Loading...
HomeMy WebLinkAboutFCS Agenda - 2025-11-24 - Capital & Operating Budget Financial Services Department www.kitchener.ca REPORT TO: Finance and Corporate Services Committee DATE OF MEETING: November 24, 2025 SUBMITTED BY: Ryan Hagey, Director of Financial Planning & Asset Management, 519-741-2200 ext. 7353 PREPARED BY: Ryan Hagey, Director of Financial Planning & Asset Management, 519-741-2200 ext. 7353 WARD(S) INVOLVED: All DATE OF REPORT: November 10, 2025 REPORT NO.: FIN-2025-468 SUBJECT: 2026 Operating and Capital Budgets RECOMMENDATION: For discussion. REPORT HIGHLIGHTS: The purpose of this report is to introduce the 2026 operating budget and capital budgets for Council discussion. This report supports the delivery of core services. BACKGROUND: The 2026 budget process includes a series of meetings to discuss and potentially make amendments to the budget. Council has approved a schedule that includes meetings on the following dates: November 24 Operating Budget and Capital Budget presentations by staff, Public Input Night with delegations from the public December 1 Mayor proposes the budget December 11 Council votes on budget amendments/Mayor decides on amendment via veto REPORT: day-to-day costs of providing the valued public programs and services citizens use every day. Examples include recreational programming at and maintaining roads in a condition they are safe to drive on all seasons of the year. infrastructure (assets) that offer a long-term benefit to the community. Examples include parks, roads, and sanitary sewers. The projects included in the Capital Budget often take a number of years to complete, either creating new assets or renewing existing assets. The term of the budget is 10 years, which helps establish capital priorities for both the near future and the medium-term. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. t website (kitchener.ca/budget). STRATEGIC PLAN ALIGNMENT: This report supports the delivery of core services. FINANCIAL IMPLICATIONS: Financial impacts of the 2026 budget are outlined in the detailed budget information. COMMUNITY ENGAGEMENT: INFORM the council / committee meeting. PREVIOUS REPORTS/AUTHORITIES: FIN-2025-408 2026 Budget Process and Timelines APPROVED BY: Jonathan Lautenbach, Chief Financial Officer, Financial Services 2026 BUDGET SUMMARY Ubcmf!pg!Dpoufout Budget at a Glance ...........................................................3 Budget Highlights ............................................................5 About Kitchener .............................................................7 City Governance .............................................................9 General Overview ..........................................................10 Economic Considerations ..................................................19 The Budget Process ........................................................20 Services Overview .........................................................23 Tax Supported Operating Budget ..........................................25 Affordable City Services ..............................................26 Smart Investments in Infrastructure ..................................28 Focusing on the Future ................................................29 Revenues ..............................................................31 Enterprise Budget Overview ...............................................34 CITY OF KITCHENER Utilities Overview ..........................................................41 Capital Budget Overview ..................................................53 2026 BUDGET SUMMARY Debt ...................................................................59 Reserve and Reserve Funds ...........................................60 KITCHENER.CA/BUDGET Appendices .................................................................62 2026 CITY OF KITCHENER 4 Cvehfu!bu!b!Hmbodf Sbuf!Jodsfbtft!boe!Jnqbdu!po!Ipnfpxofs; The rate increases included in the budget and the estimated impact on the average homeowner are shown in the table below. Please note that there may be some differences in calculations due to rounding. Lfz!Cvehfu!Ijhimjhiut RATE ANNUAL IMPACT BASIS FOR HOW THE IMPACT BUDGET INCREASEON HOMEOWNERIS CALCULATED • Gross operating expenditures (excluding enterprises): $309,890,000 Property Taxes2.20%$29Assessment of $326,000 • Gross operating expenditures (including enterprises): $635,564,000 Water Utility4.90%$24Water Consumption of 170m³ • Net tax levy: $171,432,000 Sanitary Sewer Utility7.00%$45Water Consumption of 170m³ • Assessment growth: 1.7% Residential Single-Detached, Stormwater Utility7.40%$19 Medium • 2026 capital budget: $201,471,000 Total Impact$117 • 2026-2035 10-Year capital budget and forecast: $1,847,986,000 CITY OF KITCHENERCITY OF KITCHENER || 2026 BUDGET SUMMARY BUDGET SUMMARY 5 KITCHENER.CA/BUDGET 6 Cvehfu!Ijhimjhiut The City of Kitchener’s budget is made up of four components: tax-supported AVERAGE HOUSEHOLD IMPACT: operating, enterprise operating, utilities and capital. The City’s 2026 budget represents a combined annual increase of $117 for the average household, based on the average assessed value of $326,000 and an estimated water consumption of 170m3. The City’s operating budget delivers around 50 services to the community suppression. (2.2% per year)(6.3% per year) CITY OF KITCHENER | 2026 BUDGET SUMMARY The capital budget includes more than 400 projects with a total cost of TAX DOLLARS AT WORK TO IMPROVE OUR CITY: $1.8 billion over 10 years, with $201 million 7 meaningful investments in areas that are important to the citizens of Kitchener, such as: • Additional Fire Truck ($1.5M in 2026) • Full Road Reconstruction Projects ($45.0M in 2026, $597M overall in the capital 2619:1!ln86-611, forecast) major facilitiesof sanitary sewersstreet & park trees • Community Trail Improvements ($1.7M in 2026, $39.9M overall in the capital forecast) • Downtown Arts Facilities (Conrad, Museum SDG Idea Factory) ($5M in 2026) • Gas Pipelines ($10.4M in 2026, $101.5M overall in the the capital forecast) 514975 winter rinks • Tree Planting ($3.3M in 2026, $8.2M overall in the capital forecast) • New Neighbourhood Parks ($1.5M in 2026, $22M overall in the capital forecast) • Trunk Sewer Inspection & Replacement ($6.8M in 2026, $25.6M overall in the capital forecast) 36-9:33-111!ln5-941 ice hours • Manchester Pumping Station Rehabilitation ($1.9M in 2026, $16M overall in the capital forecast) • Middle Strasburg Creek Naturalization ($4.3M in 2026) • Idlewood Greenway Stormwater Enhancements ($5.4M in 2026) 3-911921!ln4-736 of storm sewersparking spaces • Stirling Avenue Watermain Replacement ($2.9M in 2026, $5.4M overall in the capital forecast) KITCHENER.CA/BUDGET A PROGRESSIVE CITY. 8 Bcpvu!Ljudifofs The city of Kitchener is situated on the traditional territory of the Chonnonton, When Kitchener tries something new, the world follows. We’re the anchor of Anishinaabeg and Haudenosaunee Peoples. We recognize our responsibility Canada’s Innovation Corridor, and our startup density is second only to Silicon to serve as stewards for the land and honour the original caretakers who came Valley. We’re the fastest growing startup ecosystem in Canada, creating 30,000 before us. Our community is enriched by the enduring knowledge and deep-tech jobs in the past 20 years. rooted traditions of the diverse First Nations, Metis and Inuit in Kitchener today. With a population of approximately 300,000 people, Kitchener is the urban Kitchener is an innovative, caring and vibrant city. It’s a place for everyone. It’s a centre of the region. We’re connected to the City of Waterloo and part of the place where people come from across Canada and the world to put down roots. Region of Waterloo. The region’s post-secondary school system is the core of our They’re joining vibrant neighbourhood communities and enriching them with tech industry, and with thousands of students in the region there are new ideas new businesses, cultures to celebrate and innovative ideas to share. It’s a place and newer skillsets available every day. This new talent feeds into the world’s where people have a passion for citybuilding – they’re inspired by what Kitchener largest free startup incubator Velocity, located in the Communitech Hub. is becoming and they want to be a part of its vibrant future. By embracing new people and perspectives, Kitchener has always been on the cutting edge. CITY OF KITCHENER | 2026 BUDGET SUMMARY CITY OF KITCHENER WARD MAP: 9 Ljudifofs!jt!b!djuz!xifsf! cfbvujgvm!csjdl!gbdupsjft!ibwf!cffo! b!npefso!mjhiu!sbjm!tztufn/!Ju“t!b! usff.mjofe!ofjhicpvsippet!bt!xfmm! bt!csboe.ofx!ofjhicpvsippet! dsfbujoh!uifjs!pxo!tfotf!pg! dpnnvojuz/! Op!nbuufs!xip!zpv!bsf!ps!xifsf! Ljudifofs/ KITCHENER.CA/BUDGET : Djuz!Hpwfsobodf The City of Kitchener is governed by an elected Mayor and 10 elected City Councillors. Each City Councillor represents one of ten geographic wards. City Council is responsible for the overall governance of the Corporation of the City of Kitchener through approving policies, master plans and strategies. On July 1, 2023 the Ontario government provided strong mayor powers to 26 municipalities, including Kitchener. As part of this legislation, Kitchener’s Mayor is responsible for proposing the municipal budget. At the Mayor’s direction, City staff have prepared a draft budget for consideration by Council which has been informed by Council and community priorities and in The City of Kitchener is structured administratively around (CAO). The departments that deliver City services include: Community Services Department (CSD), Corporate Services Department (COR), Development Services Department (DSD), Financial Services Department (FIN) and Infrastructure Services Department (INS). City Council left to right, front row to back row: Ward 3 Councillor: Jason Deneault, Ward 8 Councillor: Margaret Johnston, Mayor: Barry Vrbanovic, Ward 4 Councillor: Christine Michaud, Ward 6 Councillor: Paul Singh Ward 1 Councillor: Scott Davey, Ward 10 Councillor: Stephanie Stretch, Ward 5 Councillor: Ayo Owodunni, Ward 2 Councillor: Dave Schnider, Ward 7 Councillor: Bil Ioannidis, CITY OF KITCHENER | 2026 BUDGET SUMMARY Ward 9 Councillor: Debbie Chapman 21 Hfofsbm!Pwfswjfx AFFORDABLE TODAY, READY FOR TOMORROW Jouspevdujpo; Each year staff prepare an annual operating budget and 10-year capital forecast for Council’s consideration. The annual budget helps identify the spending plans and priorities for the municipality for the upcoming year and is informed by the City’s strategic plan, various master plans, and feedback from the community. The 2026 budget continues to build on previous years, addressing priorities that are important for the residents of Kitchener. This year’s 2026 Budget – “Affordable Today, Ready for Tomorrow” highlights how Kitchener is moving ahead in a responsible way, with smart investments for both now and for the future, while still prioritizing the need for affordable increases during a time of general economic uncertainty. With a 2026 property tax increase of 2.2%, the City of Kitchener once again demonstrates that “it gets it”, balancing the need to deliver Affordable City Services for residents, while making Smart Investments in Infrastructure, and Focusing on the Future, with spending in key areas that advance the City’s Strategic Plan priorities. A summary of how the City of Kitchener is making progress in all these areas as part of the 2026 Budget is included as follows: KITCHENER.CA/BUDGET Bggpsebcmf!Djuz!Tfswjdft; 22 The 2026 Operating Budget has been prepared using the previous year’s budget as a starting point, with the goal of maintaining the programs and services that Kitchener residents and businesses rely on. These base services, often referred to as core programming and many others. The City follows a robust budget development process which includes setting clear targets for departments to achieve overall budget goals. The 2026 budget prioritized affordability above other factors, so budget instructions to departments new staff positions. This helped ensure the City could deliver an affordable property tax rate increase while managing other growth-related budget pressures. Taking a thoughtful approach to budgeting each year ensures the budget developed by staff for Council consideration includes only what’s viewed as necessary to support the delivery of City services for the upcoming year. Following this approach has resulted in a proposed budget that maintains existing service levels, while at the same time, responds to increased pressures related to providing programs and services for a growing community. has presented its own economic challenges. The decision by the current US administration to levy tariffs on its global partners represents a fundamental shift in policy that has upended the Canadian and US trading relationship. US tariffs have Canadian and local economy. Understanding that affordability is top of mind, the CITY OF KITCHENER | 2026 BUDGET SUMMARY City has taken measures when planning the 2026 Budget to ensure it can continue to deliver valued programs and services for residents while carefully considering the 23 those services. The City of Kitchener has a long history of prioritizing affordable property tax rate as a benchmark to assess whether the proposed property tax increase is reasonable. average (2.2%) for Ontario. This proposed increase not only supports the operating needs for the continued delivery of programs and services, but also addresses operating budget growth-related pressures, including incorporating the full operating costs for the new Cowan Recreation Centre which represented a 0.9% tax related impact on its own. Once completed, the Cowan Recreation Centre will offer a FIFA-sized indoor turf indoor walking track, and spaces for programs, camps, and community gatherings. Designed to meet growing demand for diverse recreation, the facility will attract provincial and national tournaments, boosting the local economy by supporting restaurants, hotels, and retailers, and helping fund future growth. Earlier this year, Council reviewed the operating model for the new facility. Most operating costs will be covered by users, with remaining tax-related impacts offset by anticipated assessment growth. The City’s ability to absorb these costs within a 2.2% property tax increase KITCHENER.CA/BUDGET By taking a responsible approach when preparing the annual operating budget, PROPERTY TAXES PER CAPITA Kitchener has been able to consistently deliver property tax increases below the 24 PROPERTY TAX INCREASE KITCHENER VS ONTARIO CPI The City’s commitment to considering affordability as part of the budget and rate good value for the services the City provides. Kitchener’s track record in delivering low property tax rate increases for residents Tnbsu!Jowftunfout!jo!Jogsbtusvduvsf isn’t something that all municipalities in Ontario have been able to achieve. Kitchener has one of the lowest property tax impacts per capita compared to The City owns and is responsible for maintaining approximately $15B worth of other large municipalities as shown in the following graph. This demonstrates that assets. These include transportation-focused infrastructure such as roads and Kitchener’s focus on affordability isn’t just a fad, but an ongoing commitment to bridges; underground infrastructure related to water, wastewater, and stormwater; and community-based infrastructure such as facilities, parks & open spaces, trails and forestry. CITY OF KITCHENER | 2026 BUDGET SUMMARY across Canada are facing. Most of Kitchener’s infrastructure was built after the 1950s 25 as the City experienced sustained population growth. This growth put more demand on the need for infrastructure and associated City services without the funding tools existing infrastructure. over the next 10 years. Although the City’s planned investment over 10 years is needs. Despite these challenges, the City has been proactive in addressing its infrastructure funding needs, including launching the Water Infrastructure Program (WIP) in 2017 to fund replacement of underground infrastructure (water, sanitary and stormwater). By moving to a more predictable rate model through the WIP program, the City has been able to fund approximately $555M in capital infrastructure replacements since the program was established. The City is currently in the third year of the most recently approved 2024-2027 WIP program, which will continue to see the City make progress in addressing critical core infrastructure needs. In addition to the WIP program, a detailed review of facilities was completed in 2019 that resulted in allocating a greater amount of funding towards facilities. Annual funding for facility infrastructure has been increased by approximately $5M per Capital Budget. In 2026, an additional $3.4M from reserves has been allocated to support facility repairs and rehabilitation. This includes $1M being allocated from the KITCHENER.CA/BUDGET to reduce the City’s overall facility operating costs over time, while also supporting 26 Besides the City’s own efforts and strategies to try and address capital funding needs, staff have also pursued federal and provincial grant opportunities, successfully This includes $49.9 million in funding from the Disaster Mitigation and Adaptation Fund (DMAF), $46.6 million from the Housing Accelerator Fund (HAF), $24 million from the Building Faster Fund (BFF), and $19.4 million from the Investing in Canada Infrastructure Fund (ICIF). The City was recently successful in securing $2.5 million from the Federation of Canadian Municipalities - Growing Canada’s Community Canopies fund, which will support the implementation of City’s Urban Forest Strategy and the planting of over 19,000 trees over the next three years. The City continues to make smart investments, allocating capital dollars responsibly, while leveraging other funding and grant opportunities to move important priorities forward. In addition to the rehabilitation of existing infrastructure, the City also needs to provide new infrastructure to support a growing community. This new infrastructure has traditionally been funded through development charges, maintaining the concept that growth should pay for growth. Changes to the development charge framework over the past several years have put pressure on municipalities to consider the use of other funding sources to help move forward with both housing enabling and housing supportive infrastructure. CITY OF KITCHENER | 2026 BUDGET SUMMARY In June 2025, the City was awarded $10.2 million from the Building Faster Fund indoor cricket practice nets will support training in a growing sport. Integrated with (BFF) for exceeding its housing targets. This was the second year that the City Schlegel Park’s outdoor amenities, the centre will become a premier destination for 27 was awarded BFF funding, and the current allocation will be used to help fund sport and recreation across the region. two development charge eligible projects, Otterbein Sanitary Pumping Station Another exciting project that is underway is the construction of Fire Station 8 along Capacity Upgrades and Doon South Sanitary Pumping Station Forcemain. Both projects will support further growth and housing in Kitchener with an estimated 5,000 new homes being enabled through these projects. Having housing-enabling on the City’s commitment to increasing affordable housing options in Kitchener infrastructure in place is critical to ensure that the City and Province can meet advancing the City’s Housing For All strategy. expected housing targets by 2031, but so is the housing supportive infrastructure Addressing all of the City’s new and existing infrastructure needs is not without its that makes communities a place where people want to live and call home. This type challenges, but Kitchener has always found a way to balance taking care of what of infrastructure includes new parks and playgrounds, trails, recreation facilities, we have, while still moving ahead with exciting infrastructure projects like the libraries, and inclusive spaces where people come together and develop a greater Cowan Recreation Centre, that will not only support residents today but also future sense that Kitchener is where they belong. residents that will call Kitchener home. Recreation Centre, a $174 million facility located at Schlegel Park in the city’s southwest. Fully funded through development charges, the project also received $30 million in grant funding from the Federal and Provincial governments. It’s being delivered using an Integrated Project Delivery (IPD) model - a collaborative approach that brings together designers, builders, and city staff to ensure the facility is completed on time and on budget. Opening in 2026, the Cowan Recreation Centre will be the region’s most accessible building, designed to welcome residents of all abilities. It will also be one of Canada’s most sustainable recreation centres, built to high environmental standards that reduce energy use and support opportunities with 2,100 new swimming lessons, space for 500 additional Kitchener Minor Soccer participants, and over 7,000 hours of bookable court time. Year-round KITCHENER.CA/BUDGET While the Strategic Plan is a compelling vision of a desired outcome, the City’s Gpdvtjoh!po!uif!Gvuvsf annual budget process provides an opportunity to ensure the right resources are 28 The City’s 2023-2026 Strategic Plan looks at what the City can do today to create being provided so the vision of the future doesn’t just stay an idea but becomes a the community we want to have not just today, but decades from now. This reality. forward look included a new 20-year vision for Kitchener: Building a city for The 2026 budget includes $1.7 million for community trails to help build a everyone where, together, we take care of the world around us – and each other. connected city where people can move without the need of a car. It also includes Public engagement for the Strategic Plan included a statistically valid survey and $1.5 million for new neighbourhood parks that will provide much needed green the involvement of a demographically representative resident panel, that helped spaces for the local community today and for years to come. There are investments of $5 million for local arts & culture facilities to help foster a diverse economy that is resilient to a constantly changing trade environment. The budget includes an additional $150,000 in RISE grant funding to provide additional opportunities for racialized communities as the City fosters a caring environment for all its citizens. Finally, the 2026 budget includes $2.6 million to modernize core business and • Building a Connected City Together technology systems that will keep the City agile in keeping up with modern trends like AI and ensure good stewardship of citizen’s tax dollars. • Cultivating a Green City Together In addition to funding already included in the 2026 budget, there is $1 million of one- • Creating an Economically-Thriving City Together time funding available and unallocated in the budget. Council can provide input as • Fostering a Caring City Together part of the budget process and allocate it to strategic priorities they wish to advance in the next year. • Stewarding a Better City Together CITY OF KITCHENER | 2026 BUDGET SUMMARY Jo!Tvnnbsz;!Uif!3137! cvehfu!dpoujovft!uif!mpoh. tuboejoh!usfoe!pg!Ljudifofs! 29 efmjwfsjoh!bggpsebcmf!djuz! tfswjdft!up!jut!sftjefout!boe! cvtjofttft/!!Ju!bmtp!nblft!tnbsu! jowftunfout!jo!jogsbtusvduvsf! uibu!xjmm!sfofx!fyjtujoh!bttfut! bt!xfmm!bt!dsfbuf!ofx!poft/!! Uif!cvehfu!jt!bmtp!gpdvtjoh!po! uif!gvuvsf!cz!gvoejoh!bdujpot! sfmbufe!up!Ljudifofs“t!3134.3137! Tusbufhjd!Qmbo/!!Bmm!pg!uijt!nblft! tvsf!Ljudifofs!jt!Bggpsebcmf! KITCHENER.CA/BUDGET 2: Fdpopnjd!Dpotjefsbujpot The Consumer Price Index (CPI) represents the change in prices experienced by CURRENT ECONOMIC TRENDS: The Bank of Canada cut it’s policy rate to 2.25% at the end of October 2025 and has indicated this is “about the right level” for interest rates. By cutting the DBQJUBM DPTU domestic activity and support growth in a weakening economy. FTDBMBUJPO Fuel costs are down year-over-year by nearly 20 cents as a result of the removal 2/:&3/36&%2/4:0M4/5&%899L of the federal fuel charge (carbon tax) starting April 2025. Average fuel priceAverage home price 2025 Construction costs rose moderately by 3.4% in early 2025 relative to 2024 as the US tariffs have the potential to increase the cost of everyday goods and CITY OF KITCHENER | 2026 BUDGET SUMMARY UNDERSTANDING 31 Uif!Cvehfu!Qspdftt The annual budget advances the City of Kitchener’s values and priorities, which are developed through a long process of listening to the broader community factor to take into account when setting the budget, it is not the only through various public engagement opportunities such as the strategic planning consideration. The City of Kitchener has considered a number of factors, such as: process and through the development of various master plans. • Comparison to other municipalities • Planning team. Budget targets were established using the Council-endorsed • Balance of service levels versus rate increases • Recent operating budget results average, which means that we are gradually accommodating the cost increases The timeline below shows the high level steps involved with creating and BUDGET PROCESS AND TIMELINE: MAR-APRMAY-JUNEJULY-AUGSEPT-OCTNOVEMBERDECEMBER Budget direction Budget direction Budgets prepared Budgets reviewed BudgetsMayor proposes developed by approved by by divisionsby Administrative presented by staff Financial PlanningCorporateReview Committee to Counciladoption Leadership Team(ARC) (CLT) KITCHENER.CA/BUDGET Dpnqbsjtpo!Up!Puifs!Nvojdjqbmjujft;!Jogmbujpobsz!Gbdupst!Vojrvf!up!Nvojdjqbmjujft;! 32 The City of Kitchener has one of the lowest total municipal burdens (taxes + As part of the Long-Term Financial Plan (LTFP), Council endorsed a multi-year water charges + sewer charges) of large cities in Ontario. The graph below shows the most recent results of an analysis conducted annually by BMA Management Consulting Inc. for the average residential property. Kitchener ($5,437) holds the seventh lowest ranking in the province and is well below the average ($6,150). Even comparing locally Kitchener has the lowest overall municipal burden of all increase of 2.2% is fully in line with the two-year average and accommodates the cities in the Region. Again, this points to Kitchener being a comparatively necessary spending on core services, strategic priorities, and growth pressures affordable city in which to live. on City services as the local population continues to increase. TOTAL MUNICIPAL BURDEN:CONSUMER PRICE INDEX INFLATION: CITY OF KITCHENER | 2026 BUDGET SUMMARY Cbmbodf!Pg!Tfswjdf!Mfwfmt!wt!Sbuf!Jodsfbtft;!Sfdfou!Pqfsbujoh!Cvehfu!Sftvmut;! 33 The City of Kitchener has been able to keep annual tax rate increases at or below in prior years. The City compares actuals to budget through variance reporting of services. As citizen expectations continue to increase related to the level of three times per year in June, September, and December. These projections help service that the City provides, it will become more challenging for the City to to form the next year’s budget. continue this trend. Prior to the pandemic, Kitchener had established a strong record of regularly Generational shifts in the community are putting more demands on services. ending the year with a small operating surplus. This indicated the budgets Customer service expectations related to online services are high, but traditional methods of interacting, communicating, and doing business with the City are During the pandemic (2020-2022) when various restrictions were in place, City still expected by many. Ensuring services are accessible for all is an important consideration, and this goal involves additional service delivery costs.an operating surplus and is projecting to end 2025 with a surplus as well. The year-end projections have been included in the Tax Supported Operating Budget The built environment in the City is in a stage of transition, with a greater Details by Division as an appendix. the downtown core. This urbanization is attracting new businesses and residents but also brings with it new demands for services such as cycling infrastructure, community parks, trails and arts and culture amenities. Neighbourhoods are also changing, with a greater demand for closer and connected communities. Citizens are raising the bar in terms of how they would like to see budget dollars spent. KITCHENER.CA/BUDGET CITY VERSUS REGIONAL 34 Tfswjdft!Pwfswjfx In addition to federal and provincial services, Kitchener residents and businesses receive services from two levels of BUDGET BREAKDOWN municipal government: the City of Kitchener and the Region of Waterloo. The City’s portion of the tax bill is 30%, with the Region of Waterloo and local school board portions SERVICES PROVIDED BY REGION OF WATERLOO: making up the remainder. PUBLIC HEALTH AND REGIONAL POLICING WASTE MANAGEMENT REGIONAL SOCIAL SERVICES:AND EMERGENCY AND WATER TRANSPORTATION: RESPONSE:TREATMENT: Harm reduction and Paramedic and policing Waste collection, Waterloo Regional affordable housing.services.water treatment International Airport, and wastewater Grand River Transit, ION School Boards ...........................11% • management.and regional roads. City of Kitchener .....................30% • Region of Waterloo .................59% • CITY OF KITCHENER | 2026 BUDGET SUMMARY The City of Kitchener provides the remainder of our municipal services, including: 35 SERVICES PROVIDED BY THE CITY OF KITCHENER: PARKSRECREATION AND TRANSPORTATION ANDEVENTSFIRE AND GREENSPACE:COMMUNITY CENTRES:TRAFFIC:AND CULTURE:SERVICES: Maintenance and plantings Facilities and programming Caring for our roads so Celebrating our community Keeping our homes and throughout parks.so everyone has a space to residents can travel safely.with events and festivals. play. To learn more about the services we offer visit WeAreKitchener.ca KITCHENER.CA/BUDGET OVERVIEW OF THE 36 Uby!Tvqqpsufe!Pqfsbujoh!Cvehfu The 2026 net tax levy increase is 2.2% and would amount to an additional $29 The City’s $310 million tax supported operating budget helps to deliver around per year, or just over $2 per month for the average Kitchener home (assessed at 50 core services for Kitchener residents. The operating budget expenditures are $326,000). The 2026 budget contemplates an increase of 2.2%, which is in line made up of the following major components: OPERATING BUDGET EXPENDITURES: 2026 BUDGET EXPENSES2026 BUDGET REVENUES Base BudgetRevenues Cowan Recreation CentreCowan Recreation Centre Growth/Strategic PrioritiesAssessment Growth Salaries & Wages ...................56% • 3/3&!UBY!JODSFBTF Debt Charges .............................6% • Materials ...................................12% • Contracted Services................4% %28-739-:53 • %24-814-858 Boards & Grants........................7% • Capital Reserves .......................6% • %8-788-41:%7-292-429 Interdivisional Charges ..........9% • %3-915-169 %2-173-187 CITY OF KITCHENER | 2026 BUDGET SUMMARY The 2026 budget is all about addressing your priorities. The three priorities are: Affordable City Services, Smart Investments in Infrastructure and Focusing on the 37 Future. Bggpsebcmf!Djuz!Tfswjdft Staff have prepared a budget that maintains current service levels while balancing the need for reasonable rate increases. The base budget which supports the City’s core services make up the majority of the tax rate increase. 2026 TAX RATE INCREASE Affordable • City Services ........................+2.4% Strategic Priorities • /Growth ..................................+1.5% Assessment • Growth ....................................-1.7% Total ............................................2.2% Dbqjubm!Dpousjcvujpot! Salaries and Wages, Capital Reserve Contributions and transfers to the Kitchener 38 Capital reserve contributions increased by 10% resulting in an increase of $826k in 2026 which will be used to help fund projects in the City’s Capital Budget. Tbmbsjft!Boe!Xbhft;!Cpbset!boe!Hsbout;! Total compensation makes up the largest portion of the operating budget representing 56% of the City’s expenses, which is consistent with most Library (KPL). As per the City’s guideline when establishing 2026 budget targets, municipalities. To deliver municipal services to approximately 300,000 residents the operating grants for both CITS and KPL increased by 2.5% resulting in an increase of $53k and $355k respectively. Additionally, the KPL operating budget full-time and part-time staff help keep the City running and are represented by the includes $70k in funding that was previously included in the capital budget. following bargaining groups: The Canadian Union of Public Employees (CUPE 791, CUPE 68 and CUPE 68M), the Kitchener Professional Fire Fighters Association of Canada (KPFFA), International Alliance of Theatrical Stage Employees (IATSE) and the International Brotherhood of Electrical Workers (IBEW). In addition to these bargaining groups the City employs non-unionized staff. most unions. The collective agreement between the City of Kitchener and CUPE 68 needs. The City’s positive relations with the various bargaining groups have resulted in fair wages for staff while maintaining reasonable costs for rate payers. CITY OF KITCHENER | 2026 BUDGET SUMMARY to comply with O.Reg 588/17 Asset Management Planning for Municipal Tnbsu!Jowftunfout!jo! Infrastructure. 39 Jogsbtusvduvsf The City continues to make smart investments, allocating capital dollars responsibly, while leveraging other funding and grant opportunities to move The City owns and is responsible for maintaining approximately $15B worth of important priorities forward. assets; including hard infrastructure such as roads and bridges; underground Addressing all of the City’s new and existing infrastructure needs is not without infrastructure related to water, wastewater, and storm water; and community- its challenges, but Kitchener has always found a way to balance taking care of based infrastructure such as facilities, parks and open spaces, and urban forest. what we have and are responsible for, while still moving ahead with exciting infrastructure projects like the Cowan Recreation Centre, that will not only support residents today but also future residents that will call Kitchener home. The City has developed asset management plans (AMPs) which will help identify the the areas of greatest need and the expected service levels in those areas KITCHENER’S INFRASTRUCTURE AT A GLANCE: Asset Valuation:Total Replacement Value ($15.1B) Water Utility ..............................$2.79B Water Utility ...........................18% • Gas Utility ...................................$2.17B Gas Utility .................................14% • Facilities .......................................$3.14B Sanitary Utility .......................21% • Sanitary Utility .........................$2.02B Stormwater Utility ................13% • Roads & Bridges .......................$2.50B Roads & Bridges .....................17% • Stormwater Utility ..................$2.01B Facilities .....................................13% • Other ............................................$0.46B Other .............................................3% • KITCHENER.CA/BUDGET Gpdvtjoh!po!uif!Gvuvsf 3: The City is in the third year of implementation of its 2023-2026 Strategic Plan. The 2026 Budget continues to build on investments made through previous year’s additional priorities they wish to advance as part of the 2026 Budget. Cvjmejoh!b!Dpoofdufe!Dvmujwbujoh!b!Hsffo!Djuz!Dsfbujoh!bo!Fdpopnjdbmmz!Gptufsjoh!b!Dbsjoh!Djuz!Tufxbsejoh!b!Cfuufs!Djuz! Djuz!UphfuifsUphfuifsUphfuifsUphfuifs Uisjwjoh!Djuz!Uphfuifs • $1M • $4.2M of additional Federal • $150k in continued funding • $2.6M towards the • $5M for local arts & investments in facilities Housing Accelerator of the RISE Grant which modernization of the culture facilities in the supporting goals of the Funding to continue increases opportunities City’s core business and downtown to help build a Corporate Climate Action addressing the housing crisis for Black, Indigenous and technology systems diverse economy Plan 2.0 through the implementation racialized communities in to support continued of the City’s Housing for All Kitchener • $3.3M towards strategy implementation of the City’s tree canopy plan • $2.4M for trail upgrades to help people move about • $1.5M for new parks where neighbours can come without needing a vehicle together and play in their local community CITY OF KITCHENER | 2026 BUDGET SUMMARY Qspqfsuz!Ubyft;! Sfwfovft 42 The main source of revenue for Kitchener is through the billing and collection of property taxes which account for 56% of the city’s revenue at approximately The city collects revenues through property taxes, user fees and other sources $176M. The Municipal Property Assessment Corporation is responsible for to pay for the approximately 50 core services and programs it offers to the assessing and classifying properties. The City is responsible for setting tax residents of Kitchener. rates and collecting property taxes based on the assessed value and class of the It’s very important to know that provincial government legislation in Ontario property. Property classes are assigned based on their intended use and different states that “municipalities must pass balanced budgets where the money coming tax rate is applied based on class. The majority of the City’s assessment base is made up of residential properties, which is in line with the overall assessment mix of other communities. OPERATING BUDGET REVENUES: Vtfs!Gfft;! User fee charges are one of the principal funding mechanisms for a range of Taxes ...........................................57% • municipal services. Examples include swimming lessons, site plan approvals, and User Fees ..................................12% • Grants ...........................................3% • the City to pay for a service by directly charging those who use it. The City’s user Transfers ...................................10% • fee charges make up 12% of the City’s revenues and amount to $38M. The User Other Income.............................6% • Fees Schedule is included as an appendix. Interdivisional • Recoveries ................................12% CITY OF KITCHENER | 2026 BUDGET SUMMARY Bttfttnfou!Hspxui;! 43 Assessment growth is new property tax revenue caused by changes to the makeup of the City. This can be from new properties being built, or from existing properties being redeveloped or expanded. The additional tax revenue generated through assessment growth helps offset the costs of providing tax supported services to the community. For 2026 assessment growth is 1.7% and offsets the growth related costs in the budget. ASSESSMENT GROWTH 1.7% 3.00% 2.50% 2.00% 1.50% 1.00% 0.50% 0.00% 2020202120222023202420252026 KITCHENER.CA/BUDGET 44 CITY OF KITCHENER | 2026 BUDGET SUMMARY 45 Foufsqsjtf!Cvehfu!Pwfswjfx In addition to tax-supported services, the city also operates seven business lines Building, Water, Sanitary Sewer and Stormwater are not allowed to pay a (enterprises) that are funded by their own user rates and not from property dividend to the city based on their governing legislation. While each of the taxes. These services are: enterprise has its own stabilization reserve fund that is used to manage with positive results, the surplus funds are held in reserve and are used to fund Each enterprise charges customers fees or utility rates that fully cover the costs of providing the service, so no tax dollars are needed to fund these services. In fact, two of the enterprises (parking and natural gas) pay a dividend to the city (the enterprise owner), which help offset the need for property tax increases. KITCHENER.CA/BUDGET Cvjmejoh!Foufsqsjtf!Pwfswjfx 46 Pqfsbujoh!Npefm!Boe!Qijmptpqiz; The Building enterprise is responsible for the administration and enforcement of the Building Code Act and Building Code. The Building Enterprise ensures that construction in CITY OF KITCHENER | 2026 BUDGET SUMMARY 47 Tfswjdft!Qspwjefe;Sfdfou!Dibmmfohft;! The Building Enterprise provides most of its services to external customers, This year the economic outlook did not improve for the City and locally in terms of largely related to building permits and on-site inspections. Building also new building projects. In fact, with reported job losses and threats of a tariff and actual tariff on construction materials, this caused increased uncertainty.New single detached building activity in Q1 showed an increase, but slowed down in The following chart includes the 2026-2030 Building forecast (000’s): Q2. Although the Bank of Canada has lowered its rate a few times this year, high mortgage rates coupled with buyer uncertainty has put a damper on all types of construction. BUILDING ENTERPRISE FORECAST: Sfdfou!Tvddfttft;! On January 1, the 2024 Ontario Building Code come into effect, replacing the 2012 code. The 2024 code included over 2000 code changes. To support both staff and customer knowledge transfer, the Annual Industry Workshop focused on the 2024 code, offered over 2 days due to the volume of changes and was available in both in-person and virtual options. The in-person sessions proved to be very popular with almost 200 attendees on both days. To help support customer service, a new and free customer workshop on code training for existing buildings was offered. Lastly, staff completed actions and pilots on Accelerating Commercial Business Approvals. Note: Detailed Building projections are included in the appendices. KITCHENER.CA/BUDGET Hpmg!Foufsqsjtf!Pwfswjfx 48 Pqfsbujoh!Npefm!Boe!Qijmptpqiz; Kitchener Golf manages two golf courses - Doon Valley and Rockway, offering options for players of every level of the game while providing an affordable golf experience for all. CITY OF KITCHENER | 2026 BUDGET SUMMARY Tfswjdft!Qspwjefe;Sfdfou!Dibmmfohft;! 49 Kitchener Golf operates its facilities from dawn to dusk, seven days a week Doon Valley Golf Course: Ongoing irrigation issues and recent erratic weather during the golf season (April-November, weather permitting). Kitchener Golf have begun to impact turf and green health. Proactive monitoring and investment offers recreational golf, camps, clinics, leagues, tournaments, and events. In the off-season, the facilities are used for special occasions and winter activities like Rockway Golf Course: Safety and security have become key priorities following walking, snowshoeing, and cross-country skiing. the Iron Horse Trail extension and increased community presence near the The following chart includes the 2026-2030 Golf forecast (000’s): course. GOLF ENTERPRISE FORECAST: Sfdfou!Tvddfttft;! Doon Valley Golf Course: Impact of the highway 401 expansion has been successfully managed, with operations running smoothly. Completion remains on track for 2025. Rockway Golf Course: Drainage issues on holes 4, 5, and 6 have been resolved enhancing course conditions. This summary highlights Kitchener Golf’s commitment to providing accessible golf experiences while addressing operational challenges and celebrating recent successes. Note: Detailed Golf projections are included in the appendices. KITCHENER.CA/BUDGET Qbsljoh!Foufsqsjtf!Pwfswjfx 4: Pqfsbujoh!Npefm!Boe!Qijmptpqiz; providing accessible and convenient parking in the downtown core at a fair price. This helps the City achieve and balance economic development, compact urban development and transportation objectives. CITY OF KITCHENER | 2026 BUDGET SUMMARY Tfswjdft!Qspwjefe;Sfdfou!Dibmmfohft;! 