accommodating growth through development to support existing and planned transit and rapid transit service levels; b) provide connectivity of various modes of transportation to the transit system; c) achieve a mix of residential, office (including major office), institutional (including major institutional) and commercial development (including retail commercial centres), wherever appropriate; and, d) have streetscapes and a built form that is pedestrian -friendly and transit -oriented. Policy 3.C.2.18 states that the Central Station Protected Major Transit Station Area shall be planned to achieve a minimum density of 160 residents and jobs per hectare. The subject proposal will assist the City in achieving the above noted density target. It is estimated that based on 120 dwelling units, the proposed building would result in Page 12 of 232 approximately 214 residents and based on a net site area of 0.18 hectares would result in a density of 1,190 residents per hectare. This would significantly assist in supporting rapid transit and local transit within this PMTSA. Staff is of the opinion that the requested Zoning By-law Amendment will support redevelopment that conforms to the City's PMTSA policies. Land Use Designation It should be noted that the Victoria Park Secondary Plan has been repealed when the subject property was designated `Strategic Growth Area A' (Land Use) in the City of Kitchener Official Plan, as amended by the Official Plan Amendments that emerged from the City's Growing Together Study (i.e., OPA 49 and OPA 133). The `Strategic Growth Area A' designation is generally intended to accommodate intensification within: • existing predominantly low-rise residential neighbourhoods, • lands further away from Rapid Transit station stops, and/or • lands where existing lots are generally too small to support high rise buildings. It is anticipated that the majority of development and/or redevelopment within this designation will occur through infill including missing middle housing and compatible non- residential uses. The `Strategic Growth Area A' policies state that this land use designation "will accommodate a range of low and medium density residential housing types including those permitted in the Low Rise Residential and Medium Rise Residential land use designation." No building is permitted to exceed 8 storeys in height, though zoning may require building heights less than 8 storeys. In this case, the proposed redevelopment consists of an 8 - storey, mid -rise residential apartment building of the type permitted in the Medium Rise Residential designation. The proposal conforms in this regard. Policy 15.D.2.67 states that where the implementing zoning does not permit the maximum building height, the City may consider site specific increases to the permitted building height in accordance with Policy 15.D.2.5 via a Zoning By-law Amendment (ZBA). In this case, the above policies apply directly, since the implementing zoning reduces the maximum building height to 20.0 metres, within 15 metres of a lot with a low-rise residential zone [the lands immediately to the southeast are zoned Low Rise Residential Four Zone (RES -4)]. In contrast, the proposed building height is 8 storeys / 28.8 metres, with a setback of 7.5 metres to the adjacent RES -4 Zone. In accordance with the above policies, the applicant is requesting a ZBA. Policy 15.D.2.5 states that site specific applications, which seek relief through ZBAs will consider the following factors: a) compatibility with the planned function of the subject lands and adjacent lands; b) suitability of the lot for the proposed use and/or built -form; c) lot area and consolidation as further outlined in Policy 3.C.2.11; d) compliance with the City's Urban Design Manual and Policy 11.C.1.34; Page 13 of 232 e) cultural heritage resources, including Policy 15.D.2.8; and, f) technical considerations and other contextual or site specific factors. Moreover, Policy 15.D.2.37 states, "Where new development or redevelopment is proposed at the edge of a strategic growth area land use designation, the scale and massing it will consider compatibility with and transition to the adjacent land use designation." With regard to the above policies, Development and Housing Approval (DHA) staff is of the opinion that the proposed development, which is located at the edge of the `Strategic Growth Area A' land use designation, where it abuts lands that are designated Low Rise Residential, is compatible with the adjacent low rise residential lands. It should be noted that the proposal complies with the transition provision in the SGA -2 Zone that requires a minimum 7.5 metre yard setback where the lot abuts a lot with a low-rise residential zone. Also, the proposal provides a 1.5 metre building stepback at the 5t" floor, which provides additional separation, beyond the 7.5 metre rear yard setback (and this stepback is provided earlier than the zoning regulation requires: approximately at the 14.5 metre building height rather than at the 20 metre building height). It should further be noted that one of the lots that immediately abuts the subject property is owned by the developer for the subject property (i.e., 59 Park Street). The development site, which is composed of five lots that have been consolidated to facilitate comprehensive redevelopment, is suitable to support the proposed built -form and land use. In addition, Urban Design staff has reviewed the proposal against the City's Urban Design Manual and is supportive of the proposal. DHA staff is recommending that the Urban Design Brief, submitted in support of the subject application, be endorsed by Council and that staff be directed to implement the Urban Design Brief through a future Site Plan Approval process. Moreover, Heritage Planning staff reviewed the Heritage Impact Assessment, submitted in support of the subject application, and is of the opinion that the proposal will not impact or have a minor impact on the value or significance of cultural heritage resources and adjacent cultural heritage resources. Necessary mitigation and conservation measures will be implemented through a future site plan application process. Policy Conclusion: DHA staff is of the opinion that the requested Zoning By-law Amendment Application is consistent with policies of the Provincial Policy Statement, 2024, the Regional Official Plan, and City of Kitchener Official Plan. Requested Zoning By-law Amendment: To facilitate the proposed development concept outlined in the Proposed Development Concept section of this report, the applicant is requesting a Zoning By-law Amendment (ZBA). The property is currently zoned `Low Intensity Mixed Use Corridor Zone (MU -1') in Zoning By-law 85-1. However, it should be noted that the lands are also subject to the City - initiated ZBA that emerged from the City's Growing Together Study (i.e., By-law 2024-065). By-law 2024-065, which would apply the `Mid Rise Growth Zone (SGA -2)' to the subject property, is under appeal with the Ontario Land Tribunal (OLT). In the case that no decision is issued by the OLT on the appeal prior to the PSIC meeting, to facilitate the proposed development concept, the applicant is requesting to change the zoning from Low Intensity Mixed Use Corridor Zone (MU -1) to Medium Intensity Mixed Use Page 14 of 232 Corridor Zone (MU -2) with a Special Regulation Provision (SRP) under By-law 85-1 (see Attachment `A'). In addition, the Regional Municipality of Waterloo is requesting that two zoning provisions be applied, as follows: 1. A holding provision requiring the completion of a detailed noise study, prior to site plan approval, and 2. A site specific prohibition on geothermal energy systems. In the case that the appeal no longer has implications for the subject lands prior to the PSIC meeting, the applicant is requesting to retain the SGA -2 Zone and modify the zoning request to add a Site Specific Provision (SSP) to facilitate the same development concept (see Attachment `B'). The same Region -related zoning provisions would be applied under this scenario. A zoning comparison table is provided below. Red text within a `Requirement' column denotes that the proposed development concept would be deficient under the specified zoning; bolded, red text with an asterisk under the `Proposed / Provided' column denotes the extent of the deficiency and, consequently, the need for relief via a requested Special Regulation Provision (By-law 85-1) and/or Site Specific Provision (By-law 2019-051, as amended by By-law 2024-065), as part of the Zoning By-law Amendment Application: Table 2 — Zoning Comparison / Review Table Page 15 of 232 Requirement Requirement Requirement Proposed/ under under under Provided (Note that Current MU -1 Requested Council- figures are pre - Zone (By-law MU -2 Zone Approved, road -widening, per 85-1) (By-law 85-1; Appealed Section 5.9 of By - without SGA -2 Zone law 85-1 / 4.21 of Requested (amendment By-law 2019-051). Special to By-law Regulation 2019-051; Provision) without Site Specific Provision) Minimum Lot 15 m 15 m 30.0 m 30.49 m Width (Henry St) Minimum Lot N/A N/A 1,500 m2 2,025.9 m2 Area Minimum N/A N/A *2.843 m (at Park St Yard Setback Corner Visibility Area) Minimum 1.5 m 1.5 m N/A 4.13 m Front Yard Abutting a Street (Henry St) Page 15 of 232 Minimum 1.5 m N/A 4.189 m Side Yard Abutting a Street (Victoria St) Maximum 7.5 m 7.5 m N/A 4.13 m Front Yard (Henry St) Maximum 7.5 m 7.5 m N/A 4.189 m Side Yard Abutting a Street (Victoria St) Minimum 50% 50% N/A >50% Width of Primary Ground Floor Fagade Minimum 7.5 m N/A *4.278 m Rear Yard Minimum N/A since rear N/A since N/A N/A Rear Yard yard does not rear yard Abutting any technically does not Residentially abut a technically Zoned residentially abut a Property zoned residentially property zoned property Minimum 6.0 m 6.0 m N/A 28.8 m Fagade Height Maximum 24.0 m 20.Om within *28.8 m Building 15m of lot with Height a low-rise residential zone Minimum N/A N/A 7.5 m 7.5 m Yard Setback where the Lot Abuts a Lot with a Low- Rise Residential Zone For Storeys 7 N/A N/A 6.0 m *4.189 m (at Victoria and Above: St); 2.843 m at Park Minimum St CVT); 4.13 m (at Yard Setback Henry St); 4.278 m (at Park St) Page 16 of 232 For 7 Storeys N/A N/A 60.0 m 58.4 m and Above: Maximum Building Length For 7 Storeys N/A N/A 2,000 m2 1,097.3 m2 and Above: Maximum Floor Plate Area Minimum 0.6 1.0 1.0 4.2 Floor Space Ratio Maximum N/A Floor Space Ratio Location of Shall not be Shall not be N/A N/A since building is Dwelling Unit located on the located on used only as a ground floor the ground multiple dwelling unless located floor unless within a located within building used a building only as a used only as multiple a multiple dwelling dwelling Minimum N/A for N/A for 10% 31% Fagade residential residential Openings uses uses Minimum N/A N/A 20% 29% Street Line Fagade Openings Minimum 10% 10% 20% 20% Landscaped Area Motor Vehicle Not required Not required Not required 53 spaces Parking per Bill 185 per Bill 185 per Bill 185 Driveway 4.57 rri 4.57 m N/A [see *4.2 m Visibility 4.5e)] Triangle Balconies Balconies may Balconies N/A [see *1.281 m extend within may extend 4.14.2d)] any yard within any provided that yard provided the minimum that the setback from a minimum front lot line is setback from 3.0 metres a front lot line is 3.0 metres Page 17 of 232 Priority N/A N/A A Community *No Community or Streets 6.6a)i) Use or Commercial Uses Commercial Use listed in Table 6-1 shall occupy a minimum of 50% of the street line ground floor Priority N/A N/A The minimum *29% Streets street line 6.6a)vi) ground floor fagade openings shall be 40% Loading N/A N/A Shall not be *2.4m Spaces permitted within 7.5 metres of an abutting residential zone. The SGA zoning applied to the subject lands was part of the comprehensive, City -initiated Zoning By-law review through Growing Together Study. Official Plan policies noted above provide direction for consideration where relief is requested from the SGA zoning regulations, based on a site-specific review and technical studies. The subject proposal represents one of the first privately -initiated ZBAs to request site specific zoning regulations. Considering this, staff has reviewed the supporting site-specific technical studies and ZBA requests, including SRPs/SSPs, against the considerations outlined in Policy 15.D.2.5 of the Official Plan and is satisfied that the ZBA is justified. Furthermore, DHA staff has the following additional comments regarding the requested ZBA (also see the above noted Kitchener Official Plan comments, which speak to requested zoning relief for building height adjacent to low rise residential zones): • Consideration should be given to relief sought related to setbacks to lot lines abutting a street since the subject property represents a unique situation where the property abuts streets on three sides, and the front lot line is deemed to be the side street (i.e., Henry Street). If the lot was oriented such that Victoria Street was the front lot line, SRPs/SSPs would not be required for the minimum rear yard setback and the minimum balcony setback. Moreover, the minimum balcony setback request under By-law 85-1 does not conflict with the Council -approved SGA -2 Zone, which does not require a balcony setback. • The increased maximum Floor Space Ratio (FSR) request under By-law 85-1 does not conflict with the Council -approved SGA -2 Zone, which does not have an FSR maximum. Page 18 of 232 • The Driveway Visibility Triangle (DVT) relief request under By-law 85-1 does not conflict with the Council -approved SGA -2 Zone, which does not require DVTs within SGA zones. • The request for relief from the requirement to provide Community Use or Commercial Use along 50% of the street line ground floor on a Priority Street is supportable. The proposed development has been designed to accommodate the existing grades along Victoria Street South. The main building entrance and lobby are located at the corner of Henry Street and Victoria Street South, which represents the most accessible and flattest portion of the site. However, the grade slopes downward towards Park Street, representing an approximate 1-2 metre decrease in elevation. The existing grading makes it difficult to provide accessible and active commercial and community spaces along the Victoria Street frontage. In addition, there is no surface parking at the rear of the site to allow for commercial parking. It should be noted that the approved developments on the opposite side of Victoria Street have the advantage of greater depth due to lot consolidation, which allows greater potential for Commercial / Community use. In this case, the narrow depth of the subject property makes providing Commercial / Community uses challenging, noting that the Victoria Park Heritage Conservation District limits the lot depth. Also, Henry Street is one-way, so commercial vehicles would need to traverse the neighbourhood to access the loading area. Furthermore, the rear loading area adjacent to the low rise uses might need to be expanded if Commercial / Community uses were proposed. The balance of Victoria Street is a Priority Street and many other opportunities are provided for these non-residential uses to be provided. From a design perspective, the main entrance to the building is on Victoria Street and seven dwelling units, each having balconies that face the street, are located on Victoria Street. • The request for relief from the requirement to provide 40% facade openings along the ground floor fagade is supportable. The proposed elevation along Victoria Street South includes substantially sized windows and exterior doors, which equates to approximately 29% of openings along the street line fagade. In addition, the elevations along Victoria Street include varied building materials, articulations and architectural patterns to further enhance animation and activation of the street. The proposed building has been reviewed comprehensively from an urban design perspective, including review of an Urban Design Brief (UDB). Urban Design staff is supportive of recommending that the UDB be endorsed to provide design direction for the future site plan application. • The request for relief from the loading space setback to a low rise residential zone is supportable since a 1.8m high wood fence will be provided along the lot line that will act as a visual barrier. It is unlikely that a full-size garbage truck would provide waste/ recycling collection. Region -Related Zoning Provisions: DHA staff supports the Region's request for a Holding Provision to require a noise study and implementation measures, and the SRP/SSP to prohibit geothermal systems. The former seeks to protect future residents from transportation and stationary noise sources that may generate noise levels beyond provincial guidelines. The latter would prohibit geothermal systems that might otherwise cause contamination to the region's groundwater resources, noting that the property is located within a Wellhead Protection Area and Chloride Issue Contributing Area of the Greenbrook wellfield. Page 19 of 232 Proposed Zoning By-law Amendment Application Conclusions: DHA staff is of the opinion that the requested ZBA Application represents good planning as it will facilitate the redevelopment of the lands with a "missing middle" housing, in a mid -rise built form, including the provision of approximately 120 rental dwelling units (including 24 affordable units). A mix of dwelling unit types is proposed, including 3 to 5 three-bedroom units. The proposed development will provide a compatible transition from the 38 and 42 storey -developments planned for the opposite side of Victoria Street to the low rise residential neighbourhood to the southeast. The proposal will also provide visual interest along Victoria Street. For the site-specific reasons outlined throughout this report, the requested zoning regulations are appropriate for the subject property, based on the policies and criteria that emerged from the City's Growing Together Study. The characteristics of the subject property and policy context are unique. Accordingly, the draft by-laws recommended by staff are context -specific and should not be considered as a precedent to be applied beyond the subject property / proposed development. In this context, DHA staff supports the proposed development and recommends that the requested Zoning By-law Amendment Application be approved, as shown in Attachment `A' and Attachment `B'. Department and Agency Comments: Circulation of the Zoning By-law Amendment application was undertaken to all applicable City departments and other review authorities on August 16, 2024. No major concerns were identified by any commenting City department or agency and any necessary revisions and updates have been completed. Copies of the comments are found in Attachment `E' of this report. The following reports and studies were considered as part of this proposed Zoning By-law Amendment: Planning Justification Report Prepared by: GSP Group, June 2024 Urban Design Brief Prepared by: GSP Group, October 2024 Architectural Drawings, Elevation Drawings, Floor Plans, Cross -Sections and Renderings Prepared by: ABA Architects Inc., June 6, 2024 Noise and Vibration Impact Study Prepared by: RWDI, April 5, 2024 (with revised drawings submitted May 9, 2024) Functional Servicing and Stormwater Management Report Prepared by: Walter Fedy, April 30, 2024 Functional Grading and Functional Servicing Plans Prepared by: Walter Fedy, October 6, 2023 Page 20 of 232 Sustainability Statement Prepared by: GSP Group, June 7, 2024 Transportation Impact Study and Parking Study Prepared by: Paradigm Transportation Solutions Limited, June 2024 Arborist Report Prepared by: GSP Group, March 28, 2024 Vegetation Management Plan Prepared by: GSP Group, March 28, 2024 Cultural Heritage Impact Assessment Prepared by: McCallum Sather, June 2024 Topographic Survey Prepared by: McKechnie Surveying Ltd, May 10, 2023 Community Input & Staff Responses: Staff received written responses from 14 residents in response to the circulation of the ZBA application. Responses are included in Attachment `F'. A Neighbourhood Meeting was held on September 25, 2024. A summary of what staff heard from the community, along with City staff responses, are noted below (i.e., Table 3). Table 3 — Community Comments and City Staff Responses What Staff Heard from the Community Development & Housing Approvals Staff Response Built Form & Character Concerns: The owner has stated that the proposed development will be a fully rental building and is - A better ground -floor presence (towns/ commercial); seeking funding through CMHC, which requires - Unit typology; at least 20% of units to have rents below 30% of - Amenity space; the median total income of families and the total - Height; residential rental income must be at least 10% - Approval of building design; below its gross achievable residential income in - Total number of affordable units; order to qualify. As a result, approximately 24 - Rental building or condominium; dwelling units will be provided as affordable - Sustainable and climate resilient housing. In addition, the development will be development -built form; subject to the City's new Inclusionary Zoning - Total number of homes to be requirements if building permits are issued after demolished; December 31, 2024. - Density; - The proposal is incompatible in Staff discussed the issue of unit variety with the terms of scale; applicant. The applicant has changed the unit - The existing character and charm mix within the proposed building to now include of the area will be negatively 3 to 5 three-bedroom units, as a minor building impacted; refinement to the currently proposed 92 one - bedroom units and 28 two-bedroom units. Page 21 of 232 - Management of new development; - Setbacks. Transportation Concerns: - Road systems are already overwhelmed; - Difficulty completing turning movements; - Concerns with total number of bicycle parking provided; - The potential addition of bike lanes along Victoria Street South; - Total number of onsite parking; - Total number of electric vehicle spaces; - Parking will overflow onto streets within the nearby low rise residential area; Staff is of the opinion that the 8 -storey building height is supportable given the stepback at the `rear' of the building (at the fifth storey) and provision of a 7.5 metre rear yard setback. The building is a mid -rise apartment budling, that will provide an appropriate transition between the 38 and 42 storey