HomeMy WebLinkAboutDTS-06-011 - Traffic Calming Criteria and FundingDate of Report: January 18, 2006 Report No.: DTS 06 -011 Subject: TRAFFIC CALMING CRITERIA AND FUNDING RECOMMENDATIONS: "That the existing Capital Budget funds of $100,000 annually be maintained for the implementation of traffic calming measures; and further, That a report be prepared for a future DTS Committee meeting upon completion of the 2006 traffic calming EA studies and the permanent installation of the 2005 traffic calming measures, to update the Committee on the funding projections and the timing of future permanent installations ." BACKGROUND: At the Dec 12/05 Council meeting, Councillor Lorentz raised concerns with the proposed phasing in of traffic calming measures over a 2 - 3 year period. At the request of Mayor Zehr, staff were directed to provide further clarification prior to consideration of the permanent installation of the traffic calming measures, as to the criteria to be used in the selection process; how the funding will be applied; and the project timing. REPORT: The City's Traffic Calming Policy was approved by Council in August 2004. It established a process for identifying, prioritizing and evaluating traffic calming measures throughout the City. In 2005, Paradigm Transportation Solutions was contracted to conduct three Class "B" Environmental Assessments for traffic calming. These were the first three studies undertaken as a result of the new traffic calming policy and traffic calming budget. The streets reviewed were Greenbrook Drive, David Avenue /Schneider Ave and Kingswood Drive. These reviews 4 are now complete and temporary measures have been installed on Schneider Ave and will be installed on the other streets in the near future. Council at the Nov, 28 2005 meeting approved undertaking a traffic calming environmental assessment in 2006 on Chopin Drive, Chandler Drive and Bradley Drive. These streets were chosen as per the approved Traffic Calming Policy and were based on the following criteria. Criteria used in the selection process: • Speed — Speeds are measured over a full week 24 hours per day. This allows for the differentiation between daytime, nighttime and weekend traffic. The 85% speed, or the speed at which 85% of the traffic is traveling, is measured in both directions. This speed is then compared to the expected speed based on the road classification. The difference between these speeds provides the score. • Volume — The volume of traffic over a 24 hour period is calculated for each street. The streets under consideration are all prorated out of a score of 20 with the highest volume street getting 20 points and the lowest volume street receiving 1 point. The amount of through traffic is also considered, although this is sometimes difficult to determine until further studies are completed. • Collisions — The number of collisions per kilometer of road over the previous three years are calculated and prorated out of 20 points. • Safety: • Sidewalks - proportion of neighbourhood streets with continuous sidewalks on at least one side, prorated out of 5 points. • Pedestrians & Cyclists - number of schools and major pedestrian generators in area, presence of designated bike routes in the area, prorated out of 5 points. • Emergency and Transit Routes - proximity of emergency and transit routes in the area, prorated out of 10 points. These criteria are applied against all streets considered for traffic calming within each road classification, ie local, minor collector and major collector. The highest rated streets are then recommended for traffic calming EA's. For our 2006 program, numerous streets were reviewed and the three highest rated were recommended as follows: Chandler Dr 65 points Bradley Dr 58 points Chopin Dr 53 points The 2006 traffic calming priority list for each road classification is included at the end of this report. Funding of Traffic Calming Initiatives When the Traffic Calming Policy was develop in 2004, we somewhat arbitrarily picked an annual budget figure of $100,000 and it was intended to cover the cost of any consultants, public notices, meetings, etc as well as the implementation of the measures. This amount was included in the capital budget each year for a 10 year period from 2005 to 2014 inclusive. The total cost for consulting fees, public notices, etc for the 2005 traffic calming program will be approximately $60,000 thereby leaving $40,000 for implementation of the measures. This obviously will not be sufficient to complete all the proposed measures on a permanent basis and temporary measures will be installed with the intent of installing permanent measures over two or more years. The installation of temporary measures will also allow staff to monitor their effectiveness and potentially reduce the number of devices installed, thereby saving the cost of permanent installations. The total cost of the 2005 traffic calming measures as proposed are: David /Schneider $15,000 Kingswood $70,000 Greenbrook $72,000 Total $157,000 For the 2006 traffic calming program, Chopin Dr, Chandler Dr and Bradley Dr are proposed for review. These streets are not quite as impacted by through traffic as those in the 2005 program and we do not expect modifications as extensive in order to achieve a desirable effect. Staff will also be undertaking the EA's in house which will reallocate approximately half of the annual funding to the implementation of traffic calming measures. Obviously we do not have enough funds to fully implement the 2005 program immediately. Some members of Council have expressed concern with the phased approach to the installation of permanent measures and as a result the following options have been considered: • Phase the permanent installation over a number of years as surplus funds from smaller initiatives are generated • Complete the 2006 program but do not install the measures until 2007 • Reduce the number