51 The Parking Enterprise manages and operates the City’s downtown parking Public use of the Parking Enterprise parking facilities continues to change due to the continued evolution of hybrid/virtual working conditions. Parking on-street meters and free parking spaces (totaling 3,625 spaces). It has direct revenues are still down locally and nationally but are showing signs of improvement. Kitchener’s parking revenue has improved since last year given management of the City’s public parking infrastructure.economic recovery related to recent city building objectives such as downtown The following chart includes the 2026-2030 Parking forecast (000’s): 2026 projections are based on the conditions experienced by the Parking Enterprise in 2025. These projections illustrate that the Parking Enterprise can PARKING ENTERPRISE FORECAST: be expected to achieve a net gain of $140K in 2026. Sfdfou!Tvddfttft;! The Charles & Benton and Kitchener Market garage repairs were completed in a timely manner this summer. Customers were only impacted mildly for a duration of approximately eight weeks. License Plate Recognition (LPR) technology is a powerful tool that fosters secure and automatic access control, streamlines parking enforcement and provides valuable insights for parking program optimization – all while using a vehicle license plate as a credential. LPR technology has been deployed in gated and non-gated parking facilities bringing enhanced customer experiences and more innovative business intelligence. The new system includes a web-based, self- service, on-line customer portal and mobile app. Parking customers can setup Note: Detailed Parking projections are included in the appendices. purchases, register payment method. Monthly Customers will also be able to choose parking products, set up recurring payments, register multiple vehicle license plates, view parking history, and join a waiting list. KITCHENER.CA/BUDGET 52 Vujmjujft!Pwfswjfx City of Kitchener owns and operates four utilities that comprise the Water Infrastructure Program (WIP) and Natural Gas. The utilities include: • Water • Sanitary • Stormwater • Gas The budgets for the Water, Sanitary and Stormwater were the combined subject of a comprehensive review called the Water Infrastructure Program (WIP). A comprehensive WIP review was completed in advance of the 2024 budget with collaboration between several divisions within the City, including Asset Management, Engineering, Kitchener Utilities – Gas and Water, Kitchener Planning and Communications. CITY OF KITCHENER | 2026 BUDGET SUMMARY Rate increases projected from the original WIP analysis compared to the actual The 2026 rate increase of 6.3% is driven by external factors, such as: rates for those years are shown in the table below. 53 20222023202420252026 INFRASTRUCTURE INVESTMENT NEEDS: Projected4.5%4.5%6.3%6.3%6.3% 1950’s infrastructure coming to end if its useful life. Revised/Proposed 2.2%4.5%6.3%6.3%6.3% Aging infrastructure = higher operating and maintenance costs. Approved Failing infrastructure = more service disruptions for customer. The 2026 combined WIP rate increase is 6.3%. This includes increases to Water (4.9%) and Sanitary (7.0%) which are driven by infrastructure investments as well REGULATORY COMPLIANCE: as Regional rate increases to the City for water supply and wastewater treatment. All utilities have many regulatory restrictions. The Region’s rate to provide these services have increased above what was on the water and sanitary sewer rates going forward. The City has been able to accommodate additional Regional increase within its originally projected rates, but future rates may need to be adjusted to accommodate additional changes. COMMODITY SUPPLY COSTS: Cost increases in these areas are unavoidable. government through the Disaster Mitigation and Adaptation Fund (DMAF).Water and sanitary costs from the Region of Waterloo are increasing. It is expected that WIP utility increases will need to remain higher than typical pressures. The increases for each utility are summarized in the table below. 20252026$ CHANGE% CHANGE Water$490$514$244.9% Sanitary$636$681$457.0% Stormwater$260$279$197.4% TOTAL$1,386$1,474$886.3% KITCHENER.CA/BUDGET Xbufs!Vujmjuz!Pwfswjfx 54 Pqfsbujoh!Npefm!Boe!Qijmptpqiz; distribution of water while operating in an environmentally sensitive manner and promoting conservation. CITY OF KITCHENER | 2026 BUDGET SUMMARY Tfswjdft!Qspwjefe;Sfdfou!Dibmmfohft;! 55 • The Regional of Waterloo costs for the supply of water have increased beyond Water Distribution: Monitoring, installing, replacing and repairing the network the 2024 WIP projection of water mains, meters and services to ensure a reliable and safe supply of water. • Sediment control and rehabilitation costs associated with watermain breaks near watercourses continues to be extensive Conservation: Promoting conservation programs, which help customers reduce the amount of water used, which saves both money and conserves energy. • hydrants as well as implementing the frozen water service avoidance program. The following chart includes the 2026-2030 Water forecast (000’s): • prevention) was a challenge during the Postal Strike WATER UTILITY FORECAST: • Uncertainty surrounding tariffs and cost implications for materials • Two new watermain replacement projects were added to the capital forecast (Westmount Road-Glasgow St to Victoria St S, and Lancaster St-Bridgeport Rd to Bridge St). These watermain replacements are on Regional roads, and work will be done at the same time as Regional road work in order to be cost effective and to minimize disruption to citizens. Sfdfou!Tvddfttft; • Continuing with on-going maintenance programs including valve operation and replacement, watermain cleaning, meter replacement and hydrant operation • 5-year average for watermain breaks dropped from 73 to 66/year Note: Detailed Water projections are included in the appendices • Continuing with watermain replacement projects as outlined in the City of Kitchener Engineering & Water Utility Capital Forecast • Customers continue to sign up for e-billing KITCHENER.CA/BUDGET Tbojubsz!Vujmjuz!Pwfswjfx 56 Tfswjdft!Qspwjefe; Nearly every residential, commercial, industrial, and institutional building in the for sanitary service and approximately 300,000 people served. The City’s sanitary network comprises approximately 890km of sanitary mains, approximately 13,400 manholes and 23 pumping stations. The Sanitary Utility performs a wide range of activities and programs that together support the provision of safe and reliable collection of raw sewage, including: • Pumping station inspection, maintenance, rehabilitation, and replacement • Supervisory control and data acquisition (SCADA) for pumping stations • Sewer trunks, mains & lateral inspection, rehabilitation, and replacement • Flow monitoring and hydraulic modeling • Closed circuit television (CCTV) inspection program • • Emergency response Pqfsbujoh!Npefm!Boe!Qijmptpqiz; • Service connection blockage inspection, clearing and removal • Cave-In/ Dye Testing The Sanitary Sewer Utility collects and removes wastewater generated within • Hydro Excavation environmentally responsible manner. The wastewater is then transferred to the • Update Sanitary System Asset Management Plan, including Proposed Levels of Service Region of Waterloo for treatment and disposal in compliance with legislative and • Sanitary Environmental Compliance Approvals CITY OF KITCHENER | 2026 BUDGET SUMMARY 57 The following chart includes the 2026-2030 Sanitary forecast (000’s): Sfdfou!Tvddfttft; In 2025, the utility has begun implementing various programs recommended in SANITARY UTILITY FORECAST: programs, which are improving the utility’s ability to prioritize pipe rehabilitation projects and reduce risks of infrastructure failure. licensed facility through the Ontario Ministry of Environment, Conservation, and couple of decades, the City has been replacing aging sanitary sewer pipes helping to mitigate risks of network failure. This reduced risk has helped the sanitary network transition to a Class III designation. This transition will have no impact on operations for the City. Sfdfou!Dibmmfohft;! NOTE: Detailed Sanitary projections are included in the appendices. In many parts of the City, sanitary assets are nearing the end of their lifecycle corrective maintenance. Annual sanitary utility rate increases provide critical funding to address infrastructure needs, helping reduce the risk of system failures and service interruptions. KITCHENER.CA/BUDGET The stormwater system is comprised of 29 managed subwatersheds; Tupsnxbufs!Vujmjuz!Pwfswjfx approximately 810 kilometers of storm sewer mains; over 27,500 manholes 58 and catch basins; over 140 oil-grit separators; and 114 constructed stormwater management facilities (SWMFs) that are under City ownership and maintenance The Utility has developed an Integrated Stormwater Management Master and helps inform the City’s capital program to 2030. A large number of the delivered through the Federal Disaster Mitigation and Adaptation Fund (DMAF) Program. The Utility also carries out recurring operations and maintenance as well as other programs that include: Pqfsbujoh!Npefm!Boe!Qijmptpqiz; • Stormwater Management (SWM) • Sewer mains, laterals, catchbasin, & Monitoring Program manhole maintenance and repair The Stormwater utility treats and controls stormwater runoff generated • Sediment Management Program • Watercourse/Bridge/Culvert Maintenance and Repair • Watercourse Improvement Program environmentally responsible manner to comply with legislative and regulatory • SWMF Maintenance & Sediment • Removal • Drainage Improvement Program • Catchbasin Cleaning Program • Hydraulic and hydrological modeling • Spills Response Tfswjdft!Qspwjefe; • SWM Infrastructure Implementation • Stormwater Environmental Program Compliance Approvals The utility provides funding to operate, maintain, rehabilitate, replace and build • Low Impact Development (LID) stormwater infrastructure across the city. There are over 70,000 properties in the city that are billed for the stormwater management service based on the amount The utility also funds a credit program to incentivize private property owners of their impervious area and the runoff they generate. to help manage stormwater on their property, reducing the volume of runoff (rain and snow melt) that is directed to the City’s stormwater system. CITY OF KITCHENER | 2026 BUDGET SUMMARY The following chart includes the 2026-2030 stormwater forecast (000’s): several years, particularly just after the end of the pandemic. This has resulted 59 in budgetary pressures on the DMAF program, resulting in the Stormwater STORMWATER UTILITY FORECAST: impacts, including deferring some non-essential work until after the DMAF program is complete in 2032; leveraging the innovative work of the DMAF program to secure additional provincial, federal and non-government grants (for example, through the Federation of Canadian Municipalities); and joint capital planning with other city divisions to leverage shared infrastructure needs and joint funding. Elevated construction pricing is expected to continue impacting infrastructure rehabilitation and replacement projects going forward. Sfdfou!Tvddfttft; In 2025, the City progressed to construction on several DMAF projects that saw stormwater management features installed in City parks. These projects included Sfdfou!Dibmmfohft;! very active engagement with the public and First Nations, and feedback from these engagement initiatives was used to inform the design and placement of More extreme storm events continue to be experienced annually. When infrastructure that will ultimately be installed in local parks, including stormwater these high intensity rain fall events happen over a short period of time, they ponds, multi-use trails and updated park and recreation amenities. These facilities improve the City’s ability to manage stormwater and also enhances green space neighborhoods across the City. These more intense storms are expected to and park amenities, creating inclusive and welcoming community gathering spaces. continue, and in some projections, intensify over the next several decades. This In 2025/26, the City will be updating the 2016 Stormwater Management Master Plan. This work will involve engagement with the public to help develop the scope these anticipated storms. and priorities for the new/updated Master Plan. NOTE: Detailed Stormwater projections are included in the appendices. since the program was initiated in 2018/19. Kitchener, similar to most cities KITCHENER.CA/BUDGET Hbt!Vujmjuz!Pwfswjfx 5: Pqfsbujoh!Npefm!Boe!Qijmptpqiz; Kitchener Utilities provides customers with safe, reliable, and economical natural gas. We provide prompt, cost effective and professional services related to rental water heaters while promoting conservation, greenhouse gas (GHG) reduction and operating in an environmentally sensitive manner. CITY OF KITCHENER | 2026 BUDGET SUMMARY Tfswjdft!Qspwjefe; GAS DELIVERY FORECAST: 61 Gas supply: Kitchener Utilities purchases and manages the gas supply to Gas Distribution: As a natural gas distributor, Kitchener Utilities delivers natural gas to consumers. Work includes installing and replacing meters, underground pipe installation and maintenance, providing gas services to homes and businesses, responding to gas emergencies involving gas line hits, gas odour, carbon monoxide, and gas utility locates. Regulatory Affairs: Ensuring compliance with codes, rules and regulations imposed by government agencies and regulators. Conservation: Developing and promoting greenhouse gas (GHG) reduction and conservation programs which help customers save money and conserve energy. GAS SUPPLY FORECAST: Water Heater Rentals and Service: Supply and service water heaters replacement of tanks. The adjacent charts include the 2026-2030 Gas Delivery and Supply forecast (000’s): KITCHENER.CA/BUDGET Sfdfou!Dibmmfohft;Sfdfou!Tvddfttft;! 62 • • Gas revenues vary with weather conditions. The 2024/2025 was a very cold related to protection of meter sets that are at risk of damage from vehicular winter resulting in a surplus that is decreasing pressure on the 2025 budget. • to be at risk, protection will be provided by either installing bollards or cage volatility of the natural gas market. enclosure. • Successful intervention in Enbridge rebasing application in front of Ontario • Energy Board (OEB) mitigated the initial rate increases proposed by Enbridge. The application proposed changes to the next 5-year rates that were infrastructure. • US tariffs have impacted the cost of water heaters manufactured in the U.S.A. helped reduce or defer most of the proposed increases. To help offset these added costs, we have moved part of our product line to • Continued to promote the smart thermostat $75 on-bill credit to customers a supplier that manufactures outside the U.S.A., allowing us to avoid those who upgrade their existing manual or programmable model to a smart additional expenses for that line. thermostat model. Since implementation of the program in 2022, the • Increases to the Demand Side Management (DSM) program were made in the program is averaging 350-500 applications per year. Application volumes are capital forecast in order to help fund the Home Renovation Saving Program consistent year over year. (HRSP) for Ontario residents. • Offered a condensing water heater rebate to upgrade from non-condensing to a condensing water heater model, including tankless water heaters, and increased the rebate amount from $400 to $500. A total of 173 condensing water heater upgrades were completed in 2024. • Kitchener Utilities provided 24 energy audit subsidies to Reep Green Solutions. The volume of energy audit subsidies dropped substantially due to the Canada Greener Homes program that was discontinued. CITY OF KITCHENER | 2026 BUDGET SUMMARY • Recently implemented a contractor audit program to enhance customer satisfaction, educate contractors, and 63 ensure code compliance. • Phase 2 of the KU Clean Energy Transition Strategy project kicked off at the beginning of 2024. Consulting teams have been hired to support the KU Clean Energy Transition Strategy project and are working to investigate the potential A specialized consulting team is exploring a potential thermal energy network to support new development areas. In addition, an evaluation of solar energy opportunities at City- already informing facility planning and contributing to the broader strategic framework. • The majority of statutory meter exchanges for 2025 have already been completed which allows staff to get a head start on 2026 work. • Inspection of all indoor and rooftop meter sets, that are not covered in the annual leak survey, are complete. inspections have been prioritized and are in progress. Detailed Gas projections are included in the appendices. KITCHENER.CA/BUDGET 64 Dbqjubm!Cvehfu!Pwfswjfx The City’s capital budget funds investments in ALLOCATION OF CAPITAL PROJECTS TO CITY ASSETS: (in Millions) to the community. Examples include parks, roads, and sanitary sewers. The projects included in the Capital Budget often take a number of years to complete, Full Road Reconstruction ............................$597m • either creating new assets or renewing existing Water, Sanitary & Stormwater ...................$429m • assets. The term of the budget is 10 years, which Natural Gas ........................................................$181m • helps establish capital priorities for both the near City Facilities & Community Centres ......$177m • future and the medium-term. Roads, Bridges & Sidewalks ........................$169m • The 10 year approved budget and forecast for the Parks, Trails & Forestry ....................................$79m • ALLOCATION year 2026-2035 includes over 400 projects at $1.8B. OF Fleet Vehicles .......................................................$75m • FUNDS The adjacent chart shows the allocation of capital ............$53m • projects to city assets: Other ......................................................................$50m • Fire............................................................................$31m • Parking ......................................................................$7m • CITY OF KITCHENER | 2026 BUDGET SUMMARY Tfuujoh!Dbqjubm!Cvehfu!Qsjpsjujft; 65 In preparing the Capital Budget each year, staff reviews the previous Capital different consultation processes, which are shown in the graphic below. Through these processes and then ultimately the budget, Council determines which discussed by senior staff as part of the comprehensive internal review of the availability). Capital Budget. Priority is placed on projects related to: ASSET REPLACEMENT & REHABILITATION NEEDS: PRIORITY SETTING TO PROVIDE INPUT TO THE CAPITAL BUDGET: Developed based on asset management plans & condition assessments. Progress being made through the Water and Infrastructure Program, (WIP). Addressing the facility infrastructure gap continues to be a priority. Preventative maintenance activities are also important. GROWTH RELATED NEEDS: PROPOSED CAPITAL BUDGET Investments in new infrastructure to support new residents. Maintaining the concept of ‘Growth pays for growth’. STRATEGIC ITEMS: Implementation of items included in the Strategic Plan. KITCHENER.CA/BUDGET The 2026 Budget includes meaningful investments in areas that are important to the citizens of Kitchener, including: 66 • Additional Fire Truck ($1.5M in 2026) • Full Road Reconstruction Projects ($45.0M in 2026, $597M overall in the capital forecast) • Community Trail Improvements ($1.7M in 2026, $39.9M overall in the capital forecast) • Downtown Arts Facilities (Conrad, Museum SDG Idea Factory) ($5M in 2026) • Gas Pipelines ($10.4M in 2026, $101.5M overall in the the capital forecast) • Tree Planting ($3.3M in 2026, $8.2M overall in the capital forecast) • New Neighbourhood Parks ($1.5M in 2026, $22M overall in the capital forecast) • Trunk Sewer Inspection & Replacement ($6.8M in 2026, $25.6M overall in the capital forecast) • Manchester Pumping Station Rehabilitation ($1.9M in 2026, $16M overall in the capital forecast) • Middle Strasburg Creek Naturalization ($4.3M in 2026) • Idlewood Greenway Stormwater Enhancements ($5.4M in 2026) • Stirling Avenue Watermain Replacement ($2.9M in 2026, $5.4M overall in the capital forecast) CITY OF KITCHENER | 2026 BUDGET SUMMARY Dpxbo!Sfdsfbujpo!Dfousf 67 Cowan Recreation Centre, a $174 million facility located at Schlegel Park in the city’s southwest. Fully funded through development charges, the project also received $30 million in grant funding from the Federal and Provincial governments. It’s being delivered using an Integrated Project Delivery (IPD) model - a collaborative approach that brings together designers, builders, and city staff to ensure the facility is completed on time and on budget. Opening in 2026, the Cowan Recreation Centre will be the region’s most accessible building, designed to welcome residents of all abilities. It will also be one of Canada’s most sustainable recreation centres, built to high environmental standards that reduce energy use and support climate opportunities with 2,100 new swimming lessons, space for 500 additional Kitchener Minor Soccer participants, and over 7,000 hours of bookable court time. Year-round indoor cricket practice nets will support training in a growing sport. Integrated with Schlegel Park’s outdoor amenities, the centre will become a premier destination for sport and recreation across the region. Capital forecast details by division as well as related issue papers included in the appendices KITCHENER.CA/BUDGET 68 CITY OF KITCHENER | 2026 BUDGET SUMMARY The Capital Budget is funded through various sources:The following chart shows the percentage of each funding source making up the 10 year capital forecast: 69 Enterprises: Funding transferred from the City’s seven Enterprises . FUNDING SOURCES THAT COMPRISE 10 YEAR CAPITAL FORECAST: Tax Supported Capital Pool: Funding from the operating budget, debt, and the gas & hydro utility investment reserves to support the tax supported capital program. Enterprises ...............................64% • Capital Pool .............................10% • Development Charges: Funding collected from development for growth related Development Charges ........10% infrastructure. • CAPITAL FORECAST Reserves ......................................8% • Reserves: Funding saved up ahead of time by the City. FUNDING SOURCES CCB Fund .....................................4% • Canada Community Building (CCB) Fund: Formerly known as Federal Gas Tax Grants ...........................................2% • funding. Facilities ........................................2% • Grants: Funding from other levels of government and other agencies. Facilities Infrastructure: Funding from the facilities infrastructure reserve for City building repairs. this comes from the Water Utilities (water, sanitary & storm) and is invested in full Additional details on the Capital Pool forecast is included in the appendices. development charges, and reserves. KITCHENER.CA/BUDGET Efcu! 6: Debt is funding the City has borrowed to complete capital projects. The City has had decreasing debt levels for the past decade, but will see increasing debt in order to fund growth related infrastructure needed as the city continues to grow. The chart below shows the total debt outstanding broken into components: • Tax supported debt is issued to help fund the Capital Pool. DEBT OUTSTANDING: - No Capital Pool debt is being issued in 2026 • Enterprise debt is repaid from non-tax sources. These include the Golf enterprise, Parking enterprise, the Kitchener Rangers, and cemetery debt. • EDIF (Economic Development Investment Fund) debt was issued to fund EDIF projects and will be fully paid off in 2027. • EDIF 2.0 debt will be issued between 2022-2029 to mobilize the Make It Kitchener 2.0 Strategy and will be fully paid off by 2039. • DC debt is issued for growth related projects funded by development charges (DCs). This debt has no impact of tax/ utility rates. CITY OF KITCHENER | 2026 BUDGET SUMMARY Sftfswf!boe!Sftfswf!Gvoet 71 Minimum and maximum balances have been established for these reserve funds based on best practices and benchmarks. These minimum/maximum targets have been consolidated for each category to show how the City is doing in achieving these targets. STABILIZATION RESERVES:OBLIGATORY RESERVES: PROGRAM SPECIFIC RESERVES:CORPORATE RESERVES:CAPITAL RESERVES: KITCHENER.CA/BUDGET CITY OF KITCHENER 2026 BUDGET SUMMARY KITCHENER.CA/BUDGET Bqqfoejy.B!}Hmpttbsz!pg!Ufsnt; CITY OF KITCHENER | BUDGET SUMMARY CITY OF KITCHENER | BUDGET SUMMARY APPENDIX A 1 CITY OF KITCHENER | BUDGET SUMMARY APPENDIX A 2 CITY OF KITCHENER | BUDGET SUMMARY APPENDIX A 3 CITY OF KITCHENER | BUDGET SUMMARY APPENDIX A 4 Bqqfoejy.C!}Pqfsbujoh!Cvehfu; KITCHENER.CA/BUDGET Comparative Budget by Division Budget 2026 202520252026$ Change% ChangeCommentary (Significant changes other than inflationary adjustments and Capital to Restated Year-EndAnnualvs. Restatedvs. Restated Operating budget restatements) BudgetProjectionBudgetBudgetTotal Budget CHIEF ADMINISTRATOR'S OFFICE CAO OFFICE-GENERAL 1,356,709 1,364,709 1,443,066 86,3576.37% CHIEF ADMINISTRATOR'S OFFICE TOTAL 1,356,709 1,364,709 1,443,066 86,3576.37% COMMUNITY SERVICES DEPARTMENT COMMUNITY SERVICES ADMINISTRATION 1,231,804 1,231,804 1,269,803 37,9993.08% BY-LAW ENFORCEMENT 3,616,728 3,516,728 4,089,621 472,89313.08% CORPORATE CUSTOMER SERVICE 1,386,128 1,366,128 1,541,001 154,87311.17% FIRE 43,031,547 42,862,547 44,407,986 1,376,4393.20% NEIGHBOURHOOD PROGRAMS & SERVICES 11,770,510 11,934,510 13,090,528 1,320,01811.21%Budget increase due to growth funding for Williamsburg Community Centre. SPORT DIVISION 2,174,822 2,748,822 2,596,366 421,54419.38%Budget increase due to operating and funding for Cowan Recreation Centre. COMMUNITY SERVICES DEPT TOTAL 63,211,539 63,660,539 66,995,305 3,783,7665.99% FINANCIAL SERVICES DEPARTMENT FINANCIAL SERVICES ADMINISTRATION 533,496 548,496 676,419 142,92326.79% FINANCIAL OPERATIONS 1,918,660 1,849,660 2,030,078 111,4185.81% FINANCIAL REPORTING & ERP SOLUTIONS 876,314 865,314 893,674 17,3601.98% FINANCIAL PLANNING & ASSET MANAGEMENT 1,384,120 1,368,120 1,532,407 148,28710.71% REVENUE 238,395 245,395 258,167 19,7728.29% FINANCIAL SERVICES DEPT TOTAL 4,950,985 4,876,985 5,390,745 439,7608.88% CORPORATE SERVICES DEPARTMENT CORPORATE SERVICES ADMINISTRATION 582,835 598,835 656,858 74,02312.70% EQUITY, ANTI-RACISM & INDIGENOUS INITIATIVES 879,250 858,250 908,160 28,9103.29% MAYOR & COUNCIL 1,889,111 1,891,111 1,965,527 76,4164.05% CORPORATE COMMUNICATIONS 2,037,568 2,157,568 2,094,042 56,4742.77% HUMAN RESOURCES 3,509,257 3,551,257 3,759,771 250,5147.14%Budget increase due to salary adjustments TECHNOLOGY INNOVATION & SERVICES 7,108,709 7,062,709 7,356,356 247,6473.48% LEGAL 1,192,079 1,202,079 1,227,078 34,9992.94% LEGISLATED SERVICES 1,534,072 1,553,072 1,639,426 105,3546.87%Budget increase due to salary adjustments CORPORATE SERVICES DEPT TOTAL 18,732,881 18,874,881 19,607,218 874,3374.67% DEVELOPMENT SERVICES DEPARTMENT DEVELOPMENT SERVICES ADMINISTRATION 864,384 889,384 892,317 27,9333.23% ECONOMIC DEVELOPMENT 8,169,710 8,116,710 8,808,288 638,5787.82% ENGINEERING ADMINISTRATION (78,629) 834,371 (64,627) 14,002-17.81% PLANNING 3,035,004 3,720,004 3,208,324 173,3205.71% TRANSPORTATION SERVICES 4,149,657 4,120,657 4,261,727 112,0702.70% DEVELOPMENT SERVICES DEPT TOTAL 16,140,126 17,681,126 17,106,029 965,9035.98% INFRASTRUCTURE SERVICES DEPARTMENT INFRASTRUCUTRE SERVICES ADMINISTRATION 762,140 791,140 805,631 43,4915.71% FACILITIES MANAGEMENT 18,412,347 18,731,347 20,866,831 2,454,48413.33% PARKS & CEMETERIES 22,320,705 23,320,705 23,686,131 1,365,4266.12% OPERATIONS - ROADS & TRAFFIC 13,449,901 13,599,901 14,138,347 688,4465.12% CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 2 Comparative Budget by Division Budget 2026 202520252026$ Change% ChangeCommentary (Significant changes other than inflationary adjustments and Capital to Restated Year-EndAnnualvs. Restatedvs. Restated Operating budget restatements) BudgetProjectionBudgetBudgetTotal Budget INFRASTRUCTURE SERVICES DEPARTMENT TOTAL 54,945,093 56,443,093 59,496,940 4,551,8478.28% NET DEPARTMENTAL EXPENDITURES 159,337,333 162,901,333 170,039,303 10,701,9706.72% GENERAL EXPENSES Budget increase due to increases in grants provided to boards and external GRANTS & BOARDS 18,882,754 18,940,754 19,537,655 654,9013.47% agencies. GAPPING (2,500,000) (4,300,000) (3,000,000) (500,000)20.00%Budget decrease due to increased estimated gapping revenue Budget decrease due to a reduction in the transfer to capital as some costs have CAPITAL AND RESERVE FINANCING 19,494,344 19,494,344 18,754,756 (739,588)-3.79% moved over to divisional operating budgets. CONTRACT SERVICES 1,607,654 1,984,654 1,617,668 10,0140.62% TAX WRITEOFFS & REBATES 98,05191,051 - (98,051)-100.00% OTHER 2,842,428 2,826,428 2,921,54179,1132.78% GENERAL EXPENSES TOTAL 40,425,231 39,037,231 39,831,620 (593,611)-1.47% TOTAL NET EXPENSES 199,762,564 201,938,564 209,870,923 10,108,3595.06% GENERAL REVENUES TAXES GENERAL LEVY (164,944,570) (164,944,570) (167,748,631) (2,804,061)1.70%Budget increase due to assessment growth. SUPPLEMENTARY TAXES/WRITE-OFFS (1,250,000) (1,250,000) (1,550,000) (300,000)24.00%Budget increase due to reduction of write-off estimates. PAYMENTS IN LIEU (5,009,465) (5,009,465) (4,959,465) 50,000-1.00% (171,204,035) (171,204,035) (174,258,096) (3,054,061)1.78% OTHER REVENUE INVESTMENT INCOME (8,512,241) (8,512,241) (10,585,209) (2,072,968)24.35%Budget increase due to interest rate assumptions. Budget increase due to higher revenue projection to reflect larger accounts PENALTIES AND INTEREST (4,888,551) (5,999,551) (6,210,608) (1,322,057)27.04% receivable balances. CONTRIBUTIONS FROM RESERVES AND ENTERPRISES(14,508,276) (14,508,276) (14,508,276) -0.00% SUNDRY INCOME (649,461) (515,461) (625,523) 23,938-3.69% (28,558,529) (29,535,529) (31,929,616) (3,371,087)11.80% GENERAL REVENUES TOTAL (199,762,564) (200,739,564) (206,187,712) (6,425,148)3.22% GRAND TOTAL- 1,199,000 3,683,211 3,683,211 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 3 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 4 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 5 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 6 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 7 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 8 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 9 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 10 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX B 11 Bqqfoejy.D!}Dbqjubm!Cvehfu!Efubjmt!; APPENDIX C 1 CITY OF KITCHENER 2026 - 2035 CAPITAL FORECAST Capital Target (in '000's of dollars) 2026202720282029203020312032203320342035Total Debenture Issue- 4 ,312 4 ,348 3,582 5 ,528 6 ,988 4 ,952 2 ,149 7 ,726 1 ,419 41,004 Capital out of Current 3 ,0143 ,326 3 ,657 4,008 4 ,380 4 ,775 5 ,193 5 ,635 6 ,104 6 ,601 46,693 Gas Utility Investment Reserve Fund 6 ,4686 ,472 6 ,478 6,475 6 ,473 6 ,460 6 ,498 6 ,500 6 ,156 6 ,500 64,480 Hydro Investment Reserve Fund 4 ,0263 ,096 1 ,828 4,137 1 ,454 2 ,370 3 ,344 5 ,907 3 ,074 6 ,350 35,586 13,508 17,206 16,311 18,202 17,835 20,593 19,987 20,191 23,060 20,870 187,763 Department Requests 13,508 17,206 16,311 18,202 17,835 20,593 19,987 20,191 23,060 20,870 187,763 Available/(Shortfall) - - - - - - - - - - - APPENDIX C 2 City of Kitchener Capital Forecast 2026 - 2035 Department:CAO OFFICE Division:CAO ADMINISTRATION Division/Section:CAO ADMINISTRATION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 150302001COMPASS KITCHENER COMM ENGAGE---135---143--278 Total CAO ADMINISTRATION---135---143--278 APPENDIX C 3 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:CORPORATE CUSTOMER SERVICE Division/Section:CORPORATE CUSTOMER SERVICE NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 150101004CRM SOFTWARE-252525252525252525225 202600047150101004CRM SOFTWARE - 202695---------95 Total CORPORATE CUSTOMER SERVICE95252525252525252525320 APPENDIX C 4 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:CSD ADMIN Division/Section:CSD ADMIN NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 620101004MASTERPLANS, STUDIES & PROJECTS75767880818384868890821 620201003PROVISION FOR ADD'L SPACES STUDIES--113-------113 Total CSD ADMIN757619180818384868890934 APPENDIX C 5 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:FIRE Division/Section:ADMINISTRATION - FIRE NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600093400101022FIRE RADIO SYSTEM UPGRADE - 202677---------77 202600096621506002FIRE COMMUNICATIONS EQUIPMENT - 120---------120 2026 202600108700607003PERSONAL PROTECTIVE EQUIPMENT - 234---------234 2026 400101007FIRE - MAJOR EQUIPMENT/FLEET3,3802,1111,5921,6242,1562,1892,2232,2582,2932,32922,155 400101019DEFIBRILLATOR AND MEDICAL EXPENSE83---------83 400101022FIRE RADIO SYSTEM UPGRADE-788081838486889091761 400201000AERIAL LADDER TESTING17---------17 621506002FIRE COMMUNICATIONS EQUIPMENT-1221241271301321351371401431,190 621506003400101007ADDITIONAL FLEET VEHICLE1,504---1,920-----3,424 621506010ADD'L FIRE HALL SPACE & 1,000---------1,000 FURNISHINGS 700607003PERSONAL PROTECTIVE EQUIPMENT-2642662752752552602662712762,408 Total ADMINISTRATION - FIRE6,4152,5752,0622,1074,5642,6602,7042,7492,7942,83931,469 APPENDIX C 6 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:GOLF Division/Section:DOON GOLF NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600111680101000DOON - GENERAL MTCE - 2026196---------196 202600112680101001DOON - COURSE IMPROVEMENTS 2026100---------100 680101000DOON - GENERAL MTCE-1231211191173053473924405652,529 680101001DOON - COURSE IMPROVEMENTS-102104106108110113115117120995 Total DOON GOLF2962252252252254154605075576853,820 APPENDIX C 7 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:GOLF Division/Section:ROCKWAY GOLF NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600114680201000ROCKWAY - GENERAL MTCE - 2026196---------196 202600115680201001ROCKWAY - COURSE IMPROVEMENTS - 100---------100 2026 680201000ROCKWAY - GENERAL MTCE-1231211191173053473924405652,529 680201001ROCKWAY - COURSE IMPROVEMENTS-102104106108110113115117120995 Total ROCKWAY GOLF2962252252252254154605075576853,820 APPENDIX C 8 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:NEIGHBOURHOOD PROGRAMS & SERVICES Division/Section:COMMUNITY RESOURCE CENTRES NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 620304011ROCKWAY CENTRE REDEVELOPMENTC-5,000--------5,000 620304014FOREST HEIGHTS CC ADDITION1482,7062,761-------5,615 Total COMMUNITY RESOURCE CENTRES1487,7062,761-------10,615 APPENDIX C 9 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:NEIGHBOURHOOD PROGRAMS & SERVICES Division/Section:NEIGHBOURHOOD DEVELOPMENT & VOLUNTEER NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600085620301004LOVE MY HOOD - 2026197---------197 620301004LOVE MY HOOD IMPLEMENTATION-1981992002012022032042052071,819 620302002OUTDOOR WINTER RINKS8075--------155 Total NEIGHBOURHOOD DEVELOPMENT & VOLUNTEER2772731992002012022032042052072,171 APPENDIX C 10 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:NEIGHBOURHOOD PROGRAMS & SERVICES Division/Section:NPS ADMINISTRATION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 20260011370101042CORPORATE ACCESSIBILITY FUND - 124---------124 2026 70101042COPORATE ACCESSIBILITY FUND-1271291321341371401431451481,235 Total NPS ADMINISTRATION1241271291321341371401431451481,359 APPENDIX C 11 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:SPORT Division/Section:ARENAS NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 601302001ARENAS -GEN RENOV/UPGRADING3243303373443503573653723793873,545 620202058COMMUNITY ARENA PAVING-11050-------160 Total ARENAS3244403873443503573653723793873,705 APPENDIX C 12 City of Kitchener Capital Forecast 2026 - 2035 Department:COMMUNITY SERVICES Division:SPORT Division/Section:KMAC NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600109601203001KMAC GENERAL PROVISION - 2026536---------536 202600110620202021EVENT RECRUITMENT - 202628---------28 601203001KMAC - GENERAL PROVISION-2902963023083143213273343402,832 620202021EVENT RECRUITMENT-293030313132323334282 620202023PAVING/CURBING - AUD--125130------255 620202072DOM CARDILO ARENA FLOOR-----2,026----2,026 620202075VIDEOBOARD ------500---500 REPLACEMENTS/UPGRADE Total KMAC5643194514623392,3718533593673746,459 APPENDIX C 13 City of Kitchener Capital Forecast 2026 - 2035 Department:CORPORATE SERVICES Division:CORPORATE COMMUNICATIONS Division/Section:CORPORATE COMMUNICATIONS NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 150201004WEBSITE REFRESH400----50----450 400201001INTRANET REFRESH----50-----50 Total CORPORATE COMMUNICATIONS400---5050----500 APPENDIX C 14 City of Kitchener Capital Forecast 2026 - 2035 Department:CORPORATE SERVICES Division:EQUITY, ANTI-RACISM & INDIGENOUS Division/Section:EQUITY, ANTI-RACISM & INDIGENOUS NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 401401002RISE150---------150 Total EQUITY, ANTI-RACISM & INDIGENOUS150---------150 APPENDIX C 15 City of Kitchener Capital Forecast 2026 - 2035 Department:CORPORATE SERVICES Division:HUMAN RESOURCES Division/Section:HUMAN RESOURCES NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 150401002MARKET SALARY ANALYSIS45--45--45--45180 Total HUMAN RESOURCES45--45--45--45180 APPENDIX C 16 City of Kitchener Capital Forecast 2026 - 2035 Department:CORPORATE SERVICES Division:LEGISLATED SERVICES Division/Section:MAILROOM NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 300501006MAIL SERVICES EQUIPMENT--29--31--33-93 Total MAILROOM--29--31--33-93 APPENDIX C 17 City of Kitchener Capital Forecast 2026 - 2035 Department:CORPORATE SERVICES Division:TECHNOLOGY INNOVATION & SERVICES Division/Section:INFORMATION TECHNOLOGY NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 200201000SOFTWARE-1,0021,0621,0721,1071,1171,1311,1531,1771,20010,021 200201002COMPUTER INFRASTRUCTURE -1,1651,1921,2201,2491,2781,3081,3341,3611,38811,495 PROVISION 202600041200201000SOFTWARE - 2026995---------995 202600042200201002COMPUTER INFRASTRUCTURE 1,138---------1,138 PROVISION - 2026 202600043300701001WREPNET FIBRE PROJECT - 2026404---------404 20260004470101003GEOGRAPHIC INFORMATION SYSTEM - 312---------312 2026 300701001WREPNET FIBRE PROJECT-4114184254324414504584674763,978 70101003GEOGRAPHIC INFORMATION SYSTEM-3243323423523633733843913993,260 Total INFORMATION TECHNOLOGY2,8492,9023,0043,0593,1403,1993,2623,3293,3963,46331,603 APPENDIX C 18 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:BUILDING Division/Section:BUILDING GENERAL NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 621401003TECHNOLOGY UPGRADES79-2284-2590-2795422 Total BUILDING GENERAL79-2284-2590-2795422 APPENDIX C 19 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ECONOMIC DEVELOPMENT Division/Section:ARTS & CULTURE NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202500012HOMER WATSON HOUSE & GALLERY300---------300 999900005CONRAD CENTRE50505050505050505050500 Total ARTS & CULTURE350505050505050505050800 APPENDIX C 20 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ECONOMIC DEVELOPMENT Division/Section:ECONOMIC DEVELOPMENT ADMIN NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 700101015DOWNTOWN IMPROVEMENTS92949698991011031061081101,007 700101022DOWNTOWN INCENTIVES FUNDING - 1031051071091121141161181211231,128 DT Total ECONOMIC DEVELOPMENT ADMIN1951992032072112152192242292332,135 APPENDIX C 21 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:BRIDGE REHABILITATION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600048800405002LEGISLATED BRIDGE INSPECTION - 202648---------48 701205023ROAD BRIDGE REPAIRS-544-566-589601-625-2,925 800405002LEGISLATED BRIDGE INSPECTION-495051525354555657477 801006001KENT AVENUE CULVERT-60-300-312----672 Total BRIDGE REHABILITATION48653509175295465555681574,122 APPENDIX C 22 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:FULL RECONSTRUCTION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 20240001BORDEN AVE - WEBER ST TO EAST AVET-94376-2,092-----2,562 20240002FIFTH AVE - WILSON AVE TO KINGSWAY T1,147-6,374199------7,720 DR 202600022RUTHERFORD-THALER----759-----759 202600023NINE PINES NEIGHBOURHOOD----706-----706 202600024ELIZABETH ST - BOEHMER TO OXFORD101406-2,25563-----2,825 202600025GREEN ST - PARK TO KING--82328------410 202600026AVALON-BARBARA3651,459-4,0524,052-----9,928 202600027BELLEVIEW-SMITHSON-LAYTON-6522,610-7,2507,250-----17,762 SUFFOLK 202600028HEARTH CR - ALL FROM HAHN PL----203-----203 701205020AVONDALE/DUNBART647-3,59795------4,339 701205048SPADINA - BELMONT TO PATRICIATS-2,13864-------2,202 701205070CLAREMONT - WESTMOUNT TO T859-4,772141------5,772 BELMONT 701205078PATRICIA - QUEEN TO HIGHLANDT60---------60 701205103MERNER AVE - FREDERICK TO KRUGT2,77992674-------3,779 701205119RUSHOLME RD - WESTMOUNT TO T-3,23275-------3,307 DUNBAR 701205123WOODWARD ST - GUELPH TO T--2,13064------2,194 FAIRFIELD 701205124FLOYD ST - GUELPH TO FAIRFIELDT-2,09363-------2,156 701205125GAGE AVE - BELMONT TO WAVERLYTS----184-----184 APPENDIX C 23 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:FULL RECONSTRUCTION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 701205157CRESTWOOD ST - GUELPH TO T383-2,13064------2,577 FAIRFIELD 800401024WIP ROAD RECONSTRUCTION T(2,348)2,407(3,335)2,760(1,789)60,57164,26568,18572,34576,758339,819 GENERAL ACCOUNT 801004001ST. GEORGE ST - QUEEN TO BENTONT19---------19 801004002KING ST. E - STIRLING TO OTTAWAT1,880110--------1,990 801004003DEERPARK CRES - FOREST HILL TO FORET2,54549--------2,594 801004005SHADYWOOD CRES - FOREST HILL DR T-2,52478-------2,602 TO END 801004006HERBERT ST - PINE TO C OF WATERLOOT-80420-------824 801004007BECKER - FIFE - ANNTS94---------94 801004008MONTROSE - CARLTON - METZLOFFT3,17683--------3,259 801004009LAWRENCE AVE - VICTORIA TO KARNT48---------48 801004010SOUTH DR - QUEEN'S BLVD TO TS559-3,10599------3,763 BELMONT 801004011ARDELT AVE - HANSON AVETS--3851,542------1,927 901003016JACK AVE - BELMONT TO PATRICIAT----418-----418 901003020JOHNSTON - PATRICK - WELLINGTONTS3,0674,600164-------7,831 901003033FALESY / KRAFT / HAROLD / JEANT1,548-8,600259------10,407 901003034FIRST AVE - KINGSWAY TO TS---139557-----696 CONNAUGHT 901003039ADMIRAL/MARLBOROUGH/ROXBOROUT182---------182 GH 901003042FREDERICK ST - BRUCE TO VICTORIAT360---------360 APPENDIX C 24 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:FULL RECONSTRUCTION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 901003044EAST AVE - FREDERICK TO KRUGT145---------145 901003047QUEEN'S BLVD - WESTMOUNT TO T6,576153--------6,729 BELMO 901004012ROSS - WILFRED TO FRANKLINT153610-3,390101-----4,254 901004013WILSON - NORTH END TO FAIRLAWNTS241---------241 901004017BLUERIDGE - QUEEN TO LAKESIDET202807-4,486144-----5,639 901004023RAMBLEWOOD WAY - ELMRIDGE TO T----188-----188 BROOKSIDE 901004026BIRCH - CLIFTON - ASHT----436-----436 901004030CHAPEL / MELROSET105---------105 901004031RANDERSON AVE - MCKENZIE TO E. TS-171683-3,795-----4,649 END 901004035BROADVIEW AVE - S END TO PROSPECTTS43---------43 901004036OXFORD ST - ELIZABETH TO N ENDTS722-4,011117------4,850 901004038KRUG - BECKER TO SHERWOODT----287-----287 901004039KINZIE - WEBER TO GUERINT-244977-5,430-----6,651 901004040HEATHER - BECKER TO ETONT---177707-----884 901004041ETON - ROSEMOUNT TO KRUGT---189755-----944 901004042BRUCE ST - FREDERICK TO FIFET-78311-1,726-----2,115 901004044OAKWOOD/RIDGEWOOD/PRUETER/ELT----292-----292 MW 901004047ROLAND ST - W END TO DAVIDTS--73291------364 901004049WILFRED - WEBER TO PROSPECTTS1,74382--------1,825 APPENDIX C 25 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:FULL RECONSTRUCTION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 901004051STIRLING AVE - GREENBROOK TO TS663-3,684119------4,466 AVALON 901004052ST LEGER ST. - UNION TO ELMWOODT-118470-2,613-----3,201 901004053JACKSON AVE - KING TO WEBERT---229915-----1,144 901004056DIXON / ROCKWAYTS2561,025-5,697199-----7,177 901004057MASSEY AVE - BONIFACE TO VANIERT----223-----223 