buildings planned on the opposite side of Victoria Street and the low rise residential lands to the southeast. The proposal will greatly exceed the City's new SGA -2 minimum amenity space requirement to provide 4m2 of amenity space per dwelling unit (480m2 required, whereas 796m2 provided). The applicant submitted a Sustainability Statement as part of the ZBA application. Staff has reviewed and is supportive of this Statement, noting that, "several sustainable measures have been proposed or are being considered for the development." Through the future site plan stage, sustainability measures will be further refined. Staff notes that the proposed development will be managed as a single building, rather than as 5 individual properties (as currently exist). Through a development agreement that is registered on the title of the property through the future site plan application, lifetime maintenance obligations will be placed on the owners of the new building. This may simplify maintenance of the development. A Transportation Impact Study (TIS) was submitted by the applicant in support of the ZBA application. The TIS recommends that the Region and City "monitor the future traffic volumes along the Victoria Street South and optimize the signal timings accordingly. The need for signal timing improvements at the study area intersections are noted to occur with or without the development of the subject site". The TIS states the proposed development is estimated to generate 33 AM peak hour vehicle trips (i.e., one vehicle every 1 m, 49s) and 39 PM peak hour vehicle trips (i.e., one vehicle every 1 m, 32s). Page 22 of 232 Pedestrian safety. The City's Transportation Services staff has reviewed the TIS and advises that, "Any of the vehicle turning movements... for existing, background or total traffic would occur with or without this development. Transportation Services are of the opinion that this development will not negatively impact the surrounding road network. Based on the parking demand analysis, the proposed parking supply of 53 spaces is adequate for this development..." It should be noted that Victoria Street South is under the jurisdiction of the Region of Waterloo. In this regard, Region of Waterloo Corridor Planning staff has reviewed the TIS and advises that it is satisfied with the study, noting that the "TIS demonstrates feasibility on Regional roads" and "has accounted appropriately other nearby developments". The Region of Waterloo advises that the reconstruction of Victoria Street is planned for 2029-2033. While the Region does not currently have any preliminary design drawings for the reconstruction, it is assumed, based on Regional Official Plan direction, that upgrades will include multi -modal infrastructure. It should be noted that the Province's recent changes to the Planning Act have eliminated minimum parking requirements within Protected Major Transit Station Areas, such as the Central Station PMTSA (which the subject property is within). While no parking is required, the applicant has voluntarily proposed to provide 53 fully underground parking spaces. The proposal includes provision of 120 Class A (i.e., within an enclosed, secure area with controlled access) bicycle parking stalls, which equates to 1 stall per unit, in addition to 8 Class B stalls (i.e., short- term). However, By-law 2019-051 regulates parking facilities where they are voluntarily provided. In this regard, the City will require that 10% of the 53 spaces provided are allocated to visitor parking (6 spaces), 4% are barrier -free parking spaces (3 spaces), and 20% are designed to permit the future installation of EV supply equipment (10 spaces). Page 23 of 232 Page 24 of 232 It should also be noted that sidewalks are currently provided along all three street frontages. In response to the comment provided at the Neighbourhood Meeting, "has the city ever considered parking permits for Henry St. residents during construction and thereafter?", Transportation staff advises that parking permits would be provided on a temporary basis to Henry Steet residents only if Henry Street was being reconstructed; residents would be permitted to park on neighbouring streets. Existing Residents The proposed development is subject to the - Rental replacement By-law; City's new Rental Replacement By-law, thereby - Public engagement. providing relief for residents of the 5 dwellings that will be demolished. See Site Context section of this report for more information. A circulation notice and neighbourhood meeting invitation postcard was circulated to occupants (renters, businesses, property owners, etc.) via Canada Post on August 16, 2024. Information about the applications and neighbourh000d meeting was posted on the City's Planning Applications webpage at the same time. Three notice signs with information about how to engage in the process were posted on the subject property — one on each street frontage. Two advertisements were placed in The Record, notifying the community about 1) the application itself (August 23, 2024), and 2) the Planning and Strategic Initiatives Committee meeting in which the application is being discussed (October 4, 2024). Heritage Concerns: The subject property, addressed as 169-183 - Demolition - as part of the Victoria St S, does not have any heritage status, Victoria Park heritage district; being neither listed as a non -designated - Heritage Assessment and property of cultural heritage value or interest on accuracy; the Municipal Heritage Register, designated - Proximity to heritage homes. under the Ontario Heritage Act, or identified on the Kitchener Inventory for Historic Buildings. The subject property comprises 5 low rise residential buildings, which are all proposed to be demolished to facilitate redevelopment with the proposed development concept. Page 24 of 232 Page 25 of 232 A Heritage Impact Assessment (HIA) was prepared by McCallum Sather, dated June 2024, in support of the ZBA. The HIA was reviewed by City Heritage Planning staff. No significant issues were identified. The subject property is directly adjacent to the Victoria Park Heritage Conservation District. The owners of the subject property also own 59 Park Street, which abuts the subject property and is within the District. 59 Park St is not subject to the requested ZBA and is not proposed to be demolished. Development Specifics: Regarding development timing, the owner - Development timeline; advises that this will depend on the outcome of - Noise; the ZBA and future Site Plan Application. The - Impacts on surrounding owner's hope is to start building in mid-2025. structures (foundations). Construction is only permitted to occur during construction hours as outlined in City by-laws. Construction impacts to existing buildings and foundations are a private matter between property owners (i.e., the City is not involved). If a private property owner is concerned about construction impacts, he/she may contact a private structural or geotechnical engineer to conduct a pre-condition survey of the property to document the condition of their building, prior to demolition / construction on the subject property. Natural Environmental Concerns: It should be noted that the subject property does not contain natural heritage features, as defined - Existing trees and wildlife habitat concerns; by the City's Official Plan. - Pollution; - Shade (lack of sunlight from new Urban Design staff has reviewed Arborist Report development); and Vegetation Management Plan, submitted in - Lack of greenspaces support of the application (note: also includes 59 - Tree preservation. Park Street). Of the 14 trees reviewed by the report, 9 are proposed to be removed either to allow construction, because of poor condition, or both (note that written acknowledgement for removal of one tree in poor condition, in shared ownership, will be required from the owners of 52 Henry Street). Wildlife species found within the property are common and abundant in the area and have, for the most part, adapted to human-altered or urban environments. Page 25 of 232 Planning Conclusions: It is important to ensure that the intent of the SGA zone regulations, as approved by Council, are maintained and implemented consistently. Policies in the Official plan provide criteria that must be evaluated where relief is being sought. There may be site specific reasons and criteria why minor amendments to the approved regulations may be appropriate. In this case, staff worked with the applicant to revise the development proposal to ensure that the intent of the regulations as approved by Council are maintained. Staff are satisfied with the site-specific design as revised for this property. Consideration of this site-specific application should not be considered as a precedent for other applications within strategic growth areas. All applications must be reviewed and considered for their own merit and general compliance with the regulations in the zoning bylaw and intent of the Official Plan. Built -form zoning regulations are a critical component of building a healthy, safe environment for all who live, work, and visit Kitchener's PMTSAs, while still allowing for abundant housing supply. In considering the foregoing, Development and Housing Approvals staff supports the Zoning By-law Amendment Application to permit the subject property to be developed with an 8 - storey residential development. The proposal will facilitate redevelopment of the lands with a "missing middle" housing, in a mid -rise built form, including the provision of rental units and affordable units. A mix of dwelling unit types is proposed, including 3 to 5 three-bedroom units. The proposal will be subject to the City's Rental Replacement By-law as well as Inclusionary Zoning requirements. Staff is of the opinion that the subject application is consistent with policies of the Provincial Policy Statement (2024), the Regional Official Plan, and the City of Kitchener Official Plan. Moreover, staff is of the opinion that the proposal represents good planning and is in the public interest. In this regard, staff recommends that the Zoning By-law Amendment Application be approved, as shown in Attachment `A' and Attachment `B' and that the Urban Design Brief be endorsed to provide direction for the future site plan application (see Attachment `C'). STRATEGIC PLAN ALIGNMENT: This report supports the delivery of core services. Page 26 of 232 Also see Sustainability Statement comments under the Development & Housing Approvals Staff Response column within the Built Form & Character Concerns section of this table. Reduction of Property Values Assessing the impacts to property values is not a planning consideration. Planning applications are reviewed based on the principles of `good planning' in the public interest which includes policy direction, serviceability, and functionality of the proposal. Planning Conclusions: It is important to ensure that the intent of the SGA zone regulations, as approved by Council, are maintained and implemented consistently. Policies in the Official plan provide criteria that must be evaluated where relief is being sought. There may be site specific reasons and criteria why minor amendments to the approved regulations may be appropriate. In this case, staff worked with the applicant to revise the development proposal to ensure that the intent of the regulations as approved by Council are maintained. Staff are satisfied with the site-specific design as revised for this property. Consideration of this site-specific application should not be considered as a precedent for other applications within strategic growth areas. All applications must be reviewed and considered for their own merit and general compliance with the regulations in the zoning bylaw and intent of the Official Plan. Built -form zoning regulations are a critical component of building a healthy, safe environment for all who live, work, and visit Kitchener's PMTSAs, while still allowing for abundant housing supply. In considering the foregoing, Development and Housing Approvals staff supports the Zoning By-law Amendment Application to permit the subject property to be developed with an 8 - storey residential development. The proposal will facilitate redevelopment of the lands with a "missing middle" housing, in a mid -rise built form, including the provision of rental units and affordable units. A mix of dwelling unit types is proposed, including 3 to 5 three-bedroom units. The proposal will be subject to the City's Rental Replacement By-law as well as Inclusionary Zoning requirements. Staff is of the opinion that the subject application is consistent with policies of the Provincial Policy Statement (2024), the Regional Official Plan, and the City of Kitchener Official Plan. Moreover, staff is of the opinion that the proposal represents good planning and is in the public interest. In this regard, staff recommends that the Zoning By-law Amendment Application be approved, as shown in Attachment `A' and Attachment `B' and that the Urban Design Brief be endorsed to provide direction for the future site plan application (see Attachment `C'). STRATEGIC PLAN ALIGNMENT: This report supports the delivery of core services. Page 26 of 232 FINANCIAL IMPLICATIONS: Capital Budget — The recommendation has no impact on the Capital Budget. Operating Budget — The recommendation has no impact on the Operating Budget. COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the Council / Committee meeting. Three notice signs were posted on the property and information regarding the application was posted to the City's website. Following the initial circulation referenced below, an additional notice of the statutory public meeting was circulated to residents and property owners within 240 metres of the subject lands and those who responded to the preliminary circulation. Notice of the Statutory Public Meeting was posted in The Record on October 4, 2024 (a copy of the notice may be found in Attachment `D' CONSULT — The requested Zoning By-law Amendment was circulated to residents and property owners within 240 metres of the subject lands on August 16, 2024. In response to this circulation, staff received written responses from 14 residents, which are summarized within this staff report. DHA staff also responded to emails and phone calls from the community. DHA staff also met with the Chair of the Victoria Park Neighbourhood Association (VPNA) Development Committee to discuss the application. PREVIOUS REPORTS/AUTHORITIES: • Planning Act, R.S.O. 1990, c. P.13 • Provincial Policy Statement, 2024 • Regional Official Plan, as amended by ROPA 6 • City of Kitchener Official Plan, 2014, including OPA Nos. 49 and 133 • City of Kitchener Zoning By-law 85-1 • City of Kitchener Zoning By-law 2019-051, as amended by the By-law 2024-065 (Council -Approved; Appealed) REVIEWED BY: Tina Malone -Wright — Manager, Development Approvals APPROVED BY: Justin Readman — General Manager, Development Services ATTACHMENTS: Attachment `A' — Proposed By-law & Map No.1 (Amendment under By-law 85-1) Attachment `B' — Proposed By-law & Map No.1 (Amendment under By-law 2019-051) Attachment `C' — Urban Design Brief Attachment `D' — Newspaper Notice Attachment `E' — Department and Agency Comments Attachment `F' — Community Comments Page 27 of 232 PROPOSED BY — LAW 2024 BY-LAW NUMBER OF THE CORPORATION OF THE CITY OF KITCHENER (Being a by-law to amend By-law 85-1, as amended, known as the Zoning By-laws for the City of Kitchener — 1000002286 Ontario Ltd., Legion Heights Victoria Inc., 2306975 Ontario Inc. — 169-183 Victoria Street South) WHEREAS it is deemed expedient to amend By-law 85-1 and By-law 2019-051 for the lands specified above; NOW THEREFORE the Council of the Corporation of the City of Kitchener enacts as follows: 1. Schedule Number 73 of Appendix "A" to By-law Number 85-1 is hereby amended by changing the zoning applicable to the parcel of land specified and illustrated as Area 1 on Map No. 1, in the City of Kitchener, attached hereto, from Low Intensity Mixed Use Corridor Zone (MU -1) to Medium Intensity Mixed Use Corridor Zone (MU -2) with Special Regulation Provision 816R and Holding Provision 113H. 2. Schedule Number 73 of Appendix "A" to By-law Number 85-1 is hereby further amended by incorporating additional zone boundaries as shown on Map No. 1 attached hereto. 3. Appendix "D" to By-law 85-1 is hereby amended by adding Special Regulation Provision 816R thereto as follows: "816. Notwithstanding Sections 5.3, 5.6A.1c), 5.9, 5.9A, 54.2.1 of this by-law, within the lands zoned Medium Intensity Mixed Use Corridor Zone (MU -2) and shown as affected by this provision on Schedule Number 73 of Appendix "A", the following special regulations shall apply: a) For clarity regarding Section 5.9, for any buildings constructed after the date of passing of this by-law, compliance with regulations respecting lot area, lot width, yards, floor space ratio shall be determined based on right-of-way widths existing at the time of passing of this by-law, understanding that street widenings are planned for Henry Street and Victoria Street South and are expected to be conveyed as part of a future Site Plan Application. Page 28 of 232 b) The Minimum Rear Yard shall be 4.2 metres (i.e., yard abutting Park Street); c) The Maximum Building Height shall be 28.8 metres; d) The Maximum Floor Space Ratio shall be 4.2; e) Any building constructed after the date of passing of this by-law shall be permitted to encroach into the Driveway Visibility Triangle; f) Balconies may extend within the front yard, provided that the minimum setback to the front lot line (i.e., lot line abutting Henry Street) is 1.2 metres; g) No minimum setback shall be required to a Corner Visibility Triangle; and h) Geothermal Energy Systems shall be prohibited." 4. Appendix "F" to By-law 85-1 is hereby amended by adding section 113H thereto as follows: 113. Notwithstanding Section 54 of this By-law within the lands zoned MU -2 and shown as being affected by this subsection on Zoning Grid Schedule Number 73 of Appendix "A", no new residential or other sensitive land uses shall be permitted until such time as a Detailed Transportation Noise and Stationary Noise Study has been completed, and implementation measures have been addressed, to the satisfaction of the Regional Municipality of Waterloo, and this holding provision has been removed by by-law." PASSED at the Council Chambers in the City of Kitchener this day of , 2024. Mayor Clerk Page 29 of 232 (Z Of U o a v p o c° w O w z wLLI C ZOf L�j LL Of z 0 w W 0 z NN Q Jx N Z Of W z N 0 Z LL N D Q z O z O N X O z w w > z 0 U w Z NN U 0> J Q Q m U U) 0 z O N W� z Q z >- w Q a N p aaxi ONw�Z O= z OdzO �QQz p O00 LO ui W W Z� Z Np W 0 Jp DQ zHH W d' U) 0o x X 0 z U 0~ 0 J W Z N Q O N> W W LLI Z Z 0 N LLI � Q Q Q F W z x O ww� O Of o o W x Q U } U N 0 N m z Z w0 pOwOz pcn W U �U) 0OUofofU Z 0 CO �U z z WO r �a ULLI ��� Zw QQoOLLJU(D(/) acwi�cwi�0 w�Qz w N Z x J r r J z x U-- 0 O w p- O z Q L 0- F- Q � Z�— QZ �O(>> QZ ZZ�QFpj�ZOfOfD J U ofzxN+ H W � N U p u i= z D a f W W D o 0 W F U W�� 0 W W 0 W p w CON Q W z U g 0>>_> w � aowFx2 W� ccNOXX! w 3:3: �JwZ Z =w W a -i E;�[L �jaf(n w0 wo -jwgzw-0 JJg S S OpaW ZQ2 Lu LL, Q�ww00�w ��Q �U��c�vu�co SSS W ax Z y^H EwW-000E-z }(l? N�0 I�}0D2 LL �=2(n(n W W W SSS DUW~ w Z Q fn QQWNHN�Q mow --22N WwmUw2Z00www S S N(n0Y _ 0 C v�ro s s s Z D U .`9 Z C) LU cc � ' r� � ,`a � W W o� W g < W �= S SSS SS J Q W = yti 0 o ��'M m J O _ Q w tib. Z U o LL LL Q SS �N 0 � ce) Nqt o O o cli mW�m qq (D" _ro �° Q'o. LLI Q' cp LO QP � „ � s° d �.„. 0 `a �!/� (� "Dce)C7 o � O N w Q �� _' -� ^.-. W 0 0 �D poi D- o W J W (n 0 D r �/� m H va.n Lu =— ' a,LO Z E2 (n . N a«,N Lo C4 W S S TOM 0 Q (D (/)jao� S LLJ Z J0 Q LO spa Z Jo 0 4� c O Cl) E2 N U SS, C7 °� Z z COO y SSSSS S Q 1 N W M S S G 00 D (14 � eti ss,�SS 4� o> C) S �= PROPOSED BY — LAW 2024 BY-LAW NUMBER OF THE CORPORATION OF THE CITY OF KITCHENER (Being a by-law to amend By-law 2019-051, as amended, known as the Zoning By-law for the City of Kitchener — 1000002286 Ontario Ltd., Legion Heights Victoria Inc., 2306975 Ontario Inc. —169-183 Victoria Street South) WHEREAS it is deemed expedient to amend By-law 2019-051 for the lands specified above; NOW THEREFORE the Council of the Corporation of the City of Kitchener enacts as follows: 1. Zoning Grid Schedule Number 73 of Appendix "A" to By-law Number 2019-051 is hereby amended by changing the zoning applicable to the parcel of land specified and illustrated as Area 1 on Map No. 1, in the City of Kitchener, attached hereto, from Strategic Growth Area Two Zone (SGA -2) to Strategic Growth Area Two Zone (SGA -2) with Site Specific Provision (414) and Holding Provision (94H). 2. Zoning Grid Schedule Number 73 of Appendix "A" to By-law Number 2019-051 is hereby further amended by incorporating additional zone boundaries as shown on Map No. 1 attached hereto. 3. Section 19 of Zoning By-law 2019-051 is hereby amended by adding Site Specific Provision (414) thereto as follows: "414. Notwithstanding Sections 4.5, 4.19, 4.21, 5.10b), 6.4.3 and Table 6-4, 6.6a)i) and vi) of this By-law, within the lands zoned Strategic Growth Area Two Zone (SGA -2) and shown as being affected by this subsection on Zoning Grid Schedule Number 73 of Appendix "A", the following site specific provision shall apply: a) For clarity regarding Section 4.21, for any buildings constructed after the date of passing of this by-law, compliance with regulations respecting lot area, lot width, yards, floor space ratio shall be determined based on right-of-way widths existing at the time of passing of this by-law, understanding that street widenings are Page 31 of 232 planned for Henry Street and Victoria Street South and are expected to be conveyed as part of a future Site Plan Application. b) The maximum building height within 7.5 metres of a lot with an SGA -1 zone or a lot with a low-rise residential zone shall be 28.8 metres. Despite Section 4.19, this regulation shall apply (Transition to Low - Rise Zones); c) The minimum yard setback for storeys 7 and 8 shall be 4.0 metres from a street line ; d) No Community Use or Commercial Use listed in Table 6-1 shall be required; e) The minimum percentage of street line ground floor fagade openings shall be 29%; f) No minimum setback shall be required to a Corner Visibility Area; g) No loading spaces shall be permitted within 2.1 metres of an abutting residential zone; and h) Geothermal Energy Systems shall be prohibited." 