Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutDTS-06-073 - Deer Ridge Centre Master Plan, 4263-4293 King St E
J
Development &
Technical Services
Report To:
Date of Meeting:
Submitted By:
Prepared By:
Ward(s) Involved:
Date of Report:
Report No.:
Subject:
Development and Technical Services Committee
May 1, 2006
Jeff Willmer, Director of Planning (741-2325)
Brandon Sloan, Planner (741-2648)
Ward 3
April 26, 2006
DTS-06-073
Deer Ridge Centre Master Plan
4263-4293 King Street East (former Lulu's Site)
RECOMMENDATION:
That the Master Plan, including design requirements and drawing, for the Deer Ridge
Commercial Centre located at 4293-4293 King Street East, and attached to DTS Report 06-073
as Appendix "B", be adopted; and
That the Master Plan and design requirements be implemented through the Site Plan Approval
process, with any modifications to the Master Plan being to the satisfaction of the Supervisor of
Site Plan Development.
REPORT:
The subject lands are located on the southwest side of King Street East, near the Deer Ridge
Drive intersection. This is the former Lulu's site, which currently contains 'The Brick' and the
rear building contains the 'World Access' call centre. The first two phases of redevelopment of
the property which includes the addition of the new parking area at the rear of the site and an
addition to The Brick have recently gone through the Site Plan process with the City. Part of
this process included the involvement of surrounding property owners as per the Council Policy
on Public Participation. There are future phases being planned for this property.
The lands are designated as Planned Commercial Campus in the City's Municipal Plan and are
zoned Commercial Campus (C-8) with special zoning provisions. Staff have identified the need
for a "Master Plan" for this site prior to proceeding with the next phases of redevelopment.
There are three primary reasons. The first is that it makes sense to provide a coherent and
comprehensive 'plan' for any large commercial site prior to proceeding with adding individual
new buildings. The second purpose is to help achieve conformity with the Municipal Plan
policies for this site development. The intent of these policies is to consider the larger picture of
the commercial campus environment to achieve a high level of urban design, including planning
for matters such as existing/future off-site and/or on-site transit facilities, automobile circulation
and access, safe pedestrian movement, the massing and placement of buildings as well as
other on-site service facilities. Finally, the public participation policies adopted by Council in
2001 include a specific Policy 4.7 under the Commercial section of the City's Municipal Plan.
This policy identifies that site specific urban design studies will be required for areas such as the
Planned Commercial Campus that have substantial redevelopment opportunities and that are
immediately adjacent to low rise residential lands. The former Lulu's site fits that description.
The intent of the site specific design study is to address several site development matters, such
as building placement, parking areas, site access, vegetation/buffering, etc with the primary
purpose to attain compatibility between commercial and residential development. The urban
design study and requirements are to be adopted by Council and implemented through the Site
Plan process. The study also involves consultation with the surrounding property owners.
The owner and consultant for the subject lands have worked with City staff on engaging in this
"new" process. Staff have circulated the surrounding property owners and have conducted a
meeting that included City and Region staff, the owner's consultants, the Ward Councillor,
several surrounding property owners and representatives from the adjacent neighbourhood
associations. The comments are attached to this report.
The comments received have been refined to provide a list of design objectives or requirements
that shall accompany the proposed Master Plan and both are attached to this report. One of the
primary objectives is to provide for direct and identifiable pedestrian and vehicular routes
internal to the site and as the site relates to the surrounding area.
FINANCIAL IMPLICATIONS:
There are no expected impacts on the City's Capital Budget.
COMMUNICATION:
Surrounding property owners and the adjacent neighbourhood associations have been involved
in Site Plan meetings and comments on these lands. 52 notices were mailed regarding the
Master Plan. Written comments were received and are attached as Appendix "A". A meeting
was held on April 12th that was attended by members of the public, staff and the applicant
(minutes attached in Appendix "A"). A copy of this report will be provided to those that either
provided written comments or attended the meeting.