901004058CHELSEA RD - SUFFOLK TO BELLEVIEWT-2,91889-------3,007 901004060EDWIN ST - LEONARD TO NORTH ENDTS----258-----258 901004064FAIRFIELD AVE - MARGARET TO T2,86383--------2,946 RIDGEWOOD 901004065CONWAY DR / WAYNE DRT165---------165 901004066GUELPH ST - MAPLE TO RIVERBENDTS822-4,566138------5,526 901004067LEONARD / ARNOLD / EDWINTS----258-----258 901004068DUNBAR/BALMORAL/KATHERINE/BRAT1,914-5,3155,315193-----12,737 NDO 901004071GAGE AVE - WESTMOUNT TO TS----281-----281 BELMONT 901004072UNION BLVD / GOLFVIEW PLT176706-3,921122-----4,925 901004073ROLLING MEADOWS TS--7252,901------3,626 NEIGHBOURHOOD 901004074HILLBROOK CRES / SILVER ASPEN CRESTS----433-----433 901004075CONFEDERATION NEIGHBOURHOODTS----1,169-----1,169 901004076MONTCALM NEIGHBOURHOODT---1,3265,304-----6,630 APPENDIX C 26 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:FULL RECONSTRUCTION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 901004079WESTWOOD DR - GLASGOW TO T3,5483,548262-------7,358 WESTWO 901004082CROSBY NEIGHBOURHOODT---1,7567,026-----8,782 901004084INWOOD DR / INWOOD CREST----251-----251 901004085CONNAUGHT ST - NINTH TO TRAYNORT62---------62 901004087OVERLEA NEIGHBOURHOODT--5542,215------2,769 901004089OLYMPIC DR - PATTANDON TO T61---------61 HOFFMAN 901004091FOREST GLEN NEIGHBOURHOODTS---2,0818,324-----10,405 901004092FARRIER NEIGHBOURHOODT2,7711,18879-------4,038 901004095HAZELGLEN DR - MARKWOOD TO T----310-----310 VICTORI 901004096OWEN AVE - HALLIWELL TO S BEND T---213852-----1,065 OWE 901004097CHARLES/SHELDON - OTTAWA TO T-4,683159-------4,842 PRESTON/CHARLES TO KING Total FULL RECONSTRUCTION41,35439,94950,71253,80857,08760,57164,26568,18572,34576,758585,034 APPENDIX C 27 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:NEW CONSTRUCTION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600045800401003CITY SHARE SUBDIVISIONS - 2026991---------991 202600046800401010INTENSIFICATION ALLOWANCE - 2026325---------325 800401003CITY SHARE SUBDIVISIONS-1,0111,0311,0521,0731,0941,1161,1381,1611,1849,860 800401010INTENSIFICATION ALLOWANCE-3313383453513593663733803883,231 801007002BLAIR CREEK DR ROAD & WM EXTC--5,175-------5,175 801007003DODGE DR TRUNK SAN SEWERA-44710,242-------10,689 801007004DOON SOUTH SPS - FORCEMAINC1242114,590-------4,925 901005011HURON RD IMPROVEMENTS & WM B-12,638--------12,638 EXT 901007006AMAND DR ROAD & WM EXTC---5,758------5,758 901007008STRASBURG ROAD SOUTH & WM EXTB65---------65 Total NEW CONSTRUCTION1,50514,63821,3767,1551,4241,4531,4821,5111,5411,57253,657 APPENDIX C 28 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:REGIONAL & CITY FULL RECONSTRUCTION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 7012020045497-LANCASTER-UNION TO VICTORIAT3,3687,849--------11,217 9010020095702-VICTORIA ST - LAWRENCE TO T327---------327 PAULANDER Total REGIONAL & CITY FULL RECONSTRUCTION3,6957,849--------11,544 APPENDIX C 29 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:SANITARY NETWORK REMEDIATION & IMPROVEMENTS NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600049701203024SCADA - 2026131---------131 202600050800403017TRENCHLESS REHABILITATION - 2026476---------476 202600051800404022SUMP PUMP CONNECTIONS - 202691---------91 701203024SCADA-1341361391421451471501531571,303 800403017TRENCHLESS REHABILITATION-4854955055155255365465575684,732 800404022SUMP PUMP CONNECTIONS-92949698100102104106108900 Total SANITARY NETWORK REMEDIATION & IMPROVEMENTS6987117257407557707858008168337,633 APPENDIX C 30 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:STUDIES NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600054800401000MISC LEGAL SURVEYS - 20266---------6 202600055800401007GEN PROV/SMALL PROJECTS & 15---------15 EQUIPMENT - 2026 800401000MISC LEGAL SURVEYS-66666666654 800401007GEN PROV/SMALL PROJECTS & -161616161717171818151 EQUIPMENT 800401013ENGINEERING STUDIES--2002042082122162202252291,714 901001002MASTER PLAN/FEASIBILITY STUDIES--8183848688899193695 Total STUDIES21223033093143213273323403462,635 APPENDIX C 31 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:ENGINEERING Division/Section:SURFACE RECONSTRUCTION NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600056701205059PAVEMENT SURFACE TREATMENT - 153---------153 2026 202600057800405000RESURFACING CITY STREETS - 20263,147---------3,147 202600058800405048NEW SIDEWALK INFILL - 2026204---------204 202600059901004003LANEWAY REHABILITATION PROGRAM - 529---------529 2026 701205059PAVEMENT SURFACE TREATMENT-1561591631661691731761801831,525 800405000RESURFACING CITY STREETS-3,2113,2753,3403,4073,4753,5453,6163,6883,76231,319 800405048NEW SIDEWALK INFILL-2082122162212252302342392442,029 901004003LANEWAY REHABILITATION PROGRAM-5405515625735845966086206335,267 Total SURFACE RECONSTRUCTION4,0334,1154,1974,2814,3674,4534,5444,6344,7274,82244,173 APPENDIX C 32 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:PARKING Division/Section:PARKING NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600060900303001STRUCTURAL PROVISION - GARAGES - 518---------518 2026 202600061901102005PARKING EQUIPMENT - 2026100---------100 900303001STRUCTURAL PROVISION - GARAGES-5285395505615725835956076195,154 901102005PARKING EQUIPMENT-102104106108110113115117120995 Total PARKING6186306436566696826967107247396,767 APPENDIX C 33 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:PLANNING Division/Section:PLANNING NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 150501001BROWNFIELD TIG PROGRAM1,5691,2011,1911,2061,2211,2451,2701,2951,3211,34812,867 202600063621301002PLANNING STUDIES - GENERAL - 202614---------14 202600064700101002HERITAGE RESOURCES: 21---------21 PLANNING/ASSESSMENT - 2026 202600065700101013HERITAGE RESOURCES: 15---------15 IMPLEMENTATION - 2026 202600066700101029HERITAGE PROPERTY GRANT 90---------90 PROGRAM - 2026 202600067700201002HERITAGE IMPACT ASSESSMENTS - 14---------14 2026 202600068700201005URBAN DESIGN IMPROVEMENTS - 202682---------82 202600069700201014PLANNING AWARDS - 202616---------16 621301001PLANNING STUDIES - GROWTH--8128288458628798969149336,969 621301002PLANNING STUDIES - GENERAL-151515161616161717143 700101002HERITAGE RESOURCES: -212222222323242425206 PLANNING/ASSESSMENT 700101013HERITAGE RESOURCES: -151616161717171818150 IMPLEMENTATION 700101029HERITAGE PROPERTY GRANT -9294969799101103105108895 PROGRAM 700201002HERITAGE IMPACT ASSESSMENTS-151616161617171718148 700201005URBAN DESIGN IMPROVEMENTS-848688899193959799822 700201014PLANNING AWARDS--17-18-18-19-72 Total PLANNING1,8211,4432,2692,2872,3402,3692,4342,4632,5322,56622,524 APPENDIX C 34 City of Kitchener Capital Forecast 2026 - 2035 Department:DEVELOPMENT SERVICES Division:TRANSPORTATION SERVICES Division/Section:TRANSPORTATION SERVICES NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600084600609000COMMUNITY TRAILS GNRL PROVISION 1,714---------1,714 -2026 202600086701206002TRAFFIC CALMING - 2026441---------441 202600087701206013STREET LIGHTING MAINTENANCE - 287---------287 2026 202600088701209002TRANSPORTATION DEMAND 246---------246 MANAGEMENT INITIATIVES - 2026 202600089801101001ACTIVE TRANSPORTATION 722---------722 INFRASTRUCTURE - 2026 202600090901101001SMALL SCALE TRAFFIC CALMING - 202619---------19 202600091901101002LED LIGHTING CONVERSION - 2026117---------117 202600092901306003PED BRIDGES-INSPECT & MTCE - 202672---------72 600609000COMMUNITY TRAILS GNRL PROVISION-1,8561,9033,4263,4953,5653,6363,7093,7833,85929,232 701206002TRAFFIC CALMING-4504594684784874975075175284,391 701206013STREET LIGHTING MAINTENANCE-2932993053113173233293363432,856 701209002TRANSPORTATION DEMAND -2512562612662722772832882942,448 MANAGEMENT INITIATIVES 801101001ACTIVE TRANSPORTATION -7367517667817978138298458627,180 INFRASTRUCTURE 901101001SMALL SCALE TRAFFIC CALMING-191920202021212122183 901101002LED LIGHTING CONVERSION-1201221241271291321351371401,166 901306003PED BRIDGES-INSPECT & MTCE-1237512678131134137139-943 901306016BLOCKLINE TO MANITOU TRAIL758---------758 Total TRANSPORTATION SERVICES4,3763,8483,8845,4965,5565,7185,8335,9506,0666,04852,775 APPENDIX C 35 City of Kitchener Capital Forecast 2026 - 2035 Department:FINANCIAL SERVICES Division:FINANCIAL PLANNING & ASSET MANAGEMENT Division/Section:INFRASTRUCTURE ASSET MANAGEMENT NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 800401004ROADS CONDITION STUDY131-134-140-145-148-698 Total INFRASTRUCTURE ASSET MANAGEMENT131-134-140-145-148-698 APPENDIX C 36 City of Kitchener Capital Forecast 2026 - 2035 Department:FINANCIAL SERVICES Division:FINANCIAL REPORTING & ERP SOLUTIONS Division/Section:ERP STRATEGY & SUPPORT NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202500010300501005SAP S/4HANA UPGRADE2,5002,5005,0005,000------15,000 202600034300501005ERP SYSTEMS LIFECYCLE 226---------226 ENHANCEMENTS 2026 300401005CLEVEST UPGRADE AND GENESIS-500--------500 300501005ERP SYSTEMS LIFECYCLE -2303383443523603663723783853,125 ENHANCEMENTS 70101052CITYWORKS SOFTWARE UPGRADE100100--------200 Total ERP STRATEGY & SUPPORT2,8263,3305,3385,34435236036637237838519,051 APPENDIX C 37 City of Kitchener Capital Forecast 2026 - 2035 Department:FINANCIAL SERVICES Division:REVENUE Division/Section:REVENUE (PROPERTY TAXES) NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 300601005REPLACMENT OF POS-200--------200 Total REVENUE (PROPERTY TAXES)-200--------200 APPENDIX C 38 City of Kitchener Capital Forecast 2026 - 2035 Department:GENERAL EXPENSE Division:GENERAL EXPENSE Division/Section:BOARDS NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 350601000CITS - GENERAL PROVISION6416546676806947077227367517667,018 70401000LIBRARIES - GENERAL PROVISION1101131151171191221241271291321,208 90102003LIBRARY TECHNOLOGY UPGRADE3793863944024104184274354444534,148 90102020CUSTOMER NEEDS SURVEY-66---72---78216 90102027INTEGRATED LIBRARY SYSTEM--6162636566676970523 90102029CENTRAL LIBRARY RENEWAL--------2,200-2,200 90102032RESOURCES, FURNITURE & 63646567686971727475688 EQUIPMENT 90102033AUTOMATED CHECK IN/SORTER -350--------350 REPLACE 90102036PROVISION FOR ADDTNL LIBRARY ---10,250------10,250 SPACE Total BOARDS1,1931,6331,30211,5781,3541,4531,4101,4373,6671,57426,601 APPENDIX C 39 City of Kitchener Capital Forecast 2026 - 2035 Department:GENERAL EXPENSE Division:GENERAL EXPENSE Division/Section:OTHER GENERAL EXPENSE NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600132STRATEGIC ADDITION1,000---------1,000 70101000GENERAL CAPITAL CONTINGENCY2112162202242292332382432482532,315 701201008ENVIRONMENTAL REMEDIATION-1,2251,2501,2751,3011,3271,3531,3801,4081,43611,955 800401009DEVELOPMENT CHARGE ACT STUDY269---------269 Total OTHER GENERAL EXPENSE1,4801,4411,4701,4991,5301,5601,5911,6231,6561,68915,539 APPENDIX C 40 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:FACILITIES MANAGEMENT Division/Section:FM OTHER NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600033FM - COWAN RECREATION CENTRE 1001001001001001001001001001001,000 GENERAL PROVISION 2026001162 KING ST WEST2,091---------2,091 202600117THE MUSEUM344---------344 202600118CONRAD CENTRE FOR THE 2,553---------2,553 PERFORMING ARTS 202600119500201012CITY HALL RENOS/GENERAL PROVISION 118---------118 -2026 202600120500201020AUDITORIUM - MTCE - 2026168---------168 202600121500201065CITY HALL OFFICE FURNITURE - 2026118---------118 202600122500203002KOF MAINTENANCE - 2026438---------438 202600123500203005CITY HALL COMPLEX - MTCE - 2026172---------172 202600124900401029FACILITY INFRASTRUCTURE GAP - 2026969---------969 202600133202600124CITY HALL ELEVATOR MODERNIZATION 1,925---------1,925 (1,2,3) 202600134202600124ROOF - FIRE STATION 2 (ROOF 287---------287 REPLACEMENT) 202600135202600124ROOF - HARRY CLASS POOL (ROOF 279---------279 REPLACEMENT) 202600136202600124ROOF - QUEENSMOUNT ARENA2,142---------2,142 500201012CITY HALL RENOS/GENERAL PROVISION-1241261291311341361391421451,206 500201020AUDITORIUM - MTCE-1721751781821861891931972011,673 500201065CITY HALL OFFICE FURNITURE-1241261291311341361391421451,206 500203002KOF MAINTENANCE-4474564664754844945045145244,364 APPENDIX C 41 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:FACILITIES MANAGEMENT Division/Section:FM OTHER NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 500203005CITY HALL COMPLEX - MTCE-1751781821861891931972012051,706 600901001COWAN RECREATION CENTREC30,000---------30,000 900401029FACILITY INFRASTRUCTURE GAP-6,1436,9307,4047,5457,7207,8317,9878,1478,31068,017 900401040900401029KIT FACILITIES ASSET MGMT PLAN450450--------900 900401041FACILITIES ASSESSMENT PROGRAM125127--------252 Total FM OTHER42,2797,8628,0918,5888,7508,9479,0799,2599,4439,630121,928 APPENDIX C 42 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:FACILITIES MANAGEMENT Division/Section:FM SECURITY NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 500201005SECURITY/PUNCTURE PROOF VESTS---38----42-80 Total FM SECURITY---38----42-80 APPENDIX C 43 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:FLEET Division/Section:GENERAL NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 300801001REPLACEMENT EQUIPMENT6,3874,7685,9666,3546,2256,0425,9716,0916,0916,09159,986 500401000EQUIP ACQUISITIONS & UPGRADES1,4071,4351,4641,4931,5231,5541,5851,6161,6491,68215,408 Total GENERAL7,7946,2037,4307,8477,7487,5967,5567,7077,7407,77375,394 APPENDIX C 44 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:GAS UTILITY Division/Section:GAS DELIVERY NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 20240017BUSINESS STRATEGY IN KU RENTAL -150150-------300 PROGRAMS 202600007PIPELINE CONDITION ASSESSMENT1005050-------200 20260003520240017BUSINESS STRATEGY IN KU RENTAL 150---------150 PROGRAMS - 2026 202600036870201001DEMAND SIDE MANAGEMENT - 2026800---------800 202600037870203000GAS PIPELINES - 202612,070---------12,070 202600038870204001NEW TOOLS - 2026136---------136 202600039900702024GAS METER INSTALLATION - 20262,937---------2,937 202600040900702025GAS CAPACITY PROJECTS - 2026972---------972 870201001DEMAND SIDE MANAGEMENT-1,3001,8001,8001,8001,8001,8001,8001,8001,80015,700 870203000GAS PIPELINES-12,31516,28317,45517,80910,10710,30910,51510,72610,941116,460 870204001NEW TOOLS-1391421451481511541571601631,359 900702024GAS METER INSTALLATION-2,5512,5992,6482,7012,7552,8102,8662,9242,98324,837 900702025GAS CAPACITY PROJECTS-7774861,1908411,751----5,045 Total GAS DELIVERY17,16517,28221,51023,23823,29916,56415,07315,33815,61015,887180,966 APPENDIX C 45 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:OPERATIONS - ROADS & TRAFFIC Division/Section:CONCRETE MAINTENANCE NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 800405003MAJOR SIDEWALK REPAIR/REPLACE7918649361,0101,0301,0501,0711,0931,1151,13710,097 Total CONCRETE MAINTENANCE7918649361,0101,0301,0501,0711,0931,1151,13710,097 APPENDIX C 46 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:PARKS & CEMETERIES Division/Section:ADMIN SUPPORT - PARKS NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 901301001DOWNTOWN MAINTENANCE656565656565----390 901302001CITYWIDE PARK MSTRPLN C-331-3,446------3,777 IMPLEMENTATI Total ADMIN SUPPORT - PARKS65396653,5116565----4,167 APPENDIX C 47 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:PARKS & CEMETERIES Division/Section:CEMETERIES NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600125601401001CEMETERIES - MTCE - 202646---------46 601401001CEMETERIES - MTCE-878991939553545556673 620205005LAND ACQUISITION (91 MOORE)265219--------484 901312001OUTDOOR COLUMBARIUM--2060------80 Total CEMETERIES3113061091519395535455561,283 APPENDIX C 48 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:PARKS & CEMETERIES Division/Section:FORESTRY NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600126901311001TREE PLANTING - 20263,349---------3,349 202600127901311002TREE STUMPING - 2026501---------501 202600128620403001EARTH DAY BEE CITY & NAT AREA 72---------72 EVENTS - 2026 202600129620910004KITCHENERS NATURAL AREA PROGRAM 141---------141 (KNAP) - 2026 620403001EARTH DAY BEE CITY & NAT AREA -737576787879818284706 EVNTS 620910004KITCHENERS NATURAL AREAS -1451481501541571601631661691,412 PROGRAM (KNAP) 901311001TREE PLANTING-7605656005164544894995095194,911 901311002TREE STUMPING-4624744864985105235335445554,585 Total FORESTRY4,0631,4401,2621,3121,2461,1991,2511,2761,3011,32715,677 APPENDIX C 49 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:PARKS & CEMETERIES Division/Section:TRAILS, PLAYGROUND & PARK INFRASTRUCTURE NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600130900616002NEW NEIGHBOURHOOD PARKS - 20261,513---------1,513 202600131901310002CITYWIDE PARKS GENERAL PROVISION 847---------847 -2026 600609001NEIGHBOURHOOD PARK REHAB-20389579769961,0151,0361,0561,0787,172 620910009NATURAL AREA ACQUISITION FUND1001001001001001001001001001001,000 900616002NEW NEIGHBOURHOOD PARKS-2,5542,0952,1372,1792,2232,2672,3132,3592,40620,533 901302002VIC PARK MSTRPLN IMPLEMENTATIONC1,0401,0401,040-------3,120 901308003PARKS & SPORTSFIELDS GEN PRV-837111,5431,5721,6041,6361,6691,7021,73612,256 901308013901308003COUNTRYSIDE (DMAF)800---------800 901308020901308003HIBNER, MAJOR, ARNOLD, ASH, 1,555600--------2,155 BREITHA 901308021901308003TIMBERLANE, WESTHEIGHT, TRAILVIEW-1,7001,700-------3,400 901309002PARK NATURALIZATION50---------50 901310002CITYWIDE PARKS GENERAL PROVISION-8648818989169359539739921,0128,424 901310004901310002MCLENNAN PARK IMPROVEMENTS825420950-------2,195 Total TRAILS, PLAYGROUND & PARK INFRASTRUCTURE6,7307,3817,5155,6355,7435,8585,9716,0916,2096,33263,465 APPENDIX C 50 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:SANITARY SEWER UTILITY Division/Section:SANITARY ADMIN NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 20240003MANHOLE/ZOOM INSPECTIONS-2122162202242282322362412462,055 20240005SANITARY CAPACITY PROJECTS--2,2562,3012,3472,3942,4422,4912,5412,59219,364 20240006SSU MAINTENANCE EQUIPMENT 850---------850 (VEHICLES) 20240009BRANDING REFRESH-150--------150 20240010ENHANCED COMMUNITY -1061081101121141161181201221,026 ENGAGEMENT 20240011INFILTRATION/INFLOW REDUCTION -5205305415525635745855976095,071 AND MITIGATION 20240012HYDRAULIC MODEL MAINTENANCE-1591621651681711741771811851,542 20240013FORCEMAIN CONDITION ASSESSMENT-2552602652702752802852902952,475 20240015SEWER MAIN REHAB-3831,4151,4581,5021,5471,5931,6401,6881,73712,963 202600029TRUNK SEWER INSPECTIONS-5005005005005007507507507505,500 202600030SCHNEIDER TRUNK PROTECTION AT 250500500500------1,750 PIONEER 202600031WEATHER STATION EQUIPMENT -505050505050505050450 MAINTENANCE 202600032CONTAMINATED SITE GUIDELINES--21--25--30-76 20260009420240003MANHOLE/ZOOM INSPECTIONS - 2026208---------208 20260009520240010ENHANCED COMMUNITY 104---------104 ENGAGEMENT - 2026 20260009720240011INFILTRATION/INFLOW REDUCTION 510---------510 AND MITIGATION - 2026 20260009820240012HYDRAULIC MODEL MAINTENANCE - 156---------156 2026 APPENDIX C 51 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:SANITARY SEWER UTILITY Division/Section:SANITARY ADMIN NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 20260009920240013FORCEMAIN CONDITION ASSESSMENT 250---------250 -2026 20260010020240015SEWER MAIN REHAB - 2026331---------331 202600101202600029TRUNK SEWER INSPECTIONS - 20262,000---------2,000 202600102202600031WEATHER STATION EQUIPMENT 50---------50 MAINTENANCE - 2026 202600103202600032CONTAMINATED SITE GUIDELINES - 15---------15 2026 202600104701203002SANITARY FLOW MONITORING - 2026421---------421 202600105800401012CCTV SEWER INSPECTION - 2026819---------819 202600106800403009PUMPING STATIONS GENERAL MTCE - 331---------331 2026 202600107901401002TRUNK SEWER REHAB - 20264,850---------4,850 701203002SANITARY FLOW MONITORING-4294374464544634734824925024,178 701203010PUMPING STATION REPLACEMENT---4394,5662,0403,5083,1353,1973,26120,146 800401012CCTV SEWER INSPECTION-9279469659851,0041,0251,0461,0671,0889,053 800403009PUMPING STATIONS GENERAL MTCE-3373443503573643713793873953,284 801008002701203010CARSON SPS REHABB1,250---------1,250 801008010701203010MOORE SPS REHABB2501,495--------1,745 801008011701203010OXFORD SPS REHABD-2,0003,0001,000------6,000 801008012701203010MANCHESTER SPS REHABD1,9228,0425,341700------16,005 901401002TRUNK SEWER REHAB-5,0005,1005,2025,3065,4125,5205,6305,7435,85848,771 Total SANITARY ADMIN14,56721,06521,18615,21217,39315,15017,10817,00417,37417,690173,749 APPENDIX C 52 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:STORM WATER UTILITY Division/Section:STORM ADMIN NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202500004STORM UTILITY LAND ACQUISITION1,052961--------2,013 202500005SWM POND AND CREEK ------11,71711,95112,19012,43448,292 INFRASTRUCTURE 202600011SWMF 79 RETROFIT (HYDRO)271276--------547 202600012VICTORIA PARK LAKE SEDIMENT D--------2,500-2,500 MANAGEMENT 202600013BATHYMETRIC SURVEYS-505050505050505050450 202600014SWM MASTER PLAN AND MODEL B650600200-------1,450 UPDATE 202600015SSU SERVICE LEVEL STUDYC---30--30--3090 202600016EXCESS SOIL AND BENEFICIAL REUSE -45-20--20--20105 STUDY 202600017DEVELOPMENT MANUAL UPDATES-41--25--25--91 202600018SEWER USE BY-LAW UPDATES-100-----50--150 202600019DEWATERING AND DISCHARGE -125--------125 GUIDELINES 202600020SPILLS MANAGEMENT GUIDELINES-100--15--45--160 202600021SSU O&M GUIDELINES-33--25--30--88 202600078701204001SWM MONITORING PROGRAM - 2026351---------351 202600079701204016MISC. CREEK REHABILITATION - 2026140---------140 202600080701204025DRAINAGE IMPROVEMENT PROGRAM - 168---------168 2026 202600081901402003HYDRAULIC MODELLING - 202629---------29 202600082202600015SSU SERVICE LEVEL STUDY - 202691---------91 APPENDIX C 53 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:STORM WATER UTILITY Division/Section:STORM ADMIN NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 202600083202600016EXCESS SOIL AND BENEFICIAL REUSE 360---------360 STUDY - 2026 701201012MONITOR/UPDATE PROG - UPPER --1261291311341371391421451,083 BLAIR 701204001SWM MONITORING PROGRAM-3502202172142122092062042022,034 701204016MISC. CREEK REHABILITATION-1431461491521551581611641671,395 701204021WATERCOURSE IMPROVEMENT -4354509174684784874975075174,756 PROGRAM 701204022SWM FACILITY RETROFITS PROGRAM--2822872932993053113173232,417 701204025DRAINAGE IMPROVEMENT PROGRAM-1751841931972012052092132181,795 801009003SCHNEIDER CREEK WATERCOURSEC------10,657---10,657 801009006DMAF - SCHNEIDER CREEK AT B400---------400 MANITOU IMPROVT 801009009DMAF-BORDEN CREEK AT HWY85 C--850-------850 IMPROVEMENT 801009010DMAF-BORDEN CREEK AT CONCORDIA C--1,409-------1,409 IMPROVEMENT 801009011DMAF-LOWER LAUREL CREEK C---4,3493,9394,017----12,305 IMPROVEMENTS 801009012DMAF-VOISIN CREEK AT GREENBROOK C---2,3192,365-----4,684 DR 801009013DMAF-MIDDLE STRASBURG C4,350---------4,350 NATURALIZATION 801009018SWMF 61 AT BATTLER RETROFITC--2,035---1,7161,716--5,467 801009019DMAF-PROSPECT PARK SWM C-2,5732,353510------5,436 ENHANCEMENTS 801009020DMAF-SANDROCK HYDRO CORRIDOR A1,752---------1,752 SWM APPENDIX C 54 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:STORM WATER UTILITY Division/Section:STORM ADMIN NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 801009021DMAF-CHERRY PARK SWM C--2,790-------2,790 ENHANCEMENT 801009022DMAF-COUNTRYSIDE PARK SWM C--5281,3972,929-----4,854 ENHANCEMENT 801009023DMAF-COUNTRY HILL PARK SWM A1,290---------1,290 ENHANCEMENT 801009024DMAF-IDLEWOOD GREENWAY SWM C5,360---------5,360 ENHANCEMENT 801009025DMAF-MILLWOOD PARK SWM B1,1002,132--------3,232 ENHANCEMENT 801009027BIEHN PARK SWM ENHANCEMENTC--------5,934-5,934 801009029DMAF-CREEK NATURALIZATIONC7,7637,1944,4392,9162,8092,706----27,827 801009031REEP DMAF SUPPORTA173176--------349 901009012MARKET INCENTIVE PROGRAM-----9129668486882,136 901009016PARK / SWM ENHANCEMENTS-----5,2578979159329518,952 901402003HYDRAULIC MODELLING-303132333435363738306 901402004LID IMPLEMENTATION54---------54 Total STORM ADMIN25,35415,53916,09313,51513,64514,45527,58916,42523,27615,183181,074 APPENDIX C 55 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:WATER UTILITY Division/Section:WATER ADMIN NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 20240007UNSPECIFIED WATER CAPITAL -1,8522,0002,0402,0812,1232,1652,2082,2522,29719,018 REPLACEMENTS 202600009LANCASTER ST - BRIDGEPORT RD TO --2,600-------2,600 BRIDGE ST 202600010WESTMOUNT RD-GLASGOW ST TO --4,450-------4,450 VICTORIA ST S 20260007020240007UNSPECIFIED WATER CAPITAL 903---------903 REPLACEMENTS - 2026 202600071870102001REPLACEMENT WATER METERS - 20261,102---------1,102 202600072870103000MINOR EQUIPMENT - 202654---------54 202600073870103005LEAD SERVICE REPLACEMENTS - 202652---------52 202600074870104003UNCOMMITTED WATER PROJECTS - 68---------68 2026 202600075900701041VALVE REPLACEMENT - 2026675---------675 202600076901501002HYDRANT & SERVICE REPLACEMENTS - 108---------108 2026 870102001REPLACEMENT WATER METERS-1,1241,1461,1681,1921,2161,2411,2651,2911,31710,960 870103000MINOR EQUIPMENT-555657585960616264532 870103005LEAD SERVICE REPLACEMENTS-525252525252525252468 870104003UNCOMMITTED WATER PROJECTS-697071727476777980668 900701025VICTORIA ST - FREDRICK TO BRUCEC--------1,462-1,462 900701041VALVE REPLACEMENT-6756756756756756756756756756,075 900701053DEERIDGE/SPORTSWORLD BACKFEEDC--2,000-------2,000 900701054FAIRWAY RD N - BRIARMEADOW - KINGC------1,9821,579--3,561 APPENDIX C 56 City of Kitchener Capital Forecast 2026 - 2035 Department:INFRASTRUCTURE SERVICES Division:WATER UTILITY Division/Section:WATER ADMIN NewProject Parent Project Project NameType2026202720282029203020312032203320342035Totals NumberNumber 900701055FISCHER HALLMAN - FOREST HILL TO C--1,687370------2,057 EXPRESSWAY 900701056HOWE DRIVE--338-------338 900701058WESTMOUNT RD - OTTAWA TO C-1,4661,185-------2,651 GREENBROOK 901501002HYDRANT & SERVICE REPLACEMENTS-1101121141161181201231251281,066 901501004STIRLING AVE-COURTLAND TO KING C2,9082,473--------5,381 WATERMAIN 901501007WATER METER SHOP TABLETS--33----36--69 Total WATER ADMIN5,8707,87616,4044,5474,2464,3176,3716,0765,9984,61366,318 APPENDIX C 57 Bqqfoejy.E!}Sftfswf!boe!Sftfswf!Gvoet; KITCHENER.CA/BUDGET 2026 RESERVE FUNDS BUDGET Stabilization Reserve Funds ('000's) Investment Weather Gas Utility Gas Utility Water Utility Golf Enterprise Parking Sanitary Sewer Storm Water Tax Stab. Stab.Events Stab.(Delivery) Stab.(Supply) Stab.Stab.Stab.Enterprise Stab.Utility Stab.Utility Stab. AOpening Balance 2,77424,187 2,243 6,415 4,279 9,509 (834) 217 12,226 3,543 Revenues Transfer from Operating 110- - 4,093- 1,527 150 132 567- Transfer from Capital- - - - - -- --- Transfer from Reserve Fund- - - - - -- --- Transfer from Internal Charges- - - - - -- --- Interest Income 897 103 83 237 158 352(28) 10 452 131 Other- - - - - -- --- BSubtotal Revenues 1,007 103 83 4,330 158 1,879 122 142 1,019 131 Expenses Transfer to Operating- - - 4,826 245- - -- 3,576 Transfer to Capital- - - - - - - --- Transfer to Reserve Fund 265- - - - 1,223- - 284- Transfer to Internal Charges- - - - - - - --- Direct Expenditures- - - - - - - --- Other- - - - - - - --- CSubtotal Expenses 265- - 4,826 245 1,223- - 284 3,576 DNet Change (B-C) 742 103 83 (496)( 87) 656 122 142 735 (3,445) EEnding Balance (A+D) 24,929 2,877 2,326 5,919 4,192 10,165 (712) 359 12,961 98 Reserve Fund Target Level Minimum 8,601- 1,620 5,395 4,378 6,777 407 819 8,881 3,265 Maximum 25,802 2,500 3,239 8,092 6,567 10,165 611 1,229 13,322 4,897 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 1 2026 RESERVE FUNDS BUDGET Corporate Reserve Funds ('000's) Learning & MediationArbitrationWSIBSick LeaveInsurance Development AOpening Balance 54129 166 5,400 7,573 2,053 Revenues Transfer from Operating 358- 42 3,044 3,503 - Transfer from Capital - - - - - - Transfer from Reserve Fund - - - - - - Transfer from Internal Charges - - - - - 3,492 Interest Income 1 14 5 151 215 11 Other 1 - - 14 - 73 BSubtotal Revenues 2 372 47 3,209 3,718 3,576 Expenses Transfer to Operating - - - - - - Transfer to Capital - - - - - - Transfer to Reserve Fund - - - - - - Transfer to Internal Charges - - - - - - Direct Expenditures 1 436 40 3,006 2,067 3,426 Other - - - 76 1,257 - CSubtotal Expenses 1 436 40 3,082 3,324 3,426 DNet Change (B-C) 1 (64) 7 127 394 150 EEnding Balance (A+D) 30 477 173 5,527 7,967 2,203 Reserve Fund Target Level Minimum 25 290 10,33865 10,435 2,632 Maximum 125 435 15,50698 15,652 3,948 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 2 2026 RESERVE FUNDS BUDGET Program Specific Reserve Funds ('000's) Activa Group Energy Economic Municipal Affordable Arts and Public ArtEDIF 2.0ElectionOktoberfest SportsplexRetrofitDevelopmentAccom. TaxHousingEntertainment AOpening Balance 341 2,163 79 3,319 9,381 430 16 3913 08 14 - - - Revenues- - - Transfer from Operating- 750- 3641,664 - - 149- 12 Transfer from Capital- -- 5- - - - -- Transfer from Reserve Fund- - 5- - - - 265-- Transfer from Internal Charges- -- - - - - - -- Interest Income9 56 2 96 522 12- 69 1 Other- 200- - 29,753 398- 11 00- BSubtotal Revenues9 1,006 7 465 31,939 410- 4211 09 13 Expenses Transfer to Operating- - - - 1,390 100- 8031 00- Transfer to Capital- 2,000- 110 11,503- - - -- Transfer to Reserve Fund- - - 5- - - - -- Transfer to Internal Charges- - - - - - - - -- Direct Expenditures5 1 10- - - - - - 3 Other- 200- - - 311- - -- CSubtotal Expenses5 2,201 10 115 12,893 411- 8031 00 3 DNet Change (B-C) 4 (1,195)(3) 350 19,046(1) - (382)9 10 EEnding Balance (A+D) 345 968 76 3,669 28,427 429 16 93 17 24 Reserve Fund Target Level Minimum- - - - - - - - - 15 Maximum 500 400 65 10,000 10,000 1,900 2,000 7751 ,000 50 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 3 2026 RESERVE FUNDS BUDGET Capital Reserve Funds ('000's) Facility Auditorium Land Business Technology Hydro Gas Utility Tax Cap.DC RecoveryEquipment InfrastructureTicket SalesInventoryParksInfrastructureInvestmentInvestment AOpening Balance (31)8,199 90 289 4,156 3,619 2,266 2,430 4,004 2,548 Revenues Transfer from Operating - - 3,186 408 - - 400 - 4,985 15,847 Transfer from Capital - - - - 264 - - - 1,429 - Transfer from Reserve Fund - 2,027 - - - - - - - - Transfer from Internal Charges - - - - - - 1,790 - - - Interest Income 129 (2) 2 10 119 101 37 56 97 70 Other - - - - - - 28 6,844 328 - BSubtotal Revenues 129 2,025 3,188 418 383 101 2,255 6,900 6,839 15,917 Expenses Transfer to Operating - - - 80 - - - 3,650 20 9,458 Transfer to Capital 7,204 2,144 3,206 209 - - 400 4,026 6,387 6,468 Transfer to Reserve Fund - - - - - - - - - - Transfer to Internal Charges - - - - - - - - - - Direct Expenditures - - - - 49 - 1,872 - 1 1 Other - - - - - - 54 - 1,407 - CSubtotal Expenses 7,204 2,144 3,206 289 49 - 2,326 7,676 7,815 15,927 DNet Change (B-C) (7,075) (119) (18) 129 334 101 (71) (776) (976) (10) EEnding Balance (A+D) 1,124 (150) 72 418 4,490 3,720 2,195 1,654 3,028 2,538 Reserve Fund Target Level Minimum 750 - - 362 - - 935 2,500 3,010 2,500 Maximum 5,932 5,000 - 1,808 5,000 5,000 2,805 7,500 9,030 7,500 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 4 2026 RESERVE FUNDS BUDGET Capital Reserve FundsObligatory Reserve Funds ('000's) Gas Utility Water Utility Golf Enterprise Parking Sanitary Sewer Storm Water Development Building Recreational CCBF Cap.Cap.Cap.Enterprise Cap.Utility Cap.Utility Cap.ChargesEnterpriseLand AOpening Balance 15,5901,821 (270) 853 22,771 10,238 (81,794) 3,503 10,754 20,620 Revenues Transfer from Operating - - 250 - - - - - - 94 Transfer from Capital - - - - - - - - - - Transfer from Reserve Fund - 1,223 - - 284 - - - - - Transfer from Internal Charges - - - - - - - - - - Interest Income 51 431 (4) 24 544 240 (1,504) 103 355 591 Other - - - - - 1 100,503 8,414 (1) 1,000 BSubtotal Revenues 51 1,654 246 24 828 241 98,999 8,517 354 1,685 Expenses Transfer to Operating - - - - - - 11,880 - 2,325 - Transfer to Capital - 200 - - 3,350 3,360 30,404 8,034 - 100 Transfer to Reserve Fund - - - - - - 2,027 - - - Transfer to Internal Charges - - - - - - - - - - Direct Expenditures - - - - - - - - - - Other - - - - - - - - - - CSubtotal Expenses - 200 - - 3,350 3,360 44,311 8,034 2,325 100 DNet Change (B-C) 51 1,454 246 24 (2,522) (3,119) 54,688 483 (1,971) 1,585 EEnding Balance (A+D) 1,872 17,044 (24) 877 20,249 7,119 (27,106) 3,986 8,783 22,205 Reserve Fund Target Level Minimum 9,420 11,897 274 602 21,897 14,599 - - 7,997 - Maximum 28,260 35,690 821 1,805 65,690 43,796 5,000 4,207 11,996 5,000 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 5 Rating Legend Reserve fund has a positive balance and is at or above the maximum target 4 Reserve fund has a positive balance and is at or above the minimum target 1 but below the maximum target Reserve fund has a positive balance but is below the minimum target 2 Reserve fund has no balance or a negative balance 3 2025202520262027202820292030 (000's) BudgetProjectionBudgetBudgetBudgetBudgetBudget Stabilization Reserve Funds Operating Stabilization Reserve Funds Tax Stabilization18,718 24,187 24,929 25,851 26,686 27,545 28,427 Investment Stabilization2,767 2,774 2,877 2,970 3,053 3,139 3,227 Weather Events2,230 2,243 2,326 2,402 2,469 2,538 2,609 Total Operating Stabilization Reserve Funds 29,20423,715 30,132 31,223 32,208 33,222 34,263 Minimum Operating Stabilization Reserve Funds 9,8119,811 10,220 10,650 11,102 11,576 12,074 Maximum Operating Stabilization Reserve Funds 30,31330,313 31,541 32,831 34,186 35,608 37,102 Enterprise Stabilization Reserve Funds Gas Utility (Delivery) Stabilization6,048 6,415 5,919 6,831 7,713 7,323 8,322 Gas Utility (Supply) Stabilization4,165 4,279 4,192 4,625 4,399 4,516 4,861 Water Utility Stabilization8,976 9,509 10,165 10,392 9,563 10,416 11,330 Golf Enterprise Stabilization(1,510) (834) (713) (467) (139) 277 584 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 6 2025202520262027202820292030 (000's) BudgetProjectionBudgetBudgetBudgetBudgetBudget Enterprise Stabilization Reserve Funds (cont'd) Parking Enterprise Stabilization(619) 217 359 661 1,448 2,300 3,333 Sanitary Sewer Utility Stabilization11,249 12,226 12,961 13,597 14,806 16,514 17,009 Storm Water Utility Stabilization3,370 3,543 98 4,457 5,662 6,088 6,528 Total Enterprise Stabilization Reserve Funds 35,35531,679 32,981 40,096 43,452 47,434 51,967 Minimum Enterprise Stabilization Reserve Funds 27,53326,028 29,923 31,780 33,520 35,227 36,407 Maximum Enterprise Stabilization Reserve Funds 41,29939,041 44,883 47,669 50,281 52,842 54,609 Total Stabilization Reserve Funds 64,55955,394 63,113 71,319 75,660 80,656 86,230 Minimun Stabilization Reserve Funds 37,34435,839 40,143 42,430 44,622 46,803 48,481 Maximum Stabilization Reserve Funds 71,61269,354 76,424 80,500 84,467 88,450 91,711 Corporate Reserve Funds Mediation28 29 30 32 33 34 36 Learning & Development575 541 477 407 411 422 435 Arbitration 204 166 173 100 106 114 123 WSIB 7,988 5,400 5,527 5,612 5,654 5,651 5,601 Sick Leave 9,134 7,573 7,967 8,394 9,319 10,047 10,861 Insurance 2,267 2,053 2,203 2,311 2,374 2,388 2,347 Total Corporate Reserve Funds 20,196 15,762 16,377 16,856 17,897 18,656 19,403 Minimum Corporate Reserve Funds 23,672 23,672 23,784 24,582 24,672 24,802 24,922 Maximum Corporate Reserve Funds 35,596 35,596 35,763 36,961 37,096 37,291 37,471 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 7 2025202520262027202820292030 (000's) BudgetProjectionBudgetBudgetBudgetBudgetBudget Program Specific Reserve Funds Activa Group Sportsplex364 341 345 350 355 359 364 Energy Retrofit756 2,163 968 742 763 784 806 Public Art69 79 76 74 71 67 64 Economic Development 2,487 3,319 3,669 4,029 4,399 4,732 5,121 EDIF 2.04,457 9,381 28,428 29,603 20,527 28,576 33,491 Municipal Accommodation Tax928 430 429 432 431 432 435 Affordable Housing38 16 16 17 17 18 18 Election185 391 7 210 423 646 49 Arts and Entertainment- 308 317 326 335 344 354 Oktoberfest23 14 24 34 44 56 67 Total Program Specific Reserve Funds 16,4429,307 34,279 35,817 27,365 36,014 40,769 Minimum Program Specific Reserve Funds 1515 15 15 15 15 15 Maximum Program Specific Reserve Funds 25,690 26,690 26,690 26,690 26,690 26,690 26,690 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 8 2025202520262027202820292030 (000's) BudgetProjectionBudgetBudgetBudgetBudgetBudget Capital Reserve Funds Tax Capital1,067 8,199 1,124 109 112 115 118 DC Recovery276 (31) (150) (214) (228) (215) (172) Facility Infrastructure75 90 72 44 41 60 66 Auditorium Ticket Sales794 289 418 555 699 852 1,014 Land Inventory2,268 4,156 4,490 4,638 4,717 4,799 4,882 Business Parks3,336 3,619 3,720 3,825 3,932 4,042 4,155 Technology Infrastructure4,060 2,266 2,195 2,370 2,738 3,102 3,489 Hydro Investment2,381 2,430 1,654 1,951 3,542 2,836 4,831 Equipment 1,936 4,004 3,028 3,750 3,376 2,701 2,241 Gas Utility Investment2,553 2,548 2,538 2,525 2,505 2,488 2,472 Gas Utility Capital1,369 1,821 1,872 2,644 1,380 912 1,223 Water Utility Capital9,117 15,590 17,044 16,472 7,630 8,429 9,287 Golf Enterprise Capital(274) (270) (24) 234 (219) 44 (233) CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 9 2025202520262027202820292030 (000's) BudgetProjectionBudgetBudgetBudgetBudgetBudget Capital Reserve Funds (cont'd) Parking Enterprise Capital858 853 877 901 927 953 979 Sanitary Sewer Utility Capital13,036 22,771 20,249 11,900 5,352 8,876 12,485 Storm Water Utility Capital1,303 10,238 7,117 7,240 4,436 7,392 11,256 Total Capital Reserve Funds 78,57344,155 66,224 58,944 40,940 47,386 58,093 Minimum Capital Reserve Funds 64,00263,852 68,745 68,740 71,315 71,285 68,715 Maximum Capital Reserve Funds 211,412210,962 225,638 225,623 223,348 223,258 225,548 Obligatory Reserve Funds Development Charges8,924 (81,794) (27,106) (33,061) (42,069) (56,328) (54,861) Canada Community Building Fund3,175 3,503 3,986 1,238 1,900 2,184 4,808 Building Enterprise9,797 10,754 8,783 7,780 8,699 11,788 15,590 Recreational Land17,793 20,620 22,205 23,835 25,510 27,232 29,002 Total Obligatory Reserve Funds (46,917)39,689 7,868 (208) (5,960) (15,124) (5,461) Minimum Obligatory Reserve Funds 7,2347,582 7,997 8,076 8,261 8,509 8,594 M aximum Obligatory Reserve Funds 25,604 25,082 26,202 26,489 26,767 27,139 27,266 Total Reserve Funds 168,741 128,419 187,861 182,728 155,902 167,588 199,034 Minimum Total Reserve Funds 130,960 132,267 140,684 143,843 148,885 151,415 150,727 Maximum Total Reserve Funds 367,205 370,391 390,718 396,262 398,367 402,827 408,685 CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX D 10 Bqqfoejy.F!}Vtfs!Gff!Tdifevmf; CITY OF KITCHENER | BUDGET SUMMARY HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1 DEVELOPMENT SERVICES 2 FARMERS' MARKET Refrigeration, inside only, based on 1 foot of cooler (per stand/per 3 $ 14.33 $16.19 Y04/01/2025 $ 14.90 $ 1.94 $16.84 3.97%04/01/2026 week)* 4 Dry Table Vendor, inside only, based on 8ft table (per stand/per year)* $ 11.56 $13.06 Y04/01/2025 $ 12.03 $ 1.56 $13.59 4.03%04/01/2026 5 Covered Area (per stand/per week)* $ 64.07 $72.40 Y04/01/2025 $ 66.63 $ 8.66 $75.29 3.99%04/01/2026 6 Craft Stalls (per Saturday) $ 54.27 $61.33 Y01/01/2025 $ 56.44 $ 7.34 $63.78 3.99%01/01/2026 7MARKETPLACE KITCHEN 8 Package 1 - Rental space only (per hour) $ 57.50 $64.98 Y01/01/2025 $ 59.80 $ 7.77 $67.57 4.01%01/01/2026 9 Package 2 - Rental space, kitchen facilities/equipment (per hour) $ 76.69 $86.66 Y01/01/2025 $ 79.76 $ 10.37 $90.13 4.00%01/01/2026 Package 3 - Rental space, kitchen facilities/equipment, china, flatware, 10 $ 108.64 $ 122.76 Y01/01/2025 $ 112.99 $ 14.69 $ 127.68 4.00%01/01/2026 linens, tables and chairs (per hour) 11MARKET PIAZZA 12 Package 1 - Rental space only (per hour) $ 171.97 $ 194.33 Y01/01/2025 $ 178.85 $ 23.25 $ 202.10 4.00%01/01/2026 13 Package 2 - Rental space, kitchen facilities/equipment (per hour) $ 189.17 $ 213.76 Y01/01/2025 $ 196.74 $ 25.58 $ 222.32 4.00%01/01/2026 Package 3 - Rental space, kitchen facilities/equipment, china, flatware, 14 $ 217.83 $ 246.15 Y01/01/2025 $ 226.55 $ 29.45 $ 256.00 4.00%01/01/2026 linens, tables and chairs (per hour) 15EBY STREET COVERED AREA 16 Package 1 - Rental space only (per hour) $ 114.65 $ 129.55 Y01/01/2025 $ 119.24 $ 15.50 $ 134.74 4.00%01/01/2026 17 Package 2 - Rental space, kitchen facilities/equipment (per hour) $ 131.85 $ 148.99 Y01/01/2025 $ 137.12 $ 17.83 $ 154.95 4.00%01/01/2026 Package 3 - Rental space, kitchen facilities/equipment, china, flatware, 18 $ 160.51 $ 181.38 Y01/01/2025 $ 166.93 $ 21.70 $ 188.63 4.00%01/01/2026 linens, tables and chairs (per hour) 19UPPER FLOOR EVENT SPACE 20 Package 1 - Rental space only (per hour) $ 171.97 $ 194.33 Y01/01/2025 $ 178.85 $ 23.25 $ 202.10 4.00%01/01/2026 21 Package 2 - Rental space, kitchen facilities/equipment (per hour) $ 189.17 $ 213.76 Y01/01/2025 $ 196.74 $ 25.58 $ 222.32 4.00%01/01/2026 Package 3 - Rental space, kitchen facilities/equipment, china, flatware, 22 $ 217.83 $ 246.15 Y01/01/2025 $ 226.55 $ 29.45 $ 256.00 4.00%01/01/2026 linens, tables and chairs (per hour) 23 Licensed Event Fee $ 170.19 $ 192.31 Y01/01/2025 $ 176.99 $ 23.01 $ 200.00 4.00%01/01/2026 24 SOCAN 25 Insurance Licensed Event 26 Insurance Non-licensed Event 27 Kitchen - Cooking Classes $ 53.82 $60.82 Y01/01/2025 $ 55.97 $ 7.28 $63.25 4.00%01/01/2026 28 Facility Attendant (per hour) $ 28.84 $32.59 Y01/01/2025 $ 29.99 $ 3.90 $33.89 3.99%01/01/2026 29*"MyPick" verified farmers will be offered a 25% discount 30 SPECIAL EVENTS 31CITY HALL ROTUNDA AND KITCHENS 32 Level 1 - up to 100 in attendance + extra fees $ 420.16 $ 474.78 Y01/01/2025 $ 436.97 $ 56.81 $ 493.78 4.00%01/01/2026 33 Level 2 - up to 200 in attendance + extra fees $ 535.47 $ 605.08 Y01/01/2025 $ 556.89 $ 72.40 $ 629.29 4.00%01/01/2026 34 Level 3 - up to 300 in attendance + extra fees $ 633.54 $ 715.90 Y01/01/2025 $ 658.88 $ 85.65 $ 744.53 4.00%01/01/2026 35 Level 4 - 301 or more in attendance + extra fees $ 746.23 $ 843.24 Y01/01/2025 $ 776.08 $ 100.89 $ 876.97 4.00%01/01/2026 36CIVIC SQUARE 37 Level 1 - up to 100 in attendance + extra fees $ 214.06 $ 241.89 Y01/01/2025 $ 222.62 $ 28.94 $ 251.56 4.00%01/01/2026 38 Level 2 - up to 200 in attendance + extra fees $ 320.77 $ 362.47 Y01/01/2025 $ 333.60 $ 43.37 $ 376.97 4.00%01/01/2026 39 Level 3 - up to 300 in attendance + extra fees $ 424.83 $ 480.06 Y01/01/2025 $ 441.82 $ 57.44 $ 499.26 4.00%01/01/2026 40 Level 4 - 301 or more in attendance + extra fees $ 536.83 $ 606.62 Y01/01/2025 $ 558.30 $ 72.58 $ 630.88 4.00%01/01/2026 41CITY HALL MEETING ROOMS 42 Conestoga Room - first 3 hours + staffing $ 90.78 $ 102.58 Y01/01/2025 $ 94.41 $ 12.27 $ 106.68 4.00%01/01/2026 43 Conestoga Room - each additional hour + staffing $ 24.54 $27.73 Y01/01/2025 $ 25.52 $ 3.32 $28.84 3.98%01/01/2026 44 Heritage Room - first 3 hours + staffing $ 80.87 $91.38 Y01/01/2025 $ 84.10 $ 10.93 $95.03 4.00%01/01/2026 45 Heritage Room - each additional hour + staffing $ 24.54 $27.73 Y01/01/2025 $ 25.52 $ 3.32 $28.84 3.98%01/01/2026 APPENDIX E 1 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 46 Council Chambers - first 3 hours $ 251.86 $ 284.60 Y01/01/2025 $ 261.93 $ 34.05 $ 295.98 4.00%01/01/2026 47 Council Chambers - each additional hour $ 60.28 $68.12 Y01/01/2025 $ 62.69 $ 8.15 $70.84 3.99%01/01/2026 48 Council Chambers - first 3 hours & AV Equip + staffing $ 356.57 $ 402.92 Y01/01/2025 $ 370.83 $ 48.21 $ 419.04 4.00%01/01/2026 49 Council Chambers - each additional hour and AV + staffing $ 100.11 $ 113.12 Y01/01/2025 $ 104.11 $ 13.53 $ 117.64 4.00%01/01/2026 50 Schmalz Room - first 3 hours + staffing $ 80.15 $90.57 Y01/01/2025 $ 83.36 $ 10.84 $94.20 4.00%01/01/2026 51 Schmalz Room - each additional hour + staffing $ 27.16 $30.69 Y01/01/2025 $ 28.25 $ 3.67 $31.92 4.01%01/01/2026 52 Learning Room - first 3 hours + staffing $ 80.87 $91.38 Y01/01/2025 $ 84.10 $ 10.93 $95.03 4.00%01/01/2026 53 Learning Room - each additional hour + staffing $ 27.16 $30.69 Y01/01/2025 $ 28.25 $ 3.67 $31.92 4.01%01/01/2026 54EXTRA FEES 55 BFI Garbage Disposal Unit At cost TBD At cost TBD Y01/01/2025 At cost TBD At cost TBD At cost TBD 0.00%01/01/2026 56 Additional Security per hour At cost TBD At cost TBD Y01/01/2025 At cost TBD At cost TBD At cost TBD 0.00%01/01/2026 57 Display booth only $ 35.10 $39.66 Y01/01/2025 $ 36.50 $ 4.75 $41.25 3.99%01/01/2026 58 Display cabinet removal of goods $ 18.54 $20.95 Y01/01/2025 $ 19.28 $ 2.51 $21.79 3.99%01/01/2026 59 Rotunda Light Adjustments $ 160.38 $ 181.23 Y01/01/2025 $ 166.80 $ 21.68 $ 188.48 4.00%01/01/2026 60 Rental Attendant $ 27.80 $31.41 Y01/01/2025 $ 28.91 $ 3.76 $32.67 3.99%01/01/2026 61 Extra day setup $ 212.09 $ 239.66 Y01/01/2025 $ 220.57 $ 28.67 $ 249.24 4.00%01/01/2026 62 Tent 10X10 $ 151.60 $ 171.31 Y01/01/2025 $ 157.66 $ 20.50 $ 178.16 4.00%01/01/2026 63 Tent 10X20 $ 256.52 $ 289.87 Y01/01/2025 $ 266.78 $ 34.68 $ 301.46 4.00%01/01/2026 64 Tent lights - clamp $5.83 $6.59 Y01/01/2025 $6.06 $ 0.79 $6.85 3.95%01/01/2026 65 Chairs - padded folding $2.91 $3.29 Y01/01/2025 $3.03 $ 0.39 $3.42 4.12%01/01/2026 66 Table - 6ft rectangular $8.17 $9.23 Y01/01/2025 $8.50 $ 1.11 $9.61 4.04%01/01/2026 67 Table - bistro $ 10.79 $12.19 Y01/01/2025 $ 11.22 $ 1.46 $12.68 3.99%01/01/2026 68 Table - 5ft round $9.90 $11.19 Y01/01/2025 $ 10.30 $ 1.34 $11.64 4.04%01/01/2026 69 Projector $ 291.50 $ 329.40 Y01/01/2025 $ 303.16 $ 39.41 $ 342.57 4.00%01/01/2026 70 Screen $ 46.63 $52.69 Y01/01/2025 $ 48.50 $ 6.31 $54.81 4.01%01/01/2026 71 Sound system - small $ 139.92 $ 158.11 Y01/01/2025 $ 145.52 $ 18.92 $ 164.44 4.00%01/01/2026 72 Sound system - large $ 174.90 $ 197.64 Y01/01/2025 $ 181.90 $ 23.65 $ 205.55 4.00%01/01/2026 73 Stanchions $ 14.00 $15.82 Y01/01/2025 $ 14.56 $ 1.89 $16.45 4.00%01/01/2026 74 Extension cords $5.83 $6.59 Y01/01/2025 $6.06 $ 0.79 $6.85 3.95%01/01/2026 75 Cable mats $8.17 $9.23 Y01/01/2025 $8.50 $ 1.11 $9.61 4.04%01/01/2026 76 Barricades $8.17 $9.23 Y01/01/2025 $8.50 $ 1.11 $9.61 4.04%01/01/2026 77 Podium $ 23.31 $26.34 Y01/01/2025 $ 24.24 $ 3.15 $27.39 3.99%01/01/2026 0.06 per 0.46 per km, 0.52 per km, 0.48 per km, 0.52 per km, 78 Van - plus staffingY01/01/2025km, $7.80 4.00%01/01/2026 $57.72 flat fee $65.23 flat fee $60.03 flat fee $65.23 flat fee flat fee 79 Trailer (per day, when used with Special Events van and staff) $ 58.31 $65.89 Y01/01/2025 $ 60.64 $ 7.88 $68.52 4.00%01/01/2026 80 A-frames $ 11.67 $13.19 Y01/01/2025 $ 12.14 $ 1.58 $13.72 4.04%01/01/2026 81 Electrical panels $ 29.13 $32.92 Y01/01/2025 $ 30.30 $ 3.94 $34.24 4.01%01/01/2026 APPENDIX E 2 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 82VICTORIA PARK PAVILION New naming convention. 