4. Section 20 of Zoning By-law 2019-051 is hereby amended by adding Section (94H) thereto as follows: "(94). Notwithstanding Section 6.4 of this By-law within the lands zoned Strategic Growth Area Two Zone (SGA -2) and shown as being affected by this subsection on Zoning Grid Schedule Number 73 of Appendix "A", no new residential or other sensitive land uses shall be permitted until such time as a Detailed Transportation Noise and Stationary Noise Study has been completed, and implementation measures have been addressed, to the satisfaction of the Region, and this holding provision has been removed by by-law." 5. This by-law to amend Zoning By-law 2019-051, as amended, shall have no force and effect until By-law 2024-065 (Growing Together PMTSAs) is in full force and effect in relation to the lands specified above. PASSED at the Council Chambers in the City of Kitchener this day of , 2024. Mayor Clerk Page 32 of 232 Z LLI Z a H W:51 Q J W Z � O W p W H Z W a W JQa O O _ Z x w Z N Q w 0 Of x z p LL N E N O Of O p Z O N X z Z o O N Z O N w U) 0 0 Q U w Z_ Q N U) p> J Q Q Q Q Q Q m La W Z= Z Q W Z Q LL LL Q a a a �' O N N W- Q O v p O -1 LLJ N d p Z O Q Q Z Q Q Q Q p 00 N Q > Z � Q Q U Z j W W H H LL,2 2 2 2 Q LL, Q 00 X U O p O W-LLJ W Z Z N L J _ Q d cn W L Of W of U) NN 0 p p����0 Q Z m� N 0 fn (7 O U O 2 U)) < O H 0 O U � cz Lu wi) C7 (7 (7 (7 z z g z J Z w F- IL w U w 0 w c O (7 z U) U) Q Q a cq LL, C7 (7 (7 (7 O OJ L Q Z w N J z— » w cn w w w w Q O wp- O z Q ALA++a Q Z Q U W Z 17 Z - Q H a p p j a Z a a x Q Q Q Q � W a Z p af 0 CO W (i LU L W ~ W co N O X O X X Q W a o CD pw p—a Z W N N = z Q O J z O J J 2 U) U) U) U) x w Z Z w W o��N�Ncnx OJ � w 2 S S 00 � Z Q 2 Q W Q W fir, N V N (O N (h V SSS W Wax Z ^ H m W W 0Q(nQJ �Z J ii �Z X X U a (n (n (n Q Q Q Q SSS Z2QU W Z i a 00-- } x0 } 0 x O x w w w C7 (7 (7 (7 S 00 LU Q (n <<LLU) U) 00 �N o0 U w �N 2 2 Z O O of of of U) U) U) U) S S N0Y 0 2 V Q sss s ss s Z 0 w S S SS SSSSSs W Z U W N s sOf 0 LU s S� s� SSSSSSSSSSss ssssssss' Sss�sss U) S S S SS S S S SSSS S ssssssss S Z S SS S S S S SSS SSSS�SSSSSSSSSSSS S SSSS SSSS � SSSSSs SS SS J � S S S SS S SSS SSS SSS S SSSSSSSSSSS } a s s SSSS ssssssss SSSSSSSSSSSSSSS SSSSSSSSSS m J V O S s S , SSSSSs S sSS SS SSSS SSSSSs sss sss ss sss sss ssss O Q LUw r;— ssssssss s ssss s Z LL s sss sssss s O LL s ss ss N O N sss s S M s N0 CD o N w w w oafO in v=' � u'w C=) 0 COco -- Cl) 0 LU .� ao o Q H v = (n 0 CO Cf) o 00 x CO S (D U Co z d = O M ,n a O Q H o (n J/ S sSS r � ao W �% U (n ss sss OLUo Q LO fy_ 0 00 � O m U_ J� s li E2N > �W yJ ss ss ss s s Q ci C,,) U SS S S Z z CO y S SS O Q M S s N O Cfl SSSS' SS o U N S SSSSSSSS S o> o WSSSSSs^ o � SSS SSSS SSS S N C7 N 4- 0 Y) W U. W Z 0 s U W 0 0U) Z L Q }' m� ca L 0 V W M U) opo Far'' Aiw, a'+aq ri 60 Y LL LU Z W 0 Z Q m 0 LU cn 5; LU w 0 V co r r d' N Co N L O v X U cB 0 2) O 0) N J �' 70 L J 0 O O (n � N O o(,-00 cy0 C,4 L i 70O O � N ON U_ m cu 0 C:) (D ;? N Y Z N M N 4- 0 M N O) N N M ':T ti 00 O O LC) CO z LLJ U � W o ao w V z0 w W a O p CU " 6 N com co � p c M CO W W a w cl) 0 a 0 w Z co co m 0 0) -2 m N LL v: � � a W o w Lri W 0 70 cu Qcu 0 cu O O cu V O o Q � Q J a p O 0 L a E 0 U 0 J p U_ � O p 7 7 m a) E m W °° cu cu Y ° (VL)) z ( � Z �0 Q 00 Q Q X m _ Q m 0 0 Q m:E W W J z M IT LO co ti 00 rn N U W U,)LnLOLOLOU-) LO (.0 (D, z a o� 0 a cfl LL U Q Ln Lf) LO ti ti r 0 z W Q Q J � X W F 0 W Z LU H z a 0 —70 Z 0 V 70 X Z Z CU O Q U) N OV " 0 J °' ° (� Z 70 o� v U F = Z ° LL U 70 o ?Q a' 0 O 0 0) `u" 0 T a c� o z� o mW :3 0 LU o Q- Q F- H U o " E Czo 7 QY a_ a_ C/) Wcu °LUOnJ -i Q c cn �— N CO X F N LU W N W C) W 0 z 0 N N z 0 Q 2 M CO 0 V-: C� U ri U 14 N M N 4- 0 M N O) z LLJ U � � o ao w V z0 w W a O p CU " 6 N com co � p c M CO W W a w cl) 0 a 0 w 0) 0o Z 0 0) -2 m , co co m 0 0) -2 m N LL v: � � a W o w Lri N M N 4- 0 M N O) 7 co o Q � �o Q Cn p C: 'L O U 70 OO O L N +� U co U �. �, L 0- 70 7 0) U CQ 70 Z3 U Q (D M o CU Cn O 70 � Q m Q L Q N U) + Q OO N '— U -0U p 2 _0 Ut:! -0 7 C2 o Q cu (� O CU (n cB CU M N O S - m 0 to U) to N 4--C/)> CU 0 + + O } (� Yf +� O N L L L �.�� ( E � n co LL Lu coQ U p w 0.2 (� L L -0 >(n (D !n (D CU Cn N cn Q_0 Q M O W (D 0W i� l^ (B N (u ~ co 2 O 0 T p O to U Q CB c,jQ O D U-00 C: E Q N O QC\JQ (� +� L « O% O Q , --6> O L •� O N U O N Z O N CT Q N N O (n O Cn Y CZ Z5N p U O Off, — U)gyp♦ O ^�, 0) MQ N c\jc) N (1) C:^�, E0- � U U O O N70 C6 (u N CB n UU L _ a)0 >>(n O0 (Dmo o U cu N x o -0o� 00 4L � O Cp --0E N O m U)-0 Co (� N p N U VM O Q (B EN N N a Co Q- o O s= N M WQ Q Ocu o p O QO —) p p m- ai D CO (n O > CQ tq L O L a.O QN cn 0 O >,N O-0 (U vUi� vUi p aD 0N 0- 4— •— L s= �' O (u r co m Y o N N m (D Q° o a o Q co Q .�-0 co cn.� T Q pm (u N_ =0 m�2 • LL W_ m z (D W 0 z Q m F— x LU F— z 0 V z U) Z 0 F— z 0 LU F— U) z P: U) x LU D km I 0 � L OJ -0 01 0 OcO: O �� Si O (6 L (6 � u� CU � (6ZD to O U 76ZD >' O O O L 70O) U CO U O O Q� (6 Q C CU (6 N �_ (U6N E ��� �+m �.>� N (6 �� N (6 O X O y' L (� y' L O Cn U� L y' � L O L O (D CU i O fn >, Q� N U L O a) �. CU 0 U)`� O Cn 0 L- M " Q m 4T E vJ 0 (D � L 0 O _ �% (6 O _ a) 0 (6 U_ }L (D Ca X L� �. L X F- L-0 L i (6 > _- O L a) Q Q > •� M (6 0- C: y CU ~ 0 a to O U CO L L U ('7 yO Q(U O L N U = 70 7 ^> N L (6 .O i O CU (U6 O . U > ++ O1 (06 O Cn U CU a O O U �- (6 CU L Z3 CU 01 '0 O 0) O O O -0 X CU —0 � CU70 , O E - O = CU � O _ CU L O O Q (D O .� L O (6 X CU U U U� U O U) CU L Q U O 1 _0 m� L O U N O O O �i Q M O U -. O N �. O 0 n (6 L (� v J /U' A ~ CU O }� i1 O O _ — O Q L CU CF -' O U) V O � L N 4 N •X L� j = Cn CU (U L (06 c6 O C3) 0 J 70 0 Cn O p U W •Q O (6 L `� U) (6 70 N L to O (6 a —0 Fo D v J (6 U u� � L C U CU U v a C6 CU O 0 - C6 C6 U CU CU N O L O O (6 H to > >1 Q O H N H -cn O N .� c6 .- N (Y) N 00 (Y) H W NW 1L6 r co a 0 U_ M co 0 a) w r W m /z 0 U) W 0 z Q m c� C cU L O o L \ 1 I O +' L O O� I ' >� Oi I 0 I 0 70� U OC) 00FE (D QQ L Co CU m m (D ('U O L C M .^^,, O L cu d d 70 M 70 F 71 c > L W O ('I)1 Y N l I I J Y N — �C 0 C m N U) I Lo 5,, f i Lo ^, V \_ V C co C Q — a- VC E o-) O N w w LO N N U- ('I) � Y Cq �' N Cn N N 70 W W E W V/ &5 (U CUN L +� (B 70�M (n (I) 0 70 Lo 0) c O —_ 0) ('I) 70to to (B 70 Z3_ N (B p O Q i cn �_ N N 0 O (n Q (U U) U (U O 7 i 0_ (B U I O :t' O (U O (n c L CU (B CU L Co 0 /^� �_ C/)� (D V(QJ W /� CU 0 � L U) ^ (o L� OU O U i U (n iu U N (B O O (U 0_0 N U i ('I) (U L co >, O co C/) M Cn � >, _ O U ('6 Q (n N N U m M (n 0 m (Q Co a L� (B N N O +^, +' O (B m O N N N O� _ L n (D cu � N E _ �, D L U 0� W L O U ('U > 70 M O > U (Q = (U (n O j = ('U (U + P-- co rn � 70 to 70 C N >, N (U N O ' p (n O ti M (n a)(D ti to 0 � co m� L F- > O i +� L lu co CD N (Q U (II 0 O co CU (n 2 70 N -0 .O O `-- L L -0 O N-0 U m 0 to (D p N +�+ O Co (II O ¢ a) U L � N co O N N � to Co N U Q ai (n 0)_ (D w Co O LU L U O (B +� U O (Q N% (n N O N Q > �, Y m N Co (u ('U � (B —_ L U U) =cQ O Q co CU +, O O p L O n B N "O N Q U (II Co 0" CU N N _ W O or) to co cB (U H cB H (B E U- +� (B (n O O (n �. 0 � cu Cn c M CU (B 07 N_>O H.(D 7�Lo-0 QH LL LU m z U) LU 0 z Q Nm L.L >+ (1) cn 0) cu cn -�e 70 O L to O >+ C (B a) (B C a) 70 "= L U L Q L >� U y--� y-+ O U L U CCU — O o cu (6 _ Q p U) p p c� � O Q p ��+ cu A♦ cu Q CU U L.L U U O U L /�+ �+ � O U_ a) CO (Q (IIS L" > a)cu -,CU a)� C -0„J a)�cn (n>� 2� yU+ a) (B Q) 0 a) O7 I ~”' / /1 a� L Q 70 W L N (u CU =3— 70 _ O cu 0) cu_> o C CU oo(0po 70 0 0 70 (1) L-0 1 O U) Q U o C (B +L r f` (II > o o L >, O (B � (B o U V /+/�� / /� � U) C to CO a) o L y-+ M U U � y--� a) ) U) wC+ m (B O (B CU / /70 U� p L_ y>+ U -0 70 rL N O r (B i ./J a) aj L E o (B y� �i _ L _0 o (B U (B wO+ a) a) (6 N o L � U) 0 >% X Y c a) r a) a) � i Q � y + � L O C) cu -r a) a) U V 7 � O O (II � � IZZ L o (B � L >, Q (B L o �_ U (6 ,� L O a) U) `-' Z a) (B a) to (6 U) cn O 70 ° U) Q U o � a) o cB O a) O_) U CU o L "- > C (n to o Cl) L Q L� _L.>oQo (nLo� 0 X (n U c U .in -0 DL "- r L L (Q � Q C OCN OC >o O) - 0 C:� I-zo L ( C (B _rr U n a) a)a) "- cu 75 �C f1 O cuW L > O a) o Q- o U) CD cn C U- cuCU a)a) CU CU p CU JZZ U) -r L—>," Ocu -0 75 Z o JZZa) C to O C (B U U C cB C L p '' cu - C U >O O (6 ' O C (B o a) a) � cn o (B cu cn (B L N > C C a) E o a) C-0� •0 OJ Q o o Q C Q O (n o O._ >, Q (n (n C �C V CH cn E U cn 0- o._ 2 U, U to > H J Q ���=��p �E�MXL��� 0- S=� OO a) 0 C a) O a) C� 70 C Z °' N -0 p 0 cn N C U) O Q ri > O L �� °cn7 C � U (n C,4 �E .y C V C L C CU O) (n 0 E �) O L o a) C a) a) D Q cu C C (Q ".— L a) C �' C. N (II U L Q L LL ai Q 0) o 7o � • cn a) cB O H L (n E v •� N_ y --i U' o)—) L y- E U Q 0 ° Q cu C L /•(SII MWn♦ W U) U) -0 L V) W u cu .O r_-0 L (Q C (n C a) b o cu ocu 0L 0 C�c a) cu-0� a) (D V C Q (B o = 70 S o C 70 (o U Oa) CCaQv (IIx cu Q ())o a �Cp p a) (Q _0 O E Qin > (II ) p -L QQ(Q O cu - � n (G 0 O) a) O U cu cu Q _rM cHLnm >v�U�W♦♦ pL L UCC Oo U a) m a) cu 0) cu O> >,(II (D 0 JZ Z/) cu 0 _0 (n O) (B 0 (B iLE ( D u a)+ s rte(6 O �erortQ v1 Wv �o ♦V 0 (n O \, (nW = EU)�0-jC= -o a) 0= CU U-) § a� �cu �c cB Q'CD -0U � O O "Q(B L L CZ VQ]L a) (Q (o��B E Q C)Cl) L �>, E_ 0- M> >E v o �cu o o E cu D > � to cn .0 o n aEoL Q L Lo U) 0.S2 cBQ- o - Q 0 L-0 iNN 0-0w�Lcm U- W_ DO z CD U) W 0 z Q m N CO U O Z N m N F- LU LU w F- U) a 0 U_ M Go T- 0 H a) w r LL W m Z 0 U) W D Z Q m U) U) a� U U U N 70 O Q U O O N U 70 a� U O O U 2 • •) -0 -0 Q O O L Q U � L 7 � U 0 O N N E Q 0-0 0 ED > a i 70 70 N N U /O V O c6 2 D N L O O N U c6 c� 70 >S N to — O N OO L Q H O Cn rri rrr: /moi ®� .r I rr r7"11FSI ®! Mal m*1 L -Pi j m now U) LL N C7 N C7 F- LU W W w F- U) N a 0 F- U_ M Go T- 0 F- a) 69 CD r LL W m Z 0 U) W 0 Z Q m � � N M 7 0 0- ¢ CO¢ = I % 0 2 / / 2 0 S E Co 3 6�$ m / / ¢ -0 2 Co (n k $20-U- ¢ y -0 �D( 3 co (n § R 3 .7 \ '/ § 7 S 7 R 7 _ E- 7 Co E 2 2 �-? X210 o $ E O S (D W -0.g 0) ± C/) U q 70 ¢ .§ 7 0 $ F % 7 $ 2 a ¢ cu E cu / 2 ¢ I o./.- 0 ¢ ± a)_ k 20 (D cu C/) E J 2 7 =� � CU 2 ./ § _ ��_ I \ m 0 m a) �_ o E \ I I 0 ® (D ± / / % co 0- ¢ X ± % \ 3 a) 0 = E 0 2 C\j cu 0 � LL 0 ¢ ¢ 0 0 4--0 ° 0 E E _ ± 0 0-w E o ® a \ / p ) 0 2 ® ¢ E E .CU / .g 0 2 % O 0 q .2 2 Q R 0 _0 _ _ 7 0 0- ¢ CO¢ = I % 0 2 / / 2 0 S E Co 3 6�$ m / / ¢ -0 2 Co (n k $20-U- ¢ y -0 �D( 3 co (n § R 3 .7 \ '/ § 7 S 7 R 7 _ E- 7 Co E 2 2 �-? X210 o $ E O S (D W -0.g 0) PLFLk�L ; iAe@! w�iFYMa � �1 Y i J N N N 0 N O) w 0 D L N= O C/)U) , tea) Z3 O U) O —0(6 a) L U a) _ . O(D U E a) a) u)E -0 — L (6 E O U U) L O (6 a) U_ a) N C� _0U i (6 D 0)a) N U) O i c 00 o 0) U Cn Cn= v\i (D a) �y� L ^ L _ (D O (6 O O Cn > a) O �• 'L U (6 _0 (6 O U -0>, () a) U'L a 5 � 0 O O 0) CU O -C p >, O U (D 0U O O L W a) (D L 0 a) O QQQO (6 L (D ,� (6 0) ' —0 (o �U: O 0) a) O O-0 p 0)L L (6 a) U O c N m O E N p 0 C/)O i (D 'U a) U p CLL (6 0) O L O a) O N O U a) Cn Lq u UE N LO L '� (6 L p >, O Q O 0 L Q OZ3 (6 O _0 U) .�_ O O O U .- U a) >_0 a) O L a) N X (1) O -E UZ3 D -0 (u 0 vi 70 a) N Q >_ a) O) O L COC\A L O A N 0 = UO O U70 -0 O1� O_1Q U O-0-0 L U O L (6 (6 o) U Q U Q a) a) Cn 0 (6 0 0 a S —0 U •L LO H N L a) N O U E Ls 0: O O 0 0 0= .� N V) (6 �. 0 U)�. U 2 (6 -0 M �-1 Z W 0) O +, V� �W♦ i, o U� W W a- co w (B O O N Y � U� (II o U) L L O O U « U (D O (II a) a) (Q E a) O O Q + Q a) _0 � to " Q L a) (n M O U a) `� cu� �� U) � a) p 4-- `~ O .0 (D + (uQQQE L N •E a) i 0 U)- a) N E� co ' co 0 \(D CpC Qoa)co =��� c� -0-Q L +-• (� — O to 4 • L C 0- O �' OU Q a) a) a) O Q a) Q E O D a) O } N a) Co O Y� _ a) Z 0) +' L ��,�� p Q a) U a) -0 O i a) a) O N E Q o " � m U O) O O C to -0 a) cu .v 0 > > � a) > (n Z3 0- o .- � }>— L (B o -0 a) .o OC a) � C6 U ' U L X Q+ E .0 E -0 C o p (v +, a) O ton (II (n m co 0 E o0 (D to ��,Er� a) a) `� O �� : (n a) Y> (B j p a) 70 O O� _0 O OU 0) N LM ��c � L (B (B LU>ui p p N = () — 0 (6 O 0 O V J o > U O L N tOn � oL U Z (n o •C,6 I..L a) U) Q ^, ' U W a L _ O (o �~ O (B w70 O '; O U � (II U 0-- a) � p a) a) - Q > U a) a) O 4 -- O L E U L a) a) OQ 0-0 Q _0 Co 0) cB U a) 'QU N U - M } o -o () M tQ a) •� N O Q N H Q O cB Z3 > •o (II 0�� a) N� U to -0 a)a) _ a) L Qa) CO O p Q Q O U) O � OL E (B _ + -0 L +- () - L 0) a) L a) a) a) O C: a) ' � � ~ O U U) O O p YU + C: 70 0 70 CO L cnQ o O N co0 (U 0- (D m E m0°^ Q O 7 a) Q U Q •— Oj am, }cBr .� (� a) ^, O L a) 0 to a) to M (II L +� p a) a) O a) (B O U U a) p Q .- a) � vi cu O N t� � a) (n U) U 0 > U) to L 0) LiE (n + +� to a) a) Ui +� U O c: U) C C U -0 C:" - o E +� C Co O 0) m Q a a) � 70 M a) a O w V>J Q U A o° cn MY (n `�� (n °( c Q o 0 0 L (D °( o N ° p cu m ° o a°) E m o L Q o m ( U— Q ° m H a — U ° O� — Q H o° Co L a) +.. L a) O a) cB U ' cu +� >, M Q (B Iz- (uQmm �,� m(Um � Uo �c�QU F-cucn F— a a��n 1 rl RD W s � • 3 z S€ 8 y j SIJ 3 rl RD W d) s � 3 z S€ 8 y SIJ 3 C Co .0 0 N C N L U Y 4- 0 U c .-. M Q co C Co d N C co •• �� LL O= 3 - U v .2 1- - v Z E V U U -- U L E W W W W C W ~~co C C c ZEP E s c E `w e Co J RD _ ggURG N Ocl U o m � d) F z LU 5 a. 0 .j LU � LU a a LU U) 0 a. 0 w a. k2 § _ \ k .m W \ \ / > k �cu o 00���® cc) S 0- ¢ CN � � Co � % q 7 2 . E / co E 2 � $ ¢ \ cu § 2 q o" E 2 n$ 0- 2�o 0) a)/ Q � I � 2 0 D ._ -0 ._ E E '$ .g \ I / .g ¢ E = 3 � E o _ 2 ¢ 70 (Z-)3 o I E7 o 0 E 2 > 2 2 4- -'/ ® S ¢ co o E o � ® 5 @ 2 co $ 0 2 2 % o m ® 2 p ®2 % � /_ 0 (> 0) ® g 2 g 7 ® o o -0 = S - > E � ° 2 7 0 7 0)'/ I q % q 0 ¢ � ./ $ / $ E (L) @ ® . / -0Q .@ § a) ¢ 2 � F- ,� \ §Fu 2 2 .g § _ \ \ 0, o 0 -cc) cc) S 0- ¢ CN / % § o $ ¢ o 4 0-� 2 Q � I � o 2 E 3 (L)/o S 7 I 0-0222 70 I @ o E § o 0 E / 2 ® / 4- -'/ .(D 2 % o m 0 0 $ o q -M q 2 I S g o o F > E � q 2 ® (L) .E 0 I q % Q./ (u 2 / § (L) (Z-VOS'ONIN341M CIVOd add) ADVOESC1dVA1NOd1 W0'£ z z <--------- 3: � 0VL M„00.9Zo09N OO I9 OOVI �I �I, T7 � I J '1S �I�bd O s (Z v0sl ADVOESC]dVA w0 dvV d W0'£ 010 HWMl01S IEK)NOJ 'Xl O _x (I -S£ lBZI� N A3V_OEs a21VA d 3d wS' I � V9 ll3MV321V '�1V8 �E 20 z (Z-VOS'ONIN341M CIVOd add) ADVOESC1dVA1NOd1 W0'£ z z <--------- 3: � 0VL M„00.9Zo09N OO I9 OOVI �I �I, T7 � I J Y N aa l IN U Z m0 �I wl 010 of O _x w Z (D wll <IZ I �E 20 z �E2 �I ^_ - t.. O I z v ZNO D J J UwI mJl OOUI I I m I ONIN341M W0211SOd - 3NIl A1213dO21d ®III WOTXW9 11 w z m w ®I ONIN341M CIVOd1 dd -3NIl Ald1 dOdd M„99,Zi.09N 0 O LUo h _ co w m Z w � LO N II Z `JN 01111 qJO 1NliX3 c6°' u < J F-- 7 6 m w 00 1 3: /1 U oI LU z 0— ®'I Z V) U 0 JO ul II I C I I i I I U < ®I tw I I ® I I w ®I 00££I C9 U z 4 A11N3NV ® (Z-VOS'ONIN341M CIVOd add) ADVOESC1dVA1NOd1 W0'£ z z <--------- 3: � 0VL M„00.9Zo09N OO I9 OOVI �I �I, T7 � I J w IN U Z z o O w�w ll3MV321V OI1VdTI ^_ - t.. L OOUI I ONIN341M W0211SOd - 3NIl A1213dO21d I WOTXW9 11 VI ONIN341M CIVOd1 dd -3NIl Ald1 dOdd M„99,Zi.09N X. Hlb'Mlcnh]dDNOJ Xl �3IHSIlOW30 39 0 _ co w m z II Z `JN 01111 qJO 1NliX3 O u < wI 7 6 m w U Z U ml I JO ul I I i all ® 0 C9 ® �I 000£ OI J O m X � m roles � N ° a N N E I 3NllAld1 dOdd M Q N w � , O O u Q as�> (� w' N M LQ, CO n � OS P z zl� Iles oa v Z O.- l m O ol —000- 00£ IU J o > a lla w U � w x OOLI a � 0 w OS9I OOOV � OOSL X 0006 w - ll3MV321V OI1VdTI ^_ - t.. — --- ONIN341M W0211SOd - 3NIl A1213dO21d WOTXW9 11 13V911S01CIIH S'S � ONIN341M CIVOd1 dd -3NIl Ald1 dOdd M„99,Zi.09N X. Hlb'Mlcnh]dDNOJ Xl m❑ (I -S£ l8Z'ONIN341M CIVOd add) ADVOES C1dVA 1NOd1 WS' I 0 '1S ANNAH N co N 0 LO W W co a 0 F- U_ M o F— a) CD LL LLI m Z 0 U) W 0 Z Q m D N d 7a-) N J r d N N J / 1099 00091691 00 D U Q U C N U N L U Q Q Q N Co Q Q N C CO 0 O LL C 7 0 0 66 I.L N C7 N v / b32N l�3M I I IN 0411, W/M/m// --J = 1 036 68LL u ooss ® 0009 a9c --o-- 0—' -9 ll3M V3 tl� / 1099 00091691 00 D U Q U C N U N L U Q Q Q N Co Q Q N C CO 0 O LL C 7 0 0 66 I.L N C7 N v Q U 0 L 0 0 Z 7 m m O n N M¢ U O ■ 3N11 A1213d021d M„00,96o0SN b' NoV913S G21VA NVIN WS'l 111M VINV 77777z 10 v - m ° O LU LLJ h I 0 z21 1-j F Cl)I, Go D mP� y O �w I 3dudu r >¢ 'I u0081— o# LL w m�A w II z Y m v 'd '. 0091111 LLJ V Q U Z,I m^^ Q Z Z 009 w Z u m o U D w 0 h o ul N INN AL213d ONd O O O mPM i XII ^�h 0 U � C o lUl fn U I N 'I 7t=! C.) L °°Ov oVe a I z Q X I — m w � L—UU< N I co Q ro — Q � I � I w w�h w LL ZD OI1Vd lldM V321V N N z o > 93UI3 Q83AINQ1 t.. S'r `— ----- — -- -- N ° X ONINr GIM GV0211SOd - ]NJ] AlMd021d 3vei3s08anH w ss J M Z � ONIN GIM GVONiNd -imi midom MSS. 7o0SN LL 5099 0009 5694 0091 w n n N U) LO N 7FD N N J J �I 'II8 NmP � n = ILS II 0 N�i v E Ow 1:.. �oa 4111 LLL2 I B 6 X p4` � QoH E_ pE_O ED — pEE EO - _ IIr I B v �Qi I II 1�II6+ 6 I z y p EE NE_ 4 U I E I'� I'rIIa I U -H� L SEE oEE p co Q N L 2H: CL — e @2E eoi Nm 2'H:- Nim E E Comei I me w" LL 101, 000 �o L u u o 0- 0 b = 17 o" LL ------------ ...sa.... I I 1 I I I. I I I I' I I I I I I I I I I I I .__ FEII ... _ N U) Z) 0 N d (B U (B -r- L) U N 2-1 N m N LO H W W H co a O H U_ M Go T- o H C9 w r LL W_ m Z 0 U) W Z Q 00 O N 0 0 O -0 >, N OU 0 N 0 N >L (D 0 E �_ -0 _0 Cn U m Ln > CU U O -- N F 0 v-- (n ° CU Cn0 (6 CU O CU -0(6 CU (Y' U) 0 O QD U CU O CU O O N v Q •X 1S �I?Jdd (6 U)Z3-0 C� L 0' z D 0 0 CU O O O a� (n E A) O 0 00b1 U) (U QMU C/J xium3ais i �N�'x3 M009ZdJSN AWN}t�=00 y�r♦ �1 L 1L y+h t� N� 13S Q2fdA 2fd321 wS'l— �k"o\ F 13M V32fd 0019 ^0bL �W 0 0 4— \\4 -, - y--/ U CU _ �w p o L VJF7W W .EZ 0 1m JI 1i 1 z m 0 CD _0 r w 0- U)L E 2 0)M= CU ti O 1 1 u+; N Mli\ zU I100 (U� — — 0 0',a Q z 0 `JNI`A2fdd [I. o IJ 0 Z >v1 O - m �H J N1 N3ix3 >, O CU CO U) V) 0) CU L L 0 r N >> L 0 o O 1 u, 0 — 1. re,o w z 1 zo Q (6 V �I(DO m'. SIII a� a) E �_ �. L aD 1 m ®1 eI y--� 0 0 ° y/ 1.[ ° 01 ° U) o, 8 Wo Q 1 �z w 0 L U U) L (1) v% 11� Z W d' �1 . _ (� y--� 0 U V) 1 z l 0 0, 1 1 u, _ E ; _ 3Nn ua3doad -- L a� ° (6 O 0 I �1 z Q� •� 0 0 0 0 O U E N> CL � 70 U) y O a)°UEu(a(a2Ocn Flo OS6 U1 0l 2Y� O > O 0 - 0 o) a 01 LL• C/ (n U (6 a w 1 "0001z _ 0 ��-> L •� �--� Cn m 0) 1 /yam 1 1 LL � �i 1 d Q L 4— 0 0 0 0 0dj 0 O y 0,>0)co0. —UE xr1 ti -1 o (.0 0099uINIVW A CL (u •� •?) �^ 0 (� >> Q 70 7000� LL4 0006 1 w _ �°-0( y--/ U (6 U) CU o z Y �w �Oi \_/ J OINd- L. a ea ll3Mb92fd --- _ -u9— CV CV CV 0 _ U U '� LCa U �� z m `Jf�1 _ StJd-3NI1 A1213d021d -ua0'£x w5b ����35obawss ° U ^' CV 9q0 `-�1`� Qd021321d-3NI1 A1213d021d MSSZ 09 W 0 1C) num3ais 3i3a�N� x3 �5 m0 0— E _0 C: E w 0 m N � O � L � O � Ca) LO H Q-0 0 E� (u2� 1Sl?JN3H N (o N LID H W W H co a 0 U_ CID M 0 a) w LL m Z 0 U) w 0 z Q m D .............. 'EIJI EI Ell- E I :::I -77 El E N L O Cl)•� O) O)� 70 }}�.�� M O .L O).V > 2 _ — L O L (6 (L6 U 0 0 00 E ° N m o> j to o o (6 � Q O o � U (� N •- O N L Tp .............. 'EIJI EI Ell- E I :::I -77 El E 70 70 O >; 01 N N N >, N N 01 N O O N S O O �. O L U0 O L O O (6 = O (6 (6 0- cu: 2 U -0 E O yO . O) - U U L Om 7y .L o O (p c 0 9 (D (6 0) N L to L O L O 0 N-0 EQ Q L O N U (o �_ U �o (06 (6 (6 N — O N O O fn L N p > U U (6 N �O U 0 O Q �•i U X U O Q L O O Q� U N m OL OU p �� p O N E O) Q (6 O `� a) U a) to S O N LM (D N C OU N 0) a) p�E p M (D (L6 p '. � N O O p 0� 0 U �. . F _0 E O U• L N — O U.g> pL U D E N- (D o o .T N OL0 (D U N 0���Q�oo�o �������° �Q-a pEa�c5°c� o >�,�,°�° Qo°moo ocn� O1 -0 Q O O 0) =(D p (6 Q a 'L .� O N (6 Q p ' _ (6 _2 0 �o).. oz3-Fu (1) ((D �QQ E�N N vOi c6 O H U N >; (6 o 0- E (6 (6 U l(7 L i> U U Q L L O O Q O o L ON ° to O L N U) N N fn (6 U L L- (6 -0 D L- (6 _ L iL w m z 0 U) w 0 z Q m * / a E / £ E E 0 R lk\ � 17 LL \ LL t� /t / ==� W Z JZ70� W ~ 0 u O ZU 0 m QQ UNUM ZOO U i U :�i w d 6 17 LL O z a z z a a Q� O2UO UO -o z OJ 0616 z U�'2� U: tLLO2 H82 1e�101 m Q� C O co N N L O z 66 17LL c � � � � � 0 -N 8 1H`J13H `JNI011fl9 IIV2IAO OO88Z 009 Oob 009E OOZ£ OOZE 00£00 0£ 009E OOZE OOZE Oob 3Nn a3dOad o C,o o C,owo mo �o goo n o �o mo coo -o �oN o J J J J Jo �BoNwB Q- 8 � e O� 1Hel]H `JNiaiin9 IIV2IAO OO29Z E 00£ 009E 3Nnn 213/021/ --� Imilm JIM HIM in -ml =11 -Im I 1 Q o 3Nnn a3dOad C 0 co y+ Co w 6 17 �_ LL N C7 N N F— LU LU w F— U) a 0 F- U_ M Go 0 F- a) 69 CD r LL LLI m z (D U) w 0 z Q m § :< \\ : \\ :§ >u O >o 0 \\ �/< \\\ \u0 :3: :§: t:: 0%2 §/\ ;\/ O O Ed /\ /\ \ :7:: \\ t»:: C) 3 t\~2 t\ :§ ® U-. 3: u \16 u LU 2\\\ K%\/ -i -U2 -U2 � : < O O 2 / III ta 6- � § \ 2 0 £ § U) \ : E N q N 'R q F- LU LU ■ F- U) Q ■ 0 R 0 > 2 0 F- a) a) CD E L 2 E Z 0 ¥ L 2 Z < E ± 2 :< : :§ \y >o § \ 2 0 £ § U) \ : E N q N 'R q F- LU LU ■ F- U) Q ■ 0 R 0 > 2 0 F- a) a) CD E L 2 E Z 0 ¥ L 2 Z < E ± 2 \y >o § \ 2 0 £ § U) \ : E N q N 'R q F- LU LU ■ F- U) Q ■ 0 R 0 > 2 0 F- a) a) CD E L 2 E Z 0 ¥ L 2 Z < E ± 2 L (1) N 7 L L O U (6 > (6 a) E E E 0 0 0 0 0 0 -0 O oa) (06 O a) N � 0) a) 0-0 o U U O -- m U (6 U O (6 U M (D a) N (670 Lu U (D O j a) a) U J O> O� U a U L M C: > a).0)U -0 to (6 U 70 �c a. 0)a)2 L N Z3 to m0) 0 O OV U Z w10 � O oa)(D0)°-0o -0 U -0 c)) U (1) O OL N U > 0- .� >, OL (6 U E O E o O-0 U O O �1 `o 0-0 /0 W O O o TLS o O O -0 a) M O L O a)L O N �. 0)UCn-.O Ow C/) O U U Q Z �Z �o I II I :OM', NJ I '1S )I�Idd ��va13s a�v� a �s�i U N i 0 � cI I � N c6 �. (6 O L. Cn E Cn L -0 � (6 a) O Z O 0 U N Q)O OU U 70 () O U 1 Ca L �U)>� »Ii — O Z O (6 O U o - O fn O (D O U (6 O U J O> O� O U O U m w U O a).0)U -0 to to U a) 0 O L to a) to A1dAd U .VU Z w10 � I o O-0 U U Q N U L UO L N >70 D O a)L a)4 > L� - O a) 0-0 = O O a) Cn O O O > U Ow Gi a)-0 U a)�''� 2 'X v U (D 0 U v (D�. O a L O (U6 >, (6 U 0) O 0- y. U >S.C: L -0 00991 L O .L O O N Z3 P- 0-70 U) a)2-0 U U Q Z �Z �o I II I :OM', NJ I '1S )I�Idd ��va13s a�v� a �s�i J ollL 111mv- o YSVa133"QW%1NO91 't-- JI M �aa..IM aH081SOd 3NN ktd]dOdd IIN3UIM avod Idd -3NIl A,IdIdOdd W❑ '1S J.�IN�H 9 m Z IOU m - J m Z `JNIOII(19jO1N31 -NIGIII q { wI I U ZI 000E cI I of Z1 wl �w Z 0 U Q O 1 0 »Ii Z owl U J J CIO J /1 H n Z m w W Z C E. LCV w1 o o W 0 � h m A1dAd U Z w10 � I 02 L? N �6 0 os 01 311 O 00 Z / Z2 LU VI) c O O e > U Ow Ell g U '0s J Z M CL L U a 111 w U O 57< w 00991 U z uIN3Wb' QQ J ollL 111mv- o YSVa133"QW%1NO91 't-- JI M �aa..IM aH081SOd 3NN ktd]dOdd IIN3UIM avod Idd -3NIl A,IdIdOdd W❑ '1S J.�IN�H 9 m Z IOU m - J m Z `JNIOII(19jO1N31 -NIGIII q { wI I U ZI 000E JO ae c Q w r X 1 1I E I 3Nn A1dAd U w�o< N �6 a) O Z2 ° a) O e > U (6 Ell g U '0s J Z M L 01 w U O W QQ ZU O O 00Q Z_ U U U x OOLI � O U Z 1 0 - w o Z� O O O 000 (6 U o L_ L co L 1 _ _ V UO i s' tl9 V CO 99,Z .09N L Q � � O O U_ co -0�'L�' L_ w LL ` ' U N N IL N (Y) N (S) H W W H N a O H U_ M Go O F- a) 69 CD r LL NW_ LL m Z/� '0 U) LLI 0 Z Q Nm�/ LL D W L a] _U N O Q M O M > >> U a) W i O (B (3) L () O Y O Y co �M -0(II O -0 (B O N 0) �+ U p 7 � O .