CONCLUSION:
Staff support proceeding with the approval of the Master Plan and the next stages of the
redevelopment of the former Lulu's site.
Brandon Sloan, MCIP, RPP
Planner
Jeff Willmer, MCIP, RPP
Director of Planning
Brian Page, CET, OALA, CSLA
Supervisor of Site Plan Development
List of Attachments:
Location Map
Appendix "A" - Master Plan Comments and April 12, 2006 Meeting Minutes
Appendix "8" - Master Plan and Design Requirements
2
Deer Ridge Centre Master Plan
DEER RIDGE CENTRE MASTER PLAN
DEER RIDGE CENTRE MASTER PLAN
The Deer Ridge Centre Master Plan indicates the primary design and development expectations
for the redevelopment of an existing commercial centre located at the former Lulu's site.
The Master Plan establishes a strategy for site development including future site
redevelopment. A primary goal of this Master Plan is to create a high quality employment
centre integrated into the surrounding environment. The Deer Ridge Master Plan is organized
by the following principles with supporting guidelines described in further detail below:
1 Establish primary & secondary gateways
2 Create attractive edge condition & reinforce King Street
3 Create a pedestrian-oriented environment & highly integrated, direct pedestrian circulation system;
4 Integrate transit and reinforce alternate modes of transportation
5 Reinforce compatibility with surrounding residential properties
6 Integrate open space elements into the site design
7 Provide high quality building design that contributes to a sense of place
8 Plan for future redevelopment
9 The Deer Ridge Centre Master Plan
1.0 Establish Primary & Secondary Gateways
. Recognize the Deer Ridge Drive entrance as a primary gateway entrance for the
community. Treat with intensive landscaping treatments that complement existing
residential streetscape character.
. Recognize the King Street entrance (future signalized intersection) as a primary gateway
entrance to the site. Reinforce with landscaping and attractive signage similar to the Deer
Ridge Drive entrance.
. Recognize the King Street entrance (restricted access) as a secondary gateway. Define
with landscaping treatment.
. Define gateway entrances with wide sidewalks, combination of hard and soft landscaping
treatments and consideration of benches and directional signage. Promote high quality
building design at gateway entrances.
2.0 Create Attractive Edge Condition & Reinforce King Street
. Reinforce consistent edge treatment through intensive perimeter landscaping and building
mass located close to the street.
. Recognize King Street as a gateway corridor to the City of Kitchener. Orient building mass
close to the street maintaining similar setback to existing Brick Building. Reinforce with
streetscape and landscape treatments. Maximize opportunities for window openings along
King Street. Encourage active uses adjacent to King Street and discourage drive-thru lanes
and service facilities.
. Improve pedestrian interest and streetscape quality through articulated building fa9ades
along street edge.
. Fully integrate mechanical rooftop equipment into building design to screen from public
view.
DEER RIDGE CENTRE MASTER PLAN
3.0 Create Pedestrian-Oriented Environment & Highly Integrated, Direct Pedestrian Circulation System
. Provide clear and direct pedestrian connections that avoid, or minimize conflicts with
vehicular traffic particularly along major desire lines. Design site for pedestrian use and
circulation.
. Provide multiple pedestrian connections between buildings across the site.
. Establish pedestrian circulation system based on primary pedestrian linkages from King
Street and Deer Ridge Drive supported with secondary, internal pedestrian connections
. Primary Pedestrian Connections: Establish wider sidewalks with landscape treatment for
primary pedestrian connection. Provide double loaded sidewalks at primary King Street
entrance. Encourage landscaped median along primary vehicular route.
. Secondary Pedestrian Connections: Integrate pedestrian sidewalks into landscaped traffic
islands.
. Pedestrian routes that intersect with main driveway aisles should be given special treatment
(different material or striping; vehicle traffic calming measures such as stop signs, raised
platform or curb extensions; and signage)
. Provide minimum 3 meter-wide walkway along most building frontages.