3-hour minimum Mon-Wed; 83 VPP Hourly (Nonprofit/Community) $ 85.29 $96.38 Y01/01/2025 $ 88.70 $ 11.53 $ 100.23 3.99%01/01/2026 6-hour minimum Thurs-Sun 84 VPP Daily (Nonprofit/Community)NEW y NEW $ 1,330.50 $ 172.97 $ 1,503.47 NEW 01/01/2026New fee for clarity. Does not include staff charges. New fee for clarity. 3-hour minimum Mon-Wed; 6- 85 VPP Hourly (Private/Corporate)NEW y NEW $ 177.40 $ 23.06 $ 200.46 NEW 01/01/2026 hour minimum Thurs-Sun 86 VPP Daily (Private/Corporate)NEW y NEW $ 2,661.00 $ 345.93 $ 3,006.93 NEW 01/01/2026New fee for clarity. Does not include staff charges. 87 VPP Facility Fee (Hourly)NEW y NEW $7.96 $ 1.03 $8.99 NEW 01/01/2026New fee for clarity capital expenditures. 88 VPP Facility Fee (Daily)NEW y NEW $ 119.40 $ 15.52 $ 134.92 NEW 01/01/2026New fee for clarity capital expenditures. 89 VPP licensed event fee $ 316.09 $ 357.18 Y01/01/2025 $ 328.73 $ 42.73 $ 371.46 4.00%01/01/2026 Fringe benefit added. 2 staff minimum requirement 90 Facility Attendant (per attendant, per hour) $ 36.55 $41.30 Y01/01/2025 $ 26.83 $ 3.49 $30.32 -26.60%01/01/2026 for VPP rentals. 91 Post Event Cleaning NEW y NEW $ 154.00 $ 20.02 $ 174.02 NEW 01/01/2026Flat rate post event cleaning through SQM 92 Insurance VPP - licensedPer Insurance Rate Schedule. 93 Insurance VPP - Non licensedPer Insurance Rate Schedule. 94 SOCAN Charges - VPP with dancingPer SOCAN rate schedule. 95 SOCAN Charges - VPP without dancingPer SOCAN rate schedule. 96 Water Distribution $ 260.00 $ 293.80 Y01/01/2025 $ 270.40 $ 35.15 $ 305.55 4.00%01/01/2026 97GAUKEL BLOCK 98 Street Electrical $ 182.00 $ 205.66 Y01/01/2025 $ 189.28 $ 24.61 $ 213.89 4.00%01/01/2026 99 Lot and Stage Electrical $ 130.00 $ 146.90 Y01/01/2025 $ 135.20 $ 17.58 $ 152.78 4.00%01/01/2026 Fee for businesses or organizations for renting Gaukel 100 Daily Rental NEW Y NEW $ 260.00 $ 33.80 $ 293.80 NEW 01/01/2026 Block for a single day. Two consecutive days of use for the same purpose as 101 2-Day Rental NEW Y NEW $ 364.00 $ 47.32 $ 411.32 NEW 01/01/2026 above, at a slightly reduced rate per day. Applies when staff support is required (e.g., event 102 Extended Booking (Per Staff)NEW Y NEW $ 156.00 $ 20.28 $ 176.28 NEW 01/01/2026staffing, setup, or supervision). Charged per staff involved. 103SQUARE PEG Breakdown cost for reference only. Square Peg is typically offered as a full-month activation. A 2-week activation may be considered under special 104 Square Peg Daily Rental NEW Y NEW $ 18.26 $ 2.37 $20.63 NEW 01/01/2026 circumstances (i.e. Oktoberfest, last-minute filling, very low commitment). Single-day rentals are not standard and not publicly offered. Fee for renting the Square Peg pop-up space for a full 105 Square Peg Monthly Rental NEW Y NEW $ 546.00 $ 70.98 $ 616.98 NEW 01/01/2026 calendar month. Charged to cover any damages incurred during the 106 Square Peg Damage NEW Y NEW At cost TBD At cost TBD NEW 01/01/2026 rental period. TBD after inspection. 10744 GAUKEL CREATIVE ARTS HUB 108NEW y NEW $ 25.50 $ 3.32 $28.82 NEW 01/01/2026Per DSD-2024-065. Using the 2025 BMR rate on pg. 4. Tenancy Rate per square ft (Below Market Rate) FILM OFFICE (ARTS & CREATIVE INDUSTRIES) 109 Comparable with other municipalities. Nominal admin 110 Film permit NEW y NEW $ 44.25 $ 5.75 $50.00 NEW 01/01/2026 fee. APPENDIX E 3 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 111 ENGINEERING 112 Municipal Consent Plan Review $ 737.91 $ 737.91 N01/01/2025 $ 767.43 $ - $ 767.43 4.00%01/01/2026 Lawyers' Requests re: availability of services, unregistered easements, 113 $ 142.86 $ 161.43 Y01/01/2025 $ 148.57 $ 19.31 $ 167.88 4.00%01/01/2026 outstanding frontage charges and contemplated local improvements 4.5% 4.5% 4.5% 4.5% Engineering admin fee for review of engineering drawings for 114 N01/01/2025 $ - 0.00%01/01/2026 construction construction construction construction subdivisions costs costs costs costs 115 Fourth and subsequent subdivision/site plan review $ 6,602.95 $ 6,602.95 N01/01/2025 $ 6,867.07 $ - $ 6,867.07 4.00%01/01/2026 116 Third and subsequent CCTV review $ 3,374.59 $ 3,374.59 N01/01/2025 $ 3,509.58 $ - $ 3,509.58 4.00% 117 Change of Ownership for Stormwater Management Pond $ 132.73 $ 132.73 N01/01/2025 $ 138.04 $ - $ 138.04 4.00%01/01/2026 118 Development Manual $ 317.52 $ 358.80 Y01/01/2025 $ 330.22 $ 42.93 $ 373.15 4.00%01/01/2026 119 Development Charge Policy $ 96.64 $ 109.20 Y01/01/2025 $ 100.50 $ 13.07 $ 113.57 4.00%01/01/2026 120 Application - DC Credit for Service Agreement $ 6,244.12 $ 7,055.86 Y01/01/2025 $ 6,493.88 $ 844.20 $ 7,338.08 4.00%01/01/2026 121Site Alteration 122 Permit $ 333.00 $ 333.00 N01/01/2025 $ 346.00 $ - $ 346.00 3.90%01/01/2026 123 Permit with Revisions $ 206.00 $ 206.00 N01/01/2025 $ 214.00 $ - $ 214.00 3.88%01/01/2026 124 Permit Renewal $ 135.00 $ 135.00 N01/01/2025 $ 140.00 $ - $ 140.00 3.70%01/01/2026 125Engineering Prints 126 Per D size sheet of paper $8.16 $9.22 Y01/01/2025 $8.48 $ 1.10 $9.58 3.98%01/01/2026 127Damage Deposits 128 Price per meter of frontage $ 148.01 $ 148.01 N01/01/2025 $ 153.93 $ - $ 153.93 4.00%01/01/2026 $53 per metre $53 per metre of $55 per metre $55 per metre of 129 Damage deposit inspectionof frontage, to frontage, to max N01/01/2025of frontage, to $ - frontage, to max 3.90%01/01/2026Rounded to the nearest dollar. max of $508 of $508 max of $528 of $528 130 Engineering and Environmental Assessment Documents $ 243.89 $ 275.60 Y01/01/2025 $ 253.65 $ 32.97 $ 286.62 4.00%01/01/2026 131MISCELLANEOUS FEES: 132 Storm Water Management Fee (per hectare) $ 118,855.15 $ 118,855.15 N01/01/2025 $ 123,609.36 $ - $ 123,609.36 4.00%01/01/2026 133 Water connection through reconstruction project (new or upgraded) $ 1,761.20 $ 1,761.20 N01/01/2025 $ 1,831.65 $ - $ 1,831.65 4.00%01/01/2026 Sanitary connection through reconstruction project (new or 134 $ 1,761.20 $ 1,761.20 N01/01/2025 $ 1,831.65 $ - $ 1,831.65 4.00%01/01/2026 upgraded) 135 Storm/Sump Pump connection through reconstruction project $ 624.00 $ 624.00 N01/01/2025 $ 649.00 $ - $ 649.00 4.01%01/01/2026 Refund for Storm/Sump Pump connection through reconstruction 136 $ 494.00 $ 494.00 N01/01/2025 $ 514.00 $ - $ 514.00 4.05%01/01/2026 project 137 Site Servicing Permit Review $ 634.00 $ 634.00 N01/01/2025 $ 659.00 $ - $ 659.00 3.94%01/01/2026 138 On Site Plumbing Applications (On-site servicing, DND) $ 634.00 $ 634.00 N01/01/2025 $ 659.00 $ - $ 659.00 3.94%01/01/2026 139 Driveway Ramp Widening Permit $ 390.00 $ 390.00 N01/01/2025 $ 400.00 $ - $ 400.00 2.56%01/01/2026Rounding. 140 Driveway Ramp Widening Permit - Inspection Refund $ 239.00 $ 239.00 N01/01/2025 $ 249.00 $ - $ 249.00 4.18%01/01/2026 Driveway Ramp Widening through Site Plan(Deemed Not 141 $ 762.00 $ 762.00 N01/01/2025 $ 792.00 $ - $ 792.00 3.94%01/01/2026 Development) Driveway Ramp Widening through Site Plan(Deemed Not 142 $ 365.00 $ 365.00 N01/01/2025 $ 380.00 $ - $ 380.00 4.11%01/01/2026 Development)-Inspection Refund 143 Asphalt Driveway Apron (per m2) 40mm-HL3 and 60mm-HL4 $ 177.84 $ 177.84 N01/01/2025 $ 184.95 $ - $ 184.95 4.00%01/01/2026 144 Sewer Surcharge Review $ 1,124.41 $ 1,124.41 N01/01/2025 $ 1,169.39 $ - $ 1,169.39 4.00%01/01/2026 145 Sewer Capacity Analysis Request $ 654.00 $ 654.00 N01/01/2025 $ 680.16 $ - $ 680.16 4.00%01/01/2026 APPENDIX E 4 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 146APPLICATION FEES: 11% of 11% of 11% of 11% of 147Administration Fee (Applies to all application fees)application fee application fee N01/01/2025application fee $ - application fee 0.00%01/01/2026 amount amount amount amount Fee will either be used to complete the work, or 60% will be held as a guarantee. Once satisfactory work is 148Sewer Service Fees:completed, 11% of the fee will be retained to cover administrative costs with the balance refunded to the applicant. 1492 Lane Rd -Fully Serviced (66' ROW) 150 Sanitary - 0-3m depth $ 13,831.44 $ 13,831.44 N01/01/2025 $ 14,384.70 $ - $ 14,384.70 4.00%01/01/2026 151 Sanitary - 3-5m depth $ 22,631.70 $ 22,631.70 N01/01/2025 $ 23,536.97 $ - $ 23,536.97 4.00%01/01/2026 152 Storm - near side MH or CB $ 8,169.21 $ 8,169.21 N01/01/2025 $ 8,495.98 $ - $ 8,495.98 4.00%01/01/2026 153 Storm - Far side $ 16,275.32 $ 16,275.32 N01/01/2025 $ 16,926.33 $ - $ 16,926.33 4.00%01/01/2026 1542 Lane Rd- No curb, gutter or sidewalk 155 Sanitary - 0-3m depth $ 12,058.77 $ 12,058.77 N01/01/2025 $ 12,541.12 $ - $ 12,541.12 4.00%01/01/2026 156 Sanitary - 3-5m depth $ 19,275.67 $ 19,275.67 N01/01/2025 $ 20,046.70 $ - $ 20,046.70 4.00%01/01/2026 157 Storm - near side MH or CB $ 6,327.70 $ 6,327.70 N01/01/2025 $ 6,580.81 $ - $ 6,580.81 4.00%01/01/2026 158 Storm - Far side $ 14,428.07 $ 14,428.07 N01/01/2025 $ 15,005.19 $ - $ 15,005.19 4.00%01/01/2026 1594 Lane Rd - Fully Serviced (86'ROW) 160 Sanitary - 0-3m depth $ 16,602.32 $ 16,602.32 N01/01/2025 $ 17,266.41 $ - $ 17,266.41 4.00%01/01/2026 161 Sanitary - 3-5m depth $ 27,238.36 $ 27,238.36 N01/01/2025 $ 28,327.89 $ - $ 28,327.89 4.00%01/01/2026 162 Storm - near side MH or CB $ 8,169.21 $ 8,169.21 N01/01/2025 $ 8,495.98 $ - $ 8,495.98 4.00%01/01/2026 163 Storm - Far side $ 17,468.58 $ 17,468.58 N01/01/2025 $ 18,167.32 $ - $ 18,167.32 4.00%01/01/2026 1644 Lane Rd - No curb, gutter or sidewalk 165 Sanitary - 0-3m depth $ 14,818.17 $ 14,818.17 N01/01/2025 $ 15,410.90 $ - $ 15,410.90 4.00%01/01/2026 166 Sanitary - 3-5m depth $ 23,830.69 $ 23,830.69 N01/01/2025 $ 24,783.92 $ - $ 24,783.92 4.00%01/01/2026 167 Storm - near side MH or CB $ 6,327.70 $ 6,327.70 N01/01/2025 $ 6,580.81 $ - $ 6,580.81 4.00%01/01/2026 168 Storm - Far side $ 19,832.14 $ 19,832.14 N01/01/2025 $ 20,625.43 $ - $ 20,625.43 4.00%01/01/2026 169Add structure 170 Sanitary $ 3,958.40 $ 3,958.40 N01/01/2025 $ 4,116.73 $ - $ 4,116.73 4.00%01/01/2026 171 Storm $ 3,958.40 $ 3,958.40 N01/01/2025 $ 4,116.73 $ - $ 4,116.73 4.00%01/01/2026 172 Catchbasin $ 2,380.77 $ 2,380.77 N01/01/2025 $ 2,476.01 $ - $ 2,476.01 4.00%01/01/2026 173Concrete Work 174 Sidewalk - 200mm thick/m2 $ 131.95 $ 131.95 N01/01/2025 $ 137.22 $ - $ 137.22 4.00%01/01/2026 175 Sidewalk or concrete boulevard - 125mm thick/m2 $ 120.47 $ 120.47 N01/01/2025 $ 125.29 $ - $ 125.29 4.00%01/01/2026 176 Curb and Gutter/m hand placed $ 114.74 $ 114.74 N01/01/2025 $ 119.33 $ - $ 119.33 4.00%01/01/2026 177 Concrete Driveway Apron - 200mm thick/m2 $ 131.95 $ 131.95 N01/01/2025 $ 137.22 $ - $ 137.22 4.00%01/01/2026 APPENDIX E 5 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N Fee will either be used to complete the work, or 60% will be held as a guarantee. Once satisfactory work is 178Water Service Fees:completed, 11% of the fee will be retained to cover administrative costs with the balance refunded to the applicant. 17925mm (1") Road: 180 2 lanes $ 10,222.99 $ 10,222.99 N01/01/2025 $ 10,631.91 $ - $ 10,631.91 4.00%01/01/2026 181 4 lanes $ 13,171.71 $ 13,171.71 N01/01/2025 $ 13,698.58 $ - $ 13,698.58 4.00%01/01/2026 182 with sewer $ 2,638.93 $ 2,638.93 N01/01/2025 $ 2,744.49 $ - $ 2,744.49 4.00%01/01/2026 183 boulevard - no pavement $ 6,712.06 $ 6,712.06 N01/01/2025 $ 6,980.55 $ - $ 6,980.55 4.00%01/01/2026 18440mm (1-1/2'") Road: 185 2 lanes $ 10,676.20 $ 10,676.20 N01/01/2025 $ 11,103.24 $ - $ 11,103.24 4.00%01/01/2026 186 4 lanes $ 13,206.13 $ 13,206.13 N01/01/2025 $ 13,734.37 $ - $ 13,734.37 4.00%01/01/2026 187 with sewer $ 2,828.25 $ 2,828.25 N01/01/2025 $ 2,941.38 $ - $ 2,941.38 4.00%01/01/2026 188 boulevard - no pavement $ 7,205.43 $ 7,205.43 N01/01/2025 $ 7,493.65 $ - $ 7,493.65 4.00%01/01/2026 18950mm (2") Road: 190 2 lanes $ 11,186.77 $ 11,186.77 N01/01/2025 $ 11,634.24 $ - $ 11,634.24 4.00%01/01/2026 191 4 lanes $ 13,774.07 $ 13,774.07 N01/01/2025 $ 14,325.04 $ - $ 14,325.04 4.00%01/01/2026 192 with sewer $ 3,143.77 $ 3,143.77 N01/01/2025 $ 3,269.52 $ - $ 3,269.52 4.00%01/01/2026 193 boulevard - no pavement $ 8,134.79 $ 8,134.79 N01/01/2025 $ 8,460.18 $ - $ 8,460.18 4.00%01/01/2026 194100mm (4") Road: 195 2 lanes $ 17,336.63 $ 17,336.63 N01/01/2025 $ 18,030.09 $ - $ 18,030.09 4.00%01/01/2026 196 4 lanes $ 20,073.09 $ 20,073.09 N01/01/2025 $ 20,876.01 $ - $ 20,876.01 4.00%01/01/2026 197 with sewer $ 3,143.77 $ 3,143.77 N01/01/2025 $ 3,269.52 $ - $ 3,269.52 4.00%01/01/2026 198 boulevard - no pavement $ 10,096.78 $ 10,096.78 N01/01/2025 $ 10,500.65 $ - $ 10,500.65 4.00%01/01/2026 199150mm (6") Road: 200 2 lanes $ 18,868.36 $ 18,868.36 N01/01/2025 $ 19,623.09 $ - $ 19,623.09 4.00%01/01/2026 201 4 lanes $ 21,604.81 $ 21,604.81 N01/01/2025 $ 22,469.01 $ - $ 22,469.01 4.00%01/01/2026 202 with sewer $ 7,211.17 $ 7,211.17 N01/01/2025 $ 7,499.61 $ - $ 7,499.61 4.00%01/01/2026 203 boulevard - no pavement $ 12,167.77 $ 12,167.77 N01/01/2025 $ 12,654.48 $ - $ 12,654.48 4.00%01/01/2026 204200mm (8") Road: 205 2 lanes $ 21,805.60 $ 21,805.60 N01/01/2025 $ 22,677.83 $ - $ 22,677.83 4.00%01/01/2026 206 4 lanes $ 22,539.91 $ 22,539.91 N01/01/2025 $ 23,441.51 $ - $ 23,441.51 4.00%01/01/2026 207 with sewer $ 8,737.16 $ 8,737.16 N01/01/2025 $ 9,086.64 $ - $ 9,086.64 4.00%01/01/2026 208 boulevard - no pavement $ 13,206.13 $ 13,206.13 N01/01/2025 $ 13,734.37 $ - $ 13,734.37 4.00%01/01/2026 209300mm (12") Road: 210 2 lanes $ 22,901.33 $ 22,901.33 N01/01/2025 $ 23,817.38 $ - $ 23,817.38 4.00%01/01/2026 211 4 lanes $ 24,106.06 $ 24,106.06 N01/01/2025 $ 25,070.30 $ - $ 25,070.30 4.00%01/01/2026 212 with sewer $ 9,941.89 $ 9,941.89 N01/01/2025 $ 10,339.56 $ - $ 10,339.56 4.00%01/01/2026 213 boulevard - no pavement $ 14,410.86 $ 14,410.86 N01/01/2025 $ 14,987.29 $ - $ 14,987.29 4.00%01/01/2026 APPENDIX E 6 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N Fee will either be used to complete the work, or 60% will be held as a guarantee. Once satisfactory work is 214Fire Hydrants:completed, 11% of the fee will be retained to cover administrative costs with the balance refunded to the applicant. 215 Removal of hydrant (no new hydrant required) $ 3,074.93 $ 3,074.93 N01/01/2025 $ 3,197.93 $ - $ 3,197.93 4.00%01/01/2026 216 Installation of new hydrant by Kitchener Utilities $ 11,817.82 $ 11,817.82 N01/01/2025 $ 12,290.53 $ - $ 12,290.53 4.00%01/01/2026 217 Installation of new hydrant by private contractor $ 11,817.82 $ 11,817.82 N01/01/2025 $ 12,290.53 $ - $ 12,290.53 4.00%01/01/2026 218 Hydrant relocation <3m (no restoration and re-use hydrant) $ 6,390.80 $ 6,390.80 N01/01/2025 $ 6,646.43 $ - $ 6,646.43 4.00%01/01/2026 219 Hydrant relocation >3m and/or restoration required (re-use hydrant) $ 12,288.24 $ 12,288.24 N01/01/2025 $ 12,779.77 $ - $ 12,779.77 4.00%01/01/2026 220 Hydrant relocation >3m and/or restoration required (new hydrant) $ 14,835.38 $ 14,835.38 N01/01/2025 $ 15,428.80 $ - $ 15,428.80 4.00%01/01/2026 Fee will either be used to complete the work, or 60% will be held as a guarantee. Once satisfactory work is 221LRT:completed, 11% of the fee will be retained to cover administrative costs with the balance refunded to the applicant. 222Sanitary or Storm connection along LRT route 223 0-200 mm (same location, upsize one pipe size) $ 9,408.36 $ 9,408.36 N01/01/2025 $ 9,784.70 $ - $ 9,784.70 4.00%01/01/2026 224 0-300 mm (different location, upsize more than one pipe size) $ 25,081.32 $ 25,081.32 N01/01/2025 $ 26,084.57 $ - $ 26,084.57 4.00%01/01/2026 225 300 mm and over (different location, upsize more than one pipe size) $ 31,351.65 $ 31,351.65 N01/01/2025 $ 32,605.71 $ - $ 32,605.71 4.00%01/01/2026 226Water connection along LRT route 227 25mm-50mm $ 12,546.40 $ 12,546.40 N01/01/2025 $ 13,048.25 $ - $ 13,048.25 4.00%01/01/2026 228 100mm-200mm $ 25,081.32 $ 25,081.32 N01/01/2025 $ 26,084.57 $ - $ 26,084.57 4.00%01/01/2026 229MISCELLANEOUS FEES: 230Sewer/Storm Inspection Fees: 231 3rd and subsequent engineering inspection fee for site plans $ 625.31 $ 625.31 N01/01/2025 $ 650.32 $ - $ 650.32 4.00%01/01/2026 232 3rd and subsequent engineering inspection fee for subdivisions $ 1,772.67 $ 1,772.67 N01/01/2025 $ 1,843.58 $ - $ 1,843.58 4.00%01/01/2026 Sanitary/Storm pipes/Concrete work (by others) to City pipes 233 $ 2,053.78 $ 2,053.78 N01/01/2025 $ 2,135.93 $ - $ 2,135.93 4.00%01/01/2026 (Engineering inspection) 234 Watermain connection abandonment (by Others)-inspect by City $ 654.00 $ 654.00 N01/01/2025 $ 680.16 $ - $ 680.16 4.00%01/01/2026 235 Watermain tapping/inspection/testing by City - 25mm(1") - 75mm(3") $ 654.00 $ 654.00 N01/01/2025 $ 680.16 $ - $ 680.16 4.00%01/01/2026 236 Watermain tapping/inspection by City - 100mm (4") and above $ 3,069.19 $ 3,069.19 N01/01/2025 $ 3,191.96 $ - $ 3,191.96 4.00%01/01/2026 237 Watermain inspection daily rate (work by others, inspection by City) $ 636.79 $ 636.79 N01/01/2025 $ 662.26 $ - $ 662.26 4.00%01/01/2026 238Water Connections - Abandonment (Killing) Fees: 239 25mm (1") to 100mm (4") $ 6,356.38 $ 6,356.38 N01/01/2025 $ 6,610.64 $ - $ 6,610.64 4.00%01/01/2026 240 150mm (6") and 200mm (8") $ 8,731.42 $ 8,731.42 N01/01/2025 $ 9,080.68 $ - $ 9,080.68 4.00%01/01/2026 241Frontage Charges (Water): 242 City - per meter $ 94.08 $94.08 N01/01/2025 $ 97.84 $ - $97.84 4.00%01/01/2026 243 City - per foot $ 28.68 $28.68 N01/01/2025 $ 29.83 $ - $29.83 4.00%01/01/2026 244Future Sidewalks/Trails: 245 Future Multi-Use Trail (per m2) $ 56.22 $56.22 N01/01/2025 $ 58.47 $ - $58.47 4.00%01/01/2026 246 Future Sidewalk - 200mm thick (per m2) $ 148.01 $ 148.01 N01/01/2025 $ 153.93 $ - $ 153.93 4.00%01/01/2026 247 Future Sidewalk - 125mm thick (per m2) $ 131.95 $ 131.95 N01/01/2025 $ 137.22 $ - $ 137.22 4.00%01/01/2026 Project Manager Administration Fee for off-site servicing works on 248 $ 98.43 $98.43 N01/01/2025 $ 102.36 $ - $ 102.36 4.00%01/01/2026 regional roads. Price per hour. Engineering Construction Inspector Administration Fee for off-site 249 $ 89.77 $89.77 N01/01/2025 $ 93.36 $ - $93.36 4.00%01/01/2026 servicing works on regional roads. Price per hour. APPENDIX E 7 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 250 PLANNING 251Demolition Control Application: 252- First building on site demolished (includes notification sign) $ 1,152.00 $ 1,152.00 N01/01/2025 $ 1,198.00 $ - $ 1,198.00 3.99%01/01/2026Rounded to the nearest dollar. 253- If application is decided by Kitchener City Council $ 1,294.00 $ 1,294.00 N01/01/2025 $ 1,346.00 $ - $ 1,346.00 4.02%01/01/2026Rounded to the nearest dollar. 254- Each additional building on site demo'd $ 575.00 $ 575.00 N01/01/2025 $ 598.00 $ - $ 598.00 4.00%01/01/2026Rounded to the nearest dollar. 255- Exemption $ 893.00 $ 893.00 N01/01/2025 $ 929.00 $ - $ 929.00 4.03%01/01/2026Rounded to the nearest dollar. 256 Fence Variance Application $ 1,136.00 $ 1,136.00 N01/01/2025 $ 1,181.00 $ - $ 1,181.00 3.96%01/01/2026Rounded to the nearest dollar. 257 Group Home Registration (NEW) $ 326.00 $ 326.00 N01/01/2025 $ 339.00 $ - $ 339.00 3.99%01/01/2026Rounded to the nearest dollar. 258 Group Home Registration (RENEWAL) $ 81.00 $81.00 N01/01/2025 $ 84.00 $ - $84.00 3.70%01/01/2026Rounded to the nearest dollar. 259 Heritage Grant Application $ 83.00 $83.00 N01/01/2025 $ 86.00 $ - $86.00 3.61%01/01/2026Rounded to the nearest dollar. Heritage Review Surcharge - heritage review related to an Official Plan 260 Amendment, Zoning By-law Amendment, or full Site Plan (Council $ 6,922.00 $ 6,922.00 N01/01/2025 $ 7,199.00 $ - $ 7,199.00 4.00%01/01/2026Rounded to the nearest dollar. decision required) Heritage Review Surcharge - heritage review related to an Official Plan 261 $ 3,375.00 $ 3,375.00 N01/01/2025 $ 3,510.00 $ - $ 3,510.00 4.00%01/01/2026Rounded to the nearest dollar. Amendment, Zoning By-law Amendment, or full Site Plan (delegated staff approval) Review fee for recovery of staff time for reviewing hydrogeological studies by the environmental 262 Hydrogeological Study (Environmental Engineering) Review Surcharge NEW N NEW $ 2,420.00 $ - $ 2,420.00 NEW 01/01/2026 engineer. Regional planning responsibility transferred to under Bill 23. 263 Information Letters - Planning/Zoning $ 335.00 $ 335.00 N01/01/2025 $ 348.00 $ - $ 348.00 3.88%01/01/2026Rounded to the nearest dollar. 264Letters of Compliance: 265 Residential 266- Regular $ 376.00 $ 376.00 N01/01/2025 $ 391.00 $ - $ 391.00 3.99%01/01/2026 267- Regular, up to 4 dwelling units per lot $ 147.00 $ 147.00 N01/01/2025 $ 153.00 $ - $ 153.00 4.08%01/01/2026 268- Express $ 592.00 $ 592.00 N01/01/2025 $ 616.00 $ - $ 616.00 4.05%01/01/2026 269 All Other 270- Regular $ 528.00 $ 528.00 N01/01/2025 $ 549.00 $ - $ 549.00 3.98%01/01/2026 271- Express $ 800.00 $ 800.00 N01/01/2025 $ 832.00 $ - $ 832.00 4.00%01/01/2026 After a letter of compliance is prepared and sent to an applicant (such as a potential property purchaser), the applicant may coordinate with the existing owner to address deficiencies such as an open building 272 Letter of Compliance - Amendment Fee NEW N NEW $ 120.00 $ - $ 120.00 NEW 01/01/2026permit then request an updated letter to verify that the matter has been resolved. There is currently no amendment fee that addresses this situation which occurs frequently. The fee will cover staff time to process the update. 273 Mapping Services - Address List (240 metre radius, no names) $ 61.00 $61.00 N01/01/2025 $ 63.00 $ - $63.00 3.28%01/01/2026Rounded to the nearest dollar. 274 Naming of Private Road $ 1,430.00 $ 1,430.00 N01/01/2025 $ 1,487.00 $ - $ 1,487.00 3.99%01/01/2026Rounded to the nearest dollar. 275 Neighbourhood Information Meeting Fee (per meeting, as required) $ 1,278.00 $ 1,278.00 N01/01/2025 $ 1,329.00 $ - $ 1,329.00 3.99%01/01/2026Rounded to the nearest dollar. 276Official Plan Amendment: $ 34,611.00 $ 34,611.00 N01/01/2025 $ 35,995.00 $ - $ 35,995.00 4.00%01/01/2026Rounded to the nearest dollar. 277- reduced fee if submitted with concurrent ZBA $ 31,150.00 $ 31,150.00 N01/01/2025 $ 32,396.00 $ - $ 32,396.00 4.00%01/01/2026Rounded to the nearest dollar. APPENDIX E 8 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 278Official Plan Amendment Recirculation Fee $ 8,653.00 $ 8,653.00 N01/01/2025 $ 8,999.00 $ - $ 8,999.00 4.00%01/01/2026Rounded to the nearest dollar. 279- total fee if combined with Minor ZBA $ 12,411.00 $ 12,411.00 N01/01/2025 $ 12,907.00 $ - $ 12,907.00 4.00%01/01/2026Rounded to the nearest dollar. 280- total fee if combined with Major ZBA $ 14,017.00 $ 14,017.00 N01/01/2025 $ 14,578.00 $ - $ 14,578.00 4.00%01/01/2026Rounded to the nearest dollar. 281 Part Lot Control By-Law Renewal $ 501.00 $ 501.00 N01/01/2025 $ 521.00 $ - $ 521.00 3.99%01/01/2026Rounded to the nearest dollar. Review fee for recovery of staff time for reviewing 282 Phase I Environmental Site Assessment Review Surcharge NEW N NEW $ 800.00 $ - $ 800.00 NEW 01/01/2026environmental site assessments. Regional planning responsibility transferred to under Bill 23. Review fee for recovery of staff time for reviewing 283 Phase One Environmental Site Assessment Review Surcharge NEW N NEW $ 1,120.00 $ - $ 1,120.00 NEW 01/01/2026environmental site assessments. Regional planning responsibility transferred to under Bill 23. Review fee for recovery of staff time for reviewing 284 Phase II Environmental Site Assessment Review Surcharge NEW N NEW $ 1,680.00 $ - $ 1,680.00 NEW 01/01/2026environmental site assessments. Regional planning responsibility transferred to under Bill 23. Review fee for recovery of staff time for reviewing 285 Phase Two Environmental Site Assessment Review Surcharge NEW N NEW $ 2,420.00 $ - $ 2,420.00 NEW 01/01/2026environmental site assessments. Regional planning responsibility transferred to under Bill 23. 286 Photocopies/Printing - black & white, per page $0.18 $0.20 Y01/01/2025 $0.18 $ 0.02 $0.20 0.00%01/01/2026Flat fee. 287 Photocopies/Printing - colour, per page $0.66 $0.75 Y01/01/2025 $0.66 $ 0.09 $0.75 0.00%01/01/2026Flat fee. 288 Planning Application Signs $ 276.00 $ 276.00 N01/01/2025 $ 287.00 $ - $ 287.00 3.99%01/01/2026 289Pre-submission Consultation: 290- Site Plan Approval $ 1,051.00 $ 1,051.00 N01/01/2025 $ 1,093.00 $ - $ 1,093.00 4.00%01/01/2026Rounded to the nearest dollar. 291- Official Plan Amendment or Zoning By-law Amendment $ 757.00 $ 757.00 N01/01/2025 $ 787.00 $ - $ 787.00 3.96%01/01/2026Round ed to the nearest dollar. 292- Combined OPA/ZBA $ 1,083.00 $ 1,083.00 N01/01/2025 $ 1,126.00 $ - $ 1,126.00 3.97%01/01/2026Rounded to the nearest dollar. 293- Condominium (other than vacant land) $ 750.00 $ 750.00 N01/01/2025 $ 780.00 $ - $ 780.00 4.00%01/01/2026Rounded to the nearest dollar. 294- Plan of Subdivision or Vacant Land Condominium $ 1,518.00 $ 1,518.00 N01/01/2025 $ 1,579.00 $ - $ 1,579.00 4.02%01/01/2026Rounded to the nearest dollar. 295- Committee of Adjustment $ 379.00 $ 379.00 N01/01/2025 $ 394.00 $ - $ 394.00 3.96%01/01/2026Rounded to the nearest dollar. 296 Public Notice Advertisement Fee - Small (per publication) $ 759.00 $ 759.00 N01/01/2025 $ 789.00 $ - $ 789.00 3.95%01/01/2026Rounded to the nearest dollar. 297 Public Notice Advertisement Fee - Large (per publication) $ 1,518.00 $ 1,518.00 N01/01/2025 $ 1,579.00 $ - $ 1,579.00 4.02%01/01/2026Rou nded to the nearest dollar. Review fee for recovery of staff time for reviewing Record of Site Condition (RSC) and Certificate of Property Use (CPU) records of site conditions and certificates of property 298NEW N NEW $ 560.00 $ - $ 560.00 NEW 01/01/2026 Review Surchargeuse. Regional planning responsibility transferred to under Bill 23. Review fee for recovery of staff time for reviewing 299 Remediation Report Review Surcharge NEW N NEW $ 1,680.00 $ - $ 1,680.00 NEW 01/01/2026remediation reports. Regional planning responsibility transferred to under Bill 23. As directed by Council for partial recovery of staff time 300 Rental Replacement By-law Application Fee NEW N NEW $ 1,000.00 $ - $ 1,000.00 NEW 01/01/2026 for processing the application. Review fee for recovery of staff time for reviewing risk 301 Risk Assessment Review Surcharge NEW N NEW $ 2,800.00 $ - $ 2,800.00 NEW 01/01/2026 assessments. Regional planning responsibility transferred to under Bill 23. Routine Disclosure Requests (fee per 15 minutes of processing time; 302 $7.50 $7.50 N01/01/2025 $7.50 $ - $7.50 0.00%01/01/2026Flat fee. photocopying charges extra) 303 Sign By-law Amendment $ 3,375.00 $ 3,375.00 N01/01/2025 $ 3,510.00 $ - $ 3,510.00 4.00%01/01/2026Rounded to the nearest dollar. 304 Sign Variance Application $ 1,136.00 $ 1,136.00 N01/01/2025 $ 1,181.00 $ - $ 1,181.00 3.96%01/01/2026Rounded to the nearest dollar. 305Signs: 306 New Home Development Signs $ 1,298.00 $ 1,298.00 N01/01/2025 $ 1,350.00 $ - $ 1,350.00 4.01%01/01/2026Rounded to the nearest dollar. 307 Permanent Signs 308- per square metre of sign face $ 38.00 $38.00 N01/01/2025 $ 40.00 $ - $40.00 5.26%01/01/2026Rounding. APPENDIX E 9 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 309 MINIMUM of $ 276.00 $ 276.00 N01/01/2025 $ 287.00 $ - $ 287.00 3.99%01/01/2026Rounded to the nearest dollar. 310- Home Business $ 110.00 $ 110.00 N01/01/2025 $ 114.00 $ - $ 114.00 3.64%01/01/2026Rounded to the nearest dollar. 311- Billboard $ 1,514.00 $ 1,514.00 N01/01/2025 $ 1,575.00 $ - $ 1,575.00 4.03%01/01/2026Rounded to the nearest dollar. 312 Video Projection Sign (per year/sign face) $ 2,117.00 $ 2,117.00 N01/01/2025 $ 2,202.00 $ - $ 2,202.00 4.02%01/01/2026Rounded to the nearest dollar. 313*Permanent sign fees double if installed before obtaining a sign permit 314 Portable Signs (including banner & inflatable) 315- Same business, both sides $ 104.00 $ 104.00 N01/01/2025 $ 108.00 $ - $ 108.00 3.85%01/01/2026Rounded to the nearest dollar. 316- Different businesses, one per side $ 162.00 $ 162.00 N01/01/2025 $ 168.00 $ - $ 168.00 3.70%01/01/2026Rounded to the nearest dollar. New portable sign location if not shown on Landscape Plan or already 317 $ 184.00 $ 184.00 N01/01/2025 $ 191.00 $ - $ 191.00 3.80%01/01/2026Rounded to the nearest dollar. approved, per site 318*Portable sign fees double if installed before obtaining a sign permit 319Site Plan - Miscellaneous 320- Recirculation fee $ 735.00 $ 735.00 N01/01/2025 $ 764.00 $ - $ 764.00 3.95%01/01/2026Rounded to the nearest dollar. 321- Site Plan Confirmation Letter $ 297.00 $ 297.00 N01/01/2025 $ 309.00 $ - $ 309.00 4.04%01/01/2026Rounded to the nearest dollar. 322Subdivisions and Vacant Land Condominium: 323Subdivision application fee PLUS $ 26,607.00 $ 26,607.00 N01/01/2025 $ 27,671.00 $ - $ 27,671.00 4.00%01/01/2026Rounded to the nearest dollar. 324- Per hectare fee $ 1,839.00 $ 1,839.00 N01/01/2025 $ 1,913.00 $ - $ 1,913.00 4.02%01/01/2026Rounded to the nearest dollar. 325- Maximum $ 92,369.00 $ 92,369.00 N01/01/2025 $ 96,064.00 $ - $ 96,064.00 4.00%01/01/2026Rounded to the nearest dollar. 326 Major modification $ 13,304.00 $ 13,304.00 N01/01/2025 $ 13,836.00 $ - $ 13,836.00 4.00%01/01/2026Rounded to the nearest dollar. 327 Minor modification $ 6,652.00 $ 6,652.00 N01/01/2025 $ 6,918.00 $ - $ 6,918.00 4.00%01/01/2026Rounded to the nearest dollar. 328 Registration of a single stage $ 3,245.00 $ 3,245.00 N01/01/2025 $ 3,375.00 $ - $ 3,375.00 4.01%01/01/2026Rounded to the nearest dollar. 329- Each additional stage $ 314.00 $ 314.00 N01/01/2025 $ 327.00 $ - $ 327.00 4.14%01/01/2026Rounded to the nearest dollar. 330 Second registration (future phases) $ 6,598.00 $ 6,598.00 N01/01/2025 $ 6,862.00 $ - $ 6,862.00 4.00%01/01/2026Rounded to the nearest dollar. 331Vacant Land Condominium application fee PLUS $ 10,401.00 $ 10,401.00 N01/01/2025 $ 10,817.00 $ - $ 10,817.00 4.00%01/01/2026Rounded to the nearest dollar. 332- Per hectare fee $ 218.00 $ 218.00 N01/01/2025 $ 227.00 $ - $ 227.00 4.13%01/01/2026Rounded to the nearest dollar. 333- Maximum $ 21,042.00 $ 21,042.00 N01/01/2025 $ 21,884.00 $ - $ 21,884.00 4.00%01/01/2026Rounded to the nearest dollar. 334 Major modification $ 5,200.00 $ 5,200.00 N01/01/2025 $ 5,408.00 $ - $ 5,408.00 4.00%01/01/2026Rounded to the nearest dollar. 335 Minor modification $ 2,600.00 $ 2,600.00 N01/01/2025 $ 2,704.00 $ - $ 2,704.00 4.00%01/01/2026Rounded to the nearest dollar. 336 Registration of a single stage $ 3,176.00 $ 3,176.00 N01/01/2025 $ 3,303.00 $ - $ 3,303.00 4.00%01/01/2026Rounded to the nearest dollar. 337- Each additional stage $ 314.00 $ 314.00 N01/01/2025 $ 327.00 $ - $ 327.00 4.14%01/01/2026Rounded to the nearest dollar. 338 Temporary Use By-law (Zoning) - maximum 3 years $ 6,270.00 $ 6,270.00 N01/01/2025 $ 6,521.00 $ - $ 6,521.00 4.00%01/01/2026Rounded to the nearest dollar. 339 Temporary Use By-law (Zoning) - renewal (maximum 3 years) $ 1,454.00 $ 1,454.00 N01/01/2025 $ 1,512.00 $ - $ 1,512.00 3.99%01/01/2026Rou nded to the nearest dollar. 340 Zoning By-law Amendment Recirculation Fee (Minor) $ 5,138.00 $ 5,138.00 N01/01/2025 $ 5,344.00 $ - $ 5,344.00 4.01%01/01/2026Rounded to the nearest dollar. 341- total fee if combined with OPA $ 12,411.00 $ 12,411.00 N01/01/2025 $ 12,907.00 $ - $ 12,907.00 4.00%01/01/2026Rounded to the nearest dollar. 342 Zoning By-law Amendment Recirculation Fee (Major) $ 6,922.00 $ 6,922.00 N01/01/2025 $ 7,199.00 $ - $ 7,199.00 4.00%01/01/2026Rounded to the nearest dollar. 343- total fee if combined with OPA $ 14,017.00 $ 14,017.00 N01/01/2025 $ 14,578.00 $ - $ 14,578.00 4.00%01/01/2026Rounded to the nearest dollar. 344Zoning (Occupancy) Certificate $ 335.00 $ 335.00 N01/01/2025 $ 348.00 $ - $ 348.00 3.88%01/01/2026Rounded to the nearest dollar. 345- for home business only $ 167.00 $ 167.00 N01/01/2025 $ 174.00 $ - $ 174.00 4.19%01/01/2026Rounded to the nearest dollar. 346- Zoning (Occupancy) Certificate Amendment $ 167.00 $ 167.00 N01/01/2025 $ 174.00 $ - $ 174.00 4.19%01/02/2026Rounded to the nearest dollar. APPENDIX E 10 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 347 TRANSPORTATION PLANNING 348 Road Occupancy Permit $ 132.58 $ 132.58 N01/01/2025 $ 137.88 $ - $ 137.88 4.00%01/01/2026 Roadway Closure and/or Partial Closure (Per Lane/Per Day) to a 349 $ 90.41 $90.41 N01/01/2025 $ 94.03 $ - $94.03 4.00%01/01/2026 maximum of 2 lanes/per day 350 Mobile Crane Operation $ 241.06 $ 241.06 N01/01/2025 $ 250.70 $ - $ 250.70 4.00%01/01/2026 351 Bike fob fee $ 10.00 $10.00 N01/01/2025 $ 10.00 $ - $10.00 0.00%01/01/2026Flat fee. 352 Sidewalk closure and/or partial closure (per day) $ 10.40 $10.40 N01/01/2025 $ 10.82 $ - $10.82 4.04%01/01/2026 353 PLANNING/ENGINEERING 354Tree Conservation 355- Permit $ 147.00 $ 147.00 N01/01/2025 $ 153.00 $ - $ 153.00 4.08%01/01/2026Rounded to the nearest dollar. 356- Permit with Revisions $ 76.00 $76.00 N01/01/2025 $ 79.00 $ - $79.00 3.95%01/01/2026Rounded to the nearest dollar. 357- Permit Renewal $ 76.00 $76.00 N01/01/2025 $ 79.00 $ - $79.00 3.95%01/01/2026Rounded to the nearest dollar. 358Condominium, other than vacant land: 359 Application fee PLUS $ 6,622.00 $ 6,622.00 N01/01/2025 $ 6,887.00 $ - $ 6,887.00 4.00%01/01/2026Rounded to the nearest dollar. 360 Minor Modification $ 1,656.00 $ 1,656.00 N01/01/2025 $ 1,722.00 $ - $ 1,722.00 3.99%01/01/2026Rounded to the nearest dollar. 361 Major Modification $ 3,310.00 $ 3,310.00 N01/01/2025 $ 3,442.00 $ - $ 3,442.00 3.99%01/01/2026Rounded to the nearest dollar. 362 Registration $ 2,142.00 $ 2,142.00 N01/01/2025 $ 2,228.00 $ - $ 2,228.00 4.01%01/01/2026Rounded to the nearest dollar. 363Condominium conversion: 364 Application fee PLUS $ 8,478.00 $ 8,478.00 N01/01/2025 $ 8,817.00 $ - $ 8,817.00 4.00%01/01/2026Rounded to the nearest dollar. 365- per unit fee $ 129.00 $ 129.00 N01/01/2025 $ 134.00 $ - $ 134.00 3.88%01/01/2026Rounded to the nearest dollar. 366 Minor site audit review fee (under 30 units) $ 1,019.00 $ 1,019.00 N01/01/2025 $ 1,060.00 $ - $ 1,060.00 4.02%01/01/2026Rounded to the nearest dollar. 367 Major site audit review fee (over 30 units) $ 1,357.00 $ 1,357.00 N01/01/2025 $ 1,411.00 $ - $ 1,411.00 3.98%01/01/2026Rounded to the nearest dollar. 368 Minor Modification $ 2,120.00 $ 2,120.00 N01/01/2025 $ 2,205.00 $ - $ 2,205.00 4.01%01/01/2026Rounded to the nearest dollar. 369 Major Modification $ 4,239.00 $ 4,239.00 N01/01/2025 $ 4,409.00 $ - $ 4,409.00 4.01%01/01/2026Rounded to the nearest dollar. 370 Registration $ 5,208.00 $ 5,208.00 N01/01/2025 $ 5,416.00 $ - $ 5,416.00 3.99%01/01/2026Rounded to the nearest dollar. 371Part Lot Control 372 Per original lot, block or part thereof $ 3,539.00 $ 3,539.00 N01/01/2025 $ 3,681.00 $ - $ 3,681.00 4.01%01/01/2026Rounded to the nearest dollar. 373 First easement (e.g. maintenance easement) PLUS $ 3,539.00 $ 3,539.00 N01/01/2025 $ 3,681.00 $ - $ 3,681.00 4.01%01/01/2026Rounded to the nearest dollar. 374 - each subsequent easement required on single detached lots $ 229.00 $ 229.00 N01/01/2025 $ 238.00 $ - $ 238.00 3.93%01/01/2026Rounded to the nearest dollar. 375Site Plan Approval: 376Full Site Plan - PLUS $ 6,662.00 $ 6,662.00 N01/01/2025 $ 6,928.00 $ - $ 6,928.00 3.99%01/01/2026Rounded to the nearest dollar. 377 Per residential unit - AND/OR $ 110.00 $ 110.00 N01/01/2025 $ 114.00 $ - $ 114.00 3.64%01/01/2026Rounded to the nearest dollar. 378 Per square metre GFA - AND/OR 379- non-residential $2.31 $2.31 N01/01/2025 $2.40 $ - $2.40 3.90%01/01/2026 380- renovation $0.53 $0.53 N01/01/2025 $0.55 $ - $0.55 3.77%01/01/2026 381 Commercial parking facilities, per vehicular parking space $ 74.00 $74.00 N01/01/2025 $ 77.00 $ - $77.00 4.05%01/01/2026Rounded to the nearest dollar. 382Stamp Plan A - PLUS $ 3,786.00 $ 3,786.00 N01/01/2025 $ 3,937.00 $ - $ 3,937.00 3.99%01/01/2026Rounded to the nearest dollar. 383 Per residential unit - AND/OR $ 110.00 $ 110.00 N01/01/2025 $ 114.00 $ - $ 114.00 3.64%01/01/2026Rounded to the nearest dollar. 384 Per square metre GFA - AND/OR 385- non-residential $2.31 $2.31 N01/01/2025 $2.40 $ - $2.40 3.90%01/01/2026 386- renovation $0.53 $0.53 N01/01/2025 $0.55 $ - $0.55 3.77%01/01/2026 387 Commercial parking facilities, per vehicular parking space $ 74.00 $74.00 N01/01/2025 $ 77.00 $ - $77.00 4.05%01/01/2026 388Stamp Plan B $ 735.00 $ 735.00 N01/01/2025 $ 764.00 $ - $ 764.00 3.95%01/01/2026Rounded to the nearest dollar. 5% of cost 5% of cost 5% of cost 5% of cost 389 Review of Site Development Works Drawings N01/01/2025 $ - 0.00%01/01/2026 estimate estimate estimate estimate 390 Letter of Credit Release Additional Inspection Fee $ 973.00 $ 973.00 N01/01/2025 $ 1,012.00 $ - $ 1,012.00 4.01%01/01/2026Rounded to the nearest dollar. APPENDIX E 11 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 391Zoning By-law Amendment Minor application - changes to zoning regulations (except building 392 $ 20,550.00 $ 20,550.00 N01/01/2025 $ 21,372.00 $ - $ 21,372.00 4.00%01/01/2026Rounded to the nearest dollar. height and Floor Space Ratio or to add one new permitted use. 393- reduced fee if submitted with concurrent OPA $ 18,495.00 $ 18,495.00 N01/01/2025 $ 19,235.00 $ - $ 19,235.00 4.00%01/01/2026Rounded to the nearest dollar. 394 Major application - all applications which are not minor. $ 27,689.00 $ 27,689.00 N01/01/2025 $ 28,797.00 $ - $ 28,797.00 4.00%01/01/2026Rounded to the nearest dollar. 395- reduced fee if submitted with concurrent OPA $ 24,920.00 $ 24,920.00 N01/01/2025 $ 25,917.00 $ - $ 25,917.00 4.00%01/01/2026Rounded to the nearest dollar. 396 Zoning By-law Amendment for Removal of Holding Provision $ 1,454.00 $ 1,454.00 N01/01/2025 $ 1,512.00 $ - $ 1,512.00 3.99%01/01/2026Roun ded to the nearest dollar. 397 PARKING 398 Monthly Parking - Surface Lots (excluding those listed above) $ 150.35 $ 169.90 Y01/01/2025 $ 150.35 $ 19.55 $ 169.90 0.00%01/01/2026 399 Monthly Parking - Garages $ 170.70 $ 192.89 Y01/01/2025 $ 170.70 $ 22.19 $ 192.89 0.00%01/01/2026 400 Monthly Parking - D/O (reserved) $ 190.50 $ 215.26 Y01/01/2025 $ 190.50 $ 24.77 $ 215.27 0.00%01/01/2026 401 Remote Parking Lot Rate - Bramm Street $ 150.35 $ 169.90 Y01/01/2025 $ 150.35 $ 19.55 $ 169.90 0.00%01/01/2026 402 Hourly Rates (meter/pay & display) $2.39 $2.70 Y01/01/2025 $2.48 $ 0.32 $2.80 3.83%01/01/2026Rounding. 403 Hourly Rates (Hospital Lots) $2.74 $3.10 Y01/01/2025 $2.83 $ 0.37 $3.20 3.17%01/01/2026Rounding. 404 Garage Rates for 2 hours* $3.72 $4.20 Y01/01/2025 $3.89 $ 0.51 $4.40 4.68%01/01/2026Rounding. 405 Garage Rates per 1/2 hour, after 1st 2 hours $1.64 $1.85 Y01/01/2025 $1.73 $ 0.22 $1.95 5.64%01/01/2026Rounding. Civic District Garage Rate per 1/2 hour for 1st hour only, after that 406 $1.11 $1.25 Y01/01/2025 $1.15 $ 0.15 $1.30 3.38%01/01/2026Rounding. regular garage rates apply 407 Garage Rates Daily Maximum $ 14.78 $16.70 Y01/01/2025 $ 15.40 $ 2.00 $17.40 4.23%01/01/2026Rounding. Last increase September 2023. Periodic changes every 408 Theatre Rate $8.85 $10.00 Y09/01/2023 $8.85 $ 1.15 $10.00 0.00%09/01/2026 3-4 years. Premium Theatre Rate - Lot 14 and Lot 19 (Excluding Valid Accessible Last increase September 2023. Periodic changes every 409 $ 10.62 $12.00 Y09/01/2023 $ 13.27 $ 1.73 $15.00 24.95%09/01/2026 Parking Permit holders)3-4 years. 410 Meter Bagging /day $ 30.00 $33.90 Y01/01/2025 $ 31.19 $ 4.05 $35.24 3.95%01/01/2026 411 Surface lot daily parking daily maximum $ 11.86 $13.40 Y01/01/2025 $ 12.35 $ 1.61 $13.96 4.18%01/01/2026 412 Surface lot daily parking (Hospital) daily maximum $ 13.63 $15.40 Y01/01/2025 $ 14.16 $ 1.84 $16.00 3.91%01/01/2026 413 Commercial Permit $ 405.95 $ 458.72 Y01/01/2025 $ 422.20 $ 54.89 $ 477.09 4.00%01/01/2026 414Cash in Lieu of Parking (Downtown Area) $ 46,085.20 $ 46,085.20 N01/01/2025 $ 47,928.60 $ - $ 47,928.60 4.00%01/01/2026 415 City Business Permit $ 243.50 $ 275.15 Y01/01/2025 $ 253.25 $ 32.92 $ 286.17 4.00%01/01/2026 416 Sports Storage Fees - Duke & Ontario Garage (per square foot) $2.39 $2.70 Y01/01/2025 $2.80 $ 0.36 $3.16 17.18%01/01/2026 417 Electric Charging Station Rate per hour $1.33 $1.50 Y01/01/2025 $1.55 $ 0.20 $1.75 16.86%01/01/2026Fee reported incorrectly in 2025. 418 Special Event Rate (After 5 pm and/or Saturdays) $5.31 $6.00 Y01/01/2025 $5.53 $ 0.72 $6.25 4.17%01/01/2026Rounding. Garage - Night Time Rate (4 pm to 9 am Monday - Friday) + Saturdays 419 $ 65.93 $74.50 Y01/01/2025 $ 68.50 $ 8.91 $77.41 3.90%01/01/2026Rounding. and Sundays - Charles & Benton Garage Saturday Flat Rate for Market Customers - Charles & Benton Garage Rounding. 420 $1.86 $2.10 Y01/01/2025 $1.95 $ 0.25 $2.20 4.66%01/01/2026 (with OTR) Saturday Flat Rate for Market Vendors and Vendor Staff - Charles & Rounding. 421 $2.74 $3.10 Y01/01/2025 $2.83 $ 0.37 $3.20 3.15%01/01/2026 Benton Garage City Hall, Charles & Benton, Duke & Ontario Garage Rate - 5 pm to Rounding. 422 $5.31 $6.00 Y01/01/2025 $5.53 $ 0.72 $6.25 4.17%01/01/2026 5:59 am (Monday to Saturday) Meter Bagging /day - duration greater than 1 week but less than 1 Rounding. 423 $ 16.20 $18.31 Y01/01/2025 $ 16.85 $ 2.19 $19.04 4.00%01/01/2026 month 424 Meter Bagging /day - greater than one month $ 10.95 $12.37 Y01/01/2025 $ 11.40 $ 1.48 $12.88 4.12%01/01/2026 Rounding. 425 Electric Charging Station Rate After Fully Charged per hour $2.65 $3.00 Y01/01/2025 $3.10 $ 0.40 $3.50 16.79%01/01/2026 Rounding. 