� O O Q � Q- 4— U — N 4— O a) cu O U O 70 70 U (II + U O) Co a) > p L N O a) 0) E Q pU O L 'E (Q �O N E c U U ' 0 � � (B (B 0 >, � N N� L a) a) Q p cu Q U O U B N a) U E ca — W I U p1 -0 ; Uto E aO 0) m cu Y C1 L a)O �p O N�-0 O U� -0 (6> aL U 2 (6 NNO OU� UU_0 CQ U -0 -0 Co (D 0) o = OY(aOvF— -0 U0O) U >-0 Q-0 U a) m L Y U U) 0 U " W U 0- Cfl a) = Y a) U O Cn a) O a) LL m co (�> O Q U U O O Q 0) L U U U 0 O pQ O O ,(D � U _0-C=U (RV O (a) n O m Q ca F— a) >X i aU Q �jO p� ( O 0_0p O LL O� a) ^F c W, n-0 pWn O co E O L O Q O +, (II L +, E-0 a) cu cB U Y Q () -0 O cn -0 a) Q � +� — J � co a)j � (Q U 0 p -0 cu �_ 0)U O ' L (Q T! > U N p L OU Q� C O L U L p Coa a co O a1 La) a) LU p Q E Cc Co > O 0 70 a) i(n6 Co o Co U (o O U O U w 0-- 0- m a) a) E U E O U > cB70 cu ca cu (B O U 2 -- U (n (B — . a) (L) C: Co o 0 a> a) _ a ca cu Co E Y n (D > Co > a) E O Q (6 L U L O +� > L " = . i ti N O = O ui U to Q Q cII (II H v> cn Q m . �? Q U co (B LL W_ m Z U W 0 z Q Nm L.L LO � a) � W � a)_0� U � U %���� — U a) (6 O 4 O L a) a) O L N (6 0 (6 O> � a) o a) Q U � �, a) Q a) L 0 U ?j =� L o 0-0 o �' L a) O O O > N U U M M a) E a) O Q M o O 0- 0 U (6 (6 N E U (6 a) U% p O H N () a) U (6 a) N -o a) 'U U L N 0 O -0 O . T O C6 N �--� o O a) �O (� L M O C6 Qzs� oo °� �������0 -oar � 0 -0a) U c� �. . W -o _0 N Q Q a) O to 0) CN4 00 - O U1 U ° a) a) 0) EL 0 a) . L Q 0 0 a) to O f O O ° V L N (6 (6 H Q � — Q p 0 a) U p U o D M U U a) 2 M p 0 CAO M E L M U1 O a) O N E :s L O E �0-0OW Q�r� 0_ 4-- C) C����a)L0°0 °���a°�i U 70 N o a) U N o L N� 2 . Lu E o O� Q U L L N >- U OU N a) N (DN E O( O >' L y M (6 to U) 0 U L= i >, O �. O "�� O (L6 O L (6 U p U 1 (6 U= Q >, (6 O O O L a) �- (6 U �. -0 O (6 L a) L O M WL U -0 U O E O Q a) to to a) Q O U b o o Q a o 5) M E a) 0 c6 a— 0 aUi aUi �o��o ���� �o>�aUi�0 0OD�oa�o �00 U L in U U� Q (6 U L N L > Q U U > L (6 U Q 0 y (6 L a) O O (6 L N ()°-6E°)LDa)Z3 0 Ma)(n> �U�u,Oo�-U) O. N -0 O O O L o 0 �U. C/)0 M O p to 0 0 a) 2 0) M 00 (6 n a) O (6 N' U 1 L a) E O 0-6 O (6 • L (6 OL a) -0 `� a) (6 (6 U 0 L U) (6 OQ L N -0 -0 a) a)L _ O O ' a) "� a) L O-0 a) U) a)o O N E L N 0 a) 0 -0 U L O (6 O(U 0 0 0 0)-0 � N uS U Q 0 � M U) Q� a� Q O -0 � D L " . — a) O >, M -0 W �_ � (6 o L— 0 o O O L O fn = O) _0 _ U1 Q a) o _ (6 Q L ``G— (6 (6 -0 (6 M -0 0fn 70 (6 C/)U o 0 N a) U1 00 a) �'0 a) a) > 01 U (n0 W a) a) Cn — U" (n 15 L6 N (6 O O O Q N E U L Q N Oo M L o �- O O C/) o >� O o a) N N O a) y ° 0 a) a) U a) p O Q (6 L o N a) O o 0 N o 0 o-0 uOi �. U) W a) 0 ° c� ° 0 0 0 �- a) a) 4-- >, 0 -0 0) co a) L L 0 0 0o. 0 >, a) a) (6 S O N p (L6 o O o L -0 t• FD 0 0 0 0 0 a) a) L M Q-0 0 0" 0 a) A in 4--o 6 L \ U C: M U U L 0 0 Q 0 =-0 M Q M (6 (6 M ) Q w w m rz V w 0 z Q m (6 L N (6 O N �- Q L 70 70 (o O) N N to >, cn 0 U O L N > D 70 0 0 0 O 70 N O- O N •— L N L 0 �. L . >, L (o O (o fn (o N U (o -0 O (o O Q (L6 (o N L p (o (o -0 N L (o 70 Q70 O N O O N a (o N >+ O L N 0 0 N 0) ��a°Q �� 0'�� ��—���0- E�o�(D�� a) 0 >1 (o L > O U �--� L (� (6 L L O N M Z (D �--� L �_� " Q p O L L p� O (o > O N O O N /., 0 L O-0 Q(D N 0-0 E (o 0 70 � �+ � L (o L — � (o (0 0 U (n > m O(D 0 0 � . O to ���(D �� ooh ��o����•o>��°•� L > > \- U 0)O N OV � O) U N m O1 Q 0 M m� �� m �- � N�� 0 0 O (0 0 U O� O o E� O- L -�n�0� �.��-oocnoUc�.o�- -0o0�c�.o2o OU fn N N N V N> O O U) 70 :-. L O O N 7 L N M O o�00(D 0Q� (Do0) 0 a) a) C: a) W (o Q U Cl i U O) (u �-. C M ( U (n � O N L �--M > m a)Q 0 0 LU) 0 U Q p Q N L L (o � N O 0 0 O) o (6 N E 9+ O) U 0 m� N N O cn U)i O — O Q O. i ILI (.0N N to O O 0 O >, N _ O1 OO 0 O OV O N O U N (o (� U - N (o L� LO -0 0 O G1 p N O L cn > p cn Q N U 70> N (n U' — N U) (o O O N 0 O O p 0 fn L O L O N U (o U L O Q O L (o p O U opO O 0 � NU) U U)-0 U) i Q>LU O Q N ) O (D(6 tQ to o o U o CLi o nN NL O co a� Q co d 0 0 0 0 a� Q E co X N N co co c N N N IL N co N 44 ti H W W H co a 0 U_ M co T- o H C9 w r W_ m Z 0 U) W 0 Z Q m 'ONldd S l�El�:IlS ` 11 :]OiOIA 77 W LU H U) Z W 2 a 0 a cn cn F -m CL 'i Lu 0 U a•+ Z (� U > LU M a Co U D � Z J N (Y) N 49 co F- LU W W w F- 0 0 F- U_ M Go 0 F- a) 69 CD r LL LLJ m z 0 U) w 0 z Q m Z <= W U w Z Z Z Z s S l�El�:IlS ` 11 :]OiOIA E a CL V 0 0 cn a� a� cn Hm a 'i Lu 0 U a•+ U > LU U Co o � Z J N (Y) N F- LU LU I.fw F- U) N a 0 F- U_ M Go T- 0 F- a) 69 CD r LL LLJ m Z 0 U) W 0 Z Q m O 4— N 01 C: O U `1 O0 70 O (o �• (6 U O O O U y O N U U U) � 0) -'Z (>o U O O Q 7FD U (6 E L (D N (6 U' U 4 'L m U > (o O) 0 N U m N o)2 p -O E U _ O) to 0 N m N 00 >, 4--O O(D to O L (o 01 Q O N -0O L (o O •� .� U � U E � > O L 0) L O O = O Q 0 N 0)> L 4-L U) U (D U 0 U (D O O -0 � Q= L L (D — L E NO `0 0 0 N � N F M O N �-0 N > O (�6 N O 0 (o 0 Q E 01 (o — UO :t� r rM bR • LL (6 O N 01 0) >+ U) O ~ "' U U 0 U N N O U U U) O (o -0 � (o � 70 0) N N 0 � 0-- N O � (o to O Q N _0 Q U U 70 (o _0 _ Ln (n m (D O N UN 00 0 V (o - O m (o Q L N O N� 00 N N N U U N > 0 c: O• 0 E U U�o� (o (6 LQ (6 (D ("DO Q E W r rM bR • LL X 2 O i U U >> (1)L L O N O N 70 O 1pdj `1 4O N _0 fA > } N ca O �42 co E — O O M _ N N L N N N (_n N O (� O c a ti N (B p �, vOi N L W Q Z CU O � L L Co � Q 4-- Q L `' Y cn U _ co Z3 M x O O m � �' N w ca Q O L U) -0 co � L to cn O co 70 0 O) U N Q� U N N m C) > Q N 0' _ ' _ N Co _ _ c1 L Cu E 0 cu C0 O N L W E O Q p a) coL +� N � O +� L N N N tea/ V) M U OSI' O Y p co �I' O •S � O� CD N L > + LO �U > ai A p O O E co m a) Qa�70 a E ) -0 c U a) p O(B O) ^(B -0LLo O -Q N �' 70 O) OQ U O O O E a) O E caQO U N n O 4_ 4 O I Z3 B, _0-0 O O U co X n omm Z L cu p aE O c ) cco Hrn 0 -0 co — LL Ln co M cu �— +' ���QO +J+J o Cu (U ,,> T)O O Vp�/ mow/ � °mN �Qo > �o�__ZC L aE O CID 00 Co cn _0 O W — L L to U (n > L W N cn C zcno c = O O M O O Z 12� OC\l QC/) co :tt m O) cA N O) O)L U } fn N + L Cu } Q�cu U E Q >,, Q N cn Q a) 0 N U� N c cQ .�_ Cu cj N > O (II Q O a- O U M > N U _ } (U Co L N N (u N W p m a) (D cUi L C: � vi o Q O o o Q } p c6� N U p O +� �- UIL CD � �> O N m = � � L a) � � � to � � � =� 0 Z5 >, X O •� H �. VJ •� `v(D W Cu U O O C Q O QOW O O Q O p% N 01 O U U) O � �O-0 N Z5 C N o mQN U) a) W 0 cu a--. �♦ L°O O — -0 O) Lcn L Co (DCD ( O p _N Co � Cn O E U Q O° OEQ O pCn O O N °O _0 U N U 4 -0 cn X OcaQLI� p EO QUI') p N Cu p N-0> O p N L U >' O o�a� ��Coo0�w Q0w N v�i�m'�00vi�m ��E m° L m' (II C w !, m cB O O ca M� m 5' ° Y L a°oma�)��Z5��c� Ov,paE °_onoo 0ao UQ \ O -O OO Z3 (D ( N co co E � O) NQ�B p a)N _ ifEn c�O BN m E Qn I E co 2 / U) E O 2 « co ± � o E E _ E @ @ @ � 2¢ 7 E 0 E 0 E 0 M % % (DR Co 0 2 (1) E a) E (D E 0 CLQ CL I Q ¢ ¢ U 7 7 m E 707070 0 2 2 2� co co 2 p 2 / CIO / / k 7 — CD(03 E CD (f) ¢ 0 0 0 0 ■ E E _ -0 $ 2 ) % @ % 70 ¢ % / 2 R R 0 R 2 CLE E q % CO O \ § § § 0 2 m 2"T 2 ca 2 z0 a_ 2(n g M C) M co (0 C) M C) M — Cu 2 @ E/ m E/ E R E R 7 = I ■ ■ q U \ \ \ b@ 7 E I @ ■IV) 7 E 7 E 7 E 7 E co CL p \ § -0 § § q 70 70 M 6 / 2% 2% 2% 2% ¢ R _ ®± : @ \ § � 9 ® / 0- / Co ®@@ — n D± M D@ Scu §% / k $ k $ k $ k 7 70 � 2 4 2 0 p ¢� ¢ ® 2 2 @ 0 � § ' a o n — 0- ; 2 0— ¢ E ¢ E ¢ E 0 ' I 7 I 0 2 ¢= p M q C CL¢ -0 0 q -0 0 ¢ Q -0 0 ¢ q — — Z 2 E 2 0 2 0 2 2 0) E 2 '/ / 0 2 S 2 I 2= _ e @\ § $ C $ 04 04 u E k Cu c 9 k 2 / n � E 2 ) �k 04 E m CO2 co ¢ k ■ Q @ c CL Q 0 § $ .3 I ' 2 Cu% D E= U 0 E w I E co 2 / U) E O 2 « co ± � -Fu cm _0 a) N ,U L6 O Fla c _cu �_ O a) U F O (B O O — U a) cB cn � c w Q- — O cB EO W a 0) 0) (� a) c a) C c a) 0 O .� c Qcu D 0 O U O j U 0) E cn W ° 0)c CU �c6c >L Z c° o o _ v _ a-0 U_0 cu QU) -0 �) � o m � � � 70 _ 0 a) 0) ° 0 cn L -o E °' .v ° O U a) o� -0oo cum O� 0-00 c ° CU U>> a) U M° O `� Z) > � o Q 75 - cn m e m CU o 0 w o Er cu 0 o 0 c OL o c � c a) C� 0)a) o_ o 0) CU � ° ° v c E cB U � "= ZL ai o cB cB cn o .c a) E -0� �' 0 a Lcu o� _0E (n _0 __c �`� °0 c6 0 U �� o o o •� � Q c "� c 0 U cu U) cu 0— 0— 0— -0 - ca m .� a `� E > J0 0 cn cno c a) a) L a) � o � o 0) O Q0 ° U cn�� � 0 0 C, U U cu O L U) cu (n cu U � O ° O Z � . Q a) U , 0) a) a) cB (D 0 0 0)— ov >, c m c c �- E 0 —( U 0) o cu c C U) T U U) �° a) H v (n 70 cc L) a' EU cB°_'a)a) �� E .Q ° a) 4— o a) c > 1 c 0 70 CL o a) I ° C 0 0_ o c Q .0 •� U U Q 70 U 0) a) L 0 -2 o — c_ > cu Cl)T° U ° I y"' W c 70 y-+ cn T V L c 70 y-+ c a) yL+ Z to c c M O c c 4? U U a) a) L L L L O ^ X' v) a) 0 (B-FU 70 CU `1 0 o (B c p OU m >, 0) cu cu O c cn E c v) E cu cn a) oo � o +Q+ a) O U a) c a) O 0) a) in a � �� 0� � ' �� ����cu al — �� W�cn / Q m O0 a) -0D O•c 0 U C> -0O Oa) IZ ° auric - EO om O=CU 0 o (E cna >'(n 0 0 U> 0 5 0 c- 0 w LM �_ o cn _0 �E °� •-CLa)c °oo �� o. L c L O Q L a) Q( L a) c) � - m 0 4-- cII cu _0 c c U • y-+ O a] CU CO Q U O N M CD a • -0 v- 0) O0) U cu O U a) C) c L >, �- p 0 c c �. L "_ c • a) L 0 Q c w p p L L O � p p O c cu cB V� _ _ c6 m m o � O mac' v > � � � 'c - a�'i��� �'� -0ai ooh ��,o'�CU _ N _ _ p a) 0) cu a) c -0 cu E cB � /� a) cB � 0' . a) Tu in � m ° 0) y-+ cn a) c a) cB L •c D D 0) a) a) U >' E r� c (6 CU > `1 � O L• L O D U p m (n— 42 U r O p cu p a) � > a) mcn Lo c L p a) U L � � �+ a) m a) c� ° Fu TS �e rtf ) ' V y�-+ i� >1 V `v a) � U fin + L 7 > O a) O cu — yr c O L X c a) c 0) a) a) m � 2) -a � •- >1 � U C6 0) c 0 �_ m a) c U U ca a) p O c c O L c Q 0 U L (Q N a) U U) 0 c cu � O O ryl VI a) 0 cB E E O U L cn a) Q U �_ L c U) z_ a) m L O U O U)'° c`� (6 �c� %Q 0 4-- E Oa) X O=3 "O CU 4-- U a) a00 (Q O) a) -0_ E ° p c° i U p c O L "pL (� -Fu cuU C LU Z O) c M C C m � 0) N o p� O' O O cn ° T a)c O cu U c a) c o' o 0 ao 4— a) cu � U o cu C� u a) � m m cn U c5 o Q> U Q cu N(3) vi "- O� O O Vi c — cn N a) a) O C c O O — a) cuCD U o a) U) 2 _0 U) � E m U U pc C: c O (6 ; cuc 'CU LUo OU O� O c O E O1 a? a) 7o Q 70 LC L) •V a)-0 A E X a) cu �> X cu>n cu C: a) -0ao p) " CUC ) c a) -0 v) OO U -o c •c vi o o ° o U) - o cu c cu C/) cn cu CU > E ocU c a)o y-+ cn to • L cu E- U U O L r i c a) � a) : � � CU c6 � O � D C � � L � CN a) E m EU) E (n °.� o)c -0 c cO a) C O O Op cu O D H cu /) �. Q 0 yr-+ O ��♦ �_ fE� O �iLf L Q- -0 Q "rtif yam-+♦ E0) LL �n cn ♦ V « p E W , `v y/ p a) c U 70 O L O •� Q p N ° U 1 L CL N — W m o a) UT t= ° U m 0) Q o c U Q° °_0 Q c ° (q () _ C) LV o �, O c •L cu N L Q ca O p o Q ,0) > cu _0 0 o Q N m F c O E a) ,C) -o a) E c c ° o 0 a)0 >_ O C6 C') 0UP U - w m z (D U) w 0 z Q m a) cB +� a)a) Y p cB � 0 >_ o � � � O Q m 0 a) � 0 p S (n a) p o �' O N — E 0 cu Qp pF � U a)) O 70 Q co�a)(D o Q = L (nCU >' N 0O U 7 N Q O a) 70 L 0) cn M N U U a) 0)cu m - a) �♦ a) U (n (n p O O cII ^U^'' cII Q' Q p •� 70 0 (n i -0 -0 (D U '�a) ' a) _cu0 70 cu O Q O (DO > _0) C a) 70 co co a)70 c_ ku Q L LZ3Q a) ( _0 .L E U� Ln O -° Q } 0) cB a) o c� � a) N Q L V) U_Q(6 Z p O E OL(n _0(n O 0 O (n Q -0 W L c L 4-- n Q O) O U Z O �(D W a) aU) > m � m L �/� _ O Q ( •L OO . O L O1 ao 0 --TN O >, (n L Q o W � m o L m (n Q} (n Q m x a) cn o) > > N �_ U M OM I nH a B OHQn U V _ O= � = m O L c L c n W L c= c VJ N +r �• O1 O) +� � (r) F- L a) 4-f (n L- m 4-- E � m Q L �_ �_ O 0 o o „ a) (n (u (n E X: > 0- (D o O + o _ a) � " " o +, +, L o U o (n +, +, o 0 o 4— E o (n o (n Q (B Q v (Q o o cII Q L (D a] L �� G Q o (n (a — c O M V (D vi L 4--O cB a1 a) (� N cII Q (n E m a) ° E cu 0 VJ mLp ����L.♦♦ N QmL�5 -0W, Q(n L m°() U Q U ai ai ai c� o Z3 ^W O O F— U) p� 0) U a) Q0) _C= (BO ( a)^a) • n >co UN -0 1 (n (n+Q-0-0 E p O LQa� N )�U O p m p U O (D L m 0 > — 0 a) Z � � � � Lo � >1 � o ° 0) 0) � a) � m v -0 Coo � O , Q J la C/)Q Q cn (n Q G) E Q (n cB o (}n o cu (n m E -a (ten ' O a) O a) U C a) _0 0) E a) O ) +' O t� O � a) > � 'U O -0 aj Y a) L O co Q a) E % a) V cu U � i O a) a) O Q >, 0) a) o� a'� �� �•�� �� cn�cua)� o �. o m -0 ami •� a) .E .Ln a o m Q E cu 0o Q(D�_c� a)0) ) o X L� �oL_ o a) cB o U m ° o o 0)-0 U E a) O a) U U L a) to N Q> to _ U ' L cII O (1) q_- ��m�° �'�� —mooCU = �� Cm�mm a) -0 E� m O -0 -0 a) m 0) a) m N > _' O L � }j a) cn a) � > co a) 0 4— (U 0) C _ ' ^, U cn cII O N D J CU W c cu a) 0 a) o co 0 O cn O COW U cn >� v� �— coi 0) -a �� L 0 a) 0 � L) 0 -0 E 3: E u) c� c� LL m /z Un l)0^^ W 0 z Q m a _0 o o _0 - — O O U O-0 CU N 0 N a) U N U Q (: 70 cu 0 Q m N N co to O E cu O U N U a) +, cn 70 () S O 0 a) U O E co j U a) to () CU Z3 O O O Q O 2 a) O m _0 a) o a) co 0- (Q 0 cB 0 U) 0 a) U Q L E vi Z3 Wco W W 0 x o O (n m o LF— , O > () 0) O O Q co L (D `~ E a) m Q L cI) W ^' Q o cII a- m cB ' O a) O a) U C a) _0 0) E a) O ) +' O t� O � a) > � 'U O -0 aj Y a) L O co Q a) E % a) V cu U � i O a) a) O Q >, 0) a) o� a'� �� �•�� �� cn�cua)� o �. o m -0 ami •� a) .E .Ln a o m Q E cu 0o Q(D�_c� a)0) ) o X L� �oL_ o a) cB o U m ° o o 0)-0 U E a) O a) U U L a) to N Q> to _ U ' L cII O (1) q_- ��m�° �'�� —mooCU = �� Cm�mm a) -0 E� m O -0 -0 a) m 0) a) m N > _' O L � }j a) cn a) � > co a) 0 4— (U 0) C _ ' ^, U cn cII O N D J CU W c cu a) 0 a) o co 0 O cn O COW U cn >� v� �— coi 0) -a �� L 0 a) 0 � L) 0 -0 E 3: E u) c� c� LL m /z Un l)0^^ W 0 z Q m a _0 vi o _0 - O N O-0 CU N 0 U N U Q (: co Q m -C to O E m O Q } cn () a) a) U N E E U () CU Z3 O O Q 2 m _0 a) o a) co 0- c U) 0 a) U L E vi c •� o m o a) a) > a) U n co (D `~ (U a) m L cI) Q n _— W W Un _0 > C -EW co �_ Q ^y� Y ^�♦♦ O 4 Q (B •0 U , L i O) U N to 0 >, L E —_ O a -- L O NC co (DC N ) 7 U N to O O uj - 0)O U Q N N70 U 0 N c O Co V m N L L o _0i 0) Q cum (6 C C U co(II E O (n cB N N O N 0 :tf _0 ( (II (D 0 >' U V) (6 O �- .L O) Co 0 +' Q O L a5 w 0 (D(D 7oLO � (n (n Y(n U UM N N �>, 0 U 70 O (II > Q .NN E c N U > O j N O (6 ' U � cu i to (IIN U N > c O O N L70�- — O to O� Q Y O cu N Q � 0 U U O �_ 0 co cu 0 O O O " O to Y U - .� E +_ N 7 � O �� o N N N N U cu.2 C V Q (Q (n W -0 0 2 C� N c N 0) O O c U 0- a) 0 O N w w L _0 O) L � +� - O co �. + (II N (B U Co +, � U p to O 0) 0 Q 0) L O O N Q O N o O m� a), C L 70 0) 0) 0 p O o o m= °( U D O O N � L o� C 0-0 U O O O -0 -0 L tpn .� N Y (U > Qj (6 to N L 0 7 N 0 O O o W A-0 0- C: 0)N .O -0 U (II U +� N Q Co E U L N OU U Co O f O L E C Q N C L O (II o 0 --0 N O (B O OU �_ (Q N O CD N N p O m E L co N E� N � (B } >, E N N L cn Y> +, N N U N Q O U N 0 6 O"- N }_ N Co m M QU , C/) L O 0 Co n +n O L W L ~U Z3 coN c N + N to 70 > (Q Q NQ +0 Co O N 0% ( O O N N N N C (II W -0 Q +- o I co (n a) �o o 0)0 Z- o N (o O O OZ- >( Q Z3 C >, o O Oc O 0 c 0 0 Co N O N 0) a) O Na O) O C � N w ( >O D 0 Q O o Z3 (D 0 LL 000On Q m c OF—n 0- -0U a) co (Bj co (B o U a� QOaUim 0 0-70 o o C o 0 m o (D (D .� N Z3'L O 0) a) o 0-0 L (D cII0 L M _0 0) U N a) 0 M +� m Q- O (6 _ t/j L (B 0E a (u O) -0 N O M O 0 '� (6 0 N U 0 m O) L a) a) a) (6 + to 0 E O a) L a) w 0 0- (D p E a) _0 O U 0-- a) CU 0 W > Y _Q CO 70 a) -0 O D cu 0 Q a) O O (II O �_ O O U •to > a) O m MQ O () O U O w o w E L O O) m (D (Q +� >+ + (6 O (B a) O 0 (L6 O. i 0 U U O) x U to L N 0 �_ } } C 0 W-0 (D U a) > (D 0 a) O — a) 0 O U .� (n a) Co N •c- 0 U (B 0 0 0 Q0 O a)L a) O� -O a) cn • L�LU co U L VI � L (B CO 0 +– �✓ CO L �. 0 m m O �_ O N 70 (Ua) O N O) O .0 N— O O O + / `v (D 0 E co (V C: a) .= U Co U UU- tO C �� N0 U) 0 U a)6 a) J0 x Q .� �i ° VJ O U Y 0 (�� L O W 0 •L 0- o0 �,Q��� �-(�(U0) U) co (moo V n3 (n U t a) N .O 0 0 0 Y N +� 0) 0 Q +� N ; 0 � 0� X 0 0 U U Uco c O +' tom � +� � a) � 0 0 N O U) cB O > N cII a) n3 O O U a) N 0� 0 c- 76 n3 N ) .cO 70 E U Q cII a) � CO O 0 L (B a) V 0 O O a� cu 0 0 _0 0'_0 (D 0 O >,O O L> o 0 0 0 0- co 0; m0- C-0 0 0) Lam. 00�,� o; o'0 ° " 0' m � cB 0 (6 0 -0 cu - °� O E -0 a) m 0 Q — Q 0> 0.Co a) E 0 � 0 0 m> 0 0 0, a) O, a' L 0 0 a) � :�_ -- cn 70 0) U 0- - 0 O H O a) ° E>� Y �� O c� E c Co,�, �� L� m 0� Y a) U U O° co Q= 'O L O m 0 (D C -C Co 0 X Co H L (Q a) a > CO � Q 0 (n � Q m cu U H _ a -0 m m a a H 0 L Q N C7 N V ti H W W H N Q O H U_ Cl) Oo r O H G1 r W a. 3 a O Q ) L O I N U Q 00 N U Q �Q UUW4� �,, , IL V) N U Q P. mlkL 916� t t-17, m IL N N U � Q N N V O co H W W H N Q O H U Cl) Co O a) m LL LU m z 0 U) LU 0 z Q m O ,<�, m AAS P. IL N N LU Z P. P. Q 00 V) N LU Z r -I 7 ,04a ) .A�l IL 10 N LU Z IL V) N LU Z P. IL N V) N LU Z N C7 N V H W W H U) Q O H U_ Cl) Oo O H m LL LU m z (D U) LU 0 z Q m O P. IL N N W co W W W V) P. I V) N LU m w IL LU V) P. k. V) N LU m w IL LU V) Immok �, A fih� mlkk� or,", T' .# -eyVlWlk>l P. IL 10 N W co W W W V) P. IL V) N LU m w IL LU V) P. IL N V) N LU m w IL LU V) N C7 N V (N co H W W H N Q O H U_ M co r O H a) r LL W_ m Z U_ co W 0 Z Q 00 'IRV, '4740 IO` v 40v f � 'IRV, '4740 IO` v 40v NOTICE OF PUBLIC MEETING 1 for a development in your neighbourhood 169-183 Victoria Street South X�1 K;TcC ER Concept Drawing � ;�,. ®3MID "Mo 120 8 Multiple Dwelling Storeys Residential Units Developmen Have Your Voice Heard! Planning & Strategic Initiatives Committee Date: October 28, 2024 Location: Council Chambers, Kitchener City Hall 200 King Street West orVirtual Zoom Meeting Go to kitchener.ca/meetings and select: • Current agendas and reports (posted 10 days before meeting) • Appear as a delegation • Watch a meeting To learn more about this project, including information on your appeal rights, visit: www.kitchener.ca/ PlanningApplications or contact: Andrew Pinnell, Senior Planner t andrew.pinnell@kitchener.ca 519.741.2200 x7668 The City of Kitchener will consider a Zoning By-law Amendment Application QBA) to facilitate redevelopment of the lands with an 8 -storey multiple dwelling consisting of 120 dwelling units, including 24 affordable units. The ZBA would change the zoning under By-law 85-1 and add a site specific provision (SSP) to regulate setbacks, building height, floor space ratio, parking, etc. The lands are also subject to City -initiated amendments through the Growing Together (GT) studyftqea84a6f f232ppeal is resolved during review of the subject ZBA, the GT zoningwou d be modified to facilitate the same development concept. City of Kitchener Zoning Bylaw Amendment Comment Form Project Address: 169-183 Victoria Street South Application Type: Zoning Bylaw Amendment Comments Of: Urban Design Commenter's Name: Rojan Mohammadi Email: rojan.mohammadi@kitchener.ca Phone: 519-741-2200 ext 7326 Date of Comments: August 30, 2024 ❑ I plan to attend the meeting (questions/concerns/comments for discussion) D No meeting to be held. ❑ I do NOT plan to attend the meeting (no concerns) 1. Documents Reviewed: • Urban Design Brief (June 2024), prepared by GSP Group. • Vegetation Management Plan (March 2024), prepared by GSP Group. • Arborist Report (March 2024), Prepared by GSP Group. • Architectural Design, Prepared by aba architects inc. 2. Site Specific Comments & Issues: • It is highly recommended to start the 1.5m setpback from the 3rd floor, rather than the 4t", to minimize heritage impacts and maintain a more human scale. • Include mortar lines in the precast concrete wall panel -brick formliner of the podium to create the appearance of authentic brickwork. • Indicate the recessed areas shown on the south elevation on the site plan. Please see the image below for clarification. • Written permission for removal of or impact to trees in joint ownership along property lines is required. • Tree #1384 is located within City property. Please coordinate with Parks and Cemetery regarding its removal and compensation. • The proposed ground floor balconies should be a minimum of 11 square meters in size. A City for Everyone Working Together— Growing Thoughtfully— Building Community Page 85 of 232 • Ensure the main entrance is clearly defined and emphasized through architectural elements that are clean, recognizable, and appropriately scaled and detailed to suit the building mass. • Any proposed vegetation and trees on Victoria Street should be shade tolerant. • The Urban Design Brief refers to play area, please clearly identify the proposed and provide conceptual details. • Urban Design Brief should provide conceptual details for roof top amenity area and patio area including precedent images to guide detailed site design through the site plan application. A City for Everyone Working Together— Growing Thoughtfully— Building Community Page 86 of 232 City of Kitchener Heritage — OPA/ZBA Comment Form Project Address: 169-183 Victoria St S and 59 Park St File Number: ZBA24/021 /V/AP Comments Of: Heritage Planning Commenter's Name: Jessica Vieira Email: jessica.vieira@kitchener.ca Phone: 519-741-2200 ext. 7291 Date of Comments: August 27, 2024 Heritage Planning staff has reviewed the following material for the proposed development on the lands municipally addressed as 169-183 Victoria Street South and 59 Park Street to provide the comments outlined below: • Draft Heritage Impact Assessment (HIA) prepared by McCallum Sather and dated June 2024. • Architectural Drawings prepared by aba Architects Inc. and dated June 6, 2024. • Cover Letter signed by Kristen Barisdale c/o GSP Group and dated June 14, 2024. • Arborist Report and Vegetation Management Plan prepared by GSP and dated March 28, 2024. 