of traffic calming EA's undertaken each year • Front end the cost of the 2005 program and reduce the amount available in the following years, thereby keeping the total program cost the same • Increase the annual funding to $150,000 While it is difficult to estimate what the cost will be for future traffic calming EA's beyond 2006 without knowing which streets will be completed or what measures will be recommended, we do expect them to be less in scale to what has been completed in 2005. Keep in mind that we have completed the highest rated streets first, which generated the most severe problems, whereas future EA's will be completed on more local and minor collector streets where the number of measures will likely be less. We also have recommended as part of the completed EA's that certain works be undertaken at the time of road improvements, specifically the Schneider Ave island would be constructed as part of the Queen St improvements scheduled for 2007. The schedule for implementation in relation to available funding is as follows. 1! Traffic Calming Implementation of Permanent Measures 2005 2006 2007 2008 Revenue 100,000 100,000 100,000 1001000 Study Expenses 60,000 15,000 15,000 15,000 Sub total 40,000 85,000 85,000 85,000 Accumulated Revenue 40,000 125,000 68,000 53,000 Permanent Greenbrook Schneider Installations 72,000 15,000 Kingswood Chopin 70,000 (30,000) Chandler (40,000) Bradley (15,000) Sub total 142,000 100,000 Total 1 1 -17,000 -32,000 This chart shows a deficit projection for 2006 and 2007. The cost projections have been based on the installation of all identified measures for each street. The benefit of the staged implementation of the traffic calming measures is that it will allow for the evaluation of their effectiveness and confirm the need for all or fewer measures. If, for example, we find that traffic patterns and driver behaviour can be positively shifted with fewer measures than those identified in the EA's, then we would install less restrictions. This would ultimately reduce the cost. Contingency amounts have also been included which may reduce the overall cost slightly. We have made some assumptions on what the cost may be for the 2006 program on Bradley, Chopin and Chandler Dr. These are just for illustration purposes, but knowing the types of problems, the length of the streets and the types of measures that would be effective, we don't expect that the costs would be as great as those in 2005. We have also assumed that the permanent installation of the 2006 program would not be undertaken until 2007. The 2008 program, depending on the streets chosen, could be even less than previous years. At this time, we believe that the annual budget of $100,000 is reasonable; it is just more heavily weighted in the initial years than in the later years. It is Staff's recommendation that we maintain the funding structure the way it has been budgeted, recognizing that most but not all permanent measures could be installed after one season of temporary measures. Upon completion of the 2006 traffic calming EA studies and the permanent installation of the 2005 traffic calming measures, a report will be brought back to the DTS Committee to update them on the funding projections and the timing of future permanent installations. If Council still wishes to expedite the installation of permanent traffic calming measures, than additional funds will have to be approved, as they are not currently budgeted. 5 Project Timing The 2005 traffic calming EA's were completed with the assistance of a consultant and took approx 8 months to finish. We intend to complete the 2006 EA's in house and have started some of the data collection and intend to have the first public meetings during the winter. Even still there is an extensive public participation component to an EA which must be maintained. We feel that undertaking them in house should allow us to complete them in approximately 6 months and certainly in time for warm weather installation of the temporary measures. Potential Changes in the Environmental Assessment Process The Municipal Engineers Association (MEA), which "manages" the existing Municipal Class EA process and reports annually to the Ministry of the Environment (MOE), has recommended that a number of changes should be made and the EA document should be reprinted as a 4th Edition likely in late 2006. In the approved 2000 EA document, traffic calming was identified as a schedule B activity and as such is subject to a Part 2 Order request (bump -up). MEA proposed that in the 4t" edition a new schedule will be created between Schedule A and Schedule B that would represent projects such as traffic calming and where they would be similar to Schedule A as being pre- approved but with the requirement of Public notice so that affected parties have the opportunity to appeal to Municipal Councils with their concerns. The new Toronto Act, published after City Council's resolution was forwarded to the MOE, exempts Toronto from the EA act with regard to Traffic Calming. It has been suggested that a new Municipal Act will follow to do the same for all municipalities. The MOE advisors will provide an update on relative timing etc in the near future. FINANCIAL IMPLICATIONS: The recommendation of maintaining the $100,000 annual budget for traffic calming measures will allow for the installation of permanent measures in a reasonable time frame. It allows for the installation of temporary measures to ensure their effectiveness as well as confirm community support before their permanent installation. Initially there might be minor delays, or modest over expenditures of the annual budget, but we expect that this will be eliminated in approximately three years as the larger traffic calming projects are completed and smaller, less costly, projects come on stream. John P. McBride Director Transportation Planning Rob Shamess, P. Eng Director of Engineering