426 Electric Charging Station Rate per hour - On Street $1.77 $2.00 Y01/01/2025 $1.99 $ 0.26 $2.25 12.22%01/01/2026 Rounding. Part-time 3 day a week permit package - Garage facilities only. Does 427 not include reserved areas. No surface lots. A total of 14 coupons $ 145.13 $ 164.00 Y01/01/2025 $ 145.13 $ 18.87 $ 164.00 0.00%01/01/2026Held Flat. issued per month that expire each month 10% premium APPENDIX E 12 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 428 BUILDING The Building Enterprise is proposing a 0% change to ** Except where specifically noted otherwise, where the fee the 2023 permit fees. Favourable results over the last 429 calculation is based on a monetary amount per sq ft and the amount few years have allowed the Building Stabilization calculated totals less than $95, a fee of $95 shall be paid. reserve fund to reach its target level. BUILDING PERMITS - Fees tied to cost of providing service associated 430 with regulatory function ** 431New Buildings, Additions, Mezzanines 432- Group A: Assembly (finished)-per sq ft. $2.07 $2.07 N01/01/2025 $2.07 $ - $2.07 0.00%01/01/2026 433 Assembly (shell)- per sq ft. $1.82 $1.82 N01/01/2025 $1.82 $ - $1.82 0.00%01/01/2026 434 Outdoor public pool $ 711.00 $ 711.00 N01/01/2025 $ 711.00 $ - $ 711.00 0.00%01/01/2026 435- Group B: Institutional (finished)-per sq ft. $2.21 $2.21 N01/01/2025 $2.21 $ - $2.21 0.00%01/01/2026 436 Institutional (shell)-per sq ft. $1.94 $1.94 N01/01/2025 $1.94 $ - $1.94 0.00%01/01/2026 437- Group C: Residential: 438 Single family, Semi, Row, Townhouse, Duplex-per sq ft. $1.07 $1.07 N01/01/2025 $1.07 $ - $1.07 0.00%01/01/2026 439 Garage/Carport (per bay) $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 440 Shed or porch $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 441 Deck or pool $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 442 Apartment building-per sq ft. $1.07 $1.07 N01/01/2025 $1.07 $ - $1.07 0.00%01/01/2026 443 Hotels/Motels-per sq ft. $1.76 $1.76 N01/01/2025 $1.76 $ - $1.76 0.00%01/01/2026 444 Residential care facility-per sq ft. $1.24 $1.24 N01/01/2025 $1.24 $ - $1.24 0.00%01/01/2026 445- Group D: Business & personal services: 446 Office buildings (shell)-per sq ft. $1.49 $1.49 N01/01/2025 $1.49 $ - $1.49 0.00%01/01/2026 447 Office buildings (finished)-per sq ft. $1.76 $1.76 N01/01/2025 $1.76 $ - $1.76 0.00%01/01/2026 448- Group E: Mercantile: 449 Retail stores (shell)-per sq ft. $0.98 $0.98 N01/01/2025 $0.98 $ - $0.98 0.00%01/01/2026 450 Retail stores (finished)-per Sq ft. $1.23 $1.23 N01/01/2025 $1.23 $ - $1.23 0.00%01/01/2026 451- Group F: Industrial: 452 Warehouse, factories (shell)-per sq ft. $0.59 $0.59 N01/01/2025 $0.59 $ - $0.59 0.00%01/01/2026 453 Warehouse, factories (finished)-per sq ft. $0.70 $0.70 N01/01/2025 $0.70 $ - $0.70 0.00%01/01/2026 Interior finishing of warehouse or factory areas only- 454 $0.14 $0.14 N01/01/2025 $0.14 $ - $0.14 0.00%01/01/2026 per sq ft. 455 Parking garage-per sq ft. $0.65 $0.65 N01/01/2025 $0.65 $ - $0.65 0.00%01/01/2026 456 Farm building-per sq ft. $0.34 $0.34 N01/01/2025 $0.34 $ - $0.34 0.00%01/01/2026 457 Foundation $0.14 $0.14 N01/01/2025 $0.14 $ - $0.14 0.00%01/01/2026 458 Conditional Permit-per greatest foot print & sq ft. (Min. $711.00) $0.14 $0.14 N01/01/2025 $0.14 $ - $0.14 0.00%01/01/2026 Interior finishes to previously unfinished area (including finishing of 459 residential basements and major renovations) - all classifications-per $0.37 $0.37 N01/01/2025 $0.37 $ - $0.37 0.00%01/01/2026 sq ft. 460 New roof structure-per sq ft. $0.22 $0.22 N01/01/2025 $0.22 $ - $0.22 0.00%01/01/2026 461 Parking garage renovations-per sq ft. $0.08 $0.08 N01/01/2025 $0.08 $ - $0.08 0.00%01/01/2026 APPENDIX E 13 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 462Minor Alterations 463 Single partitions, washrooms, new entry, new demising wall, canopies $ 163.00 $ 163.00 N01/01/2025 $ 163.00 $ - $ 163.00 0.00%01/01/2026 464Special Categories 465 Air supported structures-per sq ft. $0.40 $0.40 N01/01/2025 $0.40 $ - $0.40 0.00%01/01/2026 466 Temporary tents (per site and event) $ 163.00 $ 163.00 N01/01/2025 $ 163.00 $ - $ 163.00 0.00%01/01/2026 Temporary stages or demountable support structures (per site per 467 $ 163.00 $ 163.00 N01/01/2025 $ 163.00 $ - $ 163.00 0.00%01/01/2026 event) 468 Temporary buildings $ 163.00 $ 163.00 N01/01/2025 $ 163.00 $ - $ 163.00 0.00%01/01/2026 469 Portables/per site (excluding port-a-pak) $ 163.00 $ 163.00 N01/01/2025 $ 163.00 $ - $ 163.00 0.00%01/01/2026 470 Demolitions (minimum of $163)-per sq ft. $0.03 $0.03 N01/01/2025 $0.03 $ - $0.03 0.00%01/01/2026 471 Change of use $ 163.00 $ 163.00 N01/01/2025 $ 163.00 $ - $ 163.00 0.00%01/01/2026 472 Minor demolition (up to SDD) $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 473Miscellaneous 474 Ext. barrier free ramp $ 64.00 $64.00 N01/01/2025 $ 64.00 $ - $64.00 0.00%01/01/2026 475 Fireplace/woodstove (each) $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 476 Retaining wall (per linear foot) $2.74 $2.74 N01/01/2025 $2.74 $ - $2.74 0.00%01/01/2026 477 Balcony guard (replace per linear foot) $0.56 $0.56 N01/01/2025 $0.56 $ - $0.56 0.00%01/01/2026 478 Balcony repairs/balcony $ 12.65 $12.65 N01/01/2025 $ 12.65 $ - $12.65 0.00%01/01/2026 479 Shoring & underpinning (per linear foot) $3.04 $3.04 N01/01/2025 $3.04 $ - $3.04 0.00%01/01/2026 480 Ceiling (new or replace)-per sq ft. $0.05 $0.05 N01/01/2025 $0.05 $ - $0.05 0.00%01/01/2026 481 Façade improvement $ 163.00 $ 163.00 N01/01/2025 $ 163.00 $ - $ 163.00 0.00%01/01/2026 482 Reclad wall -per sq ft. $0.07 $0.07 N01/01/2025 $0.07 $ - $0.07 0.00%01/01/2026 483 All designated structures (except retaining walls, public pools & signs) $ 291.00 $ 291.00 N01/01/2025 $ 291.00 $ - $ 291.00 0.00%01/01/2026 484 Solar Collector; low rise residential $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 485 Solar Collector; all other application types $ 291.00 $ 291.00 N01/01/2025 $ 291.00 $ - $ 291.00 0.00%01/01/2026 486 Elevator/escalator/lift $ 291.00 $ 291.00 N01/01/2025 $ 291.00 $ - $ 291.00 0.00%01/01/2026 487 Fire retrofit (per storey) $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 488Mechanical Work - Work independent of building permit: 489 HVAC Permit (residential per suite) $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 490 HVAC Permit (non-residential)-per sq ft. $0.11 $0.11 N01/01/2025 $0.11 $ - $0.11 0.00%01/01/2026 491 Sprinkler system (minimum $163)-per sq ft. $0.05 $0.05 N01/01/2025 $0.05 $ - $0.05 0.00%01/01/2026 492 Commercial kitchen, spray booth, dust collectors $ 163.00 $ 163.00 N01/01/2025 $ 163.00 $ - $ 163.00 0.00%01/01/2026 493 Standpipe and hose system (retrofit) $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 494Electrical Work - Work independent of building permit: 495 Fire alarm system & electrical work (min. $163)-per sq ft. $0.05 $0.05 N01/01/2025 $0.05 $ - $0.05 0.00%01/01/2026 496 Electromagnetic locks (each) & hold open devices $ 39.00 $39.00 N01/01/2025 $ 39.00 $ - $39.00 0.00%01/01/2026 497 Emergency lighting (per storey) $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 498Plumbing Work - Work independent of building permit: 499 Plumbing permit (per fixture min. fee $95.00) $ 11.00 $11.00 N01/01/2025 $ 11.00 $ - $11.00 0.00%01/01/2026 500 Disconnect plumbing from septic $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 501 Connect to storm or sewer $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 502 Catchbasins/manholes/roof drains (each) $ 11.00 $11.00 N01/01/2025 $ 11.00 $ - $11.00 0.00%01/01/2026 503 Building/site services (per linear foot) $0.59 $0.59 N01/01/2025 $0.59 $ - $0.59 0.00%01/01/2026 APPENDIX E 14 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 504Sewage System 505 Installation of a new sewage system $ 462.00 $ 462.00 N01/01/2025 $ 462.00 $ - $ 462.00 0.00%01/01/2026 506 Major repair $ 231.00 $ 231.00 N01/01/2025 $ 231.00 $ - $ 231.00 0.00%01/01/2026 507 Minor repair $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 508 Examine revised plans (minimum $95)-per sq ft. $0.20 $0.20 N01/01/2025 $0.20 $ - $0.20 0.00%01/01/2026 509 Minimum permit fee (unless otherwise noted) $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 510 Transfer permit $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 511 Permit to occupy unfinished building $ 95.00 $95.00 N01/01/2025 $ 95.00 $ - $95.00 0.00%01/01/2026 512 Special Inspection Fee per hour (i.e. weeknight, weekend) $ 184.00 $ 184.00 N01/01/2025 $ 184.00 $ - $ 184.00 0.00%01/01/2026 513 Special Research Request/Written Request per hour $ 56.00 $56.00 N01/01/2025 $ 56.00 $ - $56.00 0.00%01/01/2026 514Extra Fees New construction Single Family, Duplex, Semi-detached, Townhouse & 515 $ 500.00 $ 500.00 N01/01/2025 $ 500.00 $ - $ 500.00 0.00%01/01/2026 Triplex Dwelling Units/permit New construction and additions to Multi-residential, Commercial, 516 $ 10.00 $10.00 N01/01/2025 $ 10.00 $ - $10.00 0.00%01/01/2026 Industrial & Institutional Projects/1,000. CV max. $5,000 Additions/alterations to Single Family, Duplex, Semi-detached, 517 $ 250.00 $ 250.00 N01/01/2025 $ 250.00 $ - $ 250.00 0.00%01/01/2026 Townhouse & Triplex Dwelling Units/permit Alterations/interior finish permits to Multi-residential, Commercial, 518 $ 1,000.00 $ 1,000.00 N01/01/2025 $ 1,000.00 $ - $ 1,000.00 0.00%01/01/2026 Industrial & Institutional Projects/permit This fee has been transferred from the Planning 519 Additional Dwelling Unit (ADU) Addressing Sign $ 208.00 $ 208.00 N01/01/2025 $ 208.00 $ - $ 208.00 0.00%01/01/2026 Division Fees to Building as a result of Bill 23. 520 Building Reports/Stats Can Reports (per month) $5.13 $5.80 Y01/01/2025 $5.13 $ 0.67 $5.80 0.00%01/01/2026 521 Subscriptions (Building Reports/Stats Can) (Annual) $ 28.43 $32.13 Y01/01/2025 $ 28.43 $ 3.70 $32.13 0.00%01/01/2026 522 Property Surveys - Records FOI $ 12.50 $12.50 N01/01/2025 $ 12.50 $ - $12.50 0.00%01/01/2026Legislated fee cannot be changed. 523 Administration Fee $5.00 $5.00 N01/01/2025 $5.00 $ - $5.00 0.00%01/01/2026Legislated fee cannot be changed. 524 Staff Time/15 min. $7.50 $7.50 N01/01/2025 $7.50 $ - $7.50 0.00%01/01/2026Legislated fee cannot be changed. 525 File View (street file), cost/severed page $1.00 $1.00 N01/01/2025 $1.00 $ - $1.00 0.00%01/01/2026Legislated fee cannot be changed. 526 Photocopies (Black & White) - per copy $0.18 $0.20 Y01/01/2025 $0.18 $ 0.02 $0.20 0.00%01/01/2026Flat fee. 527 Request for Environmental records $ 181.50 $ 181.50 N01/01/2025 $ 188.76 $ - $ 188.76 4.00%01/01/2026 528 Grading Certificate/Sewage System Maintenance Letter $ 20.00 $20.00 N01/01/2025 $ 20.00 $ - $20.00 0.00%01/01/2026 529 Coloured Photocopies - per copy $0.66 $0.75 Y01/01/2025 $0.66 $ 0.09 $0.75 0.00%01/01/2026Flat fee. APPENDIX E 15 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 530 COMMUNITY SERVICES 531 FIRE 532Fire Prevention Administration 533 Fire Report copies $ 101.25 $ 101.25 N01/01/2025 $ 105.50 $ - $ 105.50 4.20%01/01/2026 $42.50+ $42.50+ $44.20+ $44.20+ N 534 Status Letter - Discretionary/Commercial Inspection process01/01/2025 $ - 4.00%01/01/2026 $6.55/unit $6.55/unit $6.81/unit $6.81/unit Status Letter - Applies to specific inspection or enforcement results, 535 $ 43.25 $43.25 N01/01/2025 $ 45.00 $ - $45.00 4.05%01/01/2026 not Discretionary/Commercial Inspections. 536 File Search $ 156.50 $ 176.85 Y01/01/2025 $ 162.75 $ 21.16 $ 183.91 3.99%01/01/2026 537 Additional Hour Charge $ 92.85 $ 104.92 Y01/01/2025 $ 96.75 $ 12.58 $ 109.33 4.20%01/01/2026 538 Fireworks Display Permit $ 101.25 $ 101.25 N01/01/2025 $ 105.30 $ - $ 105.30 4.00%01/01/2026 539 Open Air Burning Permit $ 101.25 $ 101.25 N01/01/2025 $ 105.30 $ - $ 105.30 4.00%01/01/2026 $652.00/unit $626.50/unit $626.50/unit $652.00/unit first hour, Open Burning Response - Subsequent to original responsefirst hour, first hour, first hour, 540 N01/01/2025$326.00/unit $ - 4.07%01/01/2026 (consumable materials are additional)$313.25/unit per $313.25/unit per $326.00/unit per per 1/2 hour 1/2 hour after 1/2 hour after 1/2 hour after after 541 Fire Route - Establishment or Review of existing $ 249.50 $ 281.94 Y01/01/2025 $ 259.50 $ 33.74 $ 293.24 4.01%01/01/2026 542 Fire Route - Additional Hour Charge $ 93.00 $ 105.09 Y01/01/2025 $ 96.75 $ 12.58 $ 109.33 4.03%01/01/2026 543Fire Prevention - Inspections / Activities 544Fire Safety Plan Review $ 249.50 $ 249.50 N01/01/2025 $ 259.50 $ - $ 259.50 4.01%01/01/2026 545 Fire Regulation Compliance Inspection including 1st hour charge $ 249.50 $ 281.94 Y01/01/2025 $ 259.50 $ 33.74 $ 293.24 4.01%01/01/2026 546 Additional Hour Charge $ 93.00 $ 105.09 Y01/01/2025 $ 96.75 $ 12.58 $ 109.33 4.03%01/01/2026 547 Re-Inspection Fee - Hourly $ 93.00 $ 105.09 Y01/01/2025 $ 96.75 $ 12.58 $ 109.33 4.03%01/01/2026 548 Retrofit Inspections including 1st hour charge $ 249.50 $ 281.94 Y01/01/2025 $ 259.50 $ 33.74 $ 293.24 4.01%01/01/2026 549 Additional Hour Charge $ 93.00 $ 105.09 Y01/01/2025 $ 96.75 $ 12.58 $ 109.33 4.03%01/01/2026 Requested Inspections with a business application including 1st hour 550 $ 249.50 $ 281.94 Y01/01/2025 $ 259.50 $ 33.74 $ 293.24 4.01%01/01/2026 charge 551 Additional Hour Charge $ 93.00 $ 105.09 Y01/01/2025 $ 96.75 $ 12.58 $ 109.33 4.03%01/01/2026 552 Fire Investigations - Townships (Per Hour) $ 127.95 $ 144.58 Y01/01/2025 $ 133.00 $ 17.29 $ 150.29 3.95%01/01/2026 553 Liquor License Inspections including 1st hour charge $ 282.00 $ 318.66 Y01/01/2025 $ 293.00 $ 38.09 $ 331.09 3.90%01/01/2026 554 Additional Hour Charge $ 105.00 $ 118.65 Y01/01/2025 $ 109.00 $ 14.17 $ 123.17 3.81%01/01/2026 555 Rental 50' Length of Hose - per day $ 40.00 $45.20 Y01/01/2025 $ 42.00 $ 5.46 $47.46 5.00%01/01/2026 556 Rental Allied Equipment - per day $ 40.00 $45.20 Y01/01/2025 $ 42.00 $ 5.46 $47.46 5.00%01/01/2026 557 Air Bottle Recharge $ 20.00 $22.60 Y01/01/2025 $ 21.00 $ 2.73 $23.73 5.00%01/01/2026 APPENDIX E 16 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N Fire Prevention - Request Inspections - 558 Discretionary/Commercial/Residential 559 Single Family Home $ 240.00 $ 271.20 Y01/01/2025 $ 250.00 $ 32.50 $ 282.50 4.17%01/01/2026 560 Duplex 9.8 (Owner to provide proof of use as of July 14, 1994) $ 360.00 $ 406.80 Y01/01/2025 $ 375.00 $ 48.75 $ 423.75 4.17%01/01/2026 561 Residential 3 - 5 Units $ 600.00 $ 678.00 Y01/01/2025 $ 624.00 $ 81.12 $ 705.12 4.00%01/01/2026 562 Residential - More than 5 units - 3 stories or Less. $ 840.00 $ 949.20 Y01/01/2025 $ 874.00 $ 113.62 $ 987.62 4.05%01/01/2026 563 Residential - 4 - 6 Stories $ 1,080.00 $ 1,220.40 Y01/01/2025 $ 1,124.00 $ 146.12 $ 1,270.12 4.07%01/01/2026 564 Residential - 7 - 11 Stories $ 1,320.00 $ 1,491.60 Y01/01/2025 $ 1,370.00 $ 178.10 $ 1,548.10 3.79%01/01/2026 565 Residential - 12 - 18 Stories $ 1,560.00 $ 1,762.80 Y01/01/2025 $ 1,625.00 $ 211.25 $ 1,836.25 4.17%01/01/2026 $211.25 + $1,560.00 + 1762.80 + $1,625.00 + $1,836.25 + $8.06/ 566 Residential - More than 18 Stories (base + cost/additional floor)$59.00/ 66.67/additional Y01/01/2025$62.00/ $70.06/ 4.17%01/01/2026 additional additional floor floor additional floor additional floor floor 567 Residential - Parking Garage $ 240.00 $ 271.20 Y01/01/2025 $ 250.00 $ 32.50 $ 282.50 4.17%01/01/2026 568 Residential - Parking Garage with tenant storage permitted in garage. $ 600.00 $ 678.00 Y01/01/2025 $ 624.00 $ 81.12 $ 705.12 4.00%01/01/2026 Commercial - Single Tenancy- Less than 1500m2 - 1 floor (building 569 $ 360.00 $ 406.80 Y01/01/2025 $ 375.00 $ 48.75 $ 423.75 4.17%01/01/2026 only, hourly rate applies after 1st hour for additional processes) $48.75 + Commercial - Multiple Tenancy- Less than 1500m2 - 1 floor - additional $360.00 + $406.80 + $375.00 + $423.75 + $15.86/ 570 charge per unit (building only, hourly rate applies after 1st hour for $116.50/ $131.65/ Y01/01/2025$122.00/ $137.86/ 4.17%01/01/2026 additional additional processes)additional unit additional unit additional unit additional unit unit Commercial - Single Tenancy- Greater than 1500m2 or less than 571 1500m2 with more than 1 floor (building only, hourly rate applies after $ 720.00 $ 813.60 Y01/01/2025 $ 750.00 $ 97.50 $ 847.50 4.17%01/01/2026 1st hour for additional processes) $97.50 + Commercial - Multiple Tenancy- More than 1500m2 or less than $720.00 + $813.60 + $750.00 + $847.50 + $15.86/ 572 1500m2 with more than 1 floor - additional charge per unit. (building $116.50/ $131.65/ Y01/01/2025$122.00/ $137.86/ 4.17%01/01/2026 additional only, hourly rate applies after 1st hour for additional processes)additional unit additional unit additional unit additional unit unit 573Fire Alarm Monitoring/Month: 574 1G5 Residential Fire Alarm Monitoring Fee - Monthly $7.15 $8.08 Y01/01/2025 $7.45 $ 0.97 $8.42 4.20%01/01/2026 575 Extra Units/Unit - Monthly $4.70 $5.31 Y01/01/2025 $4.90 $ 0.64 $5.54 4.26%01/01/2026 Cellular fees are cost recovery and the prices from Bell 576 Cellular Alarm Fees - Monthly $6.00 $6.78 Y01/01/2025 $6.00 $ 0.78 $6.78 0.00%01/01/2026 are the same for 2026. Direct Detect Monthly Residential Maintenance Fee - 2 or 3 Smoke 577 $6.00 $6.78 Y01/01/2025 $6.25 $ 0.81 $7.06 4.17%01/01/2026 Alarms 578 Each additional device (smoke alarm, CO detector) - monthly $1.15 $1.30 Y01/01/2025 $1.20 $ 0.16 $1.36 4.35%01/01/2026 579 1G1 Monitor Commercial Non-Required (monthly) - DVAC or AES $ 37.00 $41.81 Y01/01/2025 $ 38.50 $ 5.01 $43.51 4.05%01/01/2026 580 1G2 Monitor Commercial Required (monthly) - DVAC or AES $ 59.00 $66.67 Y01/01/2025 $ 61.40 $ 7.98 $69.38 4.07%01/01/2026 1G10 Monitor Dealer Non-Required - Monthly dealer pricing (COK bills 581 $ 14.00 $15.82 Y01/01/2025 $ 14.60 $ 1.90 $16.50 4.29%01/01/2026 dealer, dealer bills customer) 1G4 Monitor Dealer Required - Monthly dealer pricing (COK bills 582 $ 20.50 $23.17 Y01/01/2025 $ 21.35 $ 2.78 $24.13 4.15%01/01/2026 dealer, dealer bills customer) 1G11 Monitor Small Premise -used for non-required monitoring only 583 $ 22.25 $25.14 Y01/01/2025 $ 23.20 $ 3.02 $26.22 4.27%01/01/2026 (small commercial buildings, churches, 3 story walk ups, student housing, schools) 584 1G13 Monitor/DVAC Replacement (monthly) $ 74.00 $83.62 Y01/01/2025 $ 77.00 $ 10.01 $87.01 4.05%01/01/2026 585Direct Detect - General Charges 01/01/2026 586 Direct Detect Service Calls - During Business Hours - Hourly* $ 106.00 $ 119.78 Y01/01/2025 $ 110.25 $ 14.33 $ 124.58 4.01%01/01/2026 587*After Hours (minimum call out time of 3 hours) APPENDIX E 17 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 588Response to Provincial Highways/Truck Fee is legislated by the Province. Rate is as of January 589 First hour $ 559.86 $ 559.86 N01/01/2025 $ 570.50 $ - $ 570.50 1.90%01/01/20262025. Unknown at this time what the 2026 rate will be. Fee is legislated by the Province. Rate is as of January 590 Each 1/2 hour thereafter $ 279.93 $ 279.93 N01/01/2025 $ 285.25 $ - $ 285.25 1.90%01/01/20262025. Unknown at this time what the 2026 rate will be. 591Other Fire Services - Charges $74.17 unit $559.86 unit $632.64 unit first $570.50 unit $644.67 unit first first hour, Fire Response and Investigation Recovery (consumable materials first hour, hour, first hour, hour, 592 Y01/01/2025$37.08/unit 1.90%01/01/2026Fee matches MTO rate. additional)$279.93/unit per $316.32/unit per $285.25/unit $322.33/unit per per ½ hour ½ hour after ½ hour after per ½ hour after ½ hour after after $652.00/unit $626.50/unit $707.95/unit $652.00/unit first hour, first hour, first hour, first hour, 593 Technical Responses (consumable materials additional)N01/01/2025$326.00/unit $ - 4.00%01/01/2026 $313.25/unit per $353.97/unit per $326.00/unit per per 1/2 hour 1/2 hour after 1/2 hour after 1/2 hour after after 594 Fire Extinguisher Training (Does not Include Not-for Profit Groups) $ 27.50 $31.08 Y01/01/2025 $ 28.60 $ 3.72 $32.32 4.00%01/01/2026 Training Other Fire Departments & Agencies (hourly rate/trainer) 595 $ 130.00 $ 146.90 Y01/01/2025 $ 135.20 $ 17.58 $ 152.78 4.00%01/01/2026 (Course materials and expenses extra) 596 Dispatch systems administration and analysis (Per Hour) $ 88.00 $99.44 Y01/01/2025 $ 95.85 $ 12.46 $ 108.31 8.92%01/01/2026Fee is based on salary recovery. 597 Post Fire Property Security/Safety (Per Hour) $ 188.00 $ 212.44 Y01/01/2025 $ 231.00 $ 30.03 $ 261.03 22.87%01/01/2026Fee is based on salary recovery. Rental of Public Education Equipment to Other Municipal Fire 598 $ 115.00 $ 115.00 N01/01/2025 $ 120.00 $ - $ 120.00 4.35%01/01/2026 Departments (Fixed Fee + consumable materials) Propane Facility RSMP Review Initial Request for Municipal Data for 599 RSMP * 600 Application + 1st hour charge $ 256.50 $ 289.85 Y01/01/2025 $ 266.75 $ 34.68 $ 301.43 4.00%01/01/2026 601 Additional Hour Charge $ 95.50 $ 107.92 Y01/01/2025 $ 99.35 $ 12.92 $ 112.27 4.03%01/01/2026 602*Plus additional costs for specialist consulting 603Submission of Propane RSMP and Plan Review 604 Application + 1st hour charge $ 256.50 $ 289.85 Y01/01/2025 $ 266.75 $ 34.68 $ 301.43 4.00%01/01/2026 605 Additional Hour Charge $ 95.50 $ 107.92 Y01/01/2025 $ 99.35 $ 12.92 $ 112.27 4.03%01/01/2026 606Upon completion of Site Work and Installations 607 Final Site Inspection + 1st hour charge $ 256.50 $ 289.85 Y01/01/2025 $ 266.75 $ 34.68 $ 301.43 4.00%01/01/2026 608 Additional Hour Charge $ 95.50 $ 107.92 Y01/01/2025 $ 99.35 $ 12.92 $ 112.27 4.03%01/01/2026 APPENDIX E 18 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 609 ENFORCEMENT 610 Snow Clearing - Admin fee $ 102.46 $ 102.46 N01/01/2025 $ 106.56 $ - $ 106.56 4.00%01/01/2026 611 Grass/Weed - Admin fee $ 57.89 $57.89 N01/01/2025 $ 60.20 $ - $60.20 4.00%01/01/2026 612 Orders to Comply 20% of costs 20% of costs N01/01/2025 20% of costs $ - 20% of costs 0.00%01/01/2026 613 Fees for Inspections $ 99.07 $99.07 N01/01/2025 $ 103.03 $ - $ 103.03 4.00%01/01/2026 614 Compliance Letters $ 90.29 $90.29 N01/01/2025 $ 93.90 $ - $93.90 4.00%01/01/2026 615 Photocopies/Printing - black & white, per page $0.18 $0.20 Y01/01/2025 $0.18 $ 0.02 $0.20 0.00%01/01/2026 616 Photocopies/Printing - colour, per page $0.76 $0.86 Y01/01/2025 $0.79 $ 0.10 $0.89 4.06%01/01/2026 617 Return of Confiscated Signs (small and easily removable) $ 37.64 $37.64 N01/01/2025 $ 39.14 $ - $39.14 3.99%01/01/2026 618 Return of Confiscated Signs (Larger) $ 139.17 $ 139.17 N01/01/2025 $ 144.74 $ - $ 144.74 4.00%01/01/2026 619 Chicken Registration Fee $ 56.24 $56.24 N01/01/2025 $ 58.49 $ - $58.49 3.99%01/01/2026 620DOG LICENSING FEES:* 621First and Renewal Licenses 622Sterilized Dogs: After 30 days of first license being required for the dog or after expiry 623 $ 57.67 $57.67 N01/01/2025 $ 59.97 $ - $59.97 3.99%01/01/2026 of previous license Within 30 days of first license being required for the dog or within 30 624 $ 38.85 $38.85 N01/01/2025 $ 40.41 $ - $40.41 4.00%01/01/2026 days prior to current license expiry 625Non-Sterilized Dogs: After 30 days of first license being required for the dog or after expiry 626 $ 115.39 $ 115.39 N01/01/2025 $ 120.00 $ - $ 120.00 4.00%01/01/2026 of previous license Within 30 days of first license being required for the dog or within 30 627 $ 76.47 $76.47 N01/01/2025 $ 79.53 $ - $79.53 4.00%01/01/2026 days prior to current license expiry 628Designated Dogs: After 30 days of first license being required for the dog or after expiry 629 $ 153.02 $ 153.02 N01/01/2025 $ 159.14 $ - $ 159.14 4.00%01/01/2026 of previous license Within 30 days of first license being required for the dog or within 30 630 $ 102.85 $ 102.85 N01/01/2025 $ 106.96 $ - $ 106.96 4.00%01/01/2026 days prior to current license expiry Transfer License: 631 Reduced fee applies to valid licenses from another municipality if $ 10.02 $10.02 N01/01/2025 $ 10.42 $ - $10.42 4.04%01/01/2026 purchased within 30 days of moving to Kitchener 632Animal Boarding fee $ 42.19 $42.19 N01/01/2025 $ 43.88 $ - $43.88 4.00%01/01/2026 Impound Fee for 1st day or part thereof, where a dog has been 633 $ 51.40 $51.40 N01/01/2025 $ 53.45 $ - $53.45 3.99%01/01/2026 impounded *Discount for all license purchases by Seniors (upon proof of age 65 or $6.26 $6.26 N01/01/2025 $6.51 $ - $6.51 3.98%01/01/2026 634 older) 635Replacement of lost tag $8.79 $8.79 N01/01/2025 $9.14 $ - $9.14 4.01%01/01/2026 APPENDIX E 19 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 636 NEIGHBOURHOOD PROGRAMS & SERVICES 637ROOM RENTALS - ALL CENTRES Affiliated sport groups receive a 3% reduction off room rental rates as 638 listed 639 Administrative Fee for Contract Changes $ 25.47 $28.78 Y01/01/2025 $ 26.49 $ 3.44 $29.93 4.01%01/01/2026 640 Rental Deposit Required (Minimum) $ 178.79 $ 178.79 N01/01/2025 $ 185.94 $ - $ 185.94 4.00%01/01/2026 641 Community Centre Attendants - Specified Holidays $ 36.64 $41.40 Y01/01/2025 $ 38.10 $ 4.95 $43.05 3.99%01/01/2026 642 Community Centre Attendant $ 25.81 $29.17 Y01/01/2025 $ 26.85 $ 3.49 $30.34 4.02%01/01/2026 643 Kitchen reheating flat fee $ 36.16 $40.86 Y01/01/2025 $ 37.61 $ 4.89 $42.50 4.01%01/01/2026 644 Custodial Hourly Fee $ 22.14 $25.02 Y01/01/2025 $ 23.03 $ 2.99 $26.02 4.01%01/01/2026 645 Custodial hourly fee Specified Holiday $ 33.22 $37.54 Y01/01/2025 $ 34.55 $ 4.49 $39.04 4.01%01/01/2026 646 SOCANPer SOCAN rate schedule. 647 ReSoundPer ReSound rate schedule. Setting fee to a fixed amount that will not be 648 Damage Deposit $ 500.00 $ 500.00 N01/01/2025 $ 500.00 $ - $ 500.00 0.00%01/01/2026 increased annually. 649BRIDGEPORT COMMUNITY CENTRE 650 Room #1 $ 55.24 $62.43 Y01/01/2025 $ 57.45 $ 7.47 $64.92 3.99%01/01/2026 651 Room #2 $ 19.86 $22.45 Y01/01/2025 $ 20.66 $ 2.69 $23.35 4.01%01/01/2026 652 Room #3 $ 39.32 $44.43 Y01/01/2025 $ 40.90 $ 5.32 $46.22 4.01%01/01/2026 653 Licensed Event Fee - Room #1 $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 654 Licensed Event Fee - Room #2 $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 655 Licensed Event Fee - Room #3 $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 656 Insurance - Licensed Event Per Insurance Rate Schedule. 657 Insurance Non-licensed EventPer Insurance Rate Schedule. 658CENTREVILLE – CHICOPEE COMMUNITY CENTRE 659 Gym (Single) $ 55.24 $62.43 Y01/01/2025 $ 57.45 $ 7.47 $64.92 3.99%01/01/2026 660 Room #1 $ 19.86 $22.45 Y01/01/2025 $ 20.66 $ 2.69 $23.35 4.01%01/01/2026 661 Room #2 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 662 Room #3 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 663 Licensed Event Fee - Gym (Single) $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 664 Licensed Event - Room 2 $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 665 Insurance - Non LicensedPer Insurance Rate Schedule. 666 Insurance - Licensed eventPer Insurance Rate Schedule. 667CHANDLER MOWAT COMMUNITY CENTRE 668 Room #1 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 669 Room #2 $ 19.86 $22.45 Y01/01/2025 $ 20.66 $ 2.69 $23.35 4.01%01/01/2026 670 Room #3 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 671 Room #4 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 672 Multi purpose room/Gym (Single) $ 61.60 $69.61 Y01/01/2025 $ 64.06 $ 8.33 $72.39 3.99%01/01/2026 673 Kitchen (Cooking) per hour $ 30.14 $34.06 Y01/01/2025 $ 31.34 $ 4.07 $35.41 3.98%01/01/2026 674 Licensed event Fee - Multi Purpose Room/Gym (Single) $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 675 Licensed Event Fee - Room 1, 2 $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 676 Insurance - Non LicensedPer Insurance Rate Schedule. 677 Insurance - Licensed eventPer Insurance Rate Schedule. APPENDIX E 20 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 678COUNTRY HILLS COMMUNITY CENTRE 679 Room 1 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 680 Room 2 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 681 Room 3 $ 39.32 $44.43 Y01/01/2025 $ 40.90 $ 5.32 $46.22 4.01%01/01/2026 Adjusted to reflect consistent pricing for the square 682 Room 4 $ 28.32 $32.00 Y01/01/2025 $ 40.90 $ 5.32 $46.22 44.42%01/01/2026 footage (previously undercharged). 683 Multipurpose Room/Gym (double) $ 78.62 $88.85 Y01/01/2025 $ 81.77 $ 10.63 $92.40 4.00%01/01/2026 684 1/2 Multipurpose Room/Gym (single) $ 55.24 $62.43 Y01/01/2025 $ 57.45 $ 7.47 $64.92 3.99%01/01/2026 685 Kitchen Only - Cooking per hour $ 30.14 $34.06 Y01/01/2025 $ 31.34 $ 4.07 $35.41 3.98%01/01/2026 686 Licensed Event Fee - multipurpose Room/Gym (Double) $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 687 Licensed Event Fee - 1/2 multipurpose Room/Gym (Single) $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 688 Licensed Event Fee - Room 1, 2 or 3 $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 689 Insurance - Non Licensed 690 Insurance - Licensed event 691DOON PIONEER PARK COMMUNITY CENTRE 692 Multipurpose Room/Gym (single) $ 61.60 $69.61 Y01/01/2025 $ 64.06 $ 8.33 $72.39 3.99%01/01/2026 693 Room 1 $ 38.94 $44.00 Y01/01/2025 $ 40.50 $ 5.26 $45.76 4.01%01/01/2026 694 Room 2 $ 19.85 $22.43 Y01/01/2025 $ 20.65 $ 2.68 $23.33 4.01%01/01/2026 695 Room 3 $ 39.32 $44.43 Y01/01/2025 $ 40.90 $ 5.32 $46.22 4.01%01/01/2026 696 Gymnasium $ 61.60 $69.61 Y01/01/2025 $ 64.06 $ 8.33 $72.39 3.99%01/01/2026 697 Licensed Event Fee - multipurpose room/Gym (single) $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 698 Licensed Event Fee - Meeting Room $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 699 Insurance - Non LicensedPer Insurance Rate Schedule. 700 Insurance - Licensed eventPer Insurance Rate Schedule. 701HURON BRIGADOON COMMUNITY CENTRE 702 Multipurpose Room 1 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 703 Multipurpose Room 2 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 704 Gym (single) $ 55.24 $62.42 Y01/01/2025 $ 57.45 $ 7.47 $64.92 4.00%01/01/2026 705KINGSDALE COMMUNITY CENTRE 706 Room 2 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 707 Room 3 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 708 Room 4 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 709 Room 5 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 710 Room 1 $ 39.32 $44.43 Y01/01/2025 $ 40.89 $ 5.32 $46.21 3.99%01/01/2026 711 Gym (Single) $ 61.60 $69.61 Y01/01/2025 $ 64.06 $ 8.33 $72.39 3.99%01/01/2026 712 Kitchen Only - Cooking per hour $ 30.14 $34.06 Y01/01/2025 $ 31.34 $ 4.07 $35.41 3.98%01/01/2026 713 Licensed event fee - Room 2,3,4,5 $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 714 Licensed event fee - Gym $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 715MILL COURTLAND COMMUNITY CENTRE 716 Room 2 (large multipurpose room) $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 717 Room 1 (craft room) $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 718 Children's Program Room $ 19.85 $22.43 Y01/01/2025 $ 20.64 $ 2.68 $23.32 3.98%01/01/2026 719 Multipurpose Room/Gym (single) $ 55.24 $62.42 Y01/01/2025 $ 57.45 $ 7.47 $64.92 4.00%01/01/2026 720 Licensed Event Fee -Multipurpose Room/ Gym (single) $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 721 Licensed Event Fee - Room 2 $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 722 Insurance - Non licensedPer Insurance Rate Schedule. 723 Insurance - Licensed eventPer Insurance Rate Schedule. APPENDIX E 21 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 724VICTORIA HILLS COMMUNITY CENTRE 725 Multipurpose Room A (old single gym) $ 55.24 $62.42 Y01/01/2025 $ 57.45 $ 7.47 $64.92 4.00%01/01/2026 726 Multipurpose Room B (dance room) $ 39.32 $44.43 Y01/01/2025 $ 40.89 $ 5.32 $46.21 3.99%01/01/2026 727 Multipurpose Room C (new single gym) $ 55.24 $62.42 Y01/01/2025 $ 57.45 $ 7.47 $64.92 4.00%01/01/2026 728 Multipurpose Room D (new single gym) $ 55.24 $62.42 Y01/01/2025 $ 57.45 $ 7.47 $64.92 4.00%01/01/2026 729 Multipurpose Room C&D (Double gym) $ 78.62 $88.84 Y01/01/2025 $ 81.76 $ 10.63 $92.39 3.99%01/01/2026 730 Room 1 $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 731 Room 2 $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 732 Room 3 and 4 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 733 Kitchen (cooking) fee/hour $ 30.14 $34.06 Y01/01/2025 $ 31.34 $ 4.07 $35.41 3.98%01/01/2026 734 Licensed Event fee - MP Room A $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 735 Licensed event fee - Dance Room B $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 736 Licensed event fee - MP Room C $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 737 Licensed event fee - MP Room D $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 738 Licensed event fee - MP Room C & D $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 739 Licensed Event fee - Room 3/4 $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 740 Insurance - Non LicensedPer Insurance Rate Schedule. 741 Insurance - LicensedPer Insurance Rate Schedule. 742FOREST HEIGHTS COMMUNITY CENTRE 743 Room 1 $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 744 Room 2 $ 39.32 $44.43 Y01/01/2025 $ 40.89 $ 5.32 $46.21 3.99%01/01/2026 745 Room 3 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 746 Room 4 $ 39.32 $44.43 Y01/01/2025 $ 40.89 $ 5.32 $46.21 3.99%01/01/2026 747 Multipurpose Room/Gym (single) $ 61.60 $69.61 Y01/01/2025 $ 64.06 $ 8.33 $72.39 3.99%01/01/2026 748 Kitchen (Cooking) fee/hour $ 30.14 $34.06 Y01/01/2025 $ 31.34 $ 4.07 $35.41 3.98%01/01/2026 749 Licensed Event Fee - Multipurpose Room/Gym (single) $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 4.00%01/01/2026 750 Licensed Event Fee - Room 1 and/or 2 $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 751 Insurance - Non LicensedPer Insurance Rate Schedule. 752 Insurance - Licensed eventPer Insurance Rate Schedule. 753STANLEY PARK COMMUNITY CENTRE 754 Meeting Room 1 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 755 Meeting Room 2 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 756 Dance/Meeting Room $ 39.32 $44.43 Y01/01/2025 $ 40.89 $ 5.32 $46.21 3.99%01/01/2026 757 Gym (Triple) $ 95.66 $ 108.10 Y01/01/2025 $ 99.49 $ 12.93 $ 112.42 4.00%01/01/2026 758 Gym 2/3 (double) $ 78.62 $88.84 Y01/01/2025 $ 81.76 $ 10.63 $92.39 3.99%01/01/2026 759 Gym 1/3 (single) $ 61.60 $69.61 Y01/01/2025 $ 64.06 $ 8.33 $72.39 3.99%01/01/2026 760 Kitchen (Cooking) fee/hour $ 30.14 $34.06 Y01/01/2025 $ 31.35 $ 4.07 $35.42 4.01%01/01/2026 761 Licensed Event Fee - Gym (triple) $ 95.66 $ 108.10 Y01/01/2025 $ 99.49 $ 12.93 $ 112.42 4.00%01/01/2026 762 Licensed Event Fee - 2/3 Gym (double) $ 90.41 $ 102.16 Y01/01/2025 $ 94.03 $ 12.22 $ 106.25 4.00%01/01/2026 763 Licensed Event Fee - 1/3 Gym (single) $ 90.41 $ 102.16 Y01/01/2025 $ 94.03 $ 12.22 $ 106.25 4.00%01/01/2026 764 Licensed Event Fee - Rooms 1, 2 & Dance/Meeting Room $ 60.27 $68.11 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 765 Licensed Event Fee - Dance Room Full $ 90.42 $ 102.17 Y01/01/2025 $ 94.04 $ 12.22 $ 106.26 4.00%01/01/2026 766 Insurance - Non LicensedPer Insurance Rate Schedule. 767 Insurance - Licensed eventPer Insurance Rate Schedule. APPENDIX E 22 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 768WILLIAMSBURG COMMUNITY CENTRE 769 Room 1 NEW Y NEW $ 40.90 $ 5.32 $46.22 NEW 01/01/2026New Community Centre room fees. 770 Room 2 NEW Y NEW $ 40.90 $ 5.32 $46.22 NEW 01/01/2026New Community Centre room fees. 771 Room 3 NEW Y NEW $ 40.90 $ 5.32 $46.22 NEW 01/01/2026New Community Centre room fees. 772 Room 4 NEW Y NEW $ 40.90 $ 5.32 $46.22 NEW 01/01/2026New Community Centre room fees. 773 Single Gym NEW Y NEW $ 57.45 $ 7.47 $64.92 NEW 01/01/2026New Community Centre room fees. 774 Double Gym NEW Y NEW $ 81.76 $ 10.63 $92.39 NEW 01/01/2026New Community Centre room fees. 775 Licensed Event Fee - Rooms 1,2,3,4 NEW Y NEW $ 62.68 $ 8.15 $70.83 NEW 01/01/2026New Community Centre room fees. 776 License event fee Single Gym NEW Y NEW $ 94.02 $ 12.22 $ 106.24 NEW 01/01/2026New Community Centre room fees. 777 License event Fee Double Gym NEW Y NEW $ 94.02 $ 12.22 $ 106.24 NEW 01/01/2026New Community Centre room fees. 778 Insurance - Non LicensedPer Insurance Rate Schedule. 779 Insurance - Licensed eventPer Insurance Rate Schedule. 780ROCKWAY SENIOR CENTRE 781 Workshop $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 782 King Street Room $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 783 Games Room $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 784 Boardroom $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 785 Program Room $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 786 Multipurpose room $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 787 Heritage Room (studio) $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 788 Meeting Room $ 39.32 $44.43 Y01/01/2025 $ 40.89 $ 5.32 $46.21 3.99%01/01/2026 789 Auditorium $ 61.60 $69.61 Y01/01/2025 $ 64.06 $ 8.33 $72.39 3.99%01/01/2026 790 Patio $ 47.09 $53.21 Y01/01/2025 $ 48.97 $ 6.37 $55.34 3.99%01/01/2026 791 License fee - auditorium $ 90.41 $ 102.16 Y01/01/2025 $ 94.02 $ 12.22 $ 106.24 3.99%01/01/2026 792 License fee - meeting room $ 60.27 $68.11 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 793 License fee - multi-purpose room $ 60.27 $68.11 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 794 Licensed Event Fee - Patio $ 60.27 $68.11 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 795 Insurance coverage - non-licensed Per Insurance Rate Schedule. 796 Insurance coverage - licensed Per Insurance Rate Schedule. 797DOWNTOWN COMMUNITY CENTRE 798 Gym 1 (single) $ 61.60 $69.61 Y01/01/2025 $ 64.06 $ 8.33 $72.39 3.99%01/01/2026 799 Gym 2 (single) $ 61.60 $69.61 Y01/01/2025 $ 64.06 $ 8.33 $72.39 3.99%01/01/2026 800 Gym 1 & 2 (double) $ 78.62 $88.84 Y01/01/2025 $ 81.76 $ 10.63 $92.39 3.99%01/01/2026 801 Workshop $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 802 Senior Day Program Room 1 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 803 Charles St Room $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 804 Vic School Room $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.69 $23.34 3.98%01/01/2026 805 Multipurpose Room A $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 806 Multipurpose Room B $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 807 Multipurpose Room A & B $ 47.09 $53.21 Y01/01/2025 $ 48.97 $ 6.37 $55.34 3.99%01/01/2026 808 Upstairs Kitchen (Cooking) - fee/hour $ 30.14 $34.06 Y01/01/2025 $ 31.35 $ 4.07 $35.42 4.01%01/01/2026 809 Preschool Room $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 810 Youth room $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 811 Licensed Event Fee - Gym 1 & 2 (double) $ 90.41 $ 102.16 Y01/01/2025 $ 94.03 $ 12.22 $ 106.25 4.00%01/01/2026 812 Licensed Event Fee - Gym 1 (single) $ 90.41 $ 102.16 Y01/01/2025 $ 94.03 $ 12.22 $ 106.25 4.00%01/01/2026 813 Licensed Event Fee - Gym 2 (single) $ 90.41 $ 102.16 Y01/01/2025 $ 94.03 $ 12.22 $ 106.25 4.00%01/01/2026 814 Licensed Event Fee - Other Rooms $ 60.27 $68.10 Y01/01/2025 $ 62.68 $ 8.15 $70.83 4.00%01/01/2026 815 Licensed Event Fee - Room A & B $ 81.12 $91.67 Y01/01/2025 $ 84.36 $ 10.97 $95.33 3.99%01/01/2026 816 Insurance coverage - non-licensed Per Insurance Rate Schedule. 817 Insurance coverage - licensed Per Insurance Rate Schedule. APPENDIX E 23 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 818CSD DIRECT PROGRAMS 819KITCHENER GROUP CARD 820 Adult 55+ $ 16.32 $18.44 Y01/01/2025 $ 16.97 $ 2.21 $19.18 4.00%01/01/2026 821 Preschool, Children and Youth $ 16.32 $18.44 Y01/01/2025 $ 16.97 $ 2.21 $19.18 4.00%01/01/2026 822PROGRAMS CATEGORY A (Per Hour) 823 Adult 55+ $4.58 $5.17 Y01/01/2025 $4.76 $ 0.62 $5.38 4.02%01/01/2026 824 Adults 18 - 54 years $5.57 $6.29 Y01/01/2025 $5.80 $ 0.75 $6.55 4.05%01/01/2026 825 Pre-school, Children and Youth $4.58 $4.58 N01/01/2025 $4.76 $ - $4.76 4.02%01/01/2026 826PROGRAMS CATEGORY B (PER HOUR) 827 Adult 55+ $5.45 $6.16 Y01/01/2025 $5.67 $ 0.74 $6.41 4.04%01/01/2026 828 Adults 18 - 54 years $6.65 $7.51 Y01/01/2025 $6.91 $ 0.90 $7.81 3.98%01/01/2026 829 Pre-school, Children and Youth $5.45 $5.45 N01/01/2025 $5.67 $ - $5.67 4.04%01/01/2026 830PROGRAMS CATEGORY C (PER HOUR) 831 Adult 55+ $6.15 $6.95 Y01/01/2025 $6.39 $ 0.83 $7.22 3.96%01/01/2026 832 Adults 18 - 54 years $7.49 $8.46 Y01/01/2025 $7.79 $ 1.01 $8.80 4.03%01/01/2026 833 Pre-school, Children & Youth $6.15 $6.15 N01/01/2025 $6.39 $ - $6.39 3.96%01/01/2026 834PROGRAMS CATEGORY D (PER HOUR) 835 Adult 55+ $8.32 $9.40 Y01/01/2025 $8.65 $ 1.12 $9.77 3.97%01/01/2026 836 Adults 18 - 54 years $ 10.15 $11.47 Y01/01/2025 $ 10.56 $ 1.37 $11.93 4.04%01/01/2026 837 Pre-school, Children & Youth $8.32 $8.32 N01/01/2025 $8.65 $ - $8.65 3.97%01/01/2026 838PROGRAMS CATEGORY E (PER HOUR) 839 Adult 55+ $ 10.82 $12.23 Y01/01/2025 $ 11.25 $ 1.46 $12.71 4.01%01/01/2026 840 Adults 18 - 54 years $ 13.22 $14.94 Y01/01/2025 $ 13.75 $ 1.79 $15.54 4.02%01/01/2026 841 Pre-school, Children & Youth $ 10.71 $10.71 N01/01/2025 $ 11.14 $ - $11.14 4.00%01/01/2026 842PAY AS YOU PLAY 843 Adult 55+ (single ticket) $3.93 $4.44 Y01/01/2025 $4.09 $ 0.53 $4.62 4.04%01/01/2026 844 Adult 55+ (book of 10 tickets) $ 35.43 $40.04 Y01/01/2025 $ 36.85 $ 4.79 $41.64 4.00%01/01/2026 845 Adult 55+ (book of 20 tickets) $ 62.99 $71.18 Y01/01/2025 $ 65.51 $ 8.52 $74.03 4.00%01/01/2026 846 Adults-18 to 54 years (single ticket) $4.79 $5.41 Y01/01/2025 $4.99 $ 0.65 $5.64 4.08%01/01/2026 847 Adults-18 to 54 years (book of 10 tickets) $ 43.21 $48.83 Y01/01/2025 $ 44.94 $ 5.84 $50.78 4.00%01/01/2026 848 Adults - 18 to 54 years (book of 20 tickets) $ 76.81 $86.80 Y01/01/2025 $ 79.89 $ 10.39 $90.28 4.00%01/01/2026 849 Pre-school, Children & Youth (single ticket) $2.30 $2.60 Y01/01/2025 $2.39 $ 0.31 $2.70 3.99%01/01/2026 850 Pre-school, Children & Youth (book of 10 tickets) $ 20.96 $23.68 Y01/01/2025 $ 21.79 $ 2.83 $24.62 3.98%01/01/2026 851 Pre-school, Children & Youth (book of 20 tickets) $ 37.25 $42.09 Y01/01/2025 $ 38.74 $ 5.04 $43.78 3.99%01/01/2026 852 Family (single ticket) $ 11.92 $13.47 Y01/01/2025 $ 12.40 $ 1.61 $14.01 4.04%01/01/2026 853PRIVATE PROGRAMS (PER HOUR) 854 Adult 55+ $ 51.81 $58.55 Y01/01/2025 $ 53.89 $ 7.01 $60.90 4.01%01/01/2026 855 Adults 18 - 54 years $ 63.20 $71.42 Y01/01/2025 $ 65.73 $ 8.54 $74.27 4.00%01/01/2026 856 Pre-school, Children & Youth $ 51.81 $51.81 N01/01/2025 $ 53.89 $ - $53.89 4.01%01/01/2026 857SEMI PRIVATE PROGRAMS (PER HOUR) 858 Adult 55+ $ 25.91 $29.28 Y01/01/2025 $ 26.94 $ 3.50 $30.44 3.99%01/01/2026 859 Adults 18 - 54 years $ 31.60 $35.70 Y01/01/2025 $ 32.86 $ 4.27 $37.13 4.00%01/01/2026 860 Pre-school, Children & Youth $ 25.91 $25.91 N01/01/2025 $ 26.94 $ - $26.94 3.99%01/01/2026 861SENIOR DAY PROGRAM 862 Day Program $ 18.24 $18.24 N01/01/2025 $ 18.97 $ - $18.97 3.99%01/01/2026 APPENDIX E 24 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 863YOUTH PROGRAMS 864 MultiSport Mondays $ 70.23 $70.23 N01/01/2025 $ 73.04 $ - $73.04 4.00%01/01/2026 Higher increase to offset increased operating expenses 865 Youth Camp $ 171.81 $ 171.81 N01/01/2025 $ 180.40 $ - $ 180.40 5.00%01/01/2026 to run program. Higher increase to offset increased operating expenses 866 BLYD $ 87.80 $87.80 N01/01/2025 $ 92.19 $ - $92.19 5.00%01/01/2026 to run program. 867Neighbourhood Camps 868 Holiday Break/PD Programs per day $ 32.06 $32.06 N01/01/2025 $ 33.66 $ - $33.66 4.99%01/01/2026Program had been a pilot but now is offered ongoing. Higher increase to offset increased operating expenses 869 Schools Out Camps (per week) $ 98.22 $98.22 N01/01/2025 $ 103.13 $ - $ 103.13 5.00%01/01/2026 to run program. Higher increase to offset increased operating expenses 870 Full day & full day specialty camp programs (per week) $ 122.77 $ 122.77 N01/01/2025 $ 128.91 $ - $ 128.91 5.00%01/01/2026 to run program. Higher increase to offset increased operating expenses 871 Before/After Care for Full Day Programs (per week) $ 13.50 $13.50 N01/01/2025 $ 14.00 $ - $14.00 3.71%01/01/2026 to run program. 872DROP IN PROGRAMS 873 Drop-In rate Adult 18-54 (Category A) $6.41 $7.24 Y01/01/2025 $6.67 $ 0.87 $7.24 4.06%01/01/2026 874 Drop-in Program rate- Adult 55+ (Category A) $5.26 $5.94 Y01/01/2025 $5.47 $ 0.71 $5.94 3.99%01/01/2026 875 Drop-in Program rate- Adult 18-54 (Category B) $7.65 $8.64 Y01/01/2025 $7.96 $ 1.03 $8.64 4.05%01/01/2026 876 Drop-in Program rate- Adult 55+ (Category B) $6.27 $7.09 Y01/01/2025 $6.52 $ 0.85 $7.09 3.99%01/01/2026 877 Drop-in Program rate- Adult 18-54 (Category C) $8.61 $9.73 Y01/01/2025 $8.95 $ 1.16 $9.73 3.95%01/01/2026 878 Drop-in Program rate- Adult 55+ (Category C) $7.07 $7.99 Y01/01/2025 $7.35 $ 0.96 $7.99 3.96%01/01/2026 879 Drop-in Program rate- Adult 18-54 (Category D) $ 11.67 $13.19 Y01/01/2025 $ 12.14 $ 1.58 $13.19 4.03%01/01/2026 880 Drop-in Program rate- Adult 55+ (Category D) $9.57 $10.81 Y01/01/2025 $9.95 $ 1.29 $10.81 3.97%01/01/2026 881 Drop-in Program rate- Adult 18-54 (Category E) $ 15.20 $17.18 Y01/01/2025 $ 15.81 $ 2.06 $17.18 4.01%01/01/2026 882 Drop-in Program rate- Adult 55+ (Category E) $ 12.43 $14.05 Y01/01/2025 $ 12.93 $ 1.68 $14.05 4.02%01/01/2026 883MOBILE SKATEPARK $ 539.26 $ 609.36 Y01/01/2025 $ 560.83 $ 72.91 $ 633.74 4.00%01/01/2026 APPENDIX E 25 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N KITCHENER MEMORIAL AUDITORIUM COMPLEX 884 (KMAC) 885ROOM RENTALS 886 Banquet Rate $ 542.85 $ 613.42 Y01/01/2025 $ 564.57 $ 73.39 $ 637.96 4.00%01/01/2026 887 Tournament Rate $ 423.63 $ 478.70 Y01/01/2025 $ 440.57 $ 57.27 $ 497.84 4.00%01/01/2026 888 Hall Rental $ 60.80 $68.70 Y01/01/2025 $ 63.23 $ 8.22 $71.45 4.00%01/01/2026 889 Meeting Room Rental - Group 3 $ 39.32 $44.43 Y01/01/2025 $ 40.89 $ 5.32 $46.21 4.00%01/01/2026 890 Meeting Room Rental - Group 1 $ 19.86 $22.44 Y01/01/2025 $ 20.65 $ 2.68 $23.33 3.99%01/01/2026 891ICE RENTALS - Multi Pad 892 Non-prime $ 171.69 $ 194.01 Y09/01/2025 $ 178.56 $ 23.21 $ 201.77 4.00%09/01/2026 893 Non-prime Affiliated Sports - Dom Cardillo Arena $ 168.40 $ 190.29 Y09/01/2025 $ 175.14 $ 22.77 $ 197.91 4.00%09/01/2026 894 Prime time Affiliated Sports - Dom Cardillo Arena $ 170.55 $ 192.72 Y09/01/2025 $ 177.37 $ 23.06 $ 200.43 4.00%09/01/2026 895 Prime time League $ 275.68 $ 311.52 Y09/01/2025 $ 286.70 $ 37.27 $ 323.97 4.00%09/01/2026 896 Casual/Seasonal/Tournament $ 302.83 $ 342.20 Y09/01/2025 $ 314.95 $ 40.94 $ 355.89 4.00%09/01/2026 897 Floor Rental/HR/Tournament $ 84.94 $95.98 Y04/01/2025 $ 88.34 $ 11.48 $99.82 4.00%04/01/2026 898ICE RENTALS - SINGLE PAD 899 Non-Prime $ 161.95 $ 183.00 Y09/01/2025 $ 168.43 $ 21.90 $ 190.33 4.00%09/01/2026 Increase set at 3% to stay inline with neighbouring 900 Non-prime Affiliated Sports $ 147.90 $ 167.13 Y09/01/2025 $ 152.34 $ 19.80 $ 172.14 3.00%09/01/2026 municipalities. Increase set at 3% to stay inline with neighbouring 901 Prime time affiliated Sports $ 147.90 $ 167.13 Y09/01/2025 $ 152.34 $ 19.80 $ 172.14 3.00%09/01/2026 municipalities. 