1. Site Specific Comments: The subject property municipally addressed as 59 Park Street is designated under Part V of the Ontario Heritage Act, and is located within the Victoria Park Area Heritage Conservation District. The subject properties municipally addressed as 169 — 183 Victoria Street South do not have any heritage status, being neither listed as a non -designated property of cultural heritage value or interest on the Municipal Heritage Register, designated under the Ontario Heritage Act, or identified on the Kitchener Inventory for Historic Buildings. However, the subject lands are located adjacent to heritage resources, including: • Properties within the Victoria Park Area Heritage Conservation District (VPAHCD) and designated under Part V of the Ontario Heritage Act. • 163-165 Victoria Street South, listed as a non -designated property of cultural heritage value or interest on the Municipal Heritage Register A City for Everyone Working Together— Growing Thoughtfully— Building Community Page 87 of 232 • 55-57 Henry Street / 189-193 Victoria Street South, listed as a non -designated property of cultural heritage value or interest on the Municipal Heritage Register The subject lands are also in proximity to other properties within the VPAHCD. Furthermore, the subject lands are also located adjacent to the Victoria Park Area Cultural Heritage Landscape and the Warehouse District Cultural Heritage Landscape, as defined in the Kitchener Cultural Heritage Landscape Study approved by Council in 2015. This Zoning By-law Amendment is proposing to change the zoning under By-law 85-1 from MU -1 to MU - 2 and add a site specific provision to regulate certain setbacks, allow an increased building height of 28.8 metres, allow a floor space ratio of 4.2, allow for a reduced parking ratio, and allow residential units on the ground floor. The intent of this ZBA is to facilitate the development of an 8 -storey multiple dwelling consisting of 120 dwelling units, including 24 affordable units. The heritage resource on 59 Park Street is proposed to be retained in situ, with a garage addition demolished and transformer block established in the rear yard. 2. Heritage Planning Comments • A draft HIA has been submitted to the City in support of this application. The draft HIA concludes that there are minimal negative impacts anticipated to heritage resources and recommends a series of mitigation measures, including the development of a Conservation / Protection Plan. o The draft HIA has not yet been approved by the Director of Planning. The draft HIA is scheduled to go to the Heritage Kitchener Committee at its October 1, 2024 meeting. Comments received from that meeting will be provided under separate document, along with Heritage Staff comments. • Per the draft HIA, the proposed development is intended to provide a transition from the high- rises across Victoria Street South to the low-rise single -detached buildings within the Victoria Park Area Heritage Conservation District. Heritage Staff recommended that the "podium" and stepback at the rear begin at the third floor rather than the fourth, as it is on the front of the building. o In Heritage Staffs opinion, this creates a more sympathetic design to the adjacent heritage resources and a better transition in heights. The 45 -degree angular plane would be more closely met. • Heritage Staff would also recommend having a clearly visible mortar line in form liner of the pre- cast proposed for the "podium" cladding, a this creates a better illusion of brick (eg. pre -cast on 100 Victoria Street South) and helps aid in integrating the proposed development into the surrounding heritage neighborhood. A City for Everyone Working Together— Growing Thoughtfully— Building Community Page 88 of 232 o Addition of elements such as concrete header and sill on windows would also help contribute to the appearance of masonry and is reflective of the elements which help characterize the Victoria Park Area Heritage Conservation District (again, similar to what was done on 100 Victoria Street South development) • Question: Is there intention to consolidate with 59 Park Street? o Heritage Staff would recommend that the properties on Victoria Street be kept separate from the property on Park and an easement be proposed for the transformer in the rear of 59 Park Street instead. In this way Heritage Permits would not be required for the construction of the new building itself as the subject properties on Victoria Street are not designated under the Ontario Heritage Act. A Heritage Permit would still be required for the demolition of the garage addition. • Question: Is it anticipated that 59 Park Street will continue to be used for residential purposes? A City for Everyone Working Together— Growing Thoughtfully— Building Community Page 89 of 232 Andrew Pinnell From: Elyssa Pompa Sent: Friday, August 30, 2024 3:54 PM To: Andrew Pinnell Cc: Tim Donegani Subject: FW: Circulation for Comment - 169-183 Victoria Street South (ZBA) Attachments: Dept & Agency Circ Letter -169-183 Vic St S.pdf Hi Andrew, Policy's comments for Inclusionary Zoning are below. If you have any questions, please contact myself or Tim. Inclusionary Zoning (IZ) is a land -use planning tool, authorized through the Planning Act, that can be used by municipalities to require affordable housing units in new residential and mixed-use developments located in Protected Major Transit Station Areas (PMTSAs). This tool has been used successfully in a number of jurisdictions to create a modest but meaningful supply of affordable housing. On March 18, 2024, Council passed By-law 2024-068 to amend Zoning By-law 2019-051 and By-law No. 2024-069 to amend Zoning By-law 85-1, and Amendment 48 to the Official Plan (in full force and effect). The amending by-laws require affordable housing units in new developments to be included as part of market housing development within PMTSAs. The subject property is located within the Central Station PMTSA, a Prime Area. Inclusionary Zoning set-aside rates (percentage of gross leasable residential floor area to be provided as affordable units) are determined at the date of building permit issuance for above grade permits issued after January 1, 2025. Additional information is provided in the Inclusionary Zoning Implementation Guideline. The set aside rates and effective date are not up-to-date in the draft guideline, and reference should be made to the amending by-laws. Plans, Studies and Reports to submit as part of a complete Planning Act application: • Inclusionary Zoning Implementation Brief. Please refer to Section 7 of the Inclusionary Zoning Implementation Guideline for additional information. The Inclusionary Zoning Implementation Brief must be submitted as part of a complete Site Plan application. Policies, Standards and Resources: • Official Plan • Zoning By-law • Inclusionary Zoning Implementation Guidelines — Please contact Elyssa Pompa, Planner (Policy) at elyssa.pompa@kitchener.ca for the most up-to-date version of the Inclusionary Zoning Implementation Guidelines document. Elyssa Pompa (she/her), MES PI., RPP, MCIP Planner (Policy) I Planning and Housing Policy Division I City of Kitchener 519-741-2200 x 7327 1 TTY 1-866-969-9994 1 elyssa.pompa(cDkitchener.ca Page 90 of 232 City of Kitchener - Comment Form Project Address: 169-183 Victoria St South Application Type: Comments of: Environmental Planning (Sustainability) — City of Kitchener Commenter's name: Mike Balch Email: Mike.Balch@kitchener.ca Phone: 519-741-2200 x 7110 Written Comments Due: August 30, 2024 Date of comments: August 29, 2024 1. Plans, Studies and/or Reports submitted and reviewed as part of a complete application: • Sustainability Statement for 169-183 Victoria St South, as prepared by Kristen Barisdale of GSP Group. 2. Comments & Issues: I have reviewed the supporting documentation (as listed above) to support a site plan application proposing an 8 -storey multiple dwelling, regarding sustainability and energy conservation, and provide the following comments: - Although the Ontario Building Code (OBC) is progressive, going forward all developments will need to include energy conservation measures that go beyond the OBC as the City (and Region of Waterloo) strive to achieve our greenhouse gas reduction target. - A Sustainability Statement (as per the City's Terms of Reference) will be required as part of a complete Site Plan Application which can further explore and/or confirm additional sustainability measures that are best suited to the development as the design evolves. - Upon review of the supporting documentation, the Zoning Bylaw Amendment can be supported as several sustainable measures have been proposed or are being considered for the development. However, further clarification is needed as the development progresses through the building design/Site Plan process and more details become available, particularly clarifying the following: o Why the use of alternative water supply and demand management systems such as rainwater harvesting and grey water reuse, or readiness of the development to incorporate such systems in the future, will not be considered o Consideration of alternative or renewable energy systems to meet new energy demand created by the development (i.e. ground source or air source heat pumps, roof -top solar photovoltaic panels, solar thermal hot water system, capture of waste heat from industrial processes to use for thermal energy needs, etc), or design of the site and building for "readiness" to add these systems in the future. - The development proposes several sustainable measures including: 1IPage Page 91 of 232 o The compact and efficient design of an underutilized lands o The utilization of existing servicing o The consideration to encourage greater public transit use o Pedestrian supportive design o On-site secure bike parking promoting active transportation o Proposed low -flush toilets and low -flow shower heads o Cool/light coloured roofing material o On-site garbage, recycling, and compost Potential items for consideration are: o If the units will be separately metered to allow for more efficient management of energy use on a tenant -by -tenant basis o Using low or no VOC paints and finishes to minimize air pollutants in interior materials o Building orientation for southern exposure reducing heating requirements 3. Conditions of Site Plan Approval: • To submit a revised Sustainability Statement to the satisfaction of the City's Director of Planning. Further, the approved sustainability measures recommended in the Sustainability Statement will be implemented in the landscape, stormwater management, and building design, to the satisfaction of the City's Manager of Development Review. 4. Policies, Standards and Resources: • Kitchener Official Plan Policy 7.C.4.5. The City will encourage and support, where feasible and appropriate, alternative energy systems, renewable energy systems and district energy in accordance with Section 7.C.6 to accommodate current and projected needs of energy consumption. • Kitchener Official Plan Policy 7.C.6.4. In areas of new development, the City will encourage orientation of streets and/or lot design/building design with optimum southerly exposures. Such orientation will optimize opportunities for active or passive solar space heating and water heating. • Kitchener Official Plan Policy 7.C.6.8. Development applications will be required to demonstrate, to the satisfaction of the City, energy is being conserved or low energy generated. • Kitchener Official Plan Policy 7.C.6.27. The City will encourage developments to incorporate the necessary infrastructure for district energy in the detailed engineering designs where the potential for implementing district energy exists. 5. Advice: ➢ As part of the Kitchener Great Places Award program every several years there is a Sustainable Development category. Also, there are community-based programs to help with and celebrate and recognize businesses and sustainable development stewards (Regional Sustainability Initiative - http://www.sustainablewaterlooregion.ca/our-programs/regional-sustainability- initiative and TravelWise - http://www.sustainablewaterlooregion.ca/our-programs/travelwise). ➢ The 'Sustainability Statement Terms of Reference' can be found on the City's website under 'Planning Resources' at ... https://www.kitchener.ca/SustainabilitVStatement 21 Page Page 92 of 232 City of Kitchener ZBA comments Application type: Zoning By-law Amendment Application ZBA24/021/V/AP Project address: 169-183 Victoria Street South Comments of: Transportation Services Commenter's name: Dave Seller Email: dave.seller@kitchener.ca Phone: 519-783-8152 Date of comments: August 26, 2024 Comments due: August 30, 2024 Preamble As part of a complete Zoning By-law amendment application a Transportation Impact Study (TIS) and Parking Study was submitted (June 2024) by Paradigm Transportation Solutions Limited in support of this ZBA application. Transportation Services reviewed the TIS and Parking Study offer the following comments. Development proposal The applicant is proposing to redevelopment the property with an 8 -storey residential building consisting of 120 dwelling units, with approximately 24 dwelling units proposed as affordable housing. The development is estimated to generate 33 AM and 39 PM peak hour vehicle trips. The site will be serviced by one full moves access along Park Street and one access along Henry Street. A total of 53 parking spaces are being proposed to have access to/from the underground parking garage at Park Street, while Henry Street will provide access only for loading and garbage pick-up. Intersection analysis 2023 Existing Traffic Conditions The two intersections noted below were reviewed and both intersections are operating within acceptable levels of service except for the following traffic movements at Victoria Street South and Park Street. It should be noted that Henry Street functions as one-way eastbound, where vehicles travel from Victoria Street South towards Park Street. Study intersections • Victoria Street South (Regional Road 55) at Park Street - signalized • Victoria Street South (Regional Road 55) at Henry Street — unsignalized Park Streets eastbound left turn movement is operating with the 95th percentile queues exceeding the available storage length in the AM and PM peak hours. Park Streets westbound left turn movement is operating with the 95Th percentile queues exceeding the available storage length in the AM and PM peak hours. During the PM peak hour, the left turn lane operates with a LOS E and vehicle delays of 60 seconds. Victoria Street Souths southbound left turn movement is operating with a 95" percentile queues exceeding the available storage length in the PM peak hour. A City for Everyone Working Together— Growing Thoughtfully— Building Community Page 93 of 232 2029 Background Traffic Volumes The same two intersections were reviewed as noted above for this horizon year and both intersections are forecasted to operate within acceptable levels of service except for the following traffic movements at Victoria Street South and Park Street. Park Streets eastbound left turn movement is forecasted to operate with the 95th percentile queues exceeding the available storage length in the AM and PM peak hours. Park Streets westbound left turn movement is forecasted to operate with the 95th percentile queues exceeding the available storage length in the AM and PM peak hours. During the PM peak hour, the left turn lane operates with a LOS E and vehicle delays of 67 seconds. Park Streets westbound through movement is forecasted to operate a LOS E and vehicle delays of 56 seconds in the AM peak hour. Victoria Street South southbound left turn movement is forecasted to operate with the 95" percentile queues exceeding the available storage length in the AM and PM peak hours. It should be noted that the 2029 background traffic calculations included other developments in the area, specifically: • 130-142 Victoria Street South o Estimated 75 AM and 98 PM peak hour trips 0 249 residential units 0 574 mZ ground floor commercial space o 576 mZ office space • 200 Victoria Street South o Estimated 106 AM and 126 PM peak hour trips 0 436 residential units 0 703 mZ ground floor commercial space • Victoria Street at Park Street (northwest corner) o Estimated 294 AM and 387 PM peak hour trips o Up to 1200 residential units 0 1750 mZ ground floor commercial space 2029 Total Traffic Volumes The three intersections below were reviewed and are forecasted to operate with acceptable levels of service during the AM and PM peak hours except for the following traffic movements at Victoria Street South and Park Street. The new access at Henry Street was not reviewed as its only function is for loading and garbage pick-up, which has nominal traffic. Total traffic includes forecasted background traffic plus site development traffic. Study intersections • Victoria Street South (Regional Road 55) at Park Street - signalized • Victoria Street South (Regional Road 55) at Henry Street - unsignalized • Park Street at (NEW) site access - unsignalized A City for Everyone Working Together— Growing Thoughtfully— Building Community Page 94 of 232 Park Streets eastbound left turn movement is forecasted to operate with the 95" percentile queues exceeding the available storage length in the AM and PM peak hours. Park Streets westbound left turn movement is forecasted to operate with the 95th percentile queues exceeding the available storage length in the AM and PM peak hours. During the PM peak hour, the left turn lane operates with a LOS E and vehicle delays of 68 seconds. Park Streets westbound through movement is forecasted to operate a LOS E and vehicle delays of 56 seconds in the AM peak hour. Victoria Street Souths southbound left turn movement is forecasted to operate with the 95th percentile queues exceeding the available storage length in the AM and PM peak hours. The new site access to Park Street is forecasted to operate with a LOS C or better and v/c ratios of 0.06 or lower in the AM and PM peak hours. It should be noted that Park Streets westbound queues are forecasted to extend past the new site access in the AM and PM peak hours. This is to occur with or without this site being developed. Transportation Demand Management (TDM) analysis This development is well situated to take advantage of the existing typical and higher -order transit services which support residents to choose non -auto travel more frequently. There are Grand River Transit (GRT) routes and ION light rail that are within 750m of this development. They include the following routes: 20 and 301 ION Central Station. These routes offer connectivity to a broader transit network throughout the Region of Waterloo and within Kitchener itself. The walkability for pedestrians accessing the site and surrounding area can easily be accommodated as sidewalks are provided on both sides of roadways in the surrounding area which provide connections to entertainment, employment and commercial uses. Travel by bicycle to/from this development is not restricted by any access -controlled roadways. Cyclists have access to the Iron Horse Trail which provide connections to Waterloo and through Kitchener and access to the Kitchener downtown cycling network. Left turn lane analysis A left turn lane analysis was completed along Park Street at the new site access utilizing the Ministry of Transportation Design Supplement for the TAC Geometric Design Guide for Canadian Roads and it was determined that a left turn lane along Park Street is not warranted under the 2029 Total Traffic scenario. Transportation Services supports Paradigms conclusion. Queueing analysis — Park Street westbound traffic A queueing analysis was completed for 2029 Total Traffic westbound volumes along Park Street utilizing SimTraffic Simulations. SimTraffic measures the full impact of queuing and blocking. The analysis consisted of five iterations of 60 -minute simulations during the AM and PM peak hours. The analysis indicated that queue lengths of 28 and 27 metres can be expected for westbound traffic along Park Street in the AM and PM peak hours, respectively. There is approximately 20 metres of queue storage available on Park Street from the proposed parking garage access to the stop bar at Victoria Street A City for Everyone Working Together— Growing Thoughtfully— Building Community Page 95 of 232 South. There is a potential for westbound traffic to queue past the site access along Park Steet in limited circumstances. Transportation Services supports Paradigms analysis and conclusions. The site access at Park Street is forecasted to operate with 95'" percentile internal site queue lengths of 33 and 30 metres during the AM and PM peak hours, respectively. This results in approximately a 5 - vehicle queue. Transportation Services supports Paradigms analysis and conclusions. Parking demand analysis Paradigms analysis includes a review of City of Kitchener's Growing Together strategy, ITE Parking Demand, Transportation Tomorrow Survey (2016) - Area Specific Auto Ownership and parking demand data in similar developments. The analysis indicated a forecasted parking demand ratio of 0 to 0.91 space per unit (0 to 110 spaces). The applicant is proposing 53 parking spaces. It should be noted that this development is located within a Strategic Growth Area (SGA) that has been approved by City of Kitchener council. This SGA zone was part of the Growing Together zoning strategy and SGA zones are not subject to minimum parking requirements. Conclusions Any of the vehicle turning movements specifically noted above for existing, background or total traffic would occur with or without this development. Transportation Services are of the opinion that this development will not negatively impact the surrounding road network. Based on the parking demand analysis, the proposed parking supply of 53 spaces is adequate for this development. Of the 53 spaces being provided, 6 spaces must be allocated for visitor parking. Transportation Services recommends that the vehicle parking be unbundled and offered at a separate cost to leasing or owning a unit. This approach is more equitable and effective as tenants are not forced to pay for parking that they do not need. A City for Everyone Working Together— Growing Thoughtfully— Building Community Page 96 of 232 Andrew Pinnell From: Christine Goulet Sent: Wednesday, August 28, 2024 9:22 AM To: Andrew Pinnell Subject: RE: Circulation for Comment - 169-183 Victoria Street South (ZBA) Attachments: Fire Flow Requirements CN-253.pdf Hi Andrew, I've reviewed their functional servicing report and am in support of the zone change with a sanitary peak flow of 3.14L/s (an increase of 2.88L/s). I noted during the pre -submission that the Region preferred the water be serviced off of Park or Henry, and they are currently showing it off of Victoria, so this may need to change. I circulated the water distribution to Kitchener Utilities and they have noted that there should be a valve at the main and the property line for the new service. They have provided the fire flow requirements to be given to the developer. (attached) Thanks, Christine Goulet, C.E.T. Project Manager I Development Engineering 519-741-2200 Ext. 7820 Page 97 of 232 City of Kitchener Zoning By-law Amendment Comment Form Address: 169-183 Victoria Street South Owner: 1000002286 ONTARIO LTD., LEGION HEIGHTS VICTORIA INC. & 2306975 Ontario Inc. Application: Zoning By-law Amendment #ZBA24/021/V/AP Comments Of: Park Planning Commenter's Name: Lenore Ross Email: Lenore. ross@kitchener.ca Phone: 519-741-2200 ext 7427 Date of Comments: Aug 19 2024 Documents Reviewed: I have reviewed the documentation noted below submitted in support of a ZBA to facilitate the redevelopment of the lands with an 8 -storey multiple dwelling consisting of 120 dwelling units. Approximately 24 dwelling units are proposed to be provided as affordable housing. Access to two underground parking levels is proposed off Park Street and the principal pedestrian entrance would be located on Victoria Street. Interior and exterior (rooftop and at -grade) amenity spaces would be provided. A total of 120 enclosed, secured bicycle parking stalls would be provided. • Cover Letter • Planning Justification Report • Urban Design Brief • Architectural drawings • Arborist Report • Vegetation Management Plan • Functional Grading Plan and Functional Servicing Plan Site Specific Comments & Issues: There are minor updates required to the documentation noted below to address Park Planning's concerns with the proposed ZBA application. Park Planning can provide conditional support to the application subject to receiving satisfactory updates to the documentation noted. Comments on Submitted Documents Parkland Dedication • The site is within the Victoria Park Planning Community and immediately adjacent to the Cherry Hill Planning Community. Through Places and Spaces —An Open Space Strategy for Kitchener, the Victoria Park Planning Community has been identified as critically underserved with active neighbourhood park space as Victoria Park is considered as a legacy park and not included in the assessment of active neighbourhood park space. Cherry Hill Planning Community has been identified as well served with active neighbourhood