. Maximize opportunities for seating areas, patio space and outdoor amenity spaces.
. Integrate lighting of an appropriate scale and intensity along pedestrian circulation system.
. Locate buildings close to the street and pedestrian circulation connections.
4.0 Integrate Transit and Reinforce Alternate Modes of Transportation
. Encourage commuter option programs (Grand River Transit) such as corporate transit
passes, car pooling benefits and bike parking options.
. Maximize pedestrian connections to all transit stops.
. Allow opportunity for future transit stop to be fully integrated on-site (future
location/shelter/seati ng area/sig nage).
. Provide indoor and outdoor bicycle parking spaces. Integrate outdoor bicycle parking
spaces into landscape design.
5.0 Reinforce Compatibility with Surrounding Residential Properties
. Maintain existing landscaped setback in rear yard.
. Prohibit light trespass on surrounding residential properties.
. Provide intensive landscape treatment along Deer Ridge Drive.
. Fully landscape all site servicing areas that may be in the public view.
. Opportunities for vertical massing should be considered for the northern portion of the site
towards the public streets.
. Encourage residential motifs in building design.
. Any "lit" signage should not face residential areas.
6.0 Integrate Open Space Elements into Site Design
. Provide landscape treatments along primary and secondary pedestrian connections.
. Soften all large parking lot areas with landscaped traffic islands.
. Allow opportunities for common amenity areas with emphasis on outdoor patios. Encourage
decorative fencing for all patio spaces.
DEER RIDGE CENTRE MASTER PLAN
7.0 Provide High-Quality Building Design that Contributes to a Sense of Place
. Encourage building design features that convey a consistent architectural expression.
. Maximize opportunities for high quality building materials.
. Emphasize primary building entrances through cantilevered canopy and other design
features.
. Avoid or minimize blank walls where possible. In this regard, maximize window openings
internally to site and facing King Street.
ยท Fully integrate signage into fa9ade.
8.0 Plan for Future Redevelopment
. Develop site as phased development.
. Coordinate pedestrian and vehicular access with surrounding future (re)development
projects. Attempt to maintain consistent streetscape image and continue to reinforce
gateway intersections.
. Allow opportunity for possible long term future linkage with trail systems, rapid transit or
other initiatives.
9.0 The Deer Ridge Centre Master Plan
The Master Plan drawing illustrates the approved design principles and reinforces specific
design guidelines.
z CD c
(]J
"' E
<C .. t1l (]J
.. (]J >
"' .;;: 0 0
... C .$ "' c "' -0 :;;: o~
C 0 -0 wE
CD C '" '" .C C
"' '" '" 15 0> Q. 0 t1l
A- U "' 0> E E ","' -0 t1l .C
c '" cO> W 0 u tl
0> ~ > '" c.~ <1l
C 0 > 0-0 .$ a; -0 C '"
~ CD ~ OJ :;;: 0 u= i:i) ~ c "(UQ) -0
II c:l :;;: OJ t1l '" ..
OJ C ~c:l 0 Ii5 ...J :;;:'" 0.. TI w
m to -0 t1l ro QI"' '"
W '" :s "C c :s -0 Iii O.c Iii (f) <D
" 0> "' "3 ~'" '" +' Co> +' 0
C 0 <1l 0 <1l", <1l C C t1lOJ C 0
~ '" ~~ " '" (]J
t- .- Q. -0 :c '" -E~ N~
0 '" -0 -0 ~ i:'g~~
D:: .x n. '" '" :> '" ~aa
W 0.. > 0...0 0 0.. W~ 0.. <ti.....-<'I<'I
In 2 :;:if1!i
.. ~~~l
<C CD <D @
CD +-' -~
'" ~
:E 0"
Q
0.
0.
en
IDiI
Ill::
Ill::
w
W
Q