902 Prime Time League $ 246.38 $ 278.41 Y09/01/2025 $ 256.24 $ 33.31 $ 289.55 4.00%09/01/2026 903 Casual/Seasonal/Tournament $ 276.45 $ 312.39 Y09/01/2025 $ 287.50 $ 37.38 $ 324.88 4.00%09/01/2026 904 Floor Rental/Tournament Floor $ 81.99 $92.65 Y04/01/2025 $ 85.27 $ 11.09 $96.36 4.00%04/01/2026 905SKATING PROGRAMS 906 Shinny - Non-prime $8.71 $9.84 Y09/01/2025 $9.05 $ 1.18 $10.23 3.95%09/01/2026 907 Shinny - Prime $ 14.93 $16.87 Y09/01/2025 $ 15.52 $ 2.02 $17.54 3.97%09/01/2026 908ADMISSIONS 909 Children 17 and under/session $4.06 $4.59 Y09/01/2025 $4.22 $ 0.55 $4.77 3.92%09/01/2026 910 Adult/session $5.95 $6.72 Y09/01/2025 $6.19 $ 0.80 $6.99 4.05%09/01/2026 911 Family/session $ 13.79 $15.58 Y09/01/2025 $ 14.34 $ 1.86 $16.20 3.99%09/01/2026 912 Seniors/session $4.06 $4.59 Y09/01/2025 $4.22 $ 0.55 $4.77 3.92%09/01/2026 913CENTENNIAL STADIUM 914 Centennial Field - minor $ 50.28 $56.82 Y04/01/2025 $ 52.29 $ 6.80 $59.09 3.99%04/01/2026 915 Centennial Field - adult $ 75.57 $85.39 Y04/01/2025 $ 78.59 $ 10.22 $88.81 4.00%04/01/2026 916 Lights - Centennial $ 72.26 $81.65 Y04/01/2025 $ 75.15 $ 9.77 $84.92 4.00%04/01/2026 917 Lights - Jack Couch $ 66.64 $75.30 Y04/01/2025 $ 69.30 $ 9.01 $78.31 3.99%04/01/2026 918JACK COUCH BALL PARK 919 Sr. Panthers Practice and Game $ 104.46 $ 118.04 Y04/01/2025 $ 108.63 $ 14.12 $ 122.75 4.00%04/01/2026 920 Jr. Panthers Practice and Game $ 100.12 $ 113.14 Y04/01/2025 $ 104.12 $ 13.54 $ 117.66 4.00%04/01/2026 921 Affiliated Jack Couch Park $ 41.72 $47.14 Y04/01/2025 $ 43.39 $ 5.64 $49.03 4.01%04/01/2026 922 Non-affiliated Jack Couch Park $ 64.60 $73.00 Y04/01/2025 $ 67.18 $ 8.73 $75.91 4.00%04/01/2026 APPENDIX E 26 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 923 SPORT DEVELOPMENT 924FIELD UNIT PRICES/HOUR 925 Budd Park Indoor 926 Budd Indoor Field Resident, Non-Resident $ 152.82 $ 172.69 Y07/01/2025 $ 158.93 $ 20.66 $ 179.59 4.00%07/01/2026 927 Budd Indoor field Affiliated $ 127.48 $ 144.05 Y07/01/2025 $ 132.58 $ 17.24 $ 149.82 4.00%07/01/2026 928 Budd Indoor Field Resident, Non-Resident, Non-Prime $ 69.54 $78.58 Y07/01/2025 $ 72.33 $ 9.40 $81.73 4.00%07/01/2026 New fee added to align pricing structure with CRC 929 Budd Indoor field Affiliated, Non-Prime Time NEW Y NEW $ 66.00 $ 8.58 $74.58 NEW 07/01/2026 Fields. Budd Indoor field Non-Affiliated, Not-For-Profit, Leagues/Clubs, Prime New fee added to align pricing structure with CRC 930NEW Y NEW $ 146.00 $ 18.98 $ 164.98 NEW 07/01/2026 Time Fields. Budd Indoor field Non-Affiliated, Not-For-Profit, Leagues/Clubs, Non-New fee added to align pricing structure with CRC 931NEW Y NEW $ 69.00 $ 8.97 $77.97 NEW 07/01/2026 Prime Time Fields. 932 Budd Park- Lounge Rental $ 50.33 $56.87 Y01/01/2025 $ 52.34 $ 6.80 $59.14 4.00%01/01/2026 933SPORTS FIELDS 934Field Unit Prices/hour 935Diamonds 936 A1 - Non-Affiliated $ 65.89 $74.46 Y01/01/2025 $ 68.53 $ 8.91 $77.44 4.01%01/01/2026 937 A1 - Affiliated $ 39.37 $44.49 Y01/01/2025 $ 40.94 $ 5.32 $46.26 3.99%01/01/2026 938 A2 - Non-Affiliated $ 59.11 $66.79 Y01/01/2025 $ 61.47 $ 7.99 $69.46 3.99%01/01/2026 939 A2 - Affiliated $ 35.40 $40.00 Y01/01/2025 $ 36.82 $ 4.79 $41.61 4.01%01/01/2026 940 Practice rate - affiliated minor groups $ 24.70 $27.91 Y01/01/2025 $ 25.69 $ 3.34 $29.03 4.01%01/01/2026 941 B - Non-Affiliated $ 21.37 $24.15 Y01/01/2025 $ 22.22 $ 2.89 $25.11 3.98%01/01/2026 942 B - Affiliated $ 12.91 $14.59 Y01/01/2025 $ 13.43 $ 1.75 $15.18 4.03%01/01/2026 943 S - Non-Affiliated $ 16.87 $19.06 Y01/01/2025 $ 17.54 $ 2.28 $19.82 3.97%01/01/2026 944 S - Affiliated $ 10.86 $12.27 Y01/01/2025 $ 11.29 $ 1.47 $12.76 3.96%01/01/2026 945Soccer/Football 946 A1 - Non-Affiliated $ 75.57 $85.39 Y01/01/2025 $ 78.59 $ 10.22 $88.81 4.00%01/01/2026 947 A1 - Affiliated $ 46.50 $52.55 Y01/01/2025 $ 48.36 $ 6.29 $54.65 4.00%01/01/2026 948 A2 - Non-Affiliated $ 40.24 $45.47 Y01/01/2025 $ 41.85 $ 5.44 $47.29 4.00%01/01/2026 949 A2 - Affiliated $ 24.38 $27.55 Y01/01/2025 $ 25.36 $ 3.30 $28.66 4.02%01/01/2026 950 B1 - Non-Affiliated $ 17.33 $19.58 Y01/01/2025 $ 18.02 $ 2.34 $20.36 3.98%01/01/2026 951 B1 - Affiliated $ 10.44 $11.80 Y01/01/2025 $ 10.86 $ 1.41 $12.27 4.02%01/01/2026 952 Synthetic Turf - Non-Affiliated $ 120.29 $ 135.93 Y01/01/2025 $ 125.10 $ 16.26 $ 141.36 4.00%01/01/2026 953 Synthetic Turf - Affiliated $ 63.99 $72.31 Y01/01/2025 $ 66.55 $ 8.65 $75.20 4.00%01/01/2026 954 Synthetic Turf - Non-Prime Time $ 50.82 $57.43 Y01/01/2025 $ 52.85 $ 6.87 $59.72 3.99%01/01/2026 955Other Charges 956 Admin fee per group per season (Ball B, S, Football B, S2) $ 110.40 $ 124.75 Y01/01/2025 $ 114.82 $ 14.93 $ 129.75 4.00%01/01/2026 957Cricket 958 Adult League Fee $ 23.43 $26.48 Y01/01/2022 $ 24.37 $ 3.17 $27.54 4.01%01/01/2026 959 Adult league flat rate max 6 hour booking $ 122.45 $ 138.37 Y01/01/2022 $ 127.35 $ 16.56 $ 143.91 4.00%01/01/2026 960 Youth and Neighborhood fee $ 15.71 $17.75 Y01/01/2022 $ 16.34 $ 2.12 $18.46 4.01%01/01/2026 961Volleyball Beach Courts 962 $ 31.74 $35.87 Y01/01/2025 $ 33.01 $ 4.29 $37.30 4.00%01/01/2026 APPENDIX E 27 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 963 AQUATICS PROGRAMS 964RECREATION SWIMS & CRC SINGLE VISIT 965 Children 17 and under and Seniors swim admission $4.07 $4.60 Y01/01/2025 $4.07 $ 0.53 $4.60 0.09%01/01/2026Currently on high end regionally. Maintain 2025 fee. 966 10 visits pass - child/senior NEW Y NEW $ 32.56 $ 4.23 $36.79 NEW 01/01/202610 visit pass. Price = (child/senior admit*0.8)*10 visits 967 Adult 18 and over admission $6.09 $6.89 Y01/01/2025 $6.09 $ 0.79 $6.88 -0.07%01/01/2026Currently on high end regionally. Maintain 2025 fee. 968 10 visits pass- Adult NEW Y NEW $ 48.72 $ 6.33 $55.05 NEW 01/01/202610 visit pass. Price = (adult admit*0.8)*10 visits 1st person is 1st person is full full price, 2nd price, 2nd person Group Discount pricing - inclusive replacement for 969 Group Admission NEW Y NEW person 25% off, 25% off, 3-4th NEW 01/01/2026 'family' admission. Available online or in person. 3-4th 50% off, 5-50% off, 5-6th 6th 75% off.75% off. 970 Daily Rate - Child, Senior (Kiwanis Park Only) $6.27 $7.09 Y01/01/2025 $6.52 $ 0.85 $7.37 3.97%01/01/2026New Fee for use at Kiwanis only. 971 Daily Rate - Adult (Kiwanis Park Only) $9.78 $11.05 Y01/01/2025 $ 10.17 $ 1.32 $11.49 4.03%01/01/2026New Fee for use at Kiwanis only. 1st person is 1st person is full full price, 2nd price, 2nd person Group Discount pricing - inclusive replacement for 972 Daily Rate - Group (Kiwanis Park Only)NEW Y NEW person 25% off, 25% off, 3-4th NEW 01/01/2026 'family' admission. Available online or in person. 3-4th 50% off, 5-50% off, 5-6th 6th 75% off.75% off. 973 Kiwanis No Swim Entry Fee $2.03 $2.29 Y01/01/2025 $2.11 $ 0.27 $2.38 3.94%01/01/2026 9743 MONTH PASS - Swim Pass 975 Child and Senior $ 125.20 $ 141.47 Y01/01/2025 $ 125.20 $ 16.28 $ 141.48 0.00%01/01/2026Currently on high end regionally. Maintain 2025 fee 976 Adult $ 196.70 $ 222.27 Y01/01/2025 $ 196.70 $ 25.57 $ 222.27 0.00%01/01/2026Currently on high end regionally. Maintain 2025 fee SUMMER SPLASH PASS (access to public swims while outdoor pools 977 are open) 978 Child/Senior $ 33.28 $37.61 Y01/01/2025 $ 34.61 $ 4.50 $39.11 4.00%01/01/2026 979 Adult $ 46.80 $52.88 Y01/01/2025 $ 48.67 $ 6.33 $55.00 4.00%01/01/2026 980KITCHENER CARD 981 14 years and under $ 38.70 $38.70 N01/01/2025 $ 40.25 $ - $40.25 4.01%01/01/2026 982 15 years and over $ 79.46 $89.79 Y01/01/2025 $ 82.63 $ 10.74 $93.37 3.99%01/01/2026 983REGISTRATION FEE – BASIC RATE 1 LESSON (6-10 lessons /session) APPENDIX E 28 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N All levels will be the same rate based off of the implementation of the new Kitchener Swims program 984NEW Y NEW $ 10.22 $ 1.33 $11.55 NEW 01/01/2026 Lessons - Adults 18 and over launched in January 2025. Still among the most expensive in the region. All lessons adjusted to top 985 Lessons - Teens 15 and over NEW Y NEW $ 10.22 $ 1.33 $11.55 NEW 01/01/2026 group lesson fee from 2025. Lines separated for 986 Lessons - Teens 13 and 14 NEW N NEW $ 10.22 $ - $10.22 NEW 01/01/2026 flexibility for future adjustments. Fees to increase May 987 Lessons - Parent & Tot, Pre-School, Child NEW N NEW $ 10.22 $ - $10.22 NEW 01/01/2026 2026 for the start of the spring session with Winter 988 Lessons - Swim Patrol NEW N NEW $ 10.22 $ - $10.22 NEW 01/01/2026 989 Lessons - Adapted Aquatics NEW N NEW $ 10.22 $ - $10.22 NEW 01/01/2026 registration opening before 2026 user fees are Aquatic Sport Programming (Junior Lifeguard Club, Water Polo, Two staff at Leadership rate with a course minimum of 990NEW N NEW $ 10.68 $ - $10.68 NEW 01/01/2026 Lifesaving Sport)6 participants. 991 Parented Aquatic Fitness Class $ 10.57 $11.94 Y01/01/2025 $ 10.99 $ 1.43 $12.42 3.97%01/01/2026 992LIFESAVING COURSES - exam fee and materials not included 993 Bronze Star +Basic First Aid + CPRA $ 64.85 $64.85 N01/01/2025 $ 67.45 $ - $67.45 4.00%01/01/2026 994 Bronze medallion/Emergency First Aid/CPR-B or Bronze Cross alone $ 85.75 $96.90 Y01/01/2025 $ 89.18 $ 11.59 $ 100.77 4.00%01/01/2026 995 Bronze cross with Standard First Aid/CPR-C $ 132.52 $ 149.75 Y01/01/2025 $ 137.82 $ 17.92 $ 155.74 4.00%01/01/2026 996 Emergency First Aid $ 45.68 $51.62 Y01/01/2025 $ 47.51 $ 6.18 $53.69 4.01%01/01/2026 997 CPR-C $ 34.02 $38.44 Y01/01/2025 $ 35.38 $ 4.60 $39.98 4.00%01/01/2026 998 Bronze Challenge$43.92 $49.63 Y01/01/2025 $ 45.68 $ 5.94 $51.62 4.01%01/01/2026 999LEADERSHIP- exam fee and materials not included 1000 Lifesaving Society Assistant Inst. $ 103.93 $ 117.44 Y01/01/2025 $ 108.09 $ 14.05 $ 122.14 4.00%01/01/2026 1001 Lifesaving Society swim Instructors $ 119.52 $ 135.06 Y01/01/2025 $ 124.30 $ 16.16 $ 140.46 4.00%01/01/2026 1002 National lifeguard $ 254.63 $ 287.73 Y01/01/2025 $ 264.82 $ 34.43 $ 299.25 4.00%01/01/2026 1003 Lifesaving Society Instructors $ 119.52 $ 135.06 Y01/01/2025 $ 124.30 $ 16.16 $ 140.46 4.00%01/01/2026 1004 Standard First Aid/CPR-C $ 83.15 $93.96 Y01/01/2025 $ 86.48 $ 11.24 $97.72 4.00%01/01/2026 1005 Summer Leadership Bundle (BRM/BRC/NL/SW/SFA) $ 499.20 $ 564.10 Y01/01/2025 $ 519.17 $ 67.49 $ 586.66 4.00%01/01/2026 1006 Standard first aid instructors $ 137.88 $ 155.80 Y01/01/2025 $ 143.40 $ 18.64 $ 162.04 4.00%01/01/2026 1007 National lifeguard instructors $ 137.88 $ 155.80 Y01/01/2025 $ 143.40 $ 18.64 $ 162.04 4.00%01/01/2026 1008 Instructor trainer course $ 137.88 $ 155.80 Y01/01/2025 $ 143.40 $ 18.64 $ 162.04 4.00%01/01/2026 1009 Pool operator course $ 61.28 $69.25 Y01/01/2025 $ 63.73 $ 8.29 $72.02 4.00%01/01/2026 1010ADVANCED LEADERSHIP- exam fee and materials not included 1011 Examiners Courses $ 68.92 $77.88 Y01/01/2025 $ 71.68 $ 9.32 $81.00 4.00%01/01/2026 1012 Aquatic Supervisor $ 91.89 $ 103.84 Y01/01/2025 $ 95.57 $ 12.42 $ 107.99 4.00%01/01/2026 1013Re-certification Fees 1014 Bronze Cross recert $ 23.94 $27.05 Y01/01/2025 $ 24.90 $ 3.24 $28.14 4.01%01/01/2026 1015 National lifeguard Recertifications $ 30.64 $34.62 Y01/01/2025 $ 31.87 $ 4.14 $36.01 4.01%01/01/2026 1016 Standard First Aid/CPR-C recertifications $ 45.68 $51.62 Y01/01/2025 $ 47.51 $ 6.18 $53.69 4.01%01/01/2026 1017 In person recertification $ 34.62 $39.12 Y01/01/2025 $ 36.00 $ 4.68 $40.68 3.99%01/01/2026 APPENDIX E 29 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1018PRIVATE LESSONS (30 mins) 10% increase for premium service and hasn't been adjusted to reflect wage increases over last few years. Increase still places us below other municipalities 1019 Private lessons for 14 and under $ 36.71 $36.71 N01/01/2025 $ 40.38 $ - $40.38 9.99%01/01/2026within the region for annual increases. Fees to increase May 2026 for the start of the spring session with Winter registration opening before 2026 user fees are approved. 10% increase for premium service and hasn't been adjusted to reflect wage increases over last few years. Increase still places us below other municipalities 1020 Private lessons for 15 and over $ 36.71 $41.48 Y01/01/2025 $ 40.38 $ 5.25 $45.63 9.99%01/01/2026within the region for annual increases. Fees to increase May 2026 for the start of the spring session with Winter registration opening before 2026 user fees are approved. 60% of private lesson rate to allow for reflection of increase of premium service that has not been adjusted to reflect wage increases over the last few years. Adjusted increase places us below other 1021 Semi-private lessons for 14 and under $ 19.50 $19.50 N01/01/2025 $ 24.23 $ - $24.23 24.26%01/01/2026 municipalities within the region for annual increases. Fees to increase May 2026 for the start of the spring session with Winter registration opening before 2026 user fees are approved 60% of private lesson rate to allow for reflection of increase of premium service that has not been adjusted to reflect wage increases over the last few years. Adjusted increase places us below other 1022 Semi private for 15 and over $ 20.40 $23.06 Y01/01/2025 $ 24.23 $ 3.15 $27.38 18.75%01/01/2026 municipalities within the region for annual increases. Fees to increase May 2026 for the start of the spring session with Winter registration opening before 2026 user fees are approved 1023SPECIALTY PROGRAMS per hour Multi-Visit session of our basic Aquafit/lane swim 1024 Sessional Lane/Aquafit programs (senior/child) - per visit NEW Y NEW $3.38 $ 0.44 $3.82 NEW 01/01/2026 programming. Multi-Visit session of our basic Aquafit/lane swim 1025 Sessional Lane/Aquafit programs (Adult) - per visit NEW Y NEW $5.07 $ 0.66 $5.73 NEW 01/01/2026 programming. Renamed to Registered Aquatic Fitness Programs Registered Aquatic Fitness Programs (Boot Camp, Triathlon, Cross 1026 $ 12.19 $13.77 Y01/01/2025 $ 12.68 $ 1.65 $14.33 4.03%01/01/2026(Boot Camp, Triathlon, Cross Training, AquaCycle, SUP, Training, AquaCycle, SUP, Yoga, Fitness Groups) Yoga, Fitness Groups) 1027 Kayaking $ 12.19 $13.77 Y01/01/2025 $ 12.68 $ 1.65 $14.33 4.03%01/01/2026 1028 Specialty Aquafit - Adult Drop-In $ 12.19 $13.77 Y01/01/2025 $ 12.68 $ 1.65 $14.33 4.03%01/01/2026 1029 Specialty Aquafit - Child Drop-In $6.26 $6.26 N01/01/2025 $6.51 $ - $6.51 3.98%01/01/2026 APPENDIX E 30 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N POOL RENTALS - (All rates per hour) 1030 Total staff required for rental will be determined by aquatic booking staff, based on established criteria available to public Change in how we price our pools to just the facility 1031 Tier 1 (CRC main pool, Harry Class, Kiwanis Park) $ 202.84 $ 229.21 Y01/01/2025 $ 150.87 $ 19.61 $ 170.48 -25.62%07/01/2026 costs, all staff costs are additional Tier 2 (CRC program pool, Forest Heights main pool, Breithaupt main Change in how we price our pools to just the facility 1032 $ 176.96 $ 199.96 Y01/01/2025 $ 123.94 $ 16.11 $ 140.05 -29.96%07/01/2026 pool, Cameron Heights, Grand River Rec Centre, Wilson, Idlewood)costs, all staff costs are additional Change in how we price our pools to just the facility 1033 Tier 3 (Forest Heights warm pool, Breithaupt warm pool) $ 110.66 $ 125.05 Y01/01/2025 $ 54.99 $ 7.15 $62.14 -50.31%07/01/2026 costs, all staff costs are additional 1034 Affiliate Rate - discount of 25% Y07/01/2026Discount to align with other sports amenities. 1035 Lifeguard per hour $ 28.10 $31.75 Y01/01/2025 $ 29.02 $ 3.77 $32.79 3.27%01/01/2026 1036 Head Lifeguard per hour NEW Y NEW $ 31.07 $ 4.04 $35.11 NEW 01/01/2026Headguard rate, to be added to pool rentals. CSA rate, to be added to pool rentals outside of 1037 Customer Service Attendant per hour NEW Y NEW $ 27.09 $ 3.52 $30.61 NEW 01/01/2026 operating hours. 1038 statutory holiday rate per hour = 1.5 X all pool rental rates.NEW Y NEWNEW 07/01/2026Fee to offset labour costs during statutory holidays. 1039SCHOOLBOARD /INSTRUCTIONAL PROGRAMS (youth 0-14 years) 1040 Extra Instructor per hour $ 28.10 $28.10 N01/01/2025 $ 29.02 $ - $29.02 3.27%01/01/2026Percentage based on wage increase. 1041RENTAL GROUP ENTRY FOR PUBLIC SWIM (full swim) 10420-10 entries $ 26.14 $29.53 Y01/01/2025 $ 27.18 $ 3.53 $30.71 4.00%01/01/2026 1043 0-30 Entries $ 52.27 $59.07 Y01/01/2025 $ 54.36 $ 7.07 $61.43 4.00%01/01/2026 1044 31-125 Entries $ 78.41 $88.60 Y01/01/2025 $ 81.54 $ 10.60 $92.14 4.00%01/01/2026 1045 After hours staffing cost $ 44.37 $50.13 Y01/01/2025 $ 46.14 $ 6.00 $52.14 4.00%01/01/2026 1046 After hours rental rate - Specified holidays $ 61.47 $69.47 Y01/01/2025 $ 63.93 $ 8.31 $72.24 3.99%01/01/2026 1047AQUATIC FACILITY ROOM RENTALS (per hour) 1048 Tier 4 (Rooms 103,201,202,205, (BRC) $ 19.85 $22.43 Y01/01/2025 $ 20.65 $ 2.68 $23.33 4.01%01/01/2026 Tier 3 (Room 206 (BRC), Tim Horton's Shelter (Kiwanis)) Meeting Room 1049 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 GRRC 1050 Tier 2 (Room 109 (BRC) $ 39.31 $44.42 Y01/01/2025 $ 40.88 $ 5.31 $46.19 3.99%01/01/2026 Tier 1 (Room 207 (BRC), Oktoberfest Lions Hall (GRRC), Beachside 1051 $ 55.24 $62.43 Y01/01/2025 $ 57.45 $ 7.47 $64.92 3.99%01/01/2026 Shelter (Kiwanis)) 1052 Kitchen $ 36.17 $40.87 Y01/01/2025 $ 37.62 $ 4.89 $42.51 4.01%01/01/2026 1053BRC GYMNASIUM RENTALS PRICES/HOUR 1054 BRC, Gymnasium, Resident and Non-Resident, Prime Time $ 78.63 $88.86 Y01/01/2025 $ 81.78 $ 10.63 $92.41 4.00%01/01/2026 Added new price points to align with CRC Gym user 1055 BRC, Gymnasium, Resident and Non-Resident, Non-Prime Time NEW Y NEW $ 60.00 $ 7.80 $67.80 NEW 01/01/2026 fee structure. Added new price points to align with CRC Gym user 1056 BRC, Gymnasium, Youth Affiliated, Prime Time NEW Y NEW $ 62.00 $ 8.06 $70.06 NEW 01/01/2026 fee structure. Added new price points to align with CRC Gym user 1057 BRC, Gymnasium, Youth Affiliated, Non-Prime Time NEW Y NEW $ 44.00 $ 5.72 $49.72 NEW 01/01/2026 fee structure. Added new price points to align with CRC Gym user 1058 BRC, Gymnasium, Non-Affiliated, Prime Time NEW Y NEW $ 71.00 $ 9.23 $80.23 NEW 01/01/2026 fee structure. Added new price points to align with CRC Gym user 1059 BRC, Gymnasium, Non-Affiliated, Non-Prime Time NEW Y NEW $ 55.00 $ 7.15 $62.15 NEW 01/01/2026 fee structure. 1060KIWANIS RENTAL GROUP ADMISSIONS PER HOUR 1061 1 - 60 Guests $ 52.27 $59.07 Y01/01/2025 $ 54.36 $ 7.07 $61.43 4.00%01/01/2026 1062 61 - 125 Guests $ 78.41 $88.60 Y01/01/2025 $ 81.54 $ 10.60 $92.14 4.00%01/01/2026 1063 126 - 250 Guests $ 104.54 $ 118.13 Y01/01/2025 $ 108.72 $ 14.13 $ 122.85 4.00%01/01/2026 1064 251 - 400 Guests $ 130.68 $ 147.66 Y01/01/2025 $ 135.90 $ 17.67 $ 153.57 4.00%01/01/2026 1065 401 - 550 Guests $ 156.81 $ 177.20 Y01/01/2025 $ 163.08 $ 21.20 $ 184.28 4.00%01/01/2026 APPENDIX E 31 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N New User fees created for the newly constructed 1066 COWAN RECREATION CENTRE (CRC) Cowan Recreation Centre. 1067INDOOR FIELD UNIT PRICES/HOUR 1068 CRC, Indoor Turf, 1/4 Field, Youth Affiliated, Prime Time (Fall/Winter)NEW Y NEW $ 175.00 $ 22.75 $ 197.75 NEW 05/01/2026 CRC, Indoor Turf, 1/4 Field, Youth Affiliated, Non-Prime Time (Fall/Winter) 1069NEW Y NEW $ 88.00 $ 11.44 $99.44 NEW 05/01/2026 CRC, Indoor Turf, 1/4 Field, Youth Affiliated, Prime Time (Spring/Summer) 1070NEW Y NEW $ 88.00 $ 11.44 $99.44 NEW 05/01/2026 1071NEW Y NEW $ 44.00 $ 5.72 $49.72 NEW 05/01/2026 CRC, Indoor Turf, 1/4 Field, Youth Affiliated, Non-Prime Time (Spring/Summer) CRC, Indoor Turf, 1/4 Field, Non-Affiliated, Not-For-Profit, Leagues/Clubs, 1072NEW Y NEW $ 200.00 $ 26.00 $ 226.00 NEW 05/01/2026 Prime Time (Fall/Winter) CRC, Indoor Turf, 1/4 Field, Non-Affiliated, Not-For-Profit, Leagues/Clubs, Non- 1073NEW Y NEW $ 100.00 $ 13.00 $ 113.00 NEW 05/01/2026 Prime Time (Fall/Winter) CRC, Indoor Turf, 1/4 Field, Non-Affiliated, Not-For-Profit, Leagues/Clubs, 1074NEW Y NEW $ 100.00 $ 13.00 $ 113.00 NEW 05/01/2026 Prime Time (Spring/Summer) CRC, Indoor Turf, 1/4 Field, Non-Affiliated, Not-For-Profit, Leagues/Clubs, Non- 1075NEW Y NEW $ 50.00 $ 6.50 $56.50 NEW 05/01/2026 Prime Time (Spring/Summer) 1076 CRC, Indoor Turf, 1/4 Field, Resident, Prime Time (Fall/Winter)NEW Y NEW $ 225.00 $ 29.25 $ 254.25 NEW 05/01/2026 1077 CRC, Indoor Turf, 1/4 Field, Resident, Non-Prime Time (Fall/Winter)NEW Y NEW $ 120.00 $ 15.60 $ 135.60 NEW 05/01/2026 CRC, Indoor Turf, 1/4 Field, Resident, Prime Time (Spring/Summer) 1078NEW Y NEW $ 120.00 $ 15.60 $ 135.60 NEW 05/01/2026 CRC, Indoor Turf, 1/4 Field, Resident, Non-Prime Time (Spring/Summer) 1079NEW Y NEW $ 60.00 $ 7.80 $67.80 NEW 05/01/2026 1080 CRC, Indoor Turf, 1/4 Field, Non-Resident, Prime Time (Fall/Winter)NEW Y NEW $ 250.00 $ 32.50 $ 282.50 NEW 05/01/2026 1081 CRC, Indoor Turf, 1/4 Field, Non-Resident, Non-Prime Time (Fall/Winter)NEW Y NEW $ 160.00 $ 20.80 $ 180.80 NEW 05/01/2026 CRC, Indoor Turf, 1/4 Field, Non-Resident, Prime Time (Spring/Summer) 1082NEW Y NEW $ 160.00 $ 20.80 $ 180.80 NEW 05/01/2026 CRC, Indoor Turf, 1/4 Field, Non-Resident, Non-Prime (Spring/Summer) 1083NEW Y NEW $ 80.00 $ 10.40 $90.40 NEW 05/01/2026 1084CRC GYMNASIUM RENTALS PRICES/HOUR 1085 CRC, Gymnasium, 1 Gym, Youth Affiliated, Prime Time NEW Y NEW $ 82.00 $ 10.66 $92.66 NEW 05/01/2026 CRC, Gymnasium, 1 Gym, Youth Affiliated, Non-Prime Time 1086NEW Y NEW $ 55.00 $ 7.15 $62.15 NEW 05/01/2026 1087NEW Y NEW $ 44.00 $ 5.72 $49.72 NEW 05/01/2026 CRC, Gymnasium, 1 Gym, Youth Affiliated, Non-Prime Time (Spring/Summer) CRC, Gymnasium, 1 Gym, Non-Affiliated, Not-For-Profit, Leagues/Clubs, Prime 1088NEW Y NEW $ 105.00 $ 13.65 $ 118.65 NEW 05/01/2026 Time CRC, Gymnasium, 1 Gym, Non-Affiliated, Not-For-Profit, Leagues/Clubs, Non- 1089NEW Y NEW $ 70.00 $ 9.10 $79.10 NEW 05/01/2026 Prime Time 1090 CRC, Gymnasium, 1 Gym, Resident, Prime Time NEW Y NEW $ 120.00 $ 15.60 $ 135.60 NEW 05/01/2026 1091 CRC, Gymnasium, 1 Gym, Resident, Non-Prime Time NEW Y NEW $ 72.00 $ 9.36 $81.36 NEW 05/01/2026 CRC, Gymnasium, 1 Gym, Non-Resident, Prime Time 1092NEW Y NEW $ 160.00 $ 20.80 $ 180.80 NEW 05/01/2026 CRC, Gymnasium, 1 Gym, Non-Resident, Non-Prime Time 1093NEW Y NEW $ 100.00 $ 13.00 $ 113.00 NEW 05/01/2026 1094CRICKET PRACTICE NETS RENTALS PRICE/HOUR 1095 CRC, Cricket Practice Nets, 20 meter, Prime Time NEW Y NEW $ 37.00 $ 4.81 $41.81 NEW 01/01/2026 1096 CRC, Cricket Practice Nets, 20 meter, Non-Prime Time NEW Y NEW $ 21.00 $ 2.73 $23.73 NEW 01/01/2026 1097 CRC, Cricket Practice Nets, 40 meter, Prime Time NEW Y NEW $ 53.00 $ 6.89 $59.89 NEW 01/01/2026 1098 CRC, Cricket Practice Nets, 40 meter, Non-Prime Time NEW Y NEW $ 32.00 $ 4.16 $36.16 NEW 01/01/2026 1099 CRC, Cricket Practice Nets, Bat Rental NEW Y NEW $ 20.00 $ 2.60 $22.60 NEW 01/01/2026 1100 CRC, Cricket Practice Nets, Kit Rental NEW Y NEW $ 10.00 $ 1.30 $11.30 NEW 01/01/2026 1101 CRC, Cricket Practice Nets, Bowling Machine NEW Y NEW $ 10.00 $ 1.30 $11.30 NEW 01/01/2026 1102CRC ROOM RENTALS PRICE/HOUR 1103 CRC, Meeting Room, Tier 4 $ 19.85 $22.43 Y01/01/2025 $ 20.65 $ 2.68 $23.33 4.01%01/01/2026 1104 CRC, Aquatics Room, Tier 3 $ 28.32 $32.00 Y01/01/2025 $ 29.45 $ 3.83 $33.28 3.99%01/01/2026 1105 CRC, Multi-Purpose Room 1, Tier 2 $ 39.31 $44.42 Y01/01/2025 $ 40.88 $ 5.31 $46.19 3.99%01/01/2026 1106 CRC, Multi-Purpose Room 2, Tier 2 $ 39.31 $44.42 Y01/01/2025 $ 40.88 $ 5.31 $46.19 3.99%01/01/2026 1107 CRC, Multi-Purpose Room 3, Tier 2 $ 39.31 $44.42 Y01/01/2025 $ 40.88 $ 5.31 $46.19 3.99%01/01/2026 1108 CRC, Multi-Purpose Room 4, Tier 2 $ 39.31 $44.42 Y01/01/2025 $ 40.88 $ 5.31 $46.19 3.99%01/01/2026 APPENDIX E 32 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1109 GOLF 1110MEMBERSHIPS 1111 Junior $ 465.01 $ 525.46 Y01/01/2025 $ 483.61 $ 62.87 $ 546.48 4.00%01/01/2026 1112 Adult full $ 2,004.52 $ 2,265.11 Y01/01/2025 $ 2,114.77 $ 274.92 $ 2,389.69 5.50%01/01/2026Higher increase to align with competitors. 1113 Adult Full Couple $ 3,813.23 $ 4,308.95 Y01/01/2025 $ 4,022.96 $ 522.98 $ 4,545.94 5.50%01/01/2026Higher increase to align with competitors. 1114 55+ Restricted $ 1,047.32 $ 1,183.47 Y01/01/2025 $ 1,104.92 $ 143.64 $ 1,248.56 5.50%01/01/2026Higher increase to align with competitors. 1115 55+ Restricted Couple $ 1,980.20 $ 2,237.63 Y01/01/2025 $ 2,089.11 $ 271.58 $ 2,360.69 5.50%01/01/2026Higher increase to align with competitors. 1116 Classic 9 Doon - 7 days $ 874.02 $ 987.64 Y01/01/2025 $ 922.09 $ 119.87 $ 1,041.96 5.50%01/01/2026Higher increase to align with competitors. 1117 Classic 9 Doon - 4 days $ 619.33 $ 699.84 Y01/01/2025 $ 653.39 $ 84.94 $ 738.33 5.50%01/01/2026Higher increase to align with competitors. 1118 Intermediate Full (19-30) $ 1,423.06 $ 1,608.06 Y01/01/2025 $ 1,501.33 $ 195.17 $ 1,696.50 5.50%01/01/2026Higher increase to align with competitors. 1119 Pitch n' Putt $ 116.91 $ 132.11 Y01/01/2025 $ 121.58 $ 15.81 $ 137.39 4.00%01/01/2026 1120 Pitch n' Putt Family $ 258.71 $ 292.34 Y01/01/2025 $ 269.06 $ 34.98 $ 304.04 4.00%01/01/2026 1121GREEN FEES 1122 9 hole course- 9 holes - 7 days/week $ 27.19 $30.72 Y01/01/2025 $ 29.00 $ 3.77 $32.77 6.66%01/01/2026Higher increase to align with competitors. Optimize 9-hole play on 9-hole course. New fee is the 1123 9 hole course - replay rate NEW Y NEW $ 19.25 $ 2.50 $21.75 NEW 01/01/2026 difference between 18-hole and 9-hole green fees. 1124 18 hole fee for Juniors & Member $ 29.35 $33.16 Y01/01/2025 $ 31.25 $ 4.06 $35.31 6.47%01/01/2026Higher increase to align with competitors. 1125 League - 9 holes $ 25.37 $28.67 Y01/01/2025 $ 27.00 $ 3.51 $30.51 6.42%01/01/2026Higher increase to align with competitors. 1126League - 18 holes 1127 Daily Rate - Monday to Thursday $ 44.43 $50.21 Y01/01/2025 $ 48.25 $ 6.27 $54.52 8.60%01/01/2026Higher increase to align with competitors. 1128 Friday Rate $ 47.70 $53.90 Y01/01/2025 $ 51.75 $ 6.73 $58.48 8.49%01/01/2026Higher increase to align with competitors. Weekend Prime Rate - Saturdays & Sundays including Statutory 1129 $ 51.36 $58.04 Y01/01/2025 $ 55.50 $ 7.22 $62.72 8.06%01/01/2026Higher increase to align with competitors. Holidays 1130 Twilight - 4pm to close $ 29.56 $33.40 Y01/01/2025 $ 32.00 $ 4.16 $36.16 8.25%01/01/2026Higher increase to align with competitors. 1131GAME PACK BUNDLES - 18 Hole Game Pack Bundles support our ongoing strategy to 1132 10-Game Pack - 18 Hole - Monday to Friday $ 428.19 $ 483.85 Y01/01/2025 $ 451.74 $ 58.73 $ 510.47 5.50%01/01/2026 evolve the golf program toward a pay-per-use model 1133 20-Game Pack - 18 Hole- Monday to Friday $ 808.79 $ 913.93 Y01/01/2025 $ 853.27 $ 110.93 $ 964.20 5.50%01/01/2026 that offers greater flexibility and affordability for 1134 30-Game Pack - 18 Hole - Monday to Friday $ 1,141.83 $ 1,290.27 Y01/01/2025 $ 1,204.63 $ 156.60 $ 1,361.23 5.50%01/01/2026 APPENDIX E 33 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N players, as an alternative to traditional memberships. 1135GAME PACK BUNDLES - 9 Hole 1136 10-Game Pack - 9 Hole - Monday to Friday NEW Y NEW $ 272.13 $ 35.38 $ 307.51 NEW 01/01/2026 This model aligns with current trends in sport & 1137 20-Game Pack - 9 Hole - Monday to Friday NEW Y NEW $ 514.02 $ 66.82 $ 580.84 NEW 01/01/2026 recreational programming, where participants 1138 30-Game Pack - 9 Hole - Monday to Friday NEW Y NEW $ 725.68 $ 94.34 $ 820.02 NEW 01/01/2026 increasingly seek choice, convenience, and value. 1139PITCH N PUTT - 9 Hole 1140 Adult $ 10.15 $11.47 Y01/01/2025 $ 10.75 $ 1.40 $12.15 5.91%01/01/2026Fee rounded. 1141 Child $6.67 $7.54 Y01/01/2025 $7.00 $ 0.91 $7.91 4.95%01/01/2026Fee rounded. Fee rounded. 1142 Senior $7.84 $8.86 Y01/01/2025 $8.25 $ 1.07 $9.32 5.23%01/01/2026 Fee rounded. 1143 Family (4) $ 25.11 $28.37 Y01/01/2025 $ 26.25 $ 3.41 $29.66 4.54%01/01/2026 1144DRIVING RANGE 1145 Small Bucket $5.53 $6.25 Y01/01/2025 $5.75 $ 0.75 $6.50 3.98%01/01/2026Fee rounded. Fee rounded. 1146 Medium Bucket $7.84 $8.86 Y01/01/2025 $8.25 $ 1.07 $9.32 5.23%01/01/2026 Fee rounded. 1147 Large Bucket $ 12.23 $13.82 Y01/01/2025 $ 12.75 $ 1.66 $14.41 4.25%01/01/2026 1148POWER CART RENTALS 1149 18 holes per person $ 19.53 $22.07 Y01/01/2025 $ 20.50 $ 2.67 $23.17 4.97%01/01/2026Fee rounded. Fee rounded. 1150 Twilight / 9 holes per person $ 12.81 $14.47 Y01/01/2025 $ 13.50 $ 1.76 $15.26 5.39%01/01/2026 1151 Full Cart Membership $ 888.33 $ 1,003.81 Y01/01/2025 $ 937.19 $ 121.83 $ 1,059.02 5.50%01/01/2026Higher increase to align with competitors. 1152 4-day Cart Membership (Mon-Thu) $ 501.65 $ 566.86 Y01/01/2025 $ 529.24 $ 68.80 $ 598.04 5.50%01/01/2026Higher increase to align with competitors. 1153 Cart Membership $ 116.90 $ 132.10 Y01/01/2025 $ 123.33 $ 16.03 $ 139.36 5.50%01/01/2026Higher increase to align with competitors. 1154 Power Cart member fee - 18 hole $ 12.48 $14.10 Y01/01/2025 $ 13.25 $ 1.72 $14.97 6.17%01/01/2026Fee rounded. Fee rounded. 1155 Power Cart member fee - 9 hole $6.70 $7.57 Y01/01/2025 $7.00 $ 0.91 $7.91 4.48%01/01/2026 1156ROOM RENTALS 1157 Capacity 20 or under 1/2 day $ 113.20 $ 127.92 Y01/01/2025 $ 117.73 $ 15.30 $ 133.03 4.00%01/01/2026 1158 Capacity 20 or Full day $ 185.91 $ 210.08 Y01/01/2025 $ 193.35 $ 25.14 $ 218.49 4.00%01/01/2026 1159 Capacity 120 1/2 day $ 566.04 $ 639.63 Y01/01/2025 $ 588.68 $ 76.53 $ 665.21 4.00%01/01/2026 1160 Capacity 120 Full Day $ 860.53 $ 972.40 Y01/01/2025 $ 894.95 $ 116.34 $ 1,011.29 4.00%01/01/2026 Discounts offered on room rental for multiple booking dates & non- 1161 prime times. APPENDIX E 34 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1162 INFRASTRUCTURE SERVICES 1163 OPERATIONS - ROADS & TRAFFIC 1164TRAFFIC/SIGN MANUFACTURING 1165 Sign Manufacturing (internal)Actual Cost Actual Cost N01/01/2025 Actual Cost $ - Actual Cost0.00%01/01/2026 Actual Cost + Actual Cost + Actual Cost + Actual Cost + 1166 Sign Manufacturing Custom (external)Y01/01/2025 $ - 0.00%01/01/2026 60% overhead60% overhead 60% overhead 60% overhead Actual Cost + Actual Cost + Actual Cost + Actual Cost + 1167 Sign Manufacturing Inventoried (external)Y01/01/2025 $ - 0.00%01/01/2026 15% overhead15% overhead 15% overhead 15% overhead Rental Fee Rental Fee Rental Fee Rental Fee Barricade Rentals Installation 1168 N01/01/2025 $ - 4.00%01/01/2026 $2.40/day to $2.40/day to $2.50/day to $2.50/day to (labour, equipment, 15% overhead + applicable rental fee/day) max. $122.17max. $122.17 max. $127.06 max. $127.06 Rental Fee Rental Fee Rental Fee Rental Fee Fencing Rentals Installation 1169$2.40/day to $2.40/day to N01/01/2025$2.50/day to $ - $2.50/day to 4.00%01/01/2026 (labour, equipment, 15% overhead + applicable rental fee/day) max. $508.57max. $508.57 max. $528.91 max. $528.91 Rental Fee Rental Fee Rental Fee Rental Fee Delineator Rentals Installation (Labour, Equip, 15% Overhead + Rental 1170 N01/01/2025 $ - 4.00%01/01/2026 $2.40/day to $2.40/day to $2.50/day to $2.50/day to Fee/day) max. $122.17max. $122.17 max. $127.06 max. $127.06 Construction Signage Installation (Labour, Equip, 15% Overhead + $7.57/day to $7.57/day to $7.87/day to $7.87/day to 1171 N01/01/2025 $ - 4.00%01/01/2026 Rental Fee/Day)max. $259.58max. $259.58 max. $269.96 max. $269.96 Actual Cost + Actual Cost + Actual Cost + Actual Cost + 1172 Bollard RelocationsN01/01/2025 $ - 0.00%01/01/2026 15% overhead 15% overhead 15% overhead 15% overhead 1173Utility Cuts 1174 Curb/Gutter/lineal meter $ 211.50 $ 239.00 Y01/01/2025 $ 219.96 $ 28.60 $ 248.56 4.00%01/01/2026 1175 Sidewalk Flat Rate (for < = 7.5 sq meter) $ 1,418.14 $ 1,602.50 Y01/01/2025 $ 1,474.86 $ 191.73 $ 1,666.59 4.00%01/01/2026 1176 Sidewalk/sq meter (for > 7.5 sq meter) $ 191.82 $ 216.76 Y01/01/2025 $ 199.49 $ 25.93 $ 225.42 4.00%01/01/2026 $15.30/m2 $113.19/m2 + $118.25/m2 + $117.72/m2 + $133.02/m2 + + $35.42 1177 Roadway - greater than 20 sq meter$261.97 $273.67 Y01/01/2025$272.45 $307.87 4.00%01/01/2026 mobilizatio mobilization feemobilization fee mobilization fee mobilization fee n fee $20.19/m2 $149.32/m2 + $156.01/m2 + $155.29/m2 + $175.48/m2 + + $35.55 1178 Roadway - less than 20 sq meter$261.94 $273.67 Y01/01/2025$273.46 $309.01 4.00%01/01/2026 mobilizatio mobilization feemobilization fee mobilization fee mobilization fee n fee 1179 Asphalt - Driveway Ramps/sq meter $ 90.19 $ 101.92 Y01/01/2025 $ 93.80 $ 12.19 $ 105.99 4.00%01/01/2026 1180Roads Misc. Labour, Labour, Material Labour, Material Labour, Material 1181 Grading of Lots, etc.N01/01/2025Material & $ - 0.00%01/01/2026 & Equipment& Equipment & Equipment Equipment Labour, Labour, Material Labour, Material Labour, Material 1182 Accident Clean-upN01/01/2025 $ - 0.00%01/01/2026 Material & & Equipment& Equipment & Equipment Equipment 1183Concrete 1184 Mud jacking/sq meter $ 28.40 $32.09 Y01/01/2025 $ 29.53 $ 3.84 $33.37 3.99%01/01/2026 APPENDIX E 35 CITY OF KITCHENCITY OF KITCHENERER | | B BUDUDGGET SUET SUMMARYMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1185 PARKS & CEMETERIES 1186 PARKS 1187Sidewalk Snow Clearing (per linear meter) 1188 Downtown $ 31.28 $31.28 N01/01/2025 $ 32.53 $ - $32.53 4.01%01/01/2026 1189 Standard Sidewalks $9.50 $9.50 N01/01/2025 $9.88 $ - $9.88 4.00%01/01/2026 1190 FORESTRY 1191 Street Tree (non urban) $ 1,200.00 $ 1,356.00 Y $ 1,248.00 $ 162.24 $ 1,410.24 4.00%01/01/2026 Public Tree Removal - based on Diameter at Breast Height (DBH) in 1192 01/01/2026 cm New fees based on the recently approved Public Tree 1193 Fee 1 - 0-9cm DBH (per tree)NEW N NEW $ 1,800.00 $ - $ 1,800.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1194 Fee 2 - 10-19cm DBH (per tree)NEW N NEW $ 3,600.00 $ - $ 3,600.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1195 Fee 3 - 20-39cm DBH (per tree)NEW N NEW $ 5,400.00 $ - $ 5,400.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1196 Fee 4 - 40-59cm DBH (per tree)NEW N NEW $ 9,000.00 $ - $ 9,000.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1197 Fee 5 - 60-79cm DBH (per tree)NEW N NEW $ 12,600.00 $ - $ 12,600.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1198 Fee 6 - 80-100cm DBH (per tree)NEW N NEW $ 16,200.00 $ - $ 16,200.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1199 Fee 7 - >100cm DBH (per tree)NEW N NEW $ 21,600.00 $ - $ 21,600.00 NEW 01/01/2026 Bylaw and tree compensation program Park or Natural Tree Removal (non-amenity tree) - based on 1200 01/01/2026 compensation planting of value of Container Grown Trees (CGT) New fees based on the recently approved Public Tree 1201 Fee 1 - 10-19cm DBH (per tree)NEW N NEW $ 980.00 $ - $ 980.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1202 Fee 2 - 20-39cm DBH (per tree)NEW N NEW $ 1,470.00 $ - $ 1,470.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1203 Fee 3 - 40-59cm DBH (per tree)NEW N NEW $ 2,450.00 $ - $ 2,450.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1204 Fee 4 - 60-79cm DBH (per tree)NEW N NEW $ 3,430.00 $ - $ 3,430.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1205 Fee 5 - 80-100cm DBH (per tree)NEW N NEW $ 4,410.00 $ - $ 4,410.00 NEW 01/01/2026 Bylaw and tree compensation program New fees based on the recently approved Public Tree 1206 Fee 6 - >100cm DBH (per tree)NEW N NEW $ 5,880.00 $ - $ 5,880.00 NEW 01/01/2026 Bylaw and tree compensation program APPENDIX E 36 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1207 01/01/2026 CEMETERIES 1208INTERMENT CHARGES 01/01/2026 1209 Bereavement Authority of Ontario Consumer protection fee $ 30.00 $33.90 Y01/01/2025 $ 30.00 $ 3.90 $33.90 0.00%01/01/2026This fee is legislated. 1210 Adult, standard depth $ 1,406.00 $ 1,588.78 Y01/01/2025 $ 1,462.00 $ 190.06 $ 1,652.06 3.98%01/01/2026 1211 Adult, extra deep $ 1,950.00 $ 2,203.50 Y01/01/2025 $ 2,028.00 $ 263.64 $ 2,291.64 4.00%01/01/2026 1212 Child $ 419.00 $ 473.47 Y01/01/2025 $ 435.00 $ 56.55 $ 491.55 3.82%01/01/2026 1213 Infant No Charge No Charge 01/01/2025 No Charge No Charge 0.00%01/01/2026 1214 Opening/sealing of crypt (end opening) $ 1,082.00 $ 1,222.66 Y01/01/2025 $ 1,125.00 $ 146.25 $ 1,271.25 3.97%01/01/2026 1215 Non-Municipal Cemetery-cremation $ 92.00 $ 103.96 Y01/01/2025 $ 95.00 $ 12.35 $ 107.35 3.26%01/01/2026Minimal increase for religious cemeteries. 1216 Non-Municipal Cemetery-adult $ 150.00 $ 169.50 Y01/01/2025 $ 156.00 $ 20.28 $ 176.28 4.00%01/01/2026Minimal increase for religious cemeteries. Cost recovery increase as recommended by consultant 1217 Saturday Committal Services arriving after 3 p.m. per 1/2 hour $ 155.00 $ 175.15 Y01/01/2025 $ 175.00 $ 22.75 $ 197.75 12.90%01/01/2026 in development of the Cemetery Strategic Plan. Cost recovery increase as recommended by consultant 1218 weekday Funerals arriving after 3:00 pm per 1/2 hour $ 155.00 $ 175.15 Y01/01/2025 $ 175.00 $ 22.75 $ 197.75 12.90%01/01/2026 in development of the Cemetery Strategic Plan. 1219CREMATION INTERMENT CHARGES 1220 Cremated remains-includes: recording, documentation, staffing $ 522.00 $ 589.86 Y01/01/2025 $ 542.00 $ 70.46 $ 612.46 3.83%01/01/2026 1221 Research Processing Charge $ 190.00 $ 214.70 Y01/01/2025 $ 197.00 $ 25.61 $ 222.61 3.68%01/01/2026 1222 Use of cremation Urn Vault-Manager's Permission Only $ 759.00 $ 857.67 Y01/01/2025 $ 789.00 $ 102.57 $ 891.57 3.95%01/01/2026 1223 Additional Interment (same grave) $ 190.00 $ 214.70 Y01/01/2025 $ 197.00 $ 25.61 $ 222.61 3.68%01/01/2026 1224 Scattering of cremated remains $ 312.00 $ 352.56 Y01/01/2025 $ 324.00 $ 42.12 $ 366.12 3.85%01/01/2026 1225 Ossuary/ includes documentation, recording, staffing $ 260.00 $ 293.80 Y01/01/2025 $ 270.00 $ 35.10 $ 305.10 3.85%01/01/2026 1226LOT PRICES 1227 Single adult, premium grave lot allowing flush marker only $ 3,407.00 $ 3,849.91 y01/01/2025 $ 3,543.00 $ 460.59 $ 4,003.59 3.99%01/01/2026 1228 Single adult grave lot allowing flush marker only $ 2,380.00 $ 2,689.40 Y01/01/2025 $ 2,475.00 $ 321.75 $ 2,796.75 3.99%01/01/2026 1229 Adult, preferred single, allowing upright marker $ 3,570.00 $ 4,034.10 Y01/01/2025 $ 3,712.00 $ 482.56 $ 4,194.56 3.98%01/01/2026 1230 Adult, premium preferred single, allowing upright marker $ 4,650.00 $ 5,254.50 Y01/01/2025 $ 4,836.00 $ 628.68 $ 5,464.68 4.00%01/01/2026 1231 2 grave adult lot allowing upright marker $ 5,950.00 $ 6,723.50 Y01/01/2025 $ 6,188.00 $ 804.44 $ 6,992.44 4.00%01/01/2026 1232 2 grave premium lot allowing upright marker $ 7,030.00 $ 7,943.90 Y01/01/2025 $ 7,311.00 $ 950.43 $ 8,261.43 4.00%01/01/2026 1233 3 grave adult lot allowing upright marker $ 8,005.00 $ 9,045.65 Y01/01/2025 $ 8,325.00 $ 1,082.25 $ 9,407.25 4.00%01/01/2026 1234 3 grave premium lot allowing upright marker $ 9,085.00 $ 10,266.05 Y01/01/2025 $ 9,448.00 $ 1,228.24 $ 10,676.24 4.00%01/01/2026 1235 4 grave lot allowing upright marker $ 10,170.00 $ 11,492.10 Y01/01/2025 $ 10,576.00 $ 1,374.88 $ 11,950.88 3.99%01/01/2026 1236 War Veterans Lot, flush marker 3' x 10' $ 975.00 $ 1,101.75 Y01/01/2025 $ 1,000.00 $ 130.00 $ 1,130.00 2.56%01/01/2026Minimal increase for Veteran lots 1237 Youth lot, flush marker $ 820.00 $ 926.60 Y01/01/2025 $ 850.00 $ 110.50 $ 960.50 3.66%01/01/2026Minimal increase for infant/children lots 1238 Child lot, flush marker 2’x4.5’ $ 384.00 $ 433.92 Y01/01/2025 $ 399.00 $ 51.87 $ 450.87 3.91%01/01/2026Minimal increase for infant/children lots 1239 Infant lot, flush marker 1’x3’ $ 265.00 $ 299.45 Y01/01/2025 $ 275.00 $ 35.75 $ 310.75 3.77%01/01/2026Minimal increase for infant/children lots 1240 Child lot, allowing upright marker 5’x3’ $ 810.00 $ 915.30 Y01/01/2025 $ 842.00 $ 109.46 $ 951.46 3.95%01/01/2026Minimal increase for infant/children lots 1241 Child lot, allowing flush marker 5’x 3’ $ 460.00 $ 519.80 Y01/01/2025 $ 478.00 $ 62.14 $ 540.14 3.91%01/01/2026Minimal increase for infant/children lots 1242 Infant lot, allowing flush marker 3’x1.5’ $ 265.00 $ 299.45 Y01/01/2025 $ 275.00 $ 35.75 $ 310.75 3.77%01/01/2026Minimal increase for infant/children lots 1243PROMONTORY POINT/ MC, MJ, 2K, 2S, 2V LOT PRICES 1244 2 grave Adult Lot, allowing upright marker (6' x 10' or equivalent) $ 7,030.00 $ 7,943.90 Y01/01/2025 $ 7,311.00 $ 950.43 $ 8,261.43 4.00%01/01/2026 1245 Adult, preferred single, allowing upright marker (4' x 10') $ 4,650.00 $ 5,254.50 Y01/01/2025 $ 4,836.00 $ 628.68 $ 5,464.68 4.00%01/01/2026 1246 Green Burial - Sanctuary Wood lots (8'x12') includes trees $ 9,195.00 $ 10,390.35 Y01/01/2025 $ 9,562.00 $ 1,243.06 $ 10,805.06 3.99%01/01/2026 1247CREMATION LOT PRICES 1248 Bronze Memorial Plaque $ 940.00 $ 1,062.20 Y01/01/2025 $ 975.00 $ 126.75 $ 1,101.75 3.72%01/01/2026 1249 Bronze Plaque Installation $ 165.00 $ 186.45 Y01/01/2025 $ 171.00 $ 22.23 $ 193.23 3.64%01/01/2026 APPENDIX E 37 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1250CREMATION LOT PRICES 1251 Cremation Lot, flush marker (1' x 3') (P & 2M) $ 625.00 $ 706.25 Y01/01/2025 $ 650.00 $ 84.50 $ 734.50 4.00%01/01/2026 1252 Cremation Lot, flush marker (2' x 4.5') $ 988.00 $ 1,116.44 Y01/01/2025 $ 1,027.00 $ 133.51 $ 1,160.51 3.95%01/01/2026Resale price only. 1253 Cremation Lot, flush marker (3' x 3') $ 988.00 $ 1,116.44 Y01/01/2025 $ 1,027.00 $ 133.51 $ 1,160.51 3.95%01/01/2026Resale price only. 1254 Cremation Lot, flush-estates (4' x 4.5') allows 14" x 30"mrkr $ 1,765.00 $ 1,994.45 Y01/01/2025 $ 1,835.00 $ 238.55 $ 2,073.55 3.97%01/01/2026Resa le price only. Cremation Lot, upright marker-Section 2S/2V (5'x6') Ceremonial 1255 $ 3,938.00 $ 4,449.94 Y01/01/2025 $ 4,095.00 $ 532.35 $ 4,627.35 3.99%01/01/2026 Garden (3'x4') 1256 War Veterans Cremation Lot, flush marker (3' x 3') $ 787.00 $ 889.31 Y01/01/2025 $ 815.00 $ 105.95 $ 920.95 3.56%01/01/2026Minimal increase for Veteran lots 1257 Flush Marker Lots (Willows, 2D, 2J & Acacia Gardens) $ 1,349.00 $ 1,524.37 Y01/01/2025 $ 1,400.00 $ 182.00 $ 1,582.00 3.78%01/01/2026 1258 Upright Marker Lots (3' x 5') (Willows) $ 2,168.00 $ 2,449.84 Y01/01/2025 $ 2,254.00 $ 293.02 $ 2,547.02 3.97%01/01/2026 1259PROMONTORY POINT LOT PRICES 1260 Reflection Stones, Cremation Lots $ 8,500.00 $ 9,605.00 Y01/01/2025 $ 8,840.00 $ 1,149.20 $ 9,989.20 4.00%01/01/2026 1261 Bronze Memorial Plaque $ 1,800.00 $ 2,034.00 Y01/01/2025 $ 1,872.00 $ 243.36 $ 2,115.36 4.00%01/01/2026 1262 Cremation Lot, upright marker (3' x 6') $ 3,735.00 $ 4,220.55 Y01/01/2025 $ 3,884.00 $ 504.92 $ 4,388.92 3.99%01/01/2026 1263 Cremation Lot, flush marker (3' x 3') $ 2,812.00 $ 3,177.56 Y01/01/2025 $ 2,924.00 $ 380.12 $ 3,304.12 3.98%01/01/2026 1264STONEY RIDGE & MEADOW LARK COMMONS LOT PRICES 1265 Reflection Stones $ 8,500.00 $ 9,605.00 Y01/01/2025 $ 8,840.00 $ 1,149.20 $ 9,989.20 4.00%01/01/2026 1266 Wall Cremation Lots $ 7,425.00 $ 8,390.25 Y01/01/2025 $ 7,722.00 $ 1,003.86 $ 8,725.86 4.00%01/01/2026 1267 Bronze Memorial Plaque 16" x 10" $ 1,800.00 $ 2,034.00 Y01/01/2025 $ 1,872.00 $ 243.36 $ 2,115.36 4.00%01/01/2026 1268 Bronze Memorial Plaque 16" x 24" unique product/bronze costs $ 2,500.00 $ 2,825.00 Y01/01/2025 $ 2,600.00 $ 338.00 $ 2,938.00 4.00%01/01/2026 1269 Bronze Memorial Plaque 18" x 24" unique product/bronze costs $ 2,800.00 $ 3,164.00 Y01/01/2025 $ 2,912.00 $ 378.56 $ 3,290.56 4.00%01/01/2026 1270 Bronze Memorial Plaque 24" x 30" unique product/bronze costs $ 5,400.00 $ 6,102.00 Y01/01/2025 $ 5,616.00 $ 730.08 $ 6,346.08 4.00%01/01/2026 1271 Cremation Lot, upright marker (3' x 5') $ 3,065.00 $ 3,463.45 Y01/01/2025 $ 3,187.00 $ 414.31 $ 3,601.31 3.98%01/01/2026 1272 Foundation cost $ 655.00 $ 740.15 Y01/01/2025 $ 681.00 $ 88.53 $ 769.53 3.97%01/01/2026 1273 Cremation Lot, premium flush marker (3' x 3') $ 2,530.00 $ 2,858.90 Y01/01/2025 $ 2,631.00 $ 342.03 $ 2,973.03 3.99%01/01/2026 1274SCATTERING GARDENS 1275 Bronze Dedication Plaque $ 940.00 $ 1,062.20 Y01/01/2025 $ 975.00 $ 126.75 $ 1,101.75 3.72%01/01/2026 1276 Garden Lot - Flush Marker lot (Acacia Gardens) $ 792.00 $ 894.96 Y01/01/2025 $ 823.00 $ 106.99 $ 929.99 3.91%01/01/2026 1277Columbarium UNITS 1278 Willows $ 2,030.00 $ 2,293.90 Y01/01/2025 $ 2,110.00 $ 274.30 $ 2,384.30 3.94%01/01/2026Resale price only. 1279 Estate Columbarium, 2 niche front/accommodates 4 urns $ 7,595.00 $ 8,582.35 Y01/01/2025 $ 7,898.00 $ 1,026.74 $ 8,924.74 3.99%01/01/2026Resale price only. 1280 Estate Columbarium, 3 niche front/accommodates 6 urns $ 8,950.00 $ 10,113.50 Y01/01/2025 $ 9,300.00 $ 1,209.00 $ 10,509.00 3.91%01/01/2026Resale price only. 1281 Estate Columbarium, 4 niche front/accommodates 8 urns $ 10,315.00 $ 11,655.95 Y01/01/2025 $ 10,700.00 $ 1,391.00 $ 12,091.00 3.73%01/01/2026Resale price only. 1282 Renaissance estate tower $ 5,110.00 $ 5,774.30 Y01/01/2025 $ 5,314.00 $ 690.82 $ 6,004.82 3.99%01/01/2026Resale price only. 1283 Exterior Niche 4 & Niche 5; Doves in Flight; Meadow Lark $ 3,980.00 $ 4,497.40 Y01/01/2025 $ 4,300.00 $ 559.00 $ 4,859.00 8.04%01/01/2026Cost recovery. 