park space. Given the location of the site on the border of A City for Everyone Working Together— Growing Thoughtfully— Building Community P`6A of 232 City of Kitchener Zoning By-law Amendment Comment Form two Planning Communities and the proximity of both active neighbourhood parks space and park facilities available at Victoria Park, Parkland Dedication as cash in lieu of land is recommended. • In accordance with the Planning Act, City of Kitchener Bylaw 2022-101 and the Park Dedication Policy MUN-PLA-1074, Parkland Dedication will be required for the site plan application taken as a cash -in -lieu of land. • Parkland dedication requirements will be deferred at the Zoning By-law Amendment application and assessed at a future Site Plan Application. Parkland dedication will be assessed based on the land use class and density approved through the ZBA and required as a condition of final Site Plan Approval. Parkland dedication will be taken as cash -in -lieu of land according to the Planning Act, Parkland Dedication Bylaw and Parkland Dedication Policy in effect. • An estimate is provided for the proposed development using the approved land valuation of $3,830,000/ha and a dedication rate of 1ha/1000 units; a maximum dedication of either land or CIL of 10% and a capped rate of $11,862/unit. The estimated cash -in -lieu park dedication for the proposed 0.17835 ha site with 120 proposed units (credit for demolition of 5 units) and an FSR of 4.2 is $68,308. Calculation: 115 units /1000 units x $3,830,000/ha = $440,450 (alternate rate Bylaw 2022-101) 0.17835 ha x 0.05 x $3,830,000/ha = $625,578 (5% rate Bylaw 2022-101) 0.17835 ha x $3,830,000/ha x 0.1= $68,308 (More Homes Built Faster Act 10% cap) The following comments should be addressed at this time. GSP Group — Arborist Report dated March 28 2024 and Vegetation Management Plan L0.0 dated March 282024 The is an existing City owned street tree located in the boulevard/front lawn of 59 Park St. This tree should be shown on the Vegetation Management Plan and included in the Arborist' Report. This tree should be protected in place to City standards throughout all construction. A valuation of existing City owned trees should be included in the Arborist Report —this should be provided for tree #1384 and for the tree located at 59 Park St. Approval for removal and any required compensation will be required. A revised Arborist Report and Vegetation Management Plan is required. A City for Everyone Working Together— Growing Thoughtfully— Building Community Pe`6§ of 232 City of Kitchener Zoning By-law Amendment Comment Form GSP Group and ABA Architects - Urban Design Brief dated June 2024 As noted in Parks Presubmission comments for the development proposal, the Urban Design Brief "should include seating and play equipment for residents of all ages and abilities. The UDB should provide conceptual details for on-site amenity spaces including commentary and precedent images to guide detailed site design through the site plan application." A revised Urban Design Brief is required. Policies, Standards and Resources: • Kitchener Official Plan • City of Kitchener Park Dedication Bylaw 2022-101 and Park Dedication Policy MUN-PLA-1074 • City of Kitchener Development Manual • Cycling and Trails Master Plan (2020) • Chapter 690 of the current Property Maintenance By-law • Places & Spaces: An Open Space Strategy for Kitchener • Multi -Use Pathways & Trails Masterplan • Urban Design Manual Anticipated Fees: Parkland Dedication The parkland dedication requirement for this submission is deferred and will be assessed at a future Site Plan Application. Parkland dedication will be assessed based on the land use class(es) and density approved through the ZBA and required as cash in lieu of land a condition of Site Plan Approval. Dedication requirements are subject to the Planning Act, Parkland Dedication Bylaw, Park Dedication Policy and rates in effect. Fees or securities related to new Street Trees may be required as a condition of the Site Plan application A City for Everyone Working Together— Growing Thoughtfully— Building Community P TO66 0f 232 N* Region of Waterloo Andrew Pinnell Senior Planner City of Kitchener 200 King Street West, 6t" Floor P.O. Box 1118, Kitchener, ON N2G 4G7 Dear Mr. Pinnell, PLANNING, DEVELOPMENT AND LEGISLATIVE SERVICES Community Planning 150 Frederick Street 8th Floor Kitchener Ontario N2G 4A Canada Telephone: 519-575-4400 TTY: 519-575-4608 Fax: 519-575-4466 www.regionofwaterloo.ca Will Towns 1-519-616-1868 File: C14/2/24021 September 25, 2024 Re: Zoning By-law Amendment ZBA24/021 169-183 Victoria Street South GSP Group Inc. (c/o Kristen Barisdale) on behalf of Victoria Heights Inc. City of Kitchener On behalf of the property owners, GSP Group has submitted a zoning by-law amendment (ZBA) application for a development proposal at 169-183 Victoria Street South in the City of Kitchener. The applicant is proposing to demolish five existing residential dwellings on the individual parcels and redevelop the consolidated site with an eight -storey multi - residential building. 120 rental dwelling units and 53 parking spaces are proposed, including two levels of below -grade parking. 24 of the dwelling units (30 percent) are planned to be operated as affordable units (rents below 30 percent of the median total income of families in the Region). The subject lands are located in the Urban Area, Delineated Built Up Area, and Central Station Major Transit Station Area (MTSA) in the Regional Official Plan (ROP). The site is designated Strategic Growth Area A in the City's Official Plan, and currently zoned Low Intensity Mixed Use Corridor (MU -1). Once the ongoing appeal to the City's Growing Together ZBA is concluded, the site will be zoned Strategic Growth Area Two: Mid Rise Growth Zone (SGA -2). The ZBA is required to permit increased building height and increased floor space ratios, and seek site-specific relief from setback and parking requirements. The Region has had the opportunity to review the proposal and offers the following: Document Number: 4770325 Version: 1 Pagel of 11 Page 101 of 232 Community Planning Provincial Policy Statement 2020 The PPS encourages the development of livable communities. It also provides a framework for planning authorities to ensure the wise use of resources while protecting Ontario's long-term prosperity and environmental and social well-being. It directs growth to built-up areas and promotes a mix of land uses that efficiently use resources, minimize negative environmental impacts, and support active transportation and transit use. It also requires land use planning authorities to be mindful of compatibility of sensitive uses in evaluating development proposals. A review of applicable PPS policies and land use compatibility more broadly has been undertaken in Section 4.3 of the Planning Justification Report (PJR) provided by GSP Group as part of the application. The development proposes an intensified use of serviced, underutilized land in an MTSA — the area is well -served by transit and active transportation options, both now and in the future. It also seeks to expand the range of housing options in the neighbourhood through the proposed types (both one- and two- bedroom units are proposed) and affordability of units proposed. Therefore, Regional staff are satisfied that the proposal is consistent with the PPS. Additional technical comments related to noise and compatibility are provided in a subsequent section. Growth Plan for the Greater Golden Horseshoe The Growth Plan recognizes the Greater Golden Horseshoe (GGH) as a fast-growing and dynamic region. It directs development in a way that supports economic prosperity, the environment, and quality of life — specifically emphasizing intensification, compact built form, and housing choice in built-up areas, and supporting higher densities in MTSAs. The PJR provides an analysis of applicable Growth Plan policies, including comments on the proposed development's ability to achieve a diverse mix of units types and appeal to a range of household income levels. The proposal's emphasis on intensification and proximity to a range of transportation options are highlighted in Section 4.4 of the PJR in relation to Growth Plan requirements. A density of 212 people per hectare is proposed in the preliminary design of the site, contributing to the Growth Plan's minimum of 160 for this MTSA. Regional staff are satisfied that the application is consistent with the Growth Plan. Regional Official Plan Section 1.6 of the ROP establishes the Regional Planning Framework and Section 2.13.1 and 2.0 establish policies for the Urban System. Section 2.F establishes policies and intensification targets within the Delineated Built -Up Area, which is set at 60% annually for the City of Kitchener. Development in the Built Up Area is intended to provide gentle density and other missing middle housing options that are designed in a manner that supports the achievement of 15 -minute neighbourhoods. The proposed density will contribute to the achievement of Kitchener's intensification target for the Delineated Built Up Area. The proposed built form (8 -storey apartment building) provides a mix of unit types and is appropriately located along a corridor in which Document Number: 4770325 Version: 1 Page 2 of 11 Page 102 of 232 growth can be located close to transit and active transportation services and infrastructure. Section 2.D.2 of ROPA 6 establishes policies for development within MTSAs. This section supports the provision of increased mixed-use densities that are transit supportive. The minimum density target established for the Central Station MTSA is 160 people and jobs/hectare, a target to which this development contributes. In addition, Chapter 3 of ROPA 6 establishes policies for housing in the Region — the provision of 30 percent of affordable housing in the development meets the policy intent of 3.A.2. Overall, Regional staff are satisfied that the proposal conforms to the ROP. Corridor Planning Approval of the Environmental and Stationary Noise Study will be required prior to final approval of the ZBA application. Environmental Noise Study (Transportation and Stationary Sources) Staff note that a noise study entitled 169-183 Victoria Street South Kitchener, Ontario Noise and Vibration Impact Study dated April 5, 2024, and a memo entitled Noise and Vibration Review — Revised Drawings 169-183 Victoria Street South, Kitchener, ON dated May 9, 2024, both prepared by RWDI were submitted in support of this application. Comments in relation to both the transportation and stationary components of the study and associated recommendations are provided below. Transportation Sources: Impacts of Transportation Sources on the Development Regional staff have reviewed the report and memo in relation to transportation noise. The report indicates that the dominant source of noise affecting the site is Regional Road #55 (Victoria Street South). Additional noise sources were identified from Park Street, and CN/Metrolinx rail traffic. The report indicates that the acoustical impacts are above acceptable levels and mitigation, including warning clauses and air conditioning, are required to ensure indoor noise levels do not exceed acceptable levels noted in NPC -300 and NPC -216. Communication with the applicant confirmed that all units will be supplied with central air conditioning. The location, installation, and sound ratings of the air conditioning devices should comply with NPC -300. The report indicates that for all units, the requirements of the Ontario Building Code (OBC) will provide adequate sound insulation. Since the noise source, Victoria Street South, is a roadway under the Region's jurisdiction, a registered agreement to implement the recommendations of the noise study will be required. Transportation Noise Recommendations The report recommends the following noise warning clauses be registered on title for all dwelling units. The Region agrees with this recommendation and will require that the Document Number: 4770325 Version: 1 Page 3 of 11 Page 103 of 232 owner enter into a registered agreement with the Region to ensure that the following clause(s) are included in all future agreements of Offers of Purchase and Sale, lease/rental agreements and condominium declarations as part of a future condominium or consent application (if applicable). Type A: Purchasers/tenants are advised that sound levels due to increasing road traffic may on occasionally interfere with some activities of the dwelling occupants as the sound levels exceed the sound level limits of the Municipality and the Ministry of the Environment, Conservation and Parks. Type D.- This :This dwelling unit has been supplied with a central air conditioning system which will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Municipality and the Ministry of the Environment, Conservation and Parks. Proximity to Railway: Warning: Canadian National Railway Company or its assigns or successors in interest has or have a right-of-way within 300 metres from the land the subject hereof. There may be alterations to or expansions of the rail facilities on such right-of-way in the future including the possibility that the railway or its assigns or successors as aforesaid may expand its operations, which expansion may affect the living environment of the residents in the vicinity, notwithstanding the inclusion of any noise and vibration attenuating measures in the design of the development and individual dwelling(s). CNR will not be responsible for any complaints or claims arising from use of such facilities and/or operations on, over or under the aforesaid right-of-way. Prior to the issuance of any building permits, a Professional Engineer will certify that the noise attenuation measures, including central air conditioning, are incorporated in the building plans. Upon completion of construction, the Professional Engineer will certify that dwelling units have been constructed accordingly. Stationary Sources: Impact of Off-site Noise Sources on the Development Stationary noise sources assessed include the GO Transit Park Street layover site, and surrounding commercial buildings. No significant industrial facilities were identified with the potential to impact the development. Commercial establishments with noise sources assessed have been included in Table 5 (Commercial Facilities Included in the Stationary Source Noise Modelling, p. 5). The assessment included continuous stationary noise sources only; no impulsive sources were identified. According to the revised drawings (RWDI, May 9, 2024) a rooftop outdoor amenity area has been included in the assessment (mechanical penthouse level), although staff note that the memo report identifies the amenity area as being on Document Number: 4770325 Version: 1 Page 4 of 11 Page 104 of 232 the 8t" floor. These assumptions are acceptable. The modelling assumptions identified in Table 6 (Stationary Source Sound Power Level Assumptions, p. 6) are also acceptable. The predicted continuous stationary sound levels at worst-case points of reception have been included in Table 7 (Predicted Sound Levels at Worst-case Receptor Locations, Continuous Stationary Sources, p. 6). As shown, the predicted daytime/evening and nighttime sound levels are below the plane of window and outdoor living area sound level limits for a Class 1 urban acoustical area. For the plane of window, predicted levels are 46 dBA and 43 dBA for daytime/evening and nighttime periods respectively. The sound level limits for these time periods are 50 dBA and 45 dBA respectively, and therefore these results are acceptable. The predicted GO Transit layover sound levels at worst-case points of reception have been included in Table 8 (Predicted Sound Levels at Worst-case Receptors — Layover site, p. 7). As shown, the predicted daytime/evening and nighttime sound levels are below the plane of window and outdoor living area sound level limits for the NPC -300 guideline limit for a Layover site. For the north building fagade, the predicated sound level is 49 dBA for daytime/evening and nighttime periods (55 dBA being the sound level limit during all periods of the day). For the outdoor amenity area predicted is 48 dBA during daytime/evening periods, which is below the sound level limit of 55 dBA. These results are acceptable. The RWDI letter report (May 9, 2024) provides an update to the assessment due to a reduction from a previous 10 -storey design to the current 8 -storey building proposal. RWDI indicates the predicted noise levels are expected to increase by less than 0.5 dBA as a result of the change; this is considered minor from a noise perspective. The results, conclusions and recommendations have not changed as a result. Notwithstanding compliance with sound level limits, the Report recommends the use of a warning clause to advise future residents (owners/tenants) of existing and future adjacent commercial/industrial uses and the GO layover noise sources that will potentially be audible at times. Impact of On-site Noise Sources on the Development The Report also acknowledges on-site noise sources being HVAC -related equipment in the rooftop mechanical penthouse and various exhaust fans, and that with acoustical design best practices, predicted sound level limits for both on-site and off-site sensitive receptors can be met. The Report recommends a professional engineer qualified in acoustics review final building design to ensure on-site noise sources comply with NPC - 300 sound level limits at all on/off-site points of reception. This requirement (detailed noise study) should be secured through a holding provision, to be completed prior to site plan approval. Staff notes the first paragraph on p. 9 of the report mentions potential noise sources associated with any on-site commercial uses. Staff notes the latest drawings do not show commercial uses. Document Number: 4770325 Version: 1 Page 5 of 11 Page 105 of 232 Stationary Noise Recommendations Stationary noise recommendations include: 1) A holding provision be used to secure completion of a detailed noise study prior to site plan approval, and 2) The following noise warning clause be included in all offers of purchase and sale, and/or rental agreements, and any future condominium declaration through a future condominium or consent application (as applicable): Purchasers/tenants are advised that due to the proximity of the adjacent industrial/commercial land -uses, and GO Transit layover site, noise from the industrial/commercial land -uses may at times be audible. Overall, both transportation and stationary noise components of the Final Report and Letter Report are acceptable. In addition to the warning clauses described above, the Region will require a Holding Provision until a detailed noise study addressing final design of the site and its impact on surrounding sensitive land uses and itself is prepared and accepted by the Region. The required wording for the holding provision is: That a holding provision shall apply to the entirety of the subject lands until a satisfactory detailed transportation (road) and stationary noise study has been completed and implementation measures addressed to the satisfaction of the Regional Municipality of Waterloo. The detailed stationary noise study shall review the potential impacts of noise (e.g. HVAC systems) on the sensitive points of reception and the impacts of the development on adjacent noise sensitive uses. Transportation Impact Study Region staff have reviewed the Transportation Impact Study (TIS) entitled 169-183 Victoria Street South Kitchener, ON Transportation Impact Study and Parking Study dated June 12, 2024 and prepared by Paradigm Transportation Solutions Ltd. While this TIS was not a Regional requirement of approval for this application, Corridor Planning is satisfied with the submission and deems this matter concluded. While the TIS demonstrates feasibility on Regional roads, the following comments are provided on an advisory basis for consideration by the City and applicant: • The TIS has accounted appropriately other nearby developments. Regional staff are satisfied that the TIS reflects current inputs from nearby existing and proposed developments, and that the Synchro results are free of errors. • Should the Region, with the City's support, consider widening Victoria Street South (Park Street to Lawrence Avenue) to introduce transit -only lanes as identified in the 2018 Transportation Master Plan, traffic demand at the intersection of Victoria and Park may be reduced. • The City could also consider widening Park Street and Jubilee Drive, as the most significant queuing identified is on City streets. Document Number: 4770325 Version: 1 Page 6 of 11 Page 106 of 232 • The Region will continue to monitor traffic operations at the intersection going forward. A potential mitigation measure may be to restrict peak hour or all -day left turns from Park Street and Jubilee Drive, but this requires additional consideration and is not currently warranted. TDM Measures (Advisory) The TIS, submitted in support to this application, included the following TDM recommendations: • Provision of an additional 45 bicycle parking spaces beyond the required amount • Carshare • Subsidized Transit Passes for two years • Unbundling parking costs Regional staff are supportive of unbundling parking costs and note that additional bike parking would also be supported so long as it does not result in the majority of bike parking being provided by double -level bike racks. In relation to the Carshare recommendation, the most established car sharing program in Waterloo Region is Communauto. GRT Staff understand that company offers unique programming to "launch" a car share vehicle through a business agreement with the property owner. The applicant should contact Janet MacLeod (imacleod(o)communauto.ca) to learn more about opportunities available locally. The applicant should also confirm with the selected carshare company if their vehicles can be located in a secure underground parking garage, or if the vehicle must be kept in a surface parking space. This may pose a challenge as there is no surface parking shown at this development. Lastly, the applicant should be made aware that providing subsidized transit passes incurs significant financial and administrative costs. This initiative requires a commitment from the owner/applicant to manage, administer, and fund the full cost of monthly transit passes for residents. If this is to be considered by the applicant, further consultation