Loading...
HomeMy WebLinkAboutDTS-06-083 - Zone Change App ZC 06/04/W/BS, 248 Woolwich St1 Kd LR Development& Technical Services 6 REPORT Report To: Development and Technical Services Committee Date of Meeting: June 12, 2006 Submitted By: Jeff Willmer, Director of Planning (741 -2325) Prepared By: Brandon Sloan, Planner (741 -2648) Ward(s) Involved: Ward 1 — Bridgeport Centre Ward Date of Report: May 24, 2006 Report No.: DTS -06 -083 Subject: ZONE CHANGE APPLICATION ZC06 /04/W /BS 248 Woolwich Street M & D Monteyne RECOMMENDATION: A. That Zone Change Application ZC06 /04/W /BS for the purpose of changing the zoning from Agricultural Zone (A -1) to Hazard Land Zone (P -3) on lands legally described part of Lot 124, German Company Tract and part of Part 1, Registered Plan 5813- 10553, municipally known as 248 Woolwich Street, in the City of Kitchener, be approved in the form shown in the attached "Proposed By -law, dated May 10, 2006 without conditions. BACKGROUND: The property is located on the east side of Woolwich Street, south of Hawkswood Dr. and is currently an existing lot containing a residential dwelling. The applicant is proposing to rezone a portion of the rear of the property to allow the lands to be severed and added to the adjacent lands that are owned by Activa Holdings. The subject lands are proposed to be utilized for the construction of a stormwater management facility to serve the adjacent proposed residential subdivision. This zone change application is being considered concurrently with a consent for lot addition application with the Committee of Adjustment. REPORT: The applicant is proposing to change the zoning on the subject lands from an Agricultural Zone (A -1) to a Hazard Land Zone (P -3). The A -1 zoning currently permits agricultural uses, kennels, horse stables, the sale and repair of tools and farm equipment, veterinary services, and single detached dwellings. The proposed P -3 zoning would recognize the lands as Hazard Lands and facilitate an appropriate zoning for a Stormwater management pond. The subject lands are currently used as a portion of the rear yard of a residential lot. The future residential subdivision that the stormwater management facility would serve will be located to the east of the site. The westerly portion of the property is currently proposed to remain A -1. Staff has discussed with the owner and applicant the possibility of considering rezoning the balance of the property to an appropriate residential zone at this time; however the owner has advised they do not wish to pursue this at this time. In the future, the lands have the potential for residential zoning and possible future severances at the rear of the property facing future Falconridge Drive (pending resolution of development restrictions in the area, etc.). Given the nature of the proposed use, the need to accommodate future stormwater runoff from the adjacent subdivision, that it is one of the locations that has been considered for potential SWM locations for many years and that the proposed use is compatibility with surrounding land uses, it is appropriate to rezone this portion of the property to P -3 for use as a stormwater management facility. Details related to the design and function of a stormwater management facility would be addressed through the subdivision process. Community Input Two letters were received from neighbouring property owners in reply to the preliminary circulation. One response was in favour of the application and one asked if a stormwater management facility would impact their well water. The impact of grading and SWM facilities on any existing wells in the area will have to be considered and perhaps monitored through the processing of the adjacent Activa plan of subdivision. Department /Agency Comments The application was circulated to all applicable agencies and internal departments and no objections or requests for conditions were received. FINANCIAL IMPLICATIONS: No new or additional capital budget requests are associated with this recommendation. COMMUNICATIONS: Preliminary circulation of the original application was undertaken on March 20, 2006 to department /agencies and all property owners within 120 metres of the site. The comments received are discussed in the report above and are attached as Appendices A and B. CONCLUSION: In summary, the Department of Development and Technical Services recommends that Zone Change Application ZC06 /04/W /BS be approved in the form shown in the Proposed By -law. Brandon Sloan, BES, MCIP, RPP Planner AttnnhmAntc- Proposed Zoning By -law and Map No.1 Newspaper Advertisement Appendix `A' — Internal /Agency Comments Appendix `B' — Property Owner Comments 14 Jeff Willmer, MCRIP, RPP Director of Planning