1284 Catholic Priest Niche Fee (Renaissance towers) $ 2,600.00 $ 2,938.00 Y01/01/2025 $ 2,700.00 $ 351.00 $ 3,051.00 3.85%01/01/2026 1285 Arbor Tree $ 9,880.00 $ 11,164.40 Y01/01/2025 $ 10,275.00 $ 1,335.75 $ 11,610.75 4.00%01/01/2026 1286PROMONTORY POINT NICHE PRICES 1287 Bottom and top Rows of peaked unit $ 3,440.00 $ 3,887.20 Y01/01/2025 $ 3,577.00 $ 465.01 $ 4,042.01 3.98%01/01/2026Resale price only. 1288 All others in unit $ 3,981.00 $ 4,498.53 Y01/01/2025 $ 4,140.00 $ 538.20 $ 4,678.20 3.99%01/01/2026Resale price only. 1289 Bronze Wreath for Outdoor Columbarium Units $ 1,075.00 $ 1,214.75 Y01/01/2025 $ 1,118.00 $ 145.34 $ 1,263.34 4.00%01/01/2026 1290 Niche replacement door $ 750.00 $ 847.50 Y01/01/2025 $ 780.00 $ 101.40 $ 881.40 4.00%01/01/2026 APPENDIX E 38 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1291DEDICATION CENTRE NICHES 1292 Unit A-8, B-15, 21, 29, 35, C-36, 42, 50, 56 D-57, 63 $ 3,915.00 $ 4,423.95 Y01/01/2025 $ 4,071.00 $ 529.23 $ 4,600.23 3.98%01/01/2026 1293 Unit A-9, 13, B-16, 20, 30, 34, C-37, 41, C-51, 55, D-58, 62 Glass $ 3,915.00 $ 4,423.95 Y01/01/2025 $ 4,071.00 $ 529.23 $ 4,600.23 3.98%01/01/2026 1294 Unit A-10,11,12B-17,18,19B-31,21,33,C-38,39,40,52,53,54,D-59,60,61 $ 4,527.00 $ 5,115.51 Y01/01/2025 $ 4,708.00 $ 612.04 $ 5,320.04 4.00%01/01/2026 1295 Unit A-1,7,B-22,28,C-43,49,D-64,70 $ 6,452.00 $ 7,290.76 Y01/01/2025 $ 6,710.00 $ 872.30 $ 7,582.30 4.00%01/01/2026 1296 Unit A-2,6,B-23,27,C-44,48,D-65,69 $ 6,452.00 $ 7,290.76 Y01/01/2025 $ 6,710.00 $ 872.30 $ 7,582.30 4.00%01/01/2026 1297 Unit A-3,4,5B-24,25,26,C-45,46,47,D-66,67,68 $ 7,080.00 $ 8,000.40 Y01/01/2025 $ 7,363.00 $ 957.19 $ 8,320.19 4.00%01/01/2026 1298Glass Fronted Units 1299 Memorialization with Photoceramic $ 681.00 $ 769.53 Y01/01/2025 $ 708.00 $ 92.04 $ 800.04 3.96%01/01/2026 1300 Memorialization with Plaque Only $ 153.00 $ 172.89 Y01/01/2025 $ 159.00 $ 20.67 $ 179.67 3.92%01/01/2026Cost recovery. 1301MAUSOLEUM UNITS/GARDEN OF HOPE 1302EXTERIOR SINGLES 1303 Rows A and E $ 10,555.00 $ 11,927.15 Y01/01/2025 $ 10,977.00 $ 1,427.01 $ 12,404.01 4.00%01/01/2026Resale price only. 1304 Rows B, C, and D $ 10,555.00 $ 11,927.15 Y01/01/2025 $ 10,977.00 $ 1,427.01 $ 12,404.01 4.00%01/01/2026Resale price only. 1305INTERIOR SINGLES 1306 Rows A and E $ 13,194.00 $ 14,909.22 Y01/01/2025 $ 13,721.00 $ 1,783.73 $ 15,504.73 3.99%01/01/2026Resale price only. 1307 Rows B, C and D $ 13,194.00 $ 14,909.22 Y01/01/2025 $ 13,721.00 $ 1,783.73 $ 15,504.73 3.99%01/01/2026Resale price only. 1308 Interior Tandem $ 19,848.00 $ 22,428.24 Y01/01/2025 $ 20,641.00 $ 2,683.33 $ 23,324.33 4.00%01/01/2026Resale price only. 1309 Replacement of vase/light unit $ 893.00 $ 1,009.09 Y01/01/2025 $ 928.00 $ 120.64 $ 1,048.64 3.92%01/01/2026 1310 Replacement of vase unit $ 540.00 $ 610.20 Y01/01/2025 $ 561.00 $ 72.93 $ 633.93 3.89%01/01/2026 1311 One time electricity charge for light $ 521.00 $ 588.73 Y01/01/2025 $ 541.00 $ 70.33 $ 611.33 3.84%01/01/2026 1312 Mausoleum Interior single crypts $ 1,338.00 $ 1,511.94 Y01/01/2025 $ 1,391.00 $ 180.83 $ 1,571.83 3.96%01/01/2026Resale price only. 1313 Mausoleum Niches $ 669.00 $ 755.97 Y01/01/2025 $ 695.00 $ 90.35 $ 785.35 3.89%01/01/2026Resale price only. 1314 Spruce Grove Wall Niches $ 669.00 $ 755.97 Y01/01/2025 $ 695.00 $ 90.35 $ 785.35 3.89%01/01/2026Resale price only. 1315 Exterior Niche #1, 2, 3 and Garden of Hope $ 669.00 $ 755.97 Y01/01/2025 $ 695.00 $ 90.35 $ 785.35 3.89%01/01/2026Resale price only. DISINTERMENT OF BODIES OR REMAINS does not include cost of 1316 grave opening at a new location 1317 Adult, standard depth with an outer case $ 3,042.00 $ 3,437.46 Y01/01/2025 $ 3,163.00 $ 411.19 $ 3,574.19 3.98%01/01/2026 1318 Adult, standard depth with NO outer case $ 4,395.00 $ 4,966.35 Y01/01/2025 $ 4,570.00 $ 594.10 $ 5,164.10 3.98%01/01/2026 1319 Child $ 905.00 $ 1,022.65 Y01/01/2025 $ 941.00 $ 122.33 $ 1,063.33 3.98%01/01/2026 1320 Infant $ 445.00 $ 502.85 Y01/01/2025 $ 462.00 $ 60.06 $ 522.06 3.82%01/01/2026 1321 Cremated remains $ 466.00 $ 526.58 Y01/01/2025 $ 484.00 $ 62.92 $ 546.92 3.86%01/01/2026 1322 Cremated remains – common ground $ 287.00 $ 324.31 Y01/01/2025 $ 298.00 $ 38.74 $ 336.74 3.83%01/01/2026 1323 Additional charge if urn vault was used $ 380.00 $ 429.40 Y01/01/2025 $ 395.00 $ 51.35 $ 446.35 3.95%01/01/2026 1324UPRIGHT MARKER CHARGES 1325 Charge for concrete (per cubic foot) includes installation fee $ 31.00 $35.03 Y01/01/2025 $ 34.00 $ 4.42 $38.42 9.68%01/01/2026Cost recovery. Fee is increased every few years. 1326 Memorial surcharge 1 $ 200.00 $ 226.00 Y01/01/2025 $ 200.00 $ 26.00 $ 226.00 0.00%01/01/2026This fee is legislated. 1327 Memorial surcharge 2 $ 400.00 $ 452.00 Y01/01/2025 $ 400.00 $ 52.00 $ 452.00 0.00%01/01/2026This fee is legislated. 1328 Removal of existing foundation $ 469.00 $ 529.97 Y01/01/2025 $ 487.00 $ 63.31 $ 550.31 3.84%01/01/2026 1329 Inspection fee $ 242.00 $ 273.46 Y01/01/2025 $ 242.00 $ 31.46 $ 273.46 0.00%01/01/2026This fee is legislated. 1330SETTING OF MARKERS 1331 Flush markers less than 173 square inches $ 165.00 $ 186.45 Y01/01/2025 $ 171.00 $ 22.23 $ 193.23 3.64%01/01/2026 1332 Flush markers >173 square inches but< 288 square inches $ 234.00 $ 264.42 Y01/01/2025 $ 243.00 $ 31.59 $ 274.59 3.85%01/01/2026 1333 Care & Maintenance $ 100.00 $ 113.00 Y01/01/2025 $ 100.00 $ 13.00 $ 113.00 0.00%01/01/2026This fee is legislated. 1334 Flush markers > 288 square inches $ 275.00 $ 310.75 Y01/01/2025 $ 286.00 $ 37.18 $ 323.18 4.00%01/01/2026 1335 Care & Maintenance $ 100.00 $ 113.00 Y01/01/2025 $ 100.00 $ 13.00 $ 113.00 0.00%01/01/2026This fee is legislated. 1336 Flower Containers supplied by owner $ 90.00 $ 101.70 Y01/01/2025 $ 93.00 $ 12.09 $ 105.09 3.33%01/01/2026 1337 Galvanized flower containers – supplied/installed by cemetery $ 104.00 $ 117.52 Y01/01/2025 $ 108.00 $ 14.04 $ 122.04 3.85%01/01/2026 1338 Die cast flower containers–supplied/installed by cemetery $ 229.00 $ 258.77 Y01/01/2025 $ 238.00 $ 30.94 $ 268.94 3.93%01/01/2026 1339 Crypt Door Removal $ 130.00 $ 146.90 Y01/01/2025 $ 135.00 $ 17.55 $ 152.55 3.85%01/01/2026 APPENDIX E 39 CITY OF KITCHENCITY OF KITCHENERER | | B BUDUDGGET SUET SUMMARYMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1340FLOWER BEDS 1341Installation of a new flowerbed by cemetery 1342 Prepare for planting $ 38.00 $42.94 Y01/01/2025 $ 39.00 $ 5.07 $44.07 2.63%01/01/2026 1343 Water & Fertilizing $ 85.00 $96.05 Y01/01/2025 $ 88.00 $ 11.44 $99.44 3.53%01/01/2026 1344 Supply annuals, plant and maintain (/year) $ 180.00 $ 203.40 Y01/01/2025 $ 187.00 $ 24.31 $ 211.31 3.89%01/01/2026 1345EVERGREENS/SHRUBS 1346 Planting cost (per plant) $ 22.00 $24.86 Y01/01/2025 $ 22.00 $ 2.86 $24.86 0.00%01/01/2026 1347HOLIDAY CHARGES 1348 Casket interment charge $ 702.00 $ 793.26 Y01/01/2025 $ 730.00 $ 94.90 $ 824.90 3.99%01/01/2026 1349 Non-Municipal Cemeteries $ 978.00 $ 1,105.14 Y01/01/2025 $ 1,017.00 $ 132.21 $ 1,149.21 3.99%01/01/2026 1350 Infant/cremation burial requiring one staff $ 353.00 $ 398.89 Y01/01/2025 $ 367.00 $ 47.71 $ 414.71 3.97%01/01/2026 1351 Additional charge for cremation/retort $ 369.00 $ 416.97 Y01/01/2025 $ 383.00 $ 49.79 $ 432.79 3.79%01/01/2026 1352MISCELLANEOUS CHARGES 1353 Replacement Card or Key $ 29.00 $32.77 Y01/01/2025 $ 30.00 $ 3.90 $33.90 3.45%01/01/2026 1354 Concrete and/or Metal Vault/Liner surcharge $ 40.00 $45.20 Y01/01/2025 $ 41.00 $ 5.33 $46.33 2.50%01/01/2026 1355 Cremated remains – common ground $ 380.00 $ 429.40 Y01/01/2025 $ 395.00 $ 51.35 $ 446.35 3.95%01/01/2026 This is a set price by the Region of Waterloo based on 1356 Regional Services - Adult flush marker $ 711.00 $ 711.00 N01/01/2025 $ 649.00 $ - $ 649.00 -8.72%01/01/2026 their funding. 1357 Use of Mortuary (per month) $ 125.00 $ 141.25 Y01/01/2025 $ 130.00 $ 16.90 $ 146.90 4.00%01/01/2026 1358ADMINISTRATIVE CHARGES 1359 Refund of Interment Rights Administrative Fee $ 350.00 $ 395.50 Y01/01/2025 $ 350.00 $ 45.50 $ 395.50 0.00%01/01/2026This fee is legislated. 1360 Transfer of interment rights Deed Rights $ 350.00 $ 395.50 Y01/01/2025 $ 350.00 $ 45.50 $ 395.50 0.00%01/01/2026This fee is legislated. 1361Application for Reservation by Rights Holder 1362 Application for Reservation - Rights Holder Deceased $ 115.00 $ 129.95 Y01/01/2025 $ 119.00 $ 15.47 $ 134.47 3.48%01/01/2026 1363 Service Fee-duplicate deed $ 63.00 $71.19 Y01/01/2025 $ 65.00 $ 8.45 $73.45 3.17%01/01/2026 1364 Administrative Fee-Refund lesser of 10% or $350.00 Per Act Per Act Y01/01/2025 Per Act Per Act Per Act 0.00%01/01/2026This fee is legislated. 1365 Genealogical Research $ 43.00 $48.59 Y01/01/2025 $ 44.00 $ 5.72 $49.72 2.33%01/01/2026 1366 Removal/Transfer remains to FH (from Niche) $ 96.00 $ 108.48 Y01/01/2025 $ 99.00 $ 12.87 $ 111.87 3.13%01/01/2026 1367CARE AND MAINTENANCE OF LOTS SOLD PRIOR TO 1955 $ 200.00 $ 226.00 Y01/01/2025 $ 200.00 $ 26.00 $ 226.00 0.00%01/01/2026This fee is legislated. 1368WILLIAMSBURG DEDICATION CENTRE 1369 Monday to Friday Memorial Service, 1 hour/No Room set-up $ 152.00 $ 171.76 Y01/01/2025 $ 158.00 $ 20.54 $ 178.54 3.95%01/01/2026 1370 Monday to Saturday Services (room set-up incl. up to 3 hours) $ 562.00 $ 635.06 Y01/01/2025 $ 584.00 $ 75.92 $ 659.92 3.91%01/01/2026 1371 Sunday Services (room set-up incl. up to 3 hours) $ 815.00 $ 920.95 Y01/01/2025 $ 847.00 $ 110.11 $ 957.11 3.93%01/01/2026 1372 Saturday Memorial Service 1 hour, no set up $ 206.00 $ 232.78 Y01/01/2025 $ 214.00 $ 27.82 $ 241.82 3.88%01/01/2026 1373 Weddings -flat fee-including rehearsal $ 603.00 $ 681.39 Y01/01/2025 $ 614.00 $ 79.82 $ 693.82 1.82%01/01/20262026 pricing (as approved previous year) 1374 Weddings -flat fee-including rehearsal $ 614.00 $ 693.82 y01/01/2025 $ 627.00 $ 81.51 $ 708.51 2.12%01/01/20262027 Pricing. 1375 Facility Attendant Conversion $ 214.00 $ 241.82 y01/01/2025 $ 222.00 $ 28.86 $ 250.86 3.74%01/01/2026 APPENDIX E 40 CITY OF KITCHENCITY OF KITCHENERER | | B BUDUDGGET SUET SUMMARYMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1376MEMORIAL PROGRAM 1377 Memorial tree, including granite mounted bronze plaque $ 1,950.00 $ 2,203.50 Y01/01/2025 $ 2,028.00 $ 263.64 $ 2,291.64 4.00%01/01/2026 1378 Larger rock for additional plaque (memorial tree option) $ 780.00 $ 881.40 Y01/01/2025 $ 811.00 $ 105.43 $ 916.43 3.97%01/01/2026 1379 Temporary Remembrance Markers $ 184.00 $ 207.92 Y01/01/2025 $ 190.00 $ 24.70 $ 214.70 3.26%01/01/2026 1380 Memorial Leaf with Plaque $ 970.00 $ 1,096.10 Y01/01/2025 $ 1,008.00 $ 131.04 $ 1,139.04 3.92%01/01/2026 1381 Memorial Bridge Railing (small) $ 2,250.00 $ 2,542.50 Y01/01/2025 $ 2,340.00 $ 304.20 $ 2,644.20 4.00%01/01/2026 1382 Memorial Bridge Railing (large) $ 2,950.00 $ 3,333.50 Y01/01/2025 $ 3,068.00 $ 398.84 $ 3,466.84 4.00%01/01/2026 1383 Railing installation $ 208.00 $ 235.04 Y01/01/2025 $ 216.00 $ 28.08 $ 244.08 3.85%01/01/2026 1384 Memorial Benches, including bronze plaque $ 3,400.00 $ 3,842.00 Y01/01/2025 $ 3,536.00 $ 459.68 $ 3,995.68 4.00%01/01/2026 1385A WORK OF ART 1386 Butterfly plaque $ 265.00 $ 299.45 Y01/01/2025 $ 265.00 $ 34.45 $ 299.45 0.00%01/01/2026 1387LEGISLATED CHANGES: 1388Mt. Hope Cemetery 1389 Single grave adult lot $ 788.00 $ 890.44 Y01/01/2025 $ 819.00 $ 106.47 $ 925.47 3.93%01/01/2026Resale price only. 1390 Preferred single upright lot $ 788.00 $ 890.44 Y01/01/2025 $ 819.00 $ 106.47 $ 925.47 3.93%01/01/2026Resale price only. 1391 2 grave adult lot, upright $ 1,048.00 $ 1,184.24 Y01/01/2025 $ 1,089.00 $ 141.57 $ 1,230.57 3.91%01/01/2026Resale price only. 1392 6 grave adult lot, upright $ 1,311.00 $ 1,481.43 Y01/01/2025 $ 1,363.00 $ 177.19 $ 1,540.19 3.97%01/01/2026Resale price only. 1393 10 grave adult lot, upright $ 2,631.00 $ 2,973.03 Y01/01/2025 $ 2,736.00 $ 355.68 $ 3,091.68 3.99%01/01/2026Resale price only. 1394 Infant lot flush marker 2' x 4' $ 378.00 $ 427.14 Y01/01/2025 $ 393.00 $ 51.09 $ 444.09 3.97%01/01/2026 1395 Cremation lot, flush 2' x 4' $ 988.00 $ 1,116.44 Y01/01/2025 $ 1,027.00 $ 133.51 $ 1,160.51 3.95%01/01/2026 1396Bridgeport Cemetery 1397 Infant/cremation lot, flush 2' x 4' $ 379.00 $ 428.27 Y01/01/2025 $ 393.00 $ 51.09 $ 444.09 3.69%01/01/2026Resale price only. 1398 Cremation lot, flush 2' x 4' $ 988.00 $ 1,116.44 Y01/01/2025 $ 1,027.00 $ 133.51 $ 1,160.51 3.95%01/01/2026 APPENDIX E 41 CITY OF KITCHENCITY OF KITCHENERER | | B BUDUDGGET SUET SUMMARYMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1399 UTILITIES 1400 GAS 1401 Gas Meter Set - Residential (Retrofit) $ 199.25 $ 225.15 Y01/01/2025 $ 207.22 $ 26.94 $ 234.16 4.00%01/01/2026 1402 Gas Meter Set - Residential (New Housing) $ 199.25 $ 225.15 Y01/01/2025 $ 207.22 $ 26.94 $ 234.16 4.00%01/01/2026 1403 Gas Meter Set - Commercial/Industrial $ 738.22 $ 834.19 Y01/01/2025 $ 767.75 $ 99.81 $ 867.56 4.00%01/01/2026 1404 Gas meter disputes $ 252.09 $ 284.86 Y01/01/2025 $ 262.17 $ 34.08 $ 296.25 4.00%01/01/2026 1405 Gas Multi Meter Manifold $ 585.16 $ 661.23 Y01/01/2025 $ 608.57 $ 79.11 $ 687.68 4.00%01/01/2026 1406 5 PSI Gas Meter Set (if load between 1,000 & 3,500 cfh) $ 6,425.10 $ 7,260.36 Y01/01/2025 $ 6,682.10 $ 868.67 $ 7,550.77 4.00%01/01/2026 Cost of meter set upgrade. The amount will vary depending on usage, and is determined based on a 1407 Gas Meter Set UpgradeY payback calculation of the meter costs plus installation. 1408 Cage for 5 PSI Gas Meter Set $ 3,444.90 $ 3,892.74 Y01/01/2025 $ 3,582.70 $ 465.75 $ 4,048.45 4.00%01/01/2026 This fee consolidates previous fees for Gas Service 1409 Gas Service Abandonment NEW Y NEW $ 1,750.00 $ 227.50 $ 1,977.50 NEW 01/01/2026 Abandonments that were based on type of pipe. Fee has been decreased to match average contractor 1410 Impact Post (100mm diameter) for Gas Meter Set Protection $ 711.33 $ 803.80 Y01/01/2025 $ 525.00 $ 68.25 $ 593.25 -26.19%01/01/2026 costs. Fee has been decreased to match average contractor 1411 Impact Post (150mm diameter) for Gas Meter Set Protection $ 1,119.09 $ 1,264.57 Y01/01/2025 $ 650.00 $ 84.50 $ 734.50 -41.92%01/01/2026 costs. Gas Design Fee per km of natural gas main 1412 $ 1,170.31 $ 1,322.45 Y01/01/2025 $ 1,217.12 $ 158.23 $ 1,375.35 4.00%01/01/2026 (Subdivision or Multi-residential Development with Multiple Buildings) Gas Design Fee 1413 $ 585.16 $ 661.23 Y01/01/2025 $ 608.57 $ 79.11 $ 687.68 4.00%01/01/2026 (Single Service requiring a design) 50% of original 50% of original 50% of original 50% of original 1414 Gas Redesign FeeY01/01/20250.00%01/01/2026 design fee design fee design fee design fee 1415 Residential OPCO Gas Regulator (Over Pressure Cut Off) $ 167.87 $ 189.69 Y01/01/2025 $ 174.58 $ 22.70 $ 197.28 4.00%01/01/2026 1416 Site Not Ready Fee $ 585.16 $ 661.23 Y01/01/2025 $ 608.57 $ 79.11 $ 687.68 4.00%01/01/2026 Customers applying for a gas service for a new or 1417 An Aid to Construction may apply based on actual gas service costs.Y revised gas service, may be required to pay a portion of the cost based on payback calculation. M1 Rate x m3 of M1 Rate x m3 of M1 Rate x m3 M1 Rate x m3 of 1418 Gas Loss from damages (fee varies based on size, material and time)gas lost + 15% gas lost + 15% Y01/01/2025of gas lost + 15% gas lost + 15% 0.00%01/01/2026 admin fees admin fees admin fees admin fees 1419 Broken, buried value box repair $ 2,435.18 $ 2,751.75 Y01/01/2025 $ 2,532.59 $ 329.24 $ 2,861.83 4.00%01/01/2026 1420 Gas Service - New Construction (Excavation Charge) $ 243.52 $ 275.18 Y01/01/2025 $ 253.26 $ 32.92 $ 286.18 4.00%01/01/2026 1421 Gas Service - Built Up $ 1,040.00 $ 1,175.20 Y01/01/2025 $ 1,081.60 $ 140.61 $ 1,222.21 4.00%01/01/2026 New fee to facilitate peak capacity upgrades with no anticipated change in overall gas use. Capacity 1422 Gas Service - Peak Capacity Upgrade - High Volume Conversion NEW Y NEW $ 540.80 $ 70.30 $ 611.10 NEW 01/01/2026 upgrades with increased overall gas use would remain free. New fee to facilitate peak capacity upgrades with no anticipated change in overall gas use. Capacity 1423 Gas Service - Peak Capacity Upgrade - Service Replacement NEW Y NEW $ 1,081.60 $ 140.61 $ 1,222.21 NEW 01/01/2026 upgrades with increased overall gas use would remain free. 1424 Gas Service Relocation (Plastic - up to 5m) $ 1,622.40 $ 1,833.31 Y01/01/2025 $ 1,687.30 $ 219.35 $ 1,906.65 4.00%01/01/2026 1425 Gas Meter Removal - Change in Fuel Source $ 167.65 $ 189.44 Y01/01/2025 $ 174.36 $ 22.67 $ 197.03 4.00%01/01/2026 1426 Frost Charges for Winter Excavation per Gas Meter $ 65.77 $ 74.32 Y01/01/2025 $ 65.57 $ 8.52 $ 74.09 -0.30%01/01/2026Fee has decreased due to decrease in contractor cost. APPENDIX E 42 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N Inches Delivery Pressure - Light Gas Usage Reduced Clearance 1427 $ 203.81 $ 230.31 Y01/01/2025 $ 211.96 $ 27.56 $ 239.52 4.00%01/01/2026 Regulator Inches Delivery Pressure - Large Gas Usage Reduced Clearance 1428 $ 1,924.81 $ 2,175.04 Y01/01/2025 $ 2,001.80 $ 260.23 $ 2,262.03 4.00%01/01/2026 Regulator 5 Pounds Delivery Pressure - Light Gas Usage Reduced Clearance 1429 $ 1,327.77 $ 1,500.38 Y01/01/2025 $ 1,380.88 $ 179.51 $ 1,560.39 4.00%01/01/2026 Regulator 5 Pounds Delivery Pressure - Large Gas Usage Reduced Clearance 1430 $ 2,240.32 $ 2,531.56 Y01/01/2025 $ 2,329.93 $ 302.89 $ 2,632.82 4.00%01/01/2026 Regulator Provide Pulse Output (Customer to supply pulse output enclosure with 1431 $ 199.80 $ 225.77 Y01/01/2025 $ 207.79 $ 27.01 $ 234.80 4.00%01/01/2026 positive barrier) 1432 Large Gas Meter Set Rebuild/Relocation Fee $ 551.62 $ 623.33 Y01/01/2025 $ 573.68 $ 74.58 $ 648.26 4.00%01/01/2026 1433RENTAL GAS WATER HEATER RATES - YEARLY 1434CONVENTIONAL Significant increase occurred in 2024, therefore 1435 40-R $ 198.29 $ 224.07 Y01/01/2025 $ 204.24 $ 26.55 $ 230.79 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1436 50-R $ 211.75 $ 239.28 Y01/01/2025 $ 218.10 $ 28.35 $ 246.45 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1437 60-R $ 225.22 $ 254.50 Y01/01/2025 $ 231.98 $ 30.16 $ 262.14 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1438 75-R $ 293.76 $ 331.95 Y01/01/2025 $ 302.57 $ 39.33 $ 341.90 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1439 40-R-FV $ 242.35 $ 273.86 Y01/01/2025 $ 249.62 $ 32.45 $ 282.07 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1440 50-R-FV $ 246.02 $ 278.00 Y01/01/2025 $ 253.40 $ 32.94 $ 286.34 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1441 60-R-FV $ 253.37 $ 286.31 Y01/01/2025 $ 260.97 $ 33.93 $ 294.90 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1442 75-R-FV $ 302.94 $ 342.32 Y01/01/2025 $ 312.03 $ 40.56 $ 352.59 3.00%01/01/2026 smaller increase in 2026. 1443POWER VENTED Significant increase occurred in 2024, therefore 1444 40-PV $ 318.12 $ 359.48 Y01/01/2025 $ 327.66 $ 42.60 $ 370.26 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1445 50-PV $ 325.34 $ 367.63 Y01/01/2025 $ 335.10 $ 43.56 $ 378.66 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1446 60-PV $ 359.37 $ 406.09 Y01/01/2025 $ 370.15 $ 48.12 $ 418.27 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1447 75-PV $ 398.90 $ 450.76 Y01/01/2025 $ 410.87 $ 53.41 $ 464.28 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1448 40-PV-FV $ 318.12 $ 359.48 Y01/01/2025 $ 327.66 $ 42.60 $ 370.26 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1449 50-PV-FV $ 325.34 $ 367.63 Y01/01/2025 $ 335.10 $ 43.56 $ 378.66 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1450 60-PV-FV $ 378.22 $ 427.39 Y01/01/2025 $ 389.57 $ 50.64 $ 440.21 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1451 75 -PV-FV $ 398.90 $ 450.76 Y01/01/2025 $ 410.87 $ 53.41 $ 464.28 3.00%01/01/2026 smaller increase in 2026. APPENDIX E 43 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1452DIRECT VENT Significant increase occurred in 2024, therefore 1453 50-DV $ 273.20 $ 308.72 Y01/01/2025 $ 281.40 $ 36.58 $ 317.98 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1454 50-DV-FV $ 304.65 $ 344.25 Y01/01/2025 $ 313.79 $ 40.79 $ 354.58 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1455 50-PV-DV $ 356.67 $ 403.04 Y01/01/2025 $ 367.37 $ 47.76 $ 415.13 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1456 50-PV-DV-H $ 385.44 $ 435.55 Y01/01/2025 $ 397.00 $ 51.61 $ 448.61 3.00%01/01/2026 smaller increase in 2026. 1457COMBO HEATING TANKS Significant increase occurred in 2024, therefore 1458 GSW 50-PV $ 356.67 $ 403.04 Y01/01/2025 $ 367.37 $ 47.76 $ 415.13 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1459 50-PV-FV-H $ 356.55 $ 402.90 Y01/01/2025 $ 367.25 $ 47.74 $ 414.99 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1460 APOLLO 50-PV $ 356.67 $ 403.04 Y01/01/2025 $ 367.37 $ 47.76 $ 415.13 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1461 APOLLO 50-DV $ 325.34 $ 367.63 Y01/01/2025 $ 335.10 $ 43.56 $ 378.66 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1462 75-PV-FV-ES $ 419.22 $ 473.72 Y01/01/2025 $ 431.80 $ 56.13 $ 487.93 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1463 POLARIS PR-34 $ 721.79 $ 815.62 Y01/01/2025 $ 743.44 $ 96.65 $ 840.09 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1464 ENVIROSENSE $ 631.46 $ 713.55 Y01/01/2025 $ 650.40 $ 84.55 $ 734.95 3.00%01/01/2026 smaller increase in 2026. Increased fee based on new rate from the tank 1465 MAXIMUS $ 568.56 $ 642.47 Y01/01/2025 $ 650.40 $ 84.55 $ 734.95 14.39%01/01/2026 manufacturer. Significant increase occurred in 2024, therefore 1466 AIR HANDLER $ 310.28 $ 350.62 Y01/01/2025 $ 319.59 $ 41.55 $ 361.14 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1467 180-DVLN $ 714.20 $ 807.05 Y01/01/2025 $ 735.63 $ 95.63 $ 831.26 3.00%01/01/2026 smaller increase in 2026. Addition of a new product option for combination 1468 CBH-199DVLN NEW Y NEW $ 768.00 $ 99.84 $ 867.84 NEW 01/01/2026 space and water heating. 1469TANKLESS/ON DEMAND HEATERS Significant increase occurred in 2024, therefore 1470 53-DVN $ 467.57 $ 528.35 Y01/01/2025 $ 481.60 $ 62.61 $ 544.21 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1471 66-DVN $ 490.09 $ 553.80 Y01/01/2025 $ 504.79 $ 65.62 $ 570.41 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1472 74-DVN $ 512.49 $ 579.11 Y01/01/2025 $ 527.86 $ 68.62 $ 596.48 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1473 95-DVN $ 490.09 $ 553.80 Y01/01/2025 $ 504.79 $ 65.62 $ 570.41 3.00%01/01/2026 smaller increase in 2026. 1474ELECTRIC Significant increase occurred in 2024, therefore 1475 40-ELEC $ 192.78 $ 217.84 Y01/01/2025 $ 198.56 $ 25.81 $ 224.37 3.00%01/01/2026 smaller increase in 2026. Significant increase occurred in 2024, therefore 1476 60-ELEC $ 211.14 $ 238.59 Y01/01/2025 $ 217.47 $ 28.27 $ 245.74 3.00%01/01/2026 smaller increase in 2026. 1477 ANTI-SCALD VALVE RENTAL $ 15.60 $ 17.63 Y01/01/2025 $ 15.60 $ 2.03 $ 17.63 0.00%01/01/2026Fee has been held flate for ease of administration. APPENDIX E 44 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1478SERVICE PRICING - ALL TYPES 1479 08:00 to 17:00 1480 First 45 minutes & Minimum Charge $ 137.69 $ 155.59 Y01/01/2025 $ 143.20 $ 18.62 $ 161.82 4.00%01/01/2026 1481 Additional Hours 1482 15 min $ 34.41 $38.88 Y01/01/2025 $ 35.79 $ 4.65 $40.44 4.01%01/01/2026 1483 30 min $ 68.85 $77.80 Y01/01/2025 $ 71.60 $ 9.31 $80.91 3.99%01/01/2026 1484 45 min $ 103.26 $ 116.68 Y01/01/2025 $ 107.39 $ 13.96 $ 121.35 4.00%01/01/2026 1485 60 min $ 137.69 $ 155.59 Y01/01/2025 $ 143.20 $ 18.62 $ 161.82 4.00%01/01/2026 1486 Stat Holidays - Persons working $ 177.84 $ 200.96 Y01/01/2025 $ 184.95 $ 24.04 $ 208.99 4.00%01/01/2026 1487 Stat Holidays - On-call $ 223.74 $ 252.83 Y01/01/2025 $ 232.69 $ 30.25 $ 262.94 4.00%01/01/2026 1488 17:00 to 24:00 & Weekends 1489 First 45 minutes & Minimum Charge $ 177.84 $ 200.96 Y01/01/2025 $ 184.95 $ 24.04 $ 208.99 4.00%01/01/2026 1490 Additional Hours 1491 15 min $ 44.74 $50.56 Y01/01/2025 $ 46.53 $ 6.05 $52.58 4.00%01/01/2026 1492 30 min $ 88.35 $99.84 Y01/01/2025 $ 91.88 $ 11.94 $ 103.82 4.00%01/01/2026 1493 45 min $ 133.09 $ 150.39 Y01/01/2025 $ 138.41 $ 17.99 $ 156.40 4.00%01/01/2026 1494 60 min $ 177.84 $ 200.96 Y01/01/2025 $ 184.95 $ 24.04 $ 208.99 4.00%01/01/2026 1495 Natural Gas Appliance Safety Check $ 221.44 $ 250.23 Y01/01/2025 $ 230.30 $ 29.94 $ 260.24 4.00%01/01/2026 1496 Direct Purchase Billing This fee is intended to recover the costs incurred for administrative activities related to the set up and 1497 Direct Purchase Administration Charge - Fixed Monthly $ 121.80 $ 137.63 Y01/01/2025 $ 130.33 $ 16.94 $ 147.27 7.00%01/01/2026 ongoing facilitation of Direct Purchase Contracts. The fee has been increased to match Enbridge fees. This fee is intended to recover costs incurred to allow Distributor Consolidated Billing Charge - per retail residential 1498 $2.23 $2.52 Y01/01/2025 $2.39 $ 0.31 $2.70 7.17%01/01/2026Kitchener Utilities the ability to charge their customers customer monthly commodity and transportation on the customer's gas Distributor Consolidated Billing Charge - per retail commercial bill. This fee is only charged when Kitchener Utilities 1499 $2.23 $2.52 Y 01/01/2025 $2.39 $ 0.31 $2.70 7.17%01/01/2026 customer monthly bills for commodity and transportation on behalf of Distributor Consolidated Billing Charge - per retail industrial customer the gas supplier. These fees have been adjusted to 1500 $2.23 $2.52 Y01/01/2025 $2.39 $ 0.31 $2.70 7.17%01/01/2026 monthly match Enbridge fees. This fee is intended to recover costs incurred for Kitchener Utilities to charge gas supplier adjustment amounts on the customer’s gas bill. This fee is only Greater of $1.85 Greater of $1.85 Greater of Greater of $1.85 charged when KU bills for commodity and 1501 Invoice Vendor AdjustmentsY01/01/20250.00%01/01/2026 or .65%or .65% $1.85 or .65% or .65%transportation on behalf of the gas supplier and the gas supplier submits a related credit or debit adjustment amount to be applied to the customer’s gas bill APPENDIX E 45 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1502 WATER User rates for water consumption will be approved as part of the 1503 annual budget process 1504 QMS Form 1 Review Fee $ 1,661.10 $ 1,661.10 N01/01/2025 $ 1,727.54 $ - $ 1,727.54 4.00%01/01/2026 1505 Frozen Water Service Customer Side investigation Weekdays $ 207.65 $ 207.65 N01/01/2025 $ 215.96 $ - $ 215.96 4.00%01/01/2026 1506 Frozen Water Service Customer Side investigation Weekends $ 415.25 $ 415.25 N01/01/2025 $ 431.86 $ - $ 431.86 4.00%01/01/2026 Published Cost Published Cost Published Cost Published Cost 1507 Bulk Water Fill Rateof Water per M3 of Water per M3 N01/01/2025of Water per M3 $ - of Water per M3 0.00%01/01/2026 plus 15% admin plus 15% admin plus 15% admin plus 15% admin 1508 Backflow Prevention Device Permit (Per Device) $ 96.01 $ 108.49 Y01/01/2025 $ 99.85 $ 12.98 $ 112.83 4.00%01/01/2026 $500 plus cost $500 plus cost of $520 plus cost $520 plus cost of 1509 Backflow Prevention Device (Borrow)N01/01/2025 $ - 4.00%01/01/2026 of water Per M3 water Per M3 of water Per M3 water Per M3 1510 Seasonal Meter Install/Remove $ 116.25 $ 116.25 N01/01/2025 $ 120.90 $ - $ 120.90 4.00%01/01/2026 1511 Confined space entry for meter in chambers $ 268.69 $ 268.69 N01/01/2025 $ 279.44 $ - $ 279.44 4.00%01/01/2026 1512 Subdivision Inspection - first 2 are free, charge for third $ 795.89 $ 795.89 N01/01/2025 $ 827.73 $ - $ 827.73 4.00%01/01/2026 $201.66 to $201.66 to $209.73 to $209.73 to 1513 Internal Issues (e.g. poor pressure/no water)N01/01/2025 $ - 4.00%01/01/2026 $413.87 $413.87 $430.42 $430.42 1514 Frozen Water service thaw - Customer Side $ 823.41 $ 823.41 N01/01/2025 $ 856.35 $ - $ 856.35 4.00%01/01/2026 1515 Water resampling due to adverse conditions $ 443.37 $ 443.37 N01/01/2025 $ 461.10 $ - $ 461.10 4.00%01/01/2026 1516 Fire flow charge $ 283.74 $ 320.63 Y01/01/2025 $ 295.09 $ 38.36 $ 333.45 4.00%01/01/2026 1517 Water meter disputes $ 252.09 $ 252.09 N01/01/2025 $ 262.17 $ - $ 262.17 4.00%01/01/2026 Water Meter - Non compliance, fee is for first offence with increasing 1518 $ 292.57 $ 292.57 N01/01/2025 $ 304.27 $ - $ 304.27 4.00%01/01/2026 increments for follow-up non-compliance New water meter fee - 5/8" (flanges and adaptors are additional, if 1519 $ 204.88 $ 204.88 N01/01/2025 $ 213.08 $ - $ 213.08 4.00%01/01/2026 required) New water meter fee - 1" (flanges and adaptors are additional, if Increased fee based on updated costing plus first 45 1520 $ 432.64 $ 432.64 N01/01/2025 $ 462.68 $ - $ 462.68 6.94%01/01/2026 required)minutes free. New water meter fee - 1 1/2" (flanges and adaptors are additional, if Increased fee based on updated costing plus first 45 1521 $ 881.50 $ 881.50 N01/01/2025 $ 960.87 $ - $ 960.87 9.00%01/01/2026 required)minutes free. New water meter fee - 2" (flanges and adaptors are additional, if Increased fee based on updated costing plus first 45 1522 $ 1,108.64 $ 1,108.64 N01/01/2025 $ 1,203.20 $ - $ 1,203.20 8.53%01/01/2026 required)minutes free. cost of meter cost of meter cost of meter cost of meter 1523 New water meter fee - 3", 4"and flanges plus and flanges plus N01/01/2025and flanges plus $ - and flanges plus 4.00%01/01/2026 $151.84 $151.84 $157.91 $157.91 1524 Turn water on after hours $ 229.96 $ 229.96 N01/01/2025 $ 239.16 $ - $ 239.16 4.00%01/01/2026 1525 Damaged/Neglect/Theft Water Meter Fee $ 266.59 $ 266.59 N01/01/2025 $ 277.25 $ - $ 277.25 4.00%01/01/2026 Rate is rounded to the nearest dollar for ease of 1526 Water Meter Water Shut off Fee for Denied Access $ 140.00 $ 140.00 N01/01/2025 $ 145.00 $ - $ 145.00 3.57%01/01/2026 administration. 1527 Damaged Water Hydrant Fee $ 13,160.91 $ 13,160.91 N01/01/2025 $ 13,687.35 $ - $ 13,687.35 4.00%01/01/2026 1528 Water meter related fee - 1"- 1 1/2" Adaptor (does not include meter) $ 272.45 $ 272.45 N01/01/2025 $ 283.35 $ - $ 283.35 4.00%01/01/2026 1529 Water meter related fee - 1" to 2" Adaptor (does not include meter) $ 287.18 $ 287.18 N01/01/2025 $ 298.67 $ - $ 298.67 4.00%01/01/2026 Water meter related fee - 1 1/2" to 2" Adaptor (does not include 1530 $ 413.21 $ 413.21 N01/01/2025 $ 429.74 $ - $ 429.74 4.00%01/01/2026 meter) 1531 Water meter related fee - 5/8" to 1" Adaptor (does not include meter) $ 39.75 $39.75 N01/01/2025 $ 41.34 $ - $41.34 4.00%01/01/2026 1532 Account Set Up Fee - Bulk Water Station $ 28.12 $28.12 N01/01/2025 $ 29.24 $ - $29.24 3.98%01/01/2026 1533 Water Meter Flange Set 1 1/2" $ 372.00 $ 372.00 N01/01/2025 $ 386.88 $ - $ 386.88 4.00%01/01/2026 1534 Water Meter Flange Set 2" $ 507.00 $ 507.00 N01/01/2025 $ 527.28 $ - $ 527.28 4.00%01/01/2026 APPENDIX E 46 CITY OF KITCHENCITY OF KITCHENERER | | B BUDUDGGET SUET SUMMARYMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1535 Cast Iron Flange Set 3" $ 507.00 $ 507.00 N01/01/2025 $ 527.28 $ - $ 527.28 4.00%01/01/2026 1536 Cast Iron Flange Set 4" $ 507.00 $ 507.00 N01/01/2025 $ 527.28 $ - $ 527.28 4.00%01/01/2026 Minimum fee is to cover water sampling costs, water loss, emergency flushing response, sample review/response, construction and maintenance time 1537 Unauthorized Water Usage/Theft/Connection - minimum fee $ 520.00 $ 520.00 N01/01/2025 $ 540.80 $ - $ 540.80 4.00%01/01/2026 associated with emergency response for unauthorized hydrant or service connection. The fee does not replace any potential charges under the By-law. Tapping fees are collected by the Engineering Department. Due to potentially severe traffic issues on some streets, the contractor may request an exemption from part of the commissioning process under the Disinfection Procedure. As part of the exemption, Kitchener Utilities staff must stay on site 1538 Greater than 6m Connection Fee - daily rate $ 1,040.00 $ 1,040.00 N01/01/2025 $ 1,081.60 $ - $ 1,081.60 4.00%01/01/2026 and witness the installation and swabbing of the main. They must also return to the site twice to turn on/off the water. These costs are in addition to the tapping and are site specific and cover full time KU inspection for 1 day, visits to the site to turn on/off and bacteriological analysis (Regional lab). 1539 Water Meter Remote NEW Y NEW $ 12.25 $ 1.59 $ 13.84 NEW 01/01/2026Cost for replacement remote due to loss or damage. Cost is the same as for the meters listed above. Meter 1540 New Construction Water Meter Fee NEW N NEW See meter costs $ - See meter costs NEW 01/01/2026must be returned for final billing. Fee is non- refundable. New fee to cover cost of water and flushing of hydrants in new development subdivisions to maintain 1541 New Subdivision Hydrant Flushing (per hydrant)NEW N NEW $ 100.00 $ - $ 100.00 NEW 01/01/2026 chlorine residuals. Cost is for the 2 year maintenance period per hydrant to cover staff time and water used. APPENDIX E 47 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1542 SANITARY AND STORMWATER UTILITIES User rates for sanitary sewer usage will be approved as part of the 1543 annual budget process User rates for monthly stormwater system usage will be approved as 1544 part of the annual budget process 1545Sewer Blockades 1546 Regular hours - flat rate $ 331.22 $ 331.22 N01/01/2025 $ 344.47 $ - $ 344.47 4.00%01/01/2026 1547 Overtime hours - flat rate $ 504.23 $ 504.23 N01/01/2025 $ 524.40 $ - $ 524.40 4.00%01/01/2026 1548Sewer Cleaning Regular hours - min. 2 hour charge, after 2hrs = labour, material & 1549 $ 439.14 $ 439.14 N01/01/2025 $ 456.71 $ - $ 456.71 4.00%01/01/2026 equipment Overtime hours - min. 2 hour charge, after 2hrs = labour, material & 1550 $ 554.69 $ 554.69 N01/01/2025 $ 576.88 $ - $ 576.88 4.00%01/01/2026 equipment Double-time hours - min. 2 hour charge, after 2hrs = labour, material 1551 $ 663.07 $ 663.07 N01/01/2025 $ 689.59 $ - $ 689.59 4.00%01/01/2026 & equipment 1552Catchbasin Cleaning $- Regular hours - min. 2 hour charge, after 2hrs = labour, material & 1553 $ 439.14 $ 439.14 N01/01/2025 $ 456.71 $ - $ 456.71 4.00%01/01/2026 equipment Overtime hours - min. 2 hour charge, after 2hrs = labour, material & 1554 $ 554.69 $ 554.69 N01/01/2025 $ 576.88 $ - $ 576.88 4.00%01/01/2026 equipment Double-time hours - min. 2 hour charge, after 2hrs = labour, material 1555 $ 663.07 $ 663.07 N01/01/2025 $ 689.59 $ - $ 689.59 4.00%01/01/2026 & equipment Material Disposal Fee for Sewer Cleaning and 1556 $ 439.14 $ 439.14 N01/01/2025 $ 456.71 $ - $ 456.71 4.00%01/01/2026 Catch basin Cleaning - if required - flat rate 1557Street Sweeping $- 1558 Regular hours - minimum charge $ 338.67 $ 338.67 N01/01/2025 $ 352.22 $ - $ 352.22 4.00%01/01/2026 1559 Overtime hours - minimum charge $ 403.51 $ 403.51 N01/01/2025 $ 419.65 $ - $ 419.65 4.00%01/01/2026 1560 Double-time hours - minimum charge $ 475.49 $ 475.49 N01/01/2025 $ 494.51 $ - $ 494.51 4.00%01/01/2026 1561Other Fees This fee cover adminstrative review and processing of discharge permit applications, including technical and 1562 Dewatering Discharge Permit Application Fee NEW N NEW $ 980.00 $ - $ 980.00 NEW 01/01/2026capacity analyses required to ensure discharges to the City's stormwater system can be accomodated and tracked. APPENDIX E 48 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N Consolidated Linear Infrastructure Environmental Compliance 1563 Approvals (CLI-ECA) CLI-ECA Application Amendment for MECP Review; required for 1564 $ 1,081.60 $ 1,081.60 N01/01/2025 $ 1,124.86 $ - $ 1,124.86 4.00%01/01/2026 activities that are not preauthorized in Schedule D of CLI-ECA 1565CLI-ECA Municipal Sewage Collection System Submission fee for Sanitary Sewers, includes adding, modifying, 1566 $ 3,244.80 $ 3,244.80 N01/01/2025 $ 3,374.59 $ - $ 3,374.59 4.00%01/01/2026 replacing or extending Fee per Sanitary Sewer Appurtenance (e.g. odour and corrosion 1567 $ 3,244.80 $ 3,244.80 N01/01/2025 $ 3,374.59 $ - $ 3,374.59 4.00%01/01/2026 control etc.) includes adding, modifying, replacing or extending Fee per Sewage Pumping Station or Forcemain, includes adding, 1568 $ 6,489.60 $ 6,489.60 N01/01/2025 $ 6,749.18 $ - $ 6,749.18 4.00%01/01/2026 modifying, replacing or extending 50% of total 13% of 50% of total 50% of total 50% of total 1569 CLI-ECA Expedited Review (available based on staff capacity)Y01/01/20250.00%01/01/2026 submission plus expedited submission plus submission submission HST fee HST 1570CLI-ECA Municipal Stormwater Management System Submission fee for Storm Sewers, includes adding, modifying, 1571 $ 3,244.80 $ 3,244.80 N01/01/2025 $ 3,374.59 $ - $ 3,374.59 4.00%01/01/2026 replacing or extending Fee per Storm Appurtenance (e.g. low impact development (LID), oil 1572 $ 3,244.80 $ 3,244.80 N01/01/2025 $ 3,374.59 $ - $ 3,374.59 4.00%01/01/2026 grit separators, flow control, exfiltration piping etc.) includes adding, modifying, replacing or extending Fee per Stormwater Management Facility (e.g. dry/wet ponds, 1573 engineer wetlands, etc.), includes adding, modifying, replacing or $ 6,489.60 $ 6,489.60 N01/01/2025 $ 6,749.18 $ - $ 6,749.18 4.00%01/01/2026 extending 50% of total 13% of 50% of total 50% of total 50% of total 1574 CLI-ECA Expedited Review (available based on staff capacity)submission plus Y01/01/2025expedited submission plus 0.00%01/01/2026 submission submission HST fee HST APPENDIX E 49 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1575 CORPORATE SERVICES 1576 TECHNOLOGY INNOVATION & SERVICES 1577 Kitchener Atlas Book $ 141.59 $ 146.02 Y01/01/2025 $ 146.02 $ 18.98 $ 165.00 3.13%01/01/2026Rounding Only 1578 Custom Mapping Services per hour $ 78.23 $81.36 Y01/01/2025 $ 81.36 $ 10.58 $91.94 4.00%01/01/2026 1579 Standard Map - Ward, Planning Community, etc. $7.83 $8.19 Y01/01/2025 $8.19 $ 1.06 $9.25 4.60%01/01/2026Rounding Only 1580 Zoning Map $ 16.59 $17.70 Y01/01/2025 $ 17.70 $ 2.30 $20.00 6.69%01/01/2026Rounding Only 1581 LEGAL $1,394.22 to $1,575.47 to $1,449.99 to $1,638.49 to $188.50 to 1582 Subdivision/Condominium Agreements$2,757.53 plus $3,116.01 plus Y01/01/2025$2,867.83 plus $3,240.65 plus 4.00%01/01/2026 $372.82 disbursements disbursements disbursements disbursements Amendment to Subdivision, Condominium agreements/other $505.66 to $571.40 to $525.89 to $594.25 to $68.37 to 1583 development related agreements (i.e.. agreements under the $1,835.85 plus $2,074.51 plus Y01/01/2025$1,909.28 plus $2,157.49 plus 4.00%01/01/2026 $248.21 Development Charge Act or Building Code Act, etc.) + disbursementsdisbursements disbursements disbursements disbursements 1584 Environmental Agreements (borehole/access, etc.) $ 298.69 $ 337.52 Y01/01/2025 $ 310.64 $ 40.38 $ 351.02 4.00%01/01/2026 $195.22 to $220.60 to $203.03 to $229.42 to Subdivision Plan Clearance/Transfer and easement registrations/Draft $26.39 to 1585$920.61 plus $1,040.29 plus Y01/01/2025$957.43 plus $1,081.90 plus 4.00%01/01/2026 document review and approval$124.47 disbursements disbursements disbursements disbursements $656.05 plus $741.34 plus $682.29 plus $770.99 plus 1586 Site Plan Agreements and amendmentsY01/01/2025 $ 88.70 4.00%01/01/2026 disbursements disbursements disbursements disbursements 1587 Deed/Easement acquired under Planning Authority disbursements disbursements 01/01/2025 disbursements disbursements 0.00%01/01/2026 $291.22 to $329.08 to $302.87 to $342.24 to $39.37 to 1588 Committee of Adjustment Agreements (preparation & review)Y01/01/20254.00%01/01/2026 $1,375.00 plus $1,553.75 plus $1,430.00 plus $1,615.90 plus $185.90 disbursements disbursements disbursements disbursements $329.63 plus $372.48 plus $342.82 plus $387.38 plus 1589 Off-Site Parking AgreementsY01/01/2025 $ 44.57 4.00%01/01/2026 disbursements disbursements disbursements disbursements $329.63 plus $372.48 plus $342.82 plus $387.38 plus 1590 Garden SuiteY01/01/2025 $ 44.57 4.00%01/01/2026 disbursements disbursements disbursements disbursements Other Agreements/Misc. Services, Misc. agreements (e.g., Municipal $256.02 to $289.30 to $266.26 to $300.87 to $34.61 to 1591 Access, Heritage easements, leases, licenses, air rights & misc. real $1,283.30 plus $1,450.10 plus Y01/01/2025$1,334.63 plus $1,508.13 plus 4.00%01/01/2026 $173.50 estate documents (e.g., Deeds, Quit Claims))disbursements disbursements disbursements disbursements $151.47 plus $171.16 plus $157.53 plus $178.01 plus 1592 Easements prepared at the request of and conveyed to other Utilities Y01/01/2025 $ 20.48 4.00%01/01/2026 disbursements disbursements disbursements disbursements $277.35 plus $313.41 plus $288.44 plus $325.94 plus 1593 Part Lot Control By-lawsY01/01/2025 $ 37.50 4.00%01/01/2026 disbursements disbursements disbursements disbursements $277.35 plus $313.41 plus $288.44 plus $325.94 plus 1594 Part Lot Control Extension By-lawsY01/01/2025 $ 37.50 4.00%01/01/2026 disbursements disbursements disbursements disbursements 1595 Releases/Letters of Compliance for Registered Agreements $ 151.47 $ 171.16 Y01/01/2025 $ 157.53 $ 20.48 $ 178.01 4.00%01/01/2026 Street/Lane Closings, Note: fee will be charged to each person, $283.75 to $320.64 to $295.10 to $333.46 to $38.36 to 1596 Y01/01/20254.00%01/01/2026 receiving a conveyance of a portion of a closed road/lane. $1,559.60 plus $1,762.35 plus $1,621.98 plus $1,832.84 plus $210.86 Disbursements are pro-rated.disbursements disbursements disbursements disbursements 1597 Industrial Restrictive Covenants - Consents $ 204.81 $ 231.44 Y01/01/2025 $ 213.00 $ 27.69 $ 240.69 4.00%01/01/2026 1598 Tieback Agreements - Initial Fee $ 1,147.36 $ 1,296.52 Y01/01/2025 $ 1,193.25 $ 155.12 $ 1,348.37 4.00%01/01/2026 1599 Tieback Agreements - resubmission Fee $ 573.68 $ 648.26 Y01/01/2025 $ 596.63 $ 77.56 $ 674.19 4.00%01/01/2026 1600 Tieback Agreements - Processing Fee $ 573.68 $ 648.26 Y01/01/2025 $ 596.63 $ 77.56 $ 674.19 4.00%01/01/2026 APPENDIX E 50 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1601Encroachment Agreements: 1602(Building, Porches and other structures) 1603 Application $ 298.70 $ 337.53 Y01/01/2025 $ 310.65 $ 40.38 $ 351.03 4.00%01/01/2026 $250.67 plus $283.25 plus $260.70 plus $294.59 plus 1604 Processing FeeY01/01/2025 $ 33.89 4.00%01/01/2026 disbursements disbursements disbursements disbursements Market Value of Market Value of Market Value of Market Value of Land x Area of Land x Area of Land x Area of Land x Area of minimum 1605 Annual FeeLand x 10% Y01/01/2025Land x 10% 4.00%01/01/2026 Land x 10% (min Land x 10% (min of $45.00 (minimum (minimum $332.83) $346.14) $376.10)$391.14) 1606(Patio Encroachment Agreements) First Time Application (also require building permit fee - found in 1607 $ 298.64 $ 337.46 Y01/01/2025 $ 310.59 $ 40.38 $ 350.97 4.00%01/01/2026 building user fees) Annual patio renewal fee (for patios with 12 or fewer seats) 1608 $ 149.31 $ 168.72 Y01/01/2025 $ 155.29 $ 20.19 $ 175.48 4.00%01/01/2026 1609 Annual patio renewal fee (for patios with 13 or more sears) $ 298.64 $ 337.46 Y01/01/2025 $ 310.59 $ 40.38 $ 350.97 4.00%01/01/2026 1610 Amendment to existing patio agreement $ 149.31 $ 168.72 Y01/01/2025 $ 155.29 $ 20.19 $ 175.48 4.00%01/01/2026 $100.29 to $113.33 to $104.30 to $13.56 to $117.86 to 1611 Miscellaneous LettersY01/01/20254.00%01/01/2026 $269.88 $304.96 $280.68 $36.49 $317.16 $329.63 plus $372.48 plus $342.82 plus $387.38 plus 1612 Highway establishment and opening By-lawsY01/01/2025 $ 44.57 4.00%01/01/2026 disbursements disbursements disbursements disbursements $195.22 to $220.60 to $203.03 to $229.42 to $26.39 to 1613 Miscellaneous By-laws (0.3 m reserve, street name change, etc.)Y01/01/20254.00%01/01/2026 $635.77 plus $718.42 plus $661.20 plus $747.16 plus $85.96 disbursements disbursements disbursements disbursements APPENDIX E 51 CITY OF KITCHENCITY OF KITCHENERER | | B BUDUDGGET SUET SUMMARYMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1614 LEGISLATED SERVICES 1615COUNCIL MINUTES 1616 Individual Sets/page $0.37 $0.42 Y01/01/2025 $0.44 $ 0.06 $0.50 18.92%01/01/2026Rounded Fees to the nearest round number. 