and confirmation of expectations between all three parties (applicant, City, and Region c/o GRT) is required as soon as possible. Conditions of Future Site Plan Application Approval of the Regional Road dedication, access permit, lot grading and servicing plans, stormwater management report, and transit fees would be required prior to final approval of a future Site Plan application. Road Widening At this location, Regional Road #55 (Victoria Street South) has a designated width in the Regional Official Plan (ROP) of 26.213m. An approximate 2- to 3 -metre road widening will be required along the Victoria Street South frontage. An Ontario Land Surveyor (OLS) would have to determine the exact road widenings. Document Number: 4770325 Version: 1 Page 7 of 11 Page 107 of 232 A 7.62m x 7.62m daylight triangle will also be required at the intersection of Victoria Street South and Park Street, and at the intersection of Victoria Street South and Henry Street. The daylight triangle should be measured after the road widening along Victoria Street South. Please note that the daylight triangles are shown incorrectly on the submitted Site Plan. The plan shows a 4.5m x 4.5m daylight triangle on Park Street and a 3m x 3m daylight triangle on Henry Street, where each should be 7.62m x 7.62m. The Owner/Applicant must engage an OLS to prepare a draft reference plan which illustrates the required road allowance widening. Prior to registering the reference plan, the OLS should submit a draft copy of the plan to the Transportation Planner for review. An electronic copy of the registered plan is to be emailed to the Transportation Planner. Further instructions will come from the Region' s Legal Assistant with regard to document preparation and registration. It is recommended that the OLS contact Region staff to discuss the road widening prior to preparing the Reference Plan. The land must be dedicated to the Region of Waterloo for road allowance purposes and must be dedicated without cost and free of encumbrance. All land dedications should be identified on the Site Plan. Stormwater Manaaement & Site Gradina and Servici Regional staff have received and reviewed the report entitled Functional Servicing and Stormwater Management Report 1000002286 Ontario Ltd. and Legion Heights Victoria Inc. dated April 30, 2024, and the drawings entitled Functional Servicing Plan and Functional Grading Plan both dated April 30, 2024 and prepared by WalterFedy. The Region finds the plans and report satisfactory. For the purposes of the planning approvals associated with this development application, the Region deems this matter concluded. The following comments must be addressed prior to future Site Plan approval, but are not a requirement of this ZBA application: Show full excavation areas required for unused service removals and full depth repaving for the entire area from edge of pavement to edge of nearest travel lane. Show 1.0m step joints as a hatched area around limits of saw cut (to edge of travel lane or Centre line of road) and add note to drawing for areas impacted that says "1.0m wide step joint as per RMOW Dwg. 207. Minimum 2.Om wide asphalt overlay longitudinal transition to be installed as per RMW Dwg 208 until full depth asphalt is restored." Show this on both existing and proposed condition drawings. These drawings can be found at the following link: https://www. regionofwaterloo.ca/en/doing-business/resources/Documents/2023- Unit-Price-Contract-Supplemental-General-Conditions-and-Standard- Specifications. PDF 2. Show existing sanitary and water service connections to 169, 173, 177, 179, and 183 as being fully removed from the Right -of -Way. Document Number: 4770325 Version: 1 Page 8 of 11 Page 108 of 232 3. Add street labels for Henry Street, Victoria Street South (RR55), and Park Street. Make sure to put (RR55) in label. 4. Confirm that the City of Kitchener has reviewed and approved the 200mmx300mm watermain connection. 5. Existing 1 00m Kitchener Utilities Gas Main is in this vicinity along Victoria Street South (RR55). Confirm and add to drawing. Note that existing gas services need to be fully removed from the ROW and shown on the drawing. The site must be graded in accordance with the approved plan and the Regional road allowance must be restored to the satisfaction of the Regional Municipality of Waterloo. Please be advised that any works occurring in the Regional ROW would require Regional approval through a separate process of Municipal Consent and a Work Permit. Transit Planning (GRT) The subject property is well serviced by transit with GRT Route 20 running in both directions along Victoria Street South and an existing GRT Stop #3224 located adjacent to the property at the intersection of Park Street and Victoria. As a result of the planned increase in density from the proposed development, stop #3224 will require upgrades that will be the financial responsibility of the applicant. Specifically, this stop will require a 11 m x boulevard depth (approximately 1.2m) concrete landing pad at the curb. The front of the landing pad (north end) will be located no closer than 6m from the Victoria Street South crosswalk at Park Street, or approximately 2m south of the existing hydro pole/light pole that the existing transit stop sign is affixed to, clear of the storm water catch basins. A 6m (length) x 2.3m (depth) concrete shelter pad will also be required, as well as a 5' x 16' glass transit shelter. The shelter pad will be located on the property side of the municipal sidewalk, just south of the proposed exit walkway at the norther end of the building. It is anticipated that the shelter pad will be located entirely within the Victoria Street South right-of-way and therefore will not require an easement. The current cost of the landing pad and shelter pad is $5,130, and the current cost of the glass 5' x 16' shelter is $17,000. These prices are subject to increase in the future, and will be made a condition of the future Site Plan application. Please include the location and dimensions of this infrastructure on future Site Plan submissions. Other A Site Plan pre -consultation fee of $300 and a Site Plan review fee of $805 will be required for the review and approval of a future Site Plan application. Hydrogeology and Water Programs/Source Water Protection The property is located within the Wellhead Protection Area (WHPA) D-2 and Chloride Issue Contributing Area (ICA) of the Greenbrook wellfield. The proponent should be advised that the Region does not support the infiltration of salty runoff from paved surfaces at this location; however, the infiltration of clean roof runoff may be accepted. Document Number: 4770325 Version: 1 Page 9 of 11 Page 109 of 232 In addition, the Region does not support permanent active or passive dewatering controls for below -grade infrastructure, including foundations, slabs, parking garages, footings, piles, elevator shafts, etc. therefore, waterproof seals should be used in lieu of permanent dewatering infrastructure. In accordance with Regional Council's endorsed position on geothermal energy, vertical closed-loop geothermal is prohibited at this location. Vertical open -loop geothermal energy may be considered subject to the submission of a Hydrogeology Study. However, given that a Hydrogeology Study has not be submitted with the application, a prohibition on geothermal energy shall be required in the amending zoning by-law for the site. The required wording for the prohibition is: Geothermal Wells are prohibited on site. A geothermal well is defined as a vertical well, borehole or pipe installation used for geothermal systems, ground -source heat pump systems, geo-exchange systems or earth energy systems for heating or cooling, including open -loop and closed-loop vertical borehole systems. A geothermal well does not include a horizontal system where construction or excavation occurs to depths less than five meters unless the protective geologic layers overlaying a vulnerable aquifer have been removed through construction or excavation. Housing Services The following Regional policies and initiatives support the development and maintenance of affordable housing: • Regional Strategic Plan o Objective 4.2 requires the Region to make affordable housing more available to individuals and families. • 10 -Year Housing and Homelessness Plan o contains an affordable housing target which is that 30% of all new residential development between 2019 and 2041 in Waterloo Region is to be affordable to low and moderate income households. • Building Better Futures Framework o shows how the Region plans to create 2,500 units of housing affordable to people with low to moderate incomes by 2025. • Region of Waterloo Official Plan o Section 3.A (range and mix of Housing) contains land use policies that ensure the provision of a full and diverse range and mix of permanent housing that is safe, affordable, of adequate size, and meets the accessibility requirements of all residents. The Region supports the provision of a full range of housing options, including affordable housing as proposed in this application. Should this ZBA be approved, the development will contribute to the stock of housing affordable to a variety of income Document Number: 4770325 Version: 1 Page 10 of 11 Page 110 of 232 levels in Waterloo Region. Support for housing objectives in ROP Chapter 3.A has been provided in the PJR (described above) and Regional staff have no concerns. Fees Please be advised that the Region is in receipt of the ZBA review fee of $3,000 (deposited July 31, 2024). In addition, the review fee for the environmental noise study ($1,000) was received on September 17, 2024. Conclusions & Next Steps Regional staff have no objection to approval of the proposed ZBA application, provided the following are addressed: The applicant enters into a registered agreement with the Region of Waterloo to implement the recommendations of the noise study (warning clauses and air conditioning provision) as part of a future plan of condominium or consent application, if applicable. A holding provision is applied requiring the completion of a detailed noise study prior to site plan approval. A site-specific prohibition on geothermal energy is written into the amending zoning by-law for the subject lands. Please be advised that any future development on the lands subject to the above -noted application will be subject to the provisions of Regional Development Charge By-law 19- 037 or any successor thereof. Further, please accept this letter as our request for a copy of the decision pertaining to this application. Should you have any questions, please do not hesitate to contact the undersigned. Yours truly, Will Towns, RPP Senior Planner C. GSP Group c/o Kristen Barisdale (Applicant) Victoria Heights Inc. c/o Nasir Saleem (Owner) Document Number: 4770325 Version: 1 Page 11 of 11 Page 111 of 232 Andrew Pinnell From: Planning <planning@wcdsb.ca> Sent: Monday, September 2, 2024 3:05 PM To: Andrew Pinnell Cc: Eric Schneider Subject: Re: Circulation for Comment - 169-183 Victoria Street South (ZBA) apologies, previous response was misdirected Jennifer Passy, BES, MCIP, RPP (she/her) Manager of Planning Waterloo Catholic District School Board Phone: 519-578-3677, ext. 2253 Cell: 519-501-5285 Please note: The offices of the WCDSB are closed on Fridays throughout the summer, and the Planning Department will be shut down from Friday, July 26th to Monday, August 5th (inclusive). All email received during this time will be reviewed and processed as soon as possible upon staff's return. From: Planning <planning@wcdsb.ca> Sent: September 2, 2024 1:25 PM To: eric.schneider@kitchener.ca <eric.schneider@kitchener.ca> Subject: Re: Circulation for Comment - 169-183 Victoria Street South (ZBA) Eric, the board's comments with regard to the applicability of EDCs remain the only comment on this application. We note that the applicant is proposing the demolition of 5 homes, which may be subject to a credit applied to the future development in accordance with the board's by-law. Jennifer Jennifer Passy, BES, MCIP, RPP (she/her) Manager of Planning Waterloo Catholic District School Board Phone: 519-578-3677, ext. 2253 Cell: 519-501-5285 Please note: The offices of the WCDSB are closed on Fridays throughout the summer, and the Planning Department will be shut down from Friday, July 26th to Monday, August 5th (inclusive). All email received during this time will be reviewed and processed as soon as possible upon staff's return. From: Planning Sent: April 3, 2023 10:37 AM To: eric.schneider@kitchener.ca <eric.schneider@kitchener.ca> Subject: RE: Notice of Pre -submission Consultation - 169-183 Victoria Street South (ZBA) Page 112 of 232 Good Morning Eric, The Waterloo Catholic District School Board has reviewed the subject application and based on our development circulation criteria have the following comment(s)/condition(s): A) That any Education Development Charges shall be collected prior to the issuance of a building permit(s). If you require any further information, please contact me by e-mail at Jordan. Neale@wcdsb.ca. Thank you, Jordan Neale Planning Technician, WCDSB 480 Dutton Dr, Waterloo, ON N2L 4C6 519-578-3660 ext. 2355 Page 113 of 232 Andrew Pinnell From: Alex Sproll Sent: Monday, August 26, 2024 4:56 PM To: Andrew Pinnell Cc: Subject: 169-183 Victoria St S [Some people who received this message don't often get email from Learn why this is important at https://aka.ms/LearnAboutSenderidentification ] Hi, I'm writing to email regarding the development proposal at 169-183 Victoria St S. While the general scope of the development is likely appropriate to the site, thee are some aspects which would make this proposal stronger. The architecture is a bit basic but my sense is that the materiality may be better than the renders show? What would make this proposal stronger is: 1. A better ground -floor presence by way of individual townhouse entrances off of Victoria St. — these could potentially be 2 -floor units and more closely align with the scale of housing on park street, providing better street activation. The cadence of white/brown brick seems to allude to this but acts as a facade only. 2. More family units - while the ratio of 2 bedroom units is decent, perhaps some 3 bedroom units could be included? 3. Amenity space. Given the high number of rental replacements/affordable units (great!), some communal space is required here - meeting room, library/playroom, kitchen, co -working space, patio? Perhaps extra space on ground floor or in mech penthouse? the one room and external patio only do not seem sufficient/flexible enough. Thanks for your time! Alex Sproll Page 114 of 232 Andrew Pinnell From: Sent: To: Cc: Subject: You don't often get email from Hi, Chris Colliver Monday, September 23, 2024 4:29 PM Andrew Pinnell 169 to 183 Victoria Street South - Comments Learn why this is important I understand the need for development in the Waterloo region, and have seen much of it already. This one hits closest to home so far, being 4 properties away on Park St. A decade ago I happened to visit an open house just for fun, and dreamt of one day owning a house along Park St between Victoria and the park. Years later, my young family was thrilled to buy the house next to that one. Our hopes are getting dashed in both initial expectations and current hopes that we purposefully chose a property to be in what feels like a residential area. My main concerns with this development include: -Setting a precedent in encroaching on Victoria Park heritage area. Even though it's not the full property, this is crossing a line for one of Kitchener's most prized neighborhoods -Too tall — I appreciate a "transition" and not dozens of stories, but can't we get 4-6 stories instead of 8? -Traffic during and after construction — in totality in this area, despite each property being redeveloped tending to report that traffic impacts are found to be acceptable, I have a hard time believing that, or have a very different opinion on what is acceptable. I already have trouble getting out of my driveway Thank you, Chris Colliver Page 115 of 232 Andrew Pinnell From: Sent: To: Subject: You don't often get email from 2 Claire D'Alton Friday, September 27, 2024 3:59 PM Andrew Pinnell new build meeting follow-up Park/Henry and Victoria Learn why this is important I hope I'm not too late, The property to be built at the corners of Park/Henry and Victoria St. I've lived on Park Street for almost 25 years now and have watched the changes and increase in traffic. I listen to and watch at the traffic at all hours of the day with impatient and frustrated driver. This an extremely busy street (PARK), there are lots of children, with school bus pickup and drop off. Has the builder consider moving the to the underground parking over to the other side of the building, (Henry) Claire D'Alton Page 116 of 232 Andrew Pinnell From: Devon Beare Sent: Saturday, August 24, 2024 2:01 PM To: Andrew Pinnell Cc: Subject: RE: Proposed Development @ 169-183 Victoria Street South Some people who received this message don't often get email from Learn why this is important Hi Andrew, I received a notice in the mail regarding the proposed development at 169-183 Victoria Street South and wanted to provide some comments / ask some questions. Comments: -1 like the concept drawing of the building. -1 like that the building is only 8 storeys, although I'd be more supportive if the building was capped at 6 storeys. Buildings at or below 6 storeys are favored in many European countries for their human scale and the sense of community. They tend to blend well with residential neighborhoods and can create a more intimate and walkable environment. -1 love that the building will have secure bike stalls, although I feel that only 1 stall per dwelling is too low. Ideally it would be 1 stall per bedroom. -I'd love it if there was commercial space for a coffee shop or small grocery / convenience store. The neighborhood currently lacks these amenities. -Given all the development planned for the area, I want to see dedicated bike lanes installed on Victoria Street (especially between King St and the Iron Horse trail) and more frequent bus service. There is currently only 1 bus (#20) running on Victoria Street and the frequency is only every 30 minutes. Bike lanes and 15 minute or better transit service would encourage people to use active transportation instead of driving. I would also like to see traffic calming on Victoria St as there are way too many cars and large trucks using the predominantly residential street. Questions: -What type of units will be available in the building (e.g. will there be any 3+ bedroom units for families)? -Is this a rental building or a condo? -Will the building have any environmentally friendly features (e.g. electric vehicle and a -bike chargers, net zero, heat pumps, etc.) or certifications (e.g. LEED, Passivehaus)? -How many parking spaces will there be? The flyer states 'Reduced Vehicle Parking' but doesn't give an exact number. Is the number decided by the city of kitchener (e.g. through minimum parking requirements) or is it the developer's decision? -Will there be any requirements for affordable housing? I look forward to attending the zoom meeting in September. Cheers, Devon Beare Page 117 of 232 Andrew Pinnell From: Frank Etherington Sent: Saturday, September 28, 2024 2:43 PM To: Andrew Pinnell Cc: Subject: Victoria St. S. 8 -storey and traffic Andrew: I am responding to Wednesday evening's public/zoom meeting. Because we did not get a notification card about that meeting, please include us (140 Water St. S.) in future information about the 8 -storey development proposed at Park and Victoria streets. My main concern involves past commitments by the city planners and councillors that any future developments will preserve the character of the city's older residential neighbourhoods. This, of course, has been destroyed by the recent approvals of enormous high-rise buildings at Park and Victoria streets overlooking and dwarfing the Victoria Park heritage area and the nearby Cherry Park neighbourhood where most buildings are little more than two-storey homes. I also cannot understand how professional planners and transportation officials can ignore or minimize the increasing traffic issues at and around the Victoria and Park intersection. This 8 -storey building which nibbles away at the heritage area, provides about 50 parking spots for 120 tenants. Even if 100 need vehicles, particularly in winter months, where will they park? On nearby residential streets or in the already over -burdened park? In addition, the developer's representative did not address where delivery vehicles would stop without a lay-by. The only options are Park, Victoria or Henry, all of which will obstruct and disrupt traffic flow. The traffic created by the 8 -storey building will be in addition to the 400-500 vehicles generated daily by the nearby high-rises. Much of that traffic will pour down Park to Jubilee further snarling traffic in Victoria Park. Jubilee is, of course, a busy route for ambulances and other emergency vehicles. Despite these and other concerns, I applaud efforts by developers of the 8 -storey building to provide 24 affordable apartments to help replace the existing residences that will be demolished on Victoria Street. I would also ask how many affordable units will be provided in the neighbouring high-rise buildings at Park and Victoria. Thanks Frank Etherington Page 118 of 232 Andrew Pinnell From: Sent: To: Cc: Subject: You don't often get email from Dear Andrew, Kandace Bogaert Wednesday, September 25, 2024 2:45 PM Andrew Pinnell 169-183 Victoria St. South Comments/Questions Learn why this is important As requested in the mailer sent to us, please find our comments/questions on the proposed development below: Comments re. Proposed Development in Our Neighbourhood - Victoria St. between Park St. and Henry St. 1. Current residents - it is our understanding that each of the proposed lots which are encompassed by the proposed development have current residents living in them, some as renters in the homes, or tenants in the two storey apartment building on the corner of Henry St. - when/where are these residents expected to go? Have they been offered any compensation for losing their homes? Have they been told they will be expected to vacate, and what options for moving back in would they have to the new building etc.? 2. Demolition - as part of the Victoria Park heritage district, the proposed development would be destroying several homes which were built in the early 20th century that were intended to be protected by the creation of the district. How many homes will be demolished? What heritage assessments have been done? How does this fit with the presumption against demolition outlined in the heritage plan for this area? Did the developer consider "moving" the buildings as outlined in the plan? Will the materials be preserved from the demolition to aid in the repair of similar heritage homes as outlined in the district plan? Will the city continue to approve plans for demolishing homes in this heritage district? Our worry is that this sets a precedent for the future of our neighbourhood - owners who do not live in the neighbourhood, and rent out their properties, who are concerned primarily for profit will continue with a lack of maintenance with the understanding that they can sell their property to a developer who will demolish for maximum profit, which will eventually erode the heritage nature of the district. 