1617STANDING COMMITTEE MINUTES 1618 Individual Sets/page $0.37 $0.42 Y01/01/2025 $0.44 $ 0.06 $0.50 18.92%01/01/2026Rounded Fees to the nearest round number. 1619COMMITTEE OF ADJUSTMENT Minor Variance (4 dwelling units or less, or 465 sq. m. or less non- 1620 $ 1,732.00 $ 1,732.00 N01/01/2025 $ 1,800.00 $ - $ 1,800.00 3.93%01/01/2026Rounded to the nearest dollar. residential GFA per lot) Minor Variance (5 dwelling units or more, or 466 sq. m. or more non- 1621 $ 2,986.00 $ 2,986.00 N01/01/2025 $ 3,110.00 $ - $ 3,110.00 4.15%01/01/2026Rounded to the nearest dollar. residential GFA per lot) 1622 Consent / Validation of Title $ 2,986.00 $ 2,986.00 N01/01/2025 $ 3,110.00 $ - $ 3,110.00 4.15%01/01/2026Rounded to the nearest dollar. 1623 Certificate of Official $ 315.00 $ 315.00 N01/01/2025 $ 330.00 $ - $ 330.00 4.76%01/01/2026Rounded to the nearest dollar. 1624 Application to Change Conditions $ 2,054.00 $ 2,054.00 N01/01/2025 $ 2,135.00 $ - $ 2,135.00 3.94%01/01/2026Rounded to the nearest dollar. 1625 Deferral Fee K20 $ 490.00 $ 490.00 N01/01/2025 $ 510.00 $ - $ 510.00 4.08%01/01/2026Rounded to the nearest dollar. Holding the fee from 2025 . Same as other 1626 Commissioning of Non-City Related Documents $ 17.70 $20.00 Y01/01/2025 $ 17.70 $ 2.30 $20.00 0.00%01/01/2026 neighbouring municipalities. $1.73 for $13.27 for first $15.00 for first $13.27 for first first $15.00 for first This fee needs to be $15.00 (Including HST) for first document, document, document, document, document, document, $5.00 (Including HST)/additional document 1627 Commissioning of Domestic & Foreign Pension DocumentsY01/01/20250.00%01/01/2026 $4.42/additional $5.00/additional $4.42/additional $0.58/additi$5.00/additional Holding the fee from 2024. document document document onal document document 1628INFORMATION ACCESS REQUEST 1629 Administration Fee $5.00 $5.00 N01/01/2025 $5.00 $ - $5.00 0.00%01/01/2026Legislated fee, cannot be changed. 1630 Staff Time/15 min. $7.50 $7.50 N01/01/2025 $7.50 $ - $7.50 0.00%01/01/2026Legislated fee, cannot be changed. 1631 Photocopies/page $0.20 $0.20 N01/01/2025 $0.20 $ - $0.20 0.00%01/01/2026Legislated fee, cannot be changed. 1632 Assessment View/Page $1.66 $1.65 N01/01/2025 $1.75 $ - $1.75 5.42%01/01/2026rounded 1633 Marriage License $ 172.64 $ 172.65 N01/01/2025 $ 180.00 $ - $ 180.00 4.26%01/01/2026Rounded to the nearest dollar. $135.20 for $135.20 for $135.20 for $135.20 for Bingo Licenses, Bingo Licenses, Bingo Licenses, Bingo Licenses, 1634 Lottery/Bingo License3% of prize value 3% of prize value N01/01/20253% of prize $ - 3% of prize value 0.00%01/01/2026Legislated fee, cannot be changed. for all other for all other value for all for all other lotteries lotteries other lotteries lotteries Holding the line to ensure the fee is in line with the 1635 Death Registration $ 30.00 $30.00 N01/01/2025 $ 30.00 $ - $30.00 0.00%01/01/2026 City of Waterloo. Reviewing, Stamping forms for Liquor License 1636 Municipal Information Forms $ 19.47 $22.00 Y01/01/2025 $ 20.25 $ 2.63 $22.88 4.01%01/01/2026 Applications. 1637 Property Standards Appeals $ 255.00 $ 255.00 N01/01/2025 $ 265.00 $ - $ 265.00 3.92%01/01/2026Rounded to the nearest dollar. Fee implimented in 2025 through Dog Desigation 1638 Dog and Animal Designation Appeal Fee NEW N NEW $ 150.00 $ - $ 150.00 New 01/01/2026 Appeal Committee composition review. Imposing an appeal feel to maintain consistency with all other quasi-judicial appeal committees. 1639 Licensing Appeal Tribunal Fee NEW N NEW $ 150.00 $ - $ 150.00 New 01/01/2026 Maintaining the fee in line with Dog Designation which was implemented in 2025. APPENDIX E 52 CITY OF KITCHENCITY OF KITCHENCITY OF KITCHENERERER | | | B B BUDUDUDGGGET SUET SUET SUMMARYMMARYMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1640 LICENSING 1641Adult Entertainment Parlours - Annual: 1642 Class A - New $ 515.84 $ 515.84 N01/01/2025 $ 537.00 $ - $ 537.00 4.10%01/01/2026Rounded to the nearest dollar. 1643 Class A - Renewal $ 116.48 $ 116.48 N01/01/2025 $ 121.00 $ - $ 121.00 3.88%01/01/2026Rounded to the nearest dollar. 1644 Class A - Late $ 283.92 $ 283.92 N01/01/2025 $ 295.28 $ - $ 295.28 4.00%01/01/2026 1645 Class B - New $ 941.20 $ 941.20 N01/01/2025 $ 979.00 $ - $ 979.00 4.02%01/01/2026Rounded to the nearest dollar. 1646 Class B - Renewal $ 116.48 $ 116.48 N01/01/2025 $ 121.00 $ - $ 121.00 3.88%01/01/2026Rounded to the nearest dollar. 1647 Class B - Late $ 283.92 $ 283.92 N01/01/2025 $ 295.00 $ - $ 295.00 3.90%01/01/2026Rounded to the nearest dollar. 1648 Class C - New $ 972.40 $ 972.40 N01/01/2025 $ 1,011.00 $ - $ 1,011.00 3.97%01/01/2026Rounded to the nearest dollar. 1649 Class C - Renewal $ 130.00 $ 130.00 N01/01/2025 $ 135.00 $ - $ 135.00 3.85%01/01/2026Rounded to the nearest dollar. 1650 Class C - Late $ 301.60 $ 301.60 N01/01/2025 $ 314.00 $ - $ 314.00 4.11%01/01/2026Rounded to the nearest dollar. 1651 Class D - Operator - New $ 5,839.60 $ 5,839.60 N01/01/2025 $ 6,073.00 $ - $ 6,073.00 4.00%01/01/2026Rounded to the nearest dollar. 1652 Class D - Operator - Renewal $ 5,726.24 $ 5,726.24 N01/01/2025 $ 5,955.00 $ - $ 5,955.00 3.99%01/01/2026Rounded to the nearest dollar. 1653 Class D - Operator - Late $ 5,909.28 $ 5,909.28 N01/01/2025 $ 6,146.00 $ - $ 6,146.00 4.01%01/01/2026Rounded to the nearest dollar. 1654 Class D - Attendant - New $ 141.44 $ 141.44 N01/01/2025 $ 147.00 $ - $ 147.00 3.93%01/01/2026Rounded to the nearest dollar. 1655 Class D - Attendant - Renewal $ 141.44 $ 141.44 N01/01/2025 $ 147.00 $ - $ 147.00 3.93%01/01/2026Rounded to the nearest dollar. 1656 Class D - Attendant - Late $ 141.44 $ 141.44 N01/01/2025 $ 147.00 $ - $ 147.00 3.93%01/01/2026Rounded to the nearest dollar. 1657 Class E - New $ 7,012.72 $ 7,012.72 N01/01/2025 $ 7,293.00 $ - $ 7,293.00 4.00%01/01/2026Rounded to the nearest dollar. 1658 Class E - Renewal $ 7,012.72 $ 7,012.72 N01/01/2025 $ 7,293.00 $ - $ 7,293.00 4.00%01/01/2026Rounded to the nearest dollar. 1659 Class E - Late $ 7,012.72 $ 7,012.72 N01/01/2025 $ 7,293.00 $ - $ 7,293.00 4.00%01/01/2026Rounded to the nearest dollar. 1660 Alternative Massage Centres - New $ 478.40 $ 478.40 N01/01/2025 $ 498.00 $ - $ 498.00 4.10%01/01/2026Rounded to the nearest dollar. 1661 Alternative Massage Centres - Renewal $ 169.52 $ 169.52 N01/01/2025 $ 176.00 $ - $ 176.00 3.82%01/01/2026Rounded to the nearest dollar. 1662 Alternative Massage Centres - Late $ 351.52 $ 351.52 N01/01/2025 $ 366.00 $ - $ 366.00 4.12%01/01/2026Rounded to the nearest dollar. 1663 Auctioneer - New $ 114.40 $ 114.40 N01/01/2025 $ 119.00 $ - $ 119.00 4.02%01/01/2026Rounded to the nearest dollar. 1664 Auctioneer - Renewal $ 86.32 $86.32 N01/01/2025 $ 90.00 $ - $90.00 4.26%01/01/2026Rounded to the nearest dollar. 1665 Auctioneer - Late $ 114.40 $ 114.40 N01/01/2025 $ 119.00 $ - $ 119.00 4.02%01/01/2026Rounded to the nearest dollar. 1666 Beauty Salon - New $ 247.52 $ 247.52 N01/01/2025 $ 257.00 $ - $ 257.00 3.83%01/01/2026Rounded to the nearest dollar. 1667 Beauty Salon - Renewal $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1668 Beauty Salon - Late $ 189.28 $ 189.28 N01/01/2025 $ 197.00 $ - $ 197.00 4.08%01/01/2026Rounded to the nearest dollar. 1669 Busker - New $ 62.40 $62.40 N01/01/2025 $ 65.00 $ - $65.00 4.17%01/01/2026Rounded to the nearest dollar. 1670 Busker - Renewal $ 62.40 $62.40 N01/01/2025 $ 65.00 $ - $65.00 4.17%01/01/2026Rounded to the nearest dollar. 1671 Busker - Late $ 62.40 $62.40 N01/01/2025 $ 65.00 $ - $65.00 4.17%01/01/2026Rounded to the nearest dollar. Commercial Kitchen - Class A - New 1672 $ 355.68 $ 355.68 N01/01/2025 $ 370.00 $ - $ 370.00 4.03%01/01/2026Rounded to the nearest dollar. 1673 Commercial Kitchen - Class A - Renewal $ 228.80 $ 228.80 N01/01/2025 $ 238.00 $ - $ 238.00 4.02%01/01/2026Rounded to the nearest dollar. 1674 Commercial Kitchen - Class A - Late $ 275.60 $ 275.60 N01/01/2025 $ 287.00 $ - $ 287.00 4.14%01/01/2026Rounded to the nearest dollar. 1675 Commercial Kitchen - Class B - New $ 140.40 $ 140.40 N01/01/2025 $ 146.00 $ - $ 146.00 3.99%01/01/2026Rounded to the nearest dollar. 1676 Commercial Kitchen - Class B - Renewal $ 140.40 $ 140.40 N01/01/2025 $ 146.00 $ - $ 146.00 3.99%01/01/2026Rounded to the nearest dollar. 1677 Commercial Kitchen - Class B - Late $ 140.40 $ 140.40 N01/01/2025 $ 146.00 $ - $ 146.00 3.99%01/01/2026Rounded to the nearest dollar. 1678 Contractors - New $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1679 Contractors - Renewal $ 86.32 $86.32 N01/01/2025 $ 90.00 $ - $90.00 4.26%01/01/2026Rounded to the nearest dollar. 1680 Contractors - Late $ 132.08 $ 132.08 N01/01/2025 $ 137.00 $ - $ 137.00 3.73%01/01/2026Rounded to the nearest dollar. 1681 Convenience Store - New $ 246.48 $ 246.48 N01/01/2025 $ 256.00 $ - $ 256.00 3.86%01/01/2026Rounded to the nearest dollar. 1682 Convenience Store - Renewal $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1683 Convenience Store - Late $ 194.48 $ 194.48 N01/01/2025 $ 202.00 $ - $ 202.00 3.87%01/01/2026Rounded to the nearest dollar. 1684 Driving School - New $ 154.96 $ 154.96 N01/01/2025 $ 161.00 $ - $ 161.00 3.90%01/01/2026Rounded to the nearest dollar. 1685 Driving School - Renewal $ 86.32 $86.32 N01/01/2025 $ 90.00 $ - $90.00 4.26%01/01/2026Rounded to the nearest dollar. 1686 Driving School - Late $ 114.40 $ 114.40 N01/01/2025 $ 119.00 $ - $ 119.00 4.02%01/01/2026Rounded to the nearest dollar. 1687 Farmers' Market - Class A - New $ 257.92 $ 257.92 N01/01/2025 $ 268.00 $ - $ 268.00 3.91%01/01/2026Rounded to the nearest dollar. 1688 Farmers' Market - Class A - Renewal $ 200.72 $ 200.72 N01/01/2025 $ 209.00 $ - $ 209.00 4.13%01/01/2026Rounded to the nearest dollar. 1689 Farmers' Market - Class A - Late $ 241.28 $ 241.28 N01/01/2025 $ 251.00 $ - $ 251.00 4.03%01/01/2026Rounded to the nearest dollar. 1690 Farmers' Market - Class B - New $ 135.00 $ 135.00 N01/01/2025 $ 140.00 $ - $ 140.00 3.70%01/01/2026Rounded to the nearest dollar. 1691 Farmers' Market - Class B - Renewal $ 81.00 $81.00 N01/01/2025 $ 81.00 $ - $81.00 0.00%01/01/2026Flat fee. APPENDIX E 53 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1692 Farmers' Market - Class B - Late $ 101.00 $ 101.00 N01/01/2025 $ 105.00 $ - $ 105.00 3.96%01/01/2026Rounded to the nearest dollar. 1693 Farmers' Market - Class C - New $ 56.16 $56.16 N01/01/2025 $ 58.00 $ - $58.00 3.28%01/01/2026Rounded to the nearest dollar. 1694 Farmers' Market - Class D - Pop-up Market $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1695 Food Shop with Liquor License - New $ 355.68 $ 355.68 N01/01/2025 $ 370.00 $ - $ 370.00 4.03%01/01/2026Rounded to the nearest dollar. 1696 Food Shop with Liquor License - Renewal $ 228.80 $ 228.80 N01/01/2025 $ 238.00 $ - $ 238.00 4.02%01/01/2026Rounded to the nearest dollar. 1697 Food Shop with Liquor License - Late $ 275.60 $ 275.60 N01/01/2025 $ 287.00 $ - $ 287.00 4.14%01/01/2026Rounded to the nearest dollar. 1698 Food Shop without Liquor License - New $ 315.12 $ 315.12 N01/01/2025 $ 328.00 $ - $ 328.00 4.09%01/01/2026Rounded to the nearest dollar. 1699 Food Shop without Liquor License - Renewal $ 213.20 $ 213.20 N01/01/2025 $ 222.00 $ - $ 222.00 4.13%01/01/2026Rounded to the nearest dollar. 1700 Food Shop without Liquor License - Late $ 265.20 $ 265.20 N01/01/2025 $ 276.00 $ - $ 276.00 4.07%01/01/2026Rounded to the nearest dollar. 1701 Food Truck - New $ 257.92 $ 257.92 N01/01/2025 $ 268.00 $ - $ 268.00 3.91%01/01/2026Rounded to the nearest dollar. 1702 Food Truck - Renewal $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1703 Food Truck - Late $ 189.28 $ 189.28 N01/01/2025 $ 197.00 $ - $ 197.00 4.08%01/01/2026Rounded to the nearest dollar. 1704 Launderette - New $ 257.92 $ 257.92 N01/01/2025 $ 268.00 $ - $ 268.00 3.91%01/01/2026Rounded to the nearest dollar. 1705 Launderette - Renewal $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1706 Launderette - Late $ 189.28 $ 189.28 N01/01/2025 $ 197.00 $ - $ 197.00 4.08%01/01/2026Rounded to the nearest dollar. 1707 Lodging/Boarding Houses - New $ 750.00 $ 750.00 N01/01/2025 $ 780.00 $ - $ 780.00 4.00%01/01/2026Rounded to the nearest dollar. 1708 Lodging/Boarding Houses - Renewal $ 525.00 $ 525.00 N01/01/2025 $ 546.00 $ - $ 546.00 4.00%01/01/2026Rounded to the nearest dollar. 1709 Lodging/Boarding Houses - Late $ 655.00 $ 655.00 N01/01/2025 $ 681.00 $ - $ 681.00 3.97%01/01/2026Rounded to the nearest dollar. 1710 Mobile Business - New $ 258.96 $ 258.96 N01/01/2025 $ 269.00 $ - $ 269.00 3.88%01/01/2026Rounded to the nearest dollar. 1711 Mobile Business - Renewal $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1712 Mobile Business - Late $ 189.28 $ 189.28 N01/01/2025 $ 197.00 $ - $ 197.00 4.08%01/01/2026Rounded to the nearest dollar. 1713 Motor Vehicle Facility - New $ 258.96 $ 258.96 N01/01/2025 $ 269.00 $ - $ 269.00 3.88%01/01/2026Rounded to the nearest dollar. 1714 Motor Vehicle Facility - Renewal $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1715 Motor Vehicle Facility - Late $ 189.28 $ 189.28 N01/01/2025 $ 197.00 $ - $ 197.00 4.08%01/01/2026Rounded to the nearest dollar. 1716 Nightclub - New $ 332.80 $ 332.80 N01/01/2025 $ 346.00 $ - $ 346.00 3.97%01/01/2026Rounded to the nearest dollar. 1717 Nightclub - Renewal $ 213.20 $ 213.20 N01/01/2025 $ 222.00 $ - $ 222.00 4.13%01/01/2026Rounded to the nearest dollar. 1718 Nightclub - Late $ 265.20 $ 265.20 N01/01/2025 $ 276.00 $ - $ 276.00 4.07%01/01/2026Rounded to the nearest dollar. 1719 Old Gold - New $ 154.96 $ 154.96 N01/01/2025 $ 161.00 $ - $ 161.00 3.90%01/01/2026Rounded to the nearest dollar. 1720 Old Gold - Renewal $ 86.32 $86.32 N01/01/2025 $ 90.00 $ - $90.00 4.26%01/01/2026Rounded to the nearest dollar. 1721 Old Gold - Late $ 114.40 $ 114.40 N01/01/2025 $ 119.00 $ - $ 119.00 4.02%01/01/2026Rounded to the nearest dollar. 1722 Payday Loan Establishments - New $ 660.40 $ 660.40 N01/01/2025 $ 687.00 $ - $ 687.00 4.03%01/01/2026Rounded to the nearest dollar. 1723 Payday Loan Establishments - Renewal $ 430.56 $ 430.56 N01/01/2025 $ 448.00 $ - $ 448.00 4.05%01/01/2026Rounded to the nearest dollar. 1724 Payday Loan Establishments - Late $ 515.84 $ 515.84 N01/01/2025 $ 536.00 $ - $ 536.00 3.91%01/01/2026Rounded to the nearest dollar. 1725 Permanent Vendor $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1726 Pet Care Establishment - New $ 149.76 $ 149.76 N01/01/2025 $ 156.00 $ - $ 156.00 4.17%01/01/2026Rounded to the nearest dollar. 1727 Pet Care Establishment - Renewal $ 86.32 $86.32 N01/01/2025 $ 90.00 $ - $90.00 4.26%01/01/2026Rounded to the nearest dollar. 1728 Pet Care Establishment - Late $ 114.40 $ 114.40 N01/01/2025 $ 119.00 $ - $ 119.00 4.02%01/01/2026Rounded to the nearest dollar. 1729 Pet Shop - New $ 149.76 $ 149.76 N01/01/2025 $ 156.00 $ - $ 156.00 4.17%01/01/2026Rounded to the nearest dollar. 1730 Pet Shop - Renewal $ 86.32 $86.32 N01/01/2025 $ 90.00 $ - $90.00 4.26%01/01/2026Rounded to the nearest dollar. 1731 Pet Shop - Late $ 114.40 $ 114.40 N01/01/2025 $ 119.00 $ - $ 119.00 4.02%01/01/2026Rounded to the nearest dollar. 1732 Places of Amusement - New $ 205.92 $ 205.92 N01/01/2025 $ 214.00 $ - $ 214.00 3.92%01/01/2026Rounded to the nearest dollar. 1733 Places of Amusement - Renewal $ 154.96 $ 154.96 N01/01/2025 $ 161.00 $ - $ 161.00 3.90%01/01/2026Rounded to the nearest dollar. 1734 Places of Amusement - Late $ 200.72 $ 200.72 N01/01/2025 $ 209.00 $ - $ 209.00 4.13%01/01/2026Rounded to the nearest dollar. 1735 Pop-up Shop (1 - 7 days) $ 84.24 $84.24 N01/01/2025 $ 88.00 $ - $88.00 4.46%01/01/2026Rounded to the nearest dollar. 1736 Pop-up Shop (8 - 250 days) $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1737 Public Hall - New $ 355.68 $ 355.68 N01/01/2025 $ 370.00 $ - $ 370.00 4.03%01/01/2026Rounded to the nearest dollar. 1738 Public Hall - Renewal $ 228.80 $ 228.80 N01/01/2025 $ 238.00 $ - $ 238.00 4.02%01/01/2026Rounded to the nearest dollar. 1739 Public Hall - Late $ 275.60 $ 275.60 N01/01/2025 $ 287.00 $ - $ 287.00 4.14%01/01/2026Rounded to the nearest dollar. 1740 Refreshment Vehicle - Class A - New $ 257.92 $ 257.92 N01/01/2025 $ 268.00 $ - $ 268.00 3.91%01/01/2026Rounded to the nearest dollar. 1741 Refreshment Vehicle - Class A - Renewal $ 200.72 $ 200.72 N01/01/2025 $ 209.00 $ - $ 209.00 4.13%01/01/2026Rounded to the nearest dollar. 1742 Refreshment Vehicle - Class A - Late $ 241.28 $ 241.28 N01/01/2025 $ 251.00 $ - $ 251.00 4.03%01/01/2026Rounded to the nearest dollar. 1743 Refreshment Vehicle - Class B - New $ 189.28 $ 189.28 N01/01/2025 $ 197.00 $ - $ 197.00 4.08%01/01/2026Rounded to the nearest dollar. APPENDIX E 54 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1744 Refreshment Vehicle - Class B - Renewal $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1745 Refreshment Vehicle - Class B - Late $ 189.28 $ 189.28 N01/01/2025 $ 197.00 $ - $ 197.00 4.08%01/01/2026Rounded to the nearest dollar. 1746 Refreshment Vehicle - Class C - New $ 213.20 $ 213.20 N01/01/2025 $ 222.00 $ - $ 222.00 4.13%01/01/2026Rounded to the nearest dollar. 1747 Refreshment Vehicle - Class C - Renewal $ 154.96 $ 154.96 N01/01/2025 $ 161.00 $ - $ 161.00 3.90%01/01/2026Rounded to the nearest dollar. 1748 Refreshment Vehicle - Class C - Late $ 200.72 $ 200.72 N01/01/2025 $ 209.00 $ - $ 209.00 4.13%01/01/2026Rounded to the nearest dollar. 1749 Special Events $ 257.92 $ 257.92 N01/01/2025 $ 268.00 $ - $ 268.00 3.91%01/01/2026Rounded to the nearest dollar. 1750 Street Vendors - New $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1751 Street Vendors - Renewal $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1752 Street Vendors - Late $ 143.52 $ 143.52 N01/01/2025 $ 149.00 $ - $ 149.00 3.82%01/01/2026Rounded to the nearest dollar. 1753 Temporary Vendor (up to 3 consecutive days) $ 114.40 $ 114.40 N01/01/2025 $ 119.00 $ - $ 119.00 4.02%01/01/2026Rounded to the nearest dollar. 1754 Theatre - New $ 315.12 $ 315.12 N01/01/2025 $ 328.00 $ - $ 328.00 4.09%01/01/2026Rounded to the nearest dollar. 1755 Theatre - Renewal $ 213.20 $ 213.20 N01/01/2025 $ 222.00 $ - $ 222.00 4.13%01/01/2026Rounded to the nearest dollar. 1756 Theatre - Late $ 265.20 $ 265.20 N01/01/2025 $ 276.00 $ - $ 276.00 4.07%01/01/2026Rounded to the nearest dollar. APPENDIX E 55 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents HST 2025 RATE (EXCL 2025 RATE LAST REVISED 2026 RATE 2026 RATE % INC vs 2025 EFFECTIVE DATE #FEE DESCRIPTIONAPPLIES HST COMPARABLE RATES/COMMENTS HST)(INCL HST) MM/DD/YYYY(EXCL HST) (INCL HST) (EXCL HST)MM/DD/YYYY Y/N 1757 FINANCIAL SERVICES 1758 REVENUE 1759 Tax Certificate $ 88.50 $88.50 N01/01/2016 $ 92.04 $ - $92.04 4. 00%01/01/2026 1760 Utility Certificate $ 88.50 $88.50 N01/01/2023 $ 92.04 $ - $92.04 4.00%01/01/2026 1761 Various Requests (detailed Tax Statement for one year, Utility Receipt) $ 25.00 $25.00 N01/01/2013 $ 26.00 $ - $26.00 4.00%01/01/2026Flat fee. 1762 Reprinting multiple bills (more than 2) $5.00 $5.65 Y01/01/2015 $5.00 $ 0.65 $5.65 0.00%01/01/2026Flat fee. 1763 Utility account administration fee $ 42.75 $48.31 Y01/01/2015 $ 44.46 $ 5.78 $50.24 4.00%01/01/2026 1764 Property Ownership Changes $ 42.75 $42.75 N01/01/2015 $ 44.46 $ - $44.46 4.00%01/01/2026 1765 Mortgage Company Information Request $ 16.75 $18.93 Y01/01/2022 $ 17.42 $ 2.26 $19.68 4.00%01/01/2026 1766 Collections notice delivery fee $ 16.25 $18.36 Y01/01/2023 $ 16.90 $ 2.20 $19.10 4.00%01/01/2026 1767 Disconnection Fee $ 59.75 $67.52 Y01/01/2023 $ 62.14 $ 8.08 $70.22 4.00%01/01/2026 A payment review fee will be charged when a payment cannot be processed as expected. This fee 1768 Payment Review Fee NEW N NEW $ 37.96 $ - $37.96 NEW 01/01/2026helps cover the work involved in reviewing, reconciling, and updating account activity to ensure a customer account balance is accurately reflected. Overhead Cost Overhead Cost Overhead Cost Overhead Cost 1769 Tampered Meter Cost Recovery 01/01/20220.00%01/01/2026 Recovery Recovery Recovery Recovery Overhead Cost Overhead Cost Overhead Cost Overhead Cost 1770 No Meter Read Access Fee01/01/20220.00%01/01/2026 Recovery Recovery Recovery Recovery 1771 Remove meter for arrears $ 111.79 $ 126.32 Y01/01/2023 $ 116.26 $ 15.11 $ 131.37 4.00%01/01/2026 1772 Tenant deposit residential - water $50 or $150 $50 or $150 N01/01/2011 $50 or $150 $ - $50 or $150 0.00%01/01/2026 1773 Tenant deposit residential - gas $ 150.00 $ 150.00 N01/01/2011 $ 150.00 $ - $ 150.00 0.00%01/01/2026Flat fee. varies based on varies based on varies based on varies based on business type business type business type business type 1774 Tenant deposit commercial - waterN01/01/2022 $ - 0.00%01/01/2026 and size of and size of and size of and size of building building building building varies based on varies based on varies based on varies based on business type business type business type business type 1775 Tenant deposit commercial - gasN01/01/2022 $ - 0.00%01/01/2026 and size of and size of and size of and size of building building building building 1776 Transfer of utility arrears to a property tax account $ 37.86 $42.78 Y01/01/2025 $ 39.37 $ 5.12 $44.49 4.00%01/01/2026 Transfer or refund of Payment made in error- (First transfer/refund 1777 $ 15.60 $17.63 Y01/01/2025 $ 16.22 $ 2.11 $18.33 3.97%01/01/2026 free) The City processes approximately 8,300 final utility bills each year, which often require a final meter reading to accurately close customer accounts. These readings fall outside the regular monthly billing cycle and necessitate an on-site visit by a meter reader. This process results in additional costs due to fees from our third-party meter 1778 Final Utility Meter Read Fee NEW Y NEW $ 30.00 $ 3.90 $33.90 NEW 01/01/2026 reading provider and extra administrative work for revenue staff, including initiating the move-out process, scheduling the reading, and finalizing the bill outside the standard billing schedule. Municipalities such as Cambridge, Toronto, and Hamilton charge similar fees. The fee is applicable for each letter sent out related to 1779 Tax Arrears Correspondence (per issuance)NEW N NEW $5.00 $ - $5.00 NEW 01/01/2026 property tax arrears. 1780 Collection reminder notices $5.00 $5.00 N01/01/2020 $5.00 $ - $5.00 0.00%01/01/2026 APPENDIX E 56 CITY OF KITCHENER | BUDGET SUMMARY Note - total fee including applicable taxes will be rounded to the nearest five cents Bqqfoejy.H!}Jttvf!Qbqfst; CITY OF KITCHENER 2025 BUDGET SUMMARY KITCHENER.CA/BUDGET CITY OF KITCHENER | 202 BUDGET SUMMARY Issue Paper Summary Issue PaperOp 01 - 2026 User Fees DepartmentFINANCIAL SERVICES DivisionFINANCIAL PLANNING & ASSET MANAGEMENT PreparerBrad Palmer, Corporate Financial Advisor Background Fees and charges are used by municipalities as an alternative to fully funding various programs and services through property taxes. Fees and charges are often used for programs and services where customers have a choice whether to use them and, for this reason, the use of fees and charges tend to be favoured over property taxes alone. Approval of the user fee schedule as detailed in Appendix E will coincide with the adoption of the 2026 budget. This also includes direction to Legal Services to prepare the necessary by-laws to amend The City of Kitchener Municipal Code Chapters for fees and charges pertaining to licensing, planning applications, building permits and Committee of Adjustment applications. Fees increased by 4% with the exception for rounding. Changes to fees outside of the target 4% are noted below. Rationale/ Analysis -Victoria Park Pavilion (Fees 82-96) Added new VPP rental fees for increased fee clarity. Also changed the structure of Facility Attendant to a per attendant rate with a 2 staff minimum for VPP rentals. -Gaukel Block (Fees 97-102) Added new Daily, 2-Day rental, and extended booking fees. -Square Peg (Fees 103-106) Added new daily and monthly rental fees as well as a damage fee. -44 Gaukel Creative Arts Hub (Fee 108) Added new Tenancy rate as per DSD-2024-065. -Hydrogeological Study (Environmental Engineering) Review Surcharge (Fee 262) New review fee added for recovery of staff time for reviewing hydrogeological studies by the environmental engineer. Regional planning responsibility transferred under Bill 23. CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 1 Issue Paper Summary -Letter of Compliance - Amendment Fee (Fee 272) New fee added. After a letter of compliance is prepared and sent to an applicant (such as a potential property purchaser), the applicant may coordinate with the existing owner to address deficiencies such as an open building permit then request an updated letter to verify that the matter has been resolved. There is currently no amendment fee that addresses this situation which occurs frequently. The fee will cover staff time to process the update. -Environmental Site Assessment Review Surcharge (Fees 282-285) New review fees added for recovery of staff time for reviewing environmental site assessments. Regional planning responsibility transferred under Bill 23. -Photocopies (Fee 286-287) These fees were held flat. -Record of Site Condition (RSC) and Certificate of Property Use (CPU) Review Surcharge (Fee 298) New review fee for recovery of staff time for reviewing Records of Site Conditions and Certificates of Property Use. Regional planning responsibility transferred under Bill 23. -Remediation Report Review Surcharge (Fee 299) New fee for recovery of staff time for reviewing remediation reports. Regional planning responsibility transferred under Bill 23. -Rental Replacement By-law Application Fee (Fee 300) New fee added as directed by Council for partial recovery of staff time for processing the application. -Risk Assessment Review Surcharge (Fee 301) New fee for recovery of staff time for reviewing risk assessments. Regional planning responsibility transferred under Bill 23. -Routine Disclosure Requests (Fee 302) This rate is held flat. Transportation Fees (Fees 347-352 on the detailed fee schedule) -Bike FOB Fee (Fee 351) This fee is held flat. Parking (Fees 397- 427) on the detailed fee schedule) CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 2 Issue Paper Summary -Monthly Parking (Fees 398-400) These rates were held flat. -Remote Parking Lot Rate - Bramm (Fee 401) This fee is held flat. -Theatre Rate () This rate changes every 3-4 years. Last increase was September 2023. Premium Theatre Rate increase to align with market pricing. -Electric Charging Station Rate per hour (Fee 417) Fee reported incorrectly in 2025. -Part-time 3 Day A Week Permit Package (Fee 427) This fee is held flat. -The Building Enterprise is proposing no change to the 2026 permit fees. Favourable results over the last few years have allowed the Building Stabilization reserve fund to reach its target level. With the exception of: -Request for Environmental records (Fee 527) Increase by the standard 4%. Fee 576) There is no increase proposed for this fee. This fee is based on cost recovery from Bell Canada and there was no increase to these fees. -Fire Response and Investigation Recovery (Fee 592) The fee increase proposed is 1.9% which matches the MTO rate. -Dispatch Systems administration and analysis (Fee 596) This fee increase is proposed at higher than 4% to align wee with salary recovery. -Post Fire Property Security/Safety (Fee 597) This fee increase is proposed at higher than 4% to align fee with salary recovery. Neighbourhood Programs & Services (F CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 3 Issue Paper Summary Fee 648) There is no increase proposed for this fee. The fee is set to a fixed amount that will not increase annually. Fee 682) A higher fee increase is proposed for this room to reflect consistent pricing based on the square footage of the space. This room was previously undercharged. Williamsburg Community Centre (Fees 768 - 779) New fees are being introduced to reflect the space at the new community Centre. Fees align with other community centres. Youth Camp, BLYD (Fees 865 - 866) A higher increase is proposed for this fee to offset the increased operating costs to run the programs. Neighbouhood Camps (Fees 867 - 871) A higher increase is proposed for this fee to offset the increased operating costs to run the programs. - Affiliated Sports fees (Fees 900 - 901) These fees are only increasing by 3% to stay within range of the affiliated rate for neighbouring municipalities. - Budd Indoor Fields (Fees 929 - 931) Three new fees are being introduced at Budd Park Indoor Fields to align with pricing structure at the Cowan Recreation Centre (CRC) fields. - Children 17 and under and Fee 965) Proposing a lower fee increase as Kitchener is currently on the higher end of pricing regionally. - 10 Visit Pass (Fee 966 & 968) New Fees are being introduced to provide a discount for returning visitors. CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 4 Issue Paper Summary -Group Admission (Fee 969) New fee being introduced to provide a group discount. online and at pools. Fee 972 will be available online and at pools. 3 Month Swim Pass () No fee increase is being proposed as Kitchener is currently on the higher end of pricing regionally. Fees 984-990) New fees are being introduced so all levels will be the same rate based off the implementation of the new Kitchener Swims program launched in January 2025. Still among the most expensive in the Region. All lessons adjusted to top group lesson fee from 2025. Lines separated for flexibility for future adjustments. Fees to increase May 2026 for the start of the spring session with Winter registration opening before 2026 user fees are approved. -Private Lessons (Fees 1018 - 1022) These fees have higher proposed increases to align with wage recovery. These fees have not been increased in many years. -Sessional Lane/Aquafit Programs (Fees 1024 - 1025) Two new fees being proposed to encourage muti-visits to our Aquafit/lane swim programs. -Pool Rentals (Fees 1030-1033) Reduction to fees to reflect change in how pools are priced. Fees are now for the facility and all staffing costs are priced separately. -Head Lifeguard per Hour (Fee 1036) New fee proposed for the Headguard hourly rate. This fee will be added to pool rentals. -Customer Service Attendant per hour (Fee 1037) New fee for a Customer Service Attendant per hour would be added to pool rentals outside of operating hours. -Statutory Holiday per Hour (Fee 1038) New fees proposed during Statutory holidays to offset labour costs during statutory holidays. -BRC Gymnasium rentals (Fees 1053 - 1059) New fees being proposed to add additional price points to align with CRC Gym user fee structure. CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 5 Issue Paper Summary Cowan Recreation Centre (CRC) (Fees -New fees are being proposed for the New CRC facility including indoor fields, gymnasium rentals, cricket practice net rentals and room rentals. -A full review of fees has been completed and many of the fees have a larger proposed rate increase to align our fees to similar neighbouring courses. -9 Hole co Fee 1123) A new fee is introduced to optimize play on the 9-hole course. -Game Pack Bundles 9 Hole (Fees 1135 - 1138) New fees are being introduced for the 9-hole course to offer greater flexibility and affordability to players. -Public Tree Removal () New fee being introduced based on the recently approved Public Tree Bylaw and tree compensation program. -Park or Natural Tree Removal () New fee being introduced based on the recently approved Public Tree Bylaw and tree compensation program. -Saturday Committal Services arriving after 3PM per 1/2 hour (Fee 1217) Cost recovery increase as recommended by consultant in of the Cemetery Strategic Plan. -Weekday Funerals arriving after 3PM per 1/2 hour (Fee 1218) Cost recovery increase as recommended by consultant in the Cemetery Strategic Plan. CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 6 Issue Paper Summary -Exterior Niche 4 & Niche 5; Doves in Flight; Meadow Lark (Fee 1283) Cost recovery increase required. -Charge for concrete (per cubic ft) includes installation fee (Fee 1325) Fee is only increased every few years. Cost recovery. -Regional Se Fee 1356) This is a set price by the Region of Waterloo based on their funding. the detailed schedule) -Gas Service Abandonment (Fee 1409) This fee consolidates previous fees for Gas Service Abandonments that were based on type of pipe. -Impact Post (100mm diameter) for Gas Meter Set Protection (Fee 1410) The fee has been decreased to match average contractor costs. -Impact Post (150mm diameter) for Gas Meter Set Protection (Fee 1411) The fee has been decreased to match average contractor costs. -Volume Conversion and Service Replacement (Fees 1422-1423) This new fee is to facilitate peak capacity upgrades with no anticipated change in overall gas use. Capacity upgrades with increased overall gas use would remain free. -Frost Charges for Winter Excavation per Gas Meter (Fee 1426) The fee has been decreased due to the decrease in contractor costs. -Fees 1433-1477) Due to significant increases to the rental rates in 2024, it was determined that the majority of the 2026 rates would be increased by 3%, with the exception of the following: -Maximus (Fee 1465 by 14% in order to keep the cost in line with the increased purchase price of a new tank. -CBH-199DVLN (Fee 1468 an additional rental option for combination space and water heating. -Anti-Scald Valve Rental (Fee 1477 for ease of administration. -Direct Purchase Billing () These fees were adjusted to be in line with Enbridge fees. detailed schedule) CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 7 Issue Paper Summary adaptors are additional, if required) (Fees 1520-1522) These fees have been increased based on updated costing for the work, plus first 45 minutes free. - Water Meter Water Shut-Off Fee for Denied Access (Fee 1526) This fee was rounded to the nearest dollar, for ease of administration. - Water Meter Remote (Fee 1539) This is a new fee to cover the replacement cost of a water meter remote due to loss or damage. - New Construction Water Meter Fee (Fee 1540) This is a new fee for the cost of a new water meter used during new construction. - New Subdivision Hydrant Flushing (per hydrant) (Fee 1541) This is a new fee to cover the cost of water the flushing of hydrants in new development subdivisions in order to maintain chlorine residuals. The cost is for the two-year maintenance period per hydrant to cover staff time and water used. Sanitary and Stormwater Utilities (Fees 1542-1574 on the detailed schedule) - Dewatering Discharge Permit Application Fee (Fee 1562) This new fee is to cover the administrative review and processing of discharge permit applications. This includes technical and capacity analyses rmwater system can be accommodated and appropriately tracked. - Commissioning of Non-City Related Documents (Fee 1626) Holding the fee from 2025 to align with neighbouring municipalities. - Commissioning of Domestic & Foreign Pension Documents (Fee 1627) This fee needs to be $15.00 (Including HST) for first document, $5.00 (Including HST)/additional document. Holding the fee from 2025. - Information Access Request (Fees 1628-1631) Legislated fee that cannot be changed. - Lottery/Bingo License (Fee 1634) Legislated fee that cannot be changed. - Death Registration (Fee 1635) Holding the fee from 2025 to ensure the fee is in line with the City of Waterloo. CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 8 Issue Paper Summary -Dog and Animal Designation Appeal Fee (Fee 1638) Fee implemented in 2025 through Dog Designation Appeal Committee composition review. -Licensing Appeal Tribunal Fee (Fee 1639) Imposing an appeal fee to maintain consistency with all other quasi-judicial appeal committees. Maintaining the fee in line with Dog Designation which was implemented in 2025. -Farmers' Market - Class B - Renewal (Fee 1691) This fee is held flat. Revenue (Fees 1758-1780 on the detailed schedule) -Payment Review Fee (Fee 1768) A payment review fee will be charged when a payment cannot be processed as expected. This fee helps cover the work involved in reviewing, reconciling, and updating account activity to ensure a customer account balance is accurately reflected. -Final Utility Meter Read Fee (Fee 1778) The City processes approximately 8,300 final utility bills each year, which often require a final meter reading to accurately close customer accounts. These readings fall outside the regular monthly billing cycle and necessitate an on-site visit by a meter reader. This process results in additional costs due to fees from our third-party meter reading provider and extra administrative work for Revenue staff, including initiating the move-out process, scheduling the reading, and finalizing the bill outside the standard billing schedule. Municipalities such as Cambridge, Toronto, and Hamilton charge similar fees. Staff are recommending the implementation of a $30 fee per final meter read in Kitchener to offset some of the costs associated with completing final meter reads. Financial Implications User fees make up approximately 12% of the revenues used to fund the tax supported operating budget. The proposed 2026 tax supported budget includes increases to fees and charges by 4% in most instances. Recommendation For information. CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 9 Issue Paper Summary Issue PaperCap 01 - Strategic Additions DepartmentGENERAL EXPENSE DivisionGENERAL EXPENSE PreparerRyan Hagey, Director of Financial Planning & Asset Management Background The City's strategic plan is the community's shared vision for the future of Kitchener. After significant public consultation, in August 2023, Council approved the 2023-2026 strategic goals, goal statements, and actions. Rationale/ Analysis Since its adoption in the summer of 2023, significant funding has been allocated to priority areas identified in Kitchener's 2023-2026 Strategic Plan. In addition to these investments, one-time funding of $1M has been earmarked and is available in this year's capital budget for direction to continue advancing important Council and community priorities. Council will have an opportunity to discuss potential options prior to the Mayor proposing the budget in early December. Options which are not advanced as part of this budget will have an opportunity to be considered in the future. Staff have identified areas potential investment which are summarized below. These are just suggested areas for investment and Council is free to consider other options not included in the list below. ating and Shade in Parks and/or Cricket Improvements From 2021-2024 the City received feedback on its outdoor recreation facilities through a masterplan update called Places & Spaces. This update includes reviewing the total amount of park space within Kitchener, as well as the quality of the amenities and experiences they provide. Data from the 2025 asset management plan (AMP) shows the City owns and operates parks, trails, and open spaces with a combined replacement value of nearly $125 million. Examples of projects that are important but unfunded include much needed seating and shade in parks which would benefit all park users, as well as improved access to cricket amenities to meet the growing demand of this sport. In addition to the City's overall Strategic Plan, divisions within the City prepare strategies which focus on a specific area of service delivery for the community. These strategies are prepared periodically to ensure divisions are putting their efforts towards the right programs, activities, and infrastructure to meet the needs of local residents and businesses. The Special Events Strategy was recently presented to Council and noted some items that could benefit from one-time funding. For example, the City sees a benefit of purchasing equipment that is often rented by the City or other organizations that put on special events. Owning this equipment would reduce costs of running events and ensure its availability. CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 10 Issue Paper Summary As a result of current economic conditions, Downtown Kitchener is experiencing significant office vacancy rates. As part of the Make It Kitchener 2.0 strategy refresh, staff anticipate a major focus will emerge to support the attraction and retention of office-based companies in the core. Any initiatives would be developed and implemented in partnership with major office building owners and organizations like the Waterloo Region Economic Development Corporation. One-time capital funding would be used to implement City-driven actions that emerge. This could include, for example, business attraction efforts, physical improvements in the downtown, new financial incentives, marketing strategy implementation, etc. 4)Continuing with In October of 2024 the City of Kitchener launched a $100,000 pilot program called Pitch Kitchener. This initiative saw the City partner with Communitech to provide opportunities for local startups that could be used in city operations with the aim of using technology to improve overall service delivery. The initial year of the program resulted in 3 local proponents piloting technologies with the City. A report on the pilot is expected to come back to Council in Q1 of 2026 but it has largely been seen as successful. One-time capital funding could be used to continue with a second year of the program in 2026 supporting more local partnerships and innovation. Financial Implications $1M has been added to the Strategic Addition capital account in General Expense to be allocated as part of the budget process. If the funds are not allocated, they will be returned to the appropriate reserve fund and can be allocated at a future date. Recommendation For direction. CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 11 Issue Paper Summary Issue PaperCap 02 - Road Reconstruction Timing Changes - 2026 Budget DepartmentFINANCIAL SERVICES DivisionFINANCIAL PLANNING & ASSET MANAGEMENT PreparerRyan Hagey, Director of Financial Planning & Asset Management Background The City reconstructs roads when the aboveground and underground infrastructure (watermains and sewers) approach the end of their useful lives. Each year staff updates its reconstruction replacement listing based on new information which can cause a change in timing of specific projects. It is common for projects to move forward or backward based on different factors such as impacts from other projects (both City projects and from other municipalities), changes in project pricing, and updated condition information. Because of the uncertainty in timing around this type of work, specific projects are only identified for the first five years of the capital forecast. It should also be noted that there can be significant cost difference between specific projects (e.g. one project may cost over $10M, while a much smaller project could cost closer to $1M). Staff try to maximize the funding available to complete the as many projects as possible within the funding constraints. Rationale/ Analysis The following changes have been made to the construction timing of the full reconstruction program: 1)Fairfield Ave: moved up to 2026 due to funding availability 2)Floyd St: moved up to 2027 due to funding availability 3)Stirling Ave: moved up to 2028 to tie into Expressway crossing project 4)Woodward Ave: moved up to 2028 due to funding availability 5)Crestwood Ave: moved up to 2028 due to funding availability 6)Belleview-Smithson-Layton-Suffolk: moved up to 2029 due to stormwater and pavement issues 7)Avalon-Barbara: moved up to 2029 due to stormwater, water and pavement issues 8)Elizabeth St: moved back to 2029 to tie in with Oxford work planned for 2028 Financial Implications None. All projects are funded through the full reconstruction budget within Engineering. Recommendation For information. CITY OF KITCHENER | 2026 BUDGET SUMMARYAPPENDIX G 12