3. Density - also part of the Victoria Park heritage district plan, there is a requirement to "blend" the density of developments so that it is not a stark contrast to the low rise neighbouring buildings. How has this been proposed to be addressed? The nearest residential apartments and homes are two stories - the proposed development is eight. In the 2021 census, there were approximately 84 residents, in 38 dwellings on this city block. The proposed building would increase the number of dwellings more than fourfold as well. A two or even four storey building would seem to "blend" much more appropriately. 4. Parking & Safety - With heavy traffic and no parking on Victoria St. or Park St., and a one way St. with very limited parking on Henry St, and with restricted parking allotments in the proposed development plan, how is this density to be appropriately and safely accommodated? Where will the Page 119 of 232 entrances and exits for the development be? What about resident and visitor safety trying to find parking - how many pedestrians have been struck by cars crossing Victoria St. already this year? How will the city prevent the residents of Henry St.'s driveways being blocked with an increased need for street parking nearby? Similarly, the bike lane on Victoria St. ends at the railroad tracks (after West St.), and does not continue in front of this proposed development. Will the city be expanding the bike lane on Victoria St. so residents have access to safe means of transport with the proposed limited car parking? 4. Design - how are the units set to be laid out? Are they designed for actual families to live in, or to maximize developer profit? Are there sufficient units allotted as affordable housing, with 2 and 3 bedroom options for families? 5. How long will the proposed development take? Is there any risk of the development not being completed on time? Henry St. is a one way street - if access is blocked by construction, how will residents access their properties? 6. What about the requirements for green space - what are the plans for this? Looking forward to the discussion this evening and thank you in advance. Thanks, Kandace & Robert (cc'd) Page 120 of 232 Andrew Pinnell From: Lianne Overholt -Stevens Sent: Wednesday, August 28, 2024 11:10 AM To: Subject: The proposed development at169-183 Victoria St.S Some people who received this message don't often get email from Learn why this is important I am completely against this development at 169-183 Victoria St S. It is too close to the park and the Heritage homes that surround it. I live at and there are century old trees on Henry St that are vital to a healthy neighborhood. They would be removed to create this development. The traffic at is very busy and it's difficult to get onto Victoria St S. By adding another building where 5 apartment buildings(3 new ones on Garment and Victoria St.S and 205,215 Victoria St S)already exist will cause more congestion. Victoria Park depends on its surroundings for its animals and trees to survive. The more congestion and pollution from cars and people living near it, the harder it is for the animals and trees to survive. I vehemently am against another building near It should be built near Victoria St and Weber St Also I am against this building at 169-183 Victoria St S as the noise and destruction would affect this beautiful area. Possibly the drilling to create the building could affect the land our building is on and make it unsettled. And in turn my home. Signed Lianne Overholt Stevens Page 121 of 232 Andrew Pinnell From: Mary Peplow Sent: Wednesday, September 25, 2024 8:58 PM To: Andrew Pinnell Cc: Subject: Zoom Neighborhood Meeting Victoria- Henry Street - Park Street - 169 Victoria. HI Andrew, I was on the call tonight for the above development. I must say we were very disappointed that we had received no information on this development at all. It was a neighbor of mine that forwarded the info from the postcard he received. I spoke with other people on Park Street and they told me the same thing. My home is at 55 Park Street and in the 9 years I have lived here I have invested over $175,000 into renovations and landscape/gardens. 50 Park Street had always been a beautiful home with award winner organic gardens and beautiful landscape. Since the investors took over they have rented out the houses by the rooms and have done nothing to maintain them. 50 Park street has had rooms divided by dry wall to accommodate as many people as possible. I have been told 8 unrelated people in a one bathroom home. We have had many complaints with them on the upkeep and lawn cutting. I have met with Saadi several times to complain and finally the city took action and had the lawn cut. I just spoke with him a few weeks ago on doing a fence between us so I don't have to see the overgrown mess and the backyard. A good neighbor fence where we split the cost. He said he was coming into town but has never shown to discuss. My concern is how do we know this rental will be well cared for, their properties ARE NOT. With rentals there are fewer rules/regulations than there are with condos. Balconies in rentals often can be more of a dumping ground or storage space and that is something we would have to look at from our backyards. I really don't want to look into balconies with summer/winter tires, bikes, laundry racks etc. The sun will definitely be affected in my yard. That is where my afternoon sun is until sundown. That will be totally blocked. I am also concerned with 50 Park as I have been told that garage is being torn down and there will be some sort of electrical unit there. That is also where the underground entrance to parking is. Traffic going onto Victoria may not be too bad but traffic turning onto Park will only further congest what we go through each day on this street. Since there is so little frontage it appears the building will be to the far back of the property line — literally putting that building in my back yard. And how will service trucks, moving trucks etc ever be able to access the narrow space? Why weren't Juliette balconies suggested for the back portion of the building since it is such a tight space- or Juliette balconies on the whole building. With limited frontage it would also be a better aesthetic. Page 122 of 232 I have been told that the value of my property will decrease significantly due to the loss of privacy. Not something I wanted to hear. 8 stories is just too high for an area that generally has been approved for 4 story. I moved into the Historic/Heritage area because I wanted to be part of that culture and the park. I didn't think my yard would now contain a high rise. Very disappointed to say the least. Mary Peplow Page 123 of 232 Andrew Pinnell From: Peggy Nickels Sent: Thursday, September 26, 2024 1:59 PM To: Andrew Pinnell Cc: Subject: 169-183 Victoria Street South - Comments Attachments: 240925 Letter to Developer & City re 169-183 Victoria Street South - Draft.docx Hi Andrew, Thanks again for meeting with me online to anser my questions this week. Please find attached my comments on the 169-183 Victoria Street South development. If I'd had more time, I would have liked to send it in the name of the Victoria Park Neighbourhood Association Development Committee, but the timeline was too short to get VPNA Board approval, which our committee needs for any publice statements. Several of our Development Committee members had input. I hope we can continue to be engaged in consultations and would appreciate receiving the site plan approval, when that is complete. Peggy Page 124 of 232 September 25, 2024 Andrew Pinnell Senior Planner City of Kitchener PO Box 1118 Kitchener, ON N2G 4G7 Dear Mr. Pinnell, I am writing on behalf of the Victoria Park Neighbourhood Association (VPNA) Development Committee in response to the proposed development at 169-183 Victoria Street South. This development is directly adjacent to the Victoria Park Heritage Neighbourhood and so is of great interest to our VPNA Development Committee. Our Development Committee's purpose is to advocate for sustainable and livable development in and around Victoria Park. Our four priorities for development, are to: • Provide a supply of affordable homes; • Balance green spaces with development; • Develop with climate change in mind; • Include the community as an integral part of the development process. We have reviewed the supporting documents related to the developer's application and would like to share the following comments and recommendations related to our priorities. Affordability — we are pleased to see that this development will ensure that 20% of the 120 units will be affordable based on the CMHC's definition. Our concern is that the plan includes only 1- and 2 -bedroom units which will not increase affordability for families needing three-bedroom units. Recommendations: • that 5% of units be 3 bedrooms to provide affordable options for families. Green Spaces —The City's Spaces Report released in June 2022 shows 6 of 9 downtown neighbourhoods in need of park space. Given the recent high rate of population increase, the need to create increase green space makes it imperative that developers contribute to livability. We are happy to see that the developer is planning two amenity spaces for residents: one on the ground floor with some green space included, and a second on the penthouse level. There are no details regarding green space in the penthouse amenity space. Further, we are encouraged to see attention to pedestrian -friendly space surrounding three sides of the building, with attention to trees, shrubs, and gardens, which also help to cool and clean the air, provide shade for walkers and habitat for birds and pollinators, and absorb rainwater. Our concern is that road - Page 125 of 232 widening will eliminate the space needed for these key elements that are essential for walkability and climate mitigation. Recommendations: • that the developer ensure the rooftop amenity space includes plants, trees, shrubs, and possibly a rooftop garden; • that a green roof be considered for the rest of the roof; • that an additional setback of 2 meters be considered for the Victoria Street South side of the building to ensure adequate space for trees after road widening; • that trees and plants be selected according to their ability to withstand and mitigate the effects of climate change, and that a maximum number of trees be planted to at least replace the ones being removed. Building for Climate Change — In 2019, the City of Kitchener joined all other Region of Waterloo municipalities in declaring a climate emergency. It is incumbent on all new developments to maximize ways of protecting the environment and minimize their green house gas emissions and environmental impacts. We are encouraged to see that attention to sustainability is mentioned in several areas of this developer's application. These areas include drought -tolerant, salt tolerant, and native vegetation, locally sources materials, use of light-coloured hardscape surfaces to reduce heat island impacts, high performance energy-efficient building components, larger -canopy trees for shading, low -consumption plumbing systems, and EnergyStar appliances. Our concern is that, in many areas, they qualify their statements by prefacing them with "where possible". This implies they are not committed to ensuring this level of sustainability. Addressing climate change requires more than good intentions; it demands commitment. The developer also notes in the Sustainability Statement that solar panels and enhanced water conservations systems such as grey water and rainwater harvesting are not being considered at this time. The developer notes that there will be 53 parking spaces for cars but doesn't mention any plans for EV charging. There will be 120 bicycle parking spaces, one for each dwelling. Recommendations: • that additional commitments be made to construct all aspects of the building with climate change in mind, including: energy sources, choices, and conservation; water conservation; rainwater run-off and heat mitigation; and choice of building materials; • that solar panels and enhanced water conservations systems be considered and committed to, if feasible; • that all car parking be equipped with EV charging stations; Page 126 of 232 • that secure visitor bicycle parking be provided. Community Engagement — During the pre -application stage, there is a great deal of discussion that takes place between developers and planners, prior to any consultation with citizens. Both developers and planners are understandably committed to a design that is already far advanced before citizens have a say. It is our belief that it would be helpful to all — developers, planners, and citizens — if the community were engaged earlier in the process. Recommendation: • that both planners and developers engage citizens earlier in the development process, and invite engagement to ensure ongoing consultation and communication throughout the development process. We are committed to a positive and collaborative approach to development in our neighbourhood. We want to work with developers, city staff, and other neighbourhoods to continue to make our City a healthy, vibrant, and inclusive place to live. We encourage you to keep us informed of all opportunities to contribute to this development process. Thank you for your consideration of our comments and recommendations; we look forward to connecting with you in the future. Sincerely yours, Peggy Nickels Peggy Nickels, Chair CC Councillor Debbie Chapman, City of Kitchener, Debbie.chapman@kitchener.ca Kristen Barisdale, GPS Group, kbarisdale@gspgroup.ca Members of the Victoria Park Neighbourhood Association Development Committee Page 127 of 232 Andrew Pinnell From: Sent: To: Subject: You don't often get email from Hello Andrew, Rachel Yavnai Wednesday, September 4, 2024 1:54 PM Andrew Pinnell Re: 169-183 Victoria St S Proposal Development Learn why this is important I am a neighbour to the proposed development to be located at 169-183 Victoria St South. I am emailing to share my comments in advance of the neighbourhood meeting on September 25 2024. I live in a rental unit which is one of two adjacent residential properties that will be most directly affected by the construction of this development. I greatly appreciate that this development proposal is not 40+ stories tall, as was decided for the development across the street at 97 Park. Mid -rise development is a must to keep up with our city's need for housing in a sustainable and intentional way! However, in reference to the City of Kitchener's Strategic Plan 2023-2026, 1 do not feel that the proposal aligns in all the ways that it has potential to. 120 total units, with 92 being 1 -bedroom or studio units. If the intent is to densify, this is not the way to do it. I encourage further consideration into the types of dwellings we want to create to achieve our city's Housing for All plan, since we have seen plenty of small -sized, urban developments in recent years around Kitchener that don't accurately reflect the needs of families in our community. Further, I am concerned for the current residents of 169-183 Victoria St S. Will our displaced neighbours receive adequate support to find alternative housing? In reference to the Housing for All plan: "We're exploring ways to support tenants in Kitchener who rent their homes. One of the tools available to cities is a rental replacement bylaw, which would apply when six or more rental units are demolished. We're conducting a financial analysis on this tool and what it might mean for current renters and developers. Staff plan to bring a report that covers the full range of tools available in Kitchener to support renters to city council in late 2023." Will the tools above be provided to our neighbours? Given the substantial rent increases in the past few years, I am worried that some of the long-term residents will find this transition difficult. Can they receive priority to rent a unit in this new building at a reduced rate? Lastly, the Arborist Report provided recommendations to remove 4 of the 6 trees directly in our backyard (trees #A, B, C, G). I would like to voice my concern about this, and compel the developer's to consider a plan to save these trees. Based on the proposal, the side of the backyard will then look upon the rear of the building right next to the move -in and waste entrances where 3 of the 4 trees currently provide coverage. If this is not possible, I would urge there to be a plan to replace this vital tree coverage. Thanks for your time. Rachel Yavnai Neighbour, Henry St. Page 128 of 232 Andrew Pinnell From: Sara Okuka Sent: Wednesday, August 21, 2024 9:02 PM To: Andrew Pinnell Subject: Re: 169-183 Victoria street South You don't often get email from Learn why this is important Apologies, I meant Joseph St. is the one way. Not Michael St. Sara Okuka On Wed, Aug 21, 2024, 5:41 p.m. Sara Okuka wrote: Hi I wanted to voice my concern regarding the building proposed. I am for development and for more housing, however making Michael St a one way has made Victoria St a nightmare. Look up the accidemt report on Victoria St & Michael. Every week there is an accident, even pedestrians hit. Making it so all the new condos exit onto Victoria is so dangerous and Victoria is already a main roadway for the city. I wish the city would plan this better. I live on Michael and when we want to go to somewhere, we would turn right on Victoria and right on Joseph st. Now that Joseph is a one way we all have to go left on Victoria towards Park St. I hope there's a plan for all this traffic that it's piling up from all the condos. So many one ways now in Kitchener and you can't even then left on many streets due to the ION. Sara Okuka Page 129 of 232 Andrew Pinnell From: Sent: Wednesday, September 25, 2024 8:31 PM To: Andrew Pinnell Subject: 169 Victoria St. S. Andrew, I will begin by asking a 'loaded' question - do city staff do a review of all documents in the Supporting Documents folder? The reason I ask is this: Within the Cultural Heritage Impact Assessment document prepared by mcCallumSather, there are some (to me) serious errors and inaccuracies. For instance, on Page 2 of the report, under Location of the Property, the Municipal Address is incomplete and the Location and Boundaries description is wrong. Further, pages 13 and 32 have not transferred properly and are an incomprehensible jumble of letters. The text for figure 39 (on page 50) makes no sense at all and on page 67 there is a reference to 8 Henry Street, which does not exist. These errors and inaccuracies allow me to question the veracity of the entire report. This is not the first time I have detected significant anomalies in Supporting Documents. I must ask again - does anyone in your department actually review these documents prior to release? I also have some concerns with the real accessibility of the service entrance from Henry St. On the site plan drawing, the depiction of a garbage truck driving nose first into the service driveway is completely spurious. Given the placement of the waste room in the proposal and the narrowness of the service roadway, the only way a packer truck will be able to usefully access the waste room is to back in. I have measured Henry St. The roadway (curb to curb) is barely 20 feet. The turning radius of a typical packer truck is 30 - 40 feet. I can't imagine a garbage truck backing into the service driveway to load garbage without using the sidewalk and probably the lawn of the property opposite. I invite your comments. Sincerely, Sheldon Atos Page 130 of 232 Andrew Pinnell From: Tim Willcox Sent: Wednesday, September 25, 2024 11:05 PM To: Cc: Subject: Re: Zoom Neighborhood Meeting Victoria- Henry Street - Park Street - 169 Victoria. Mary Unfortunately I was unable to be on this online session, and I completely side with you. To be blunt, this whole proposal is complete bullshit, and should have been immediately rejected upon receipt by city staff. The Victoria Park heritage district and the built environment that surrounds it, should be "hands off'. I believe it was 2 years ago, that city staff held a public information session at the Victoria Park pavilion, that invited input from local residents, to comment on numerous long term planning proposals for the Victoria Street South corridor. I have never seen the results of the input, we submitted. To promote intensive residential and commercial development along this corridor, is understandable, but an 8 story apartment building, on the perimeter of our heritage neighborhood, does not fit in, with the current landscape. I remember in grade 8, we had an urban design project in Environmental Studies, that taught basic neighborhood planning concepts, and adding the massing of an 8 story apartment building, next to a century old heritage district, would probably have received a failing grade. It's that simple. I am too tired right now to even get into the nonsense that comes out of 200 King West, across all levels, but someone has to put their foot down before proposals such as this, get green lighted and approved, and set a precedent for future development, that will only detract from what we have worked so hard to preserve, on a heritage district level. Hopefully on the evening of October 26, 2026, 1 will be the next Ward 9 councillor, and the preservation of our built heritage will be priority number one. Tim Willcox Prince of Park Street Page 131 of 232 Page 132 of 232 Page 133 of 232