Loading...
HomeMy WebLinkAboutCAO-05-042 - Addendum to CAO-05-037 - Financial Incentives Policy - Facade/Interior Loan Upper Storey Renovation J ~ Report To: Date of Meeting: Submitted By: Prepared By: Ward(s) Involved: Date of Report: Report No.: Subject: Council November 6, 2005 Rod Regier, Executive Director, Economic Development Silvia Wright, Manager, Downtown Community Development Ward 1 and Ward 6 November 3, 2005 CAO-05-042 ADDENDUM TO CAO-05-037 - FINANCIAL INCENTIVES POLICY - FACADE/INTERIOR LOAN AND UPPER STOREY RENOVATION PROGRAM RECOMMENDATION: For Council information REPORT: At the Finance & Corporate Services meeting of October 31, 2005, further information was requested relating to the policy for Fa<;ade/lnterior Loan and the Upper Storey Renovation Program. Multiple Incentives Funding as Percent of Total Project The general policy states "that an applicant can apply for either or both programs, as well as other available incentives but, the total value of all forgivable loans/rebates under the City's Downtown Financial Incentives Program shall not exceed the cost of rehabilitating the lands and buildings." Three sample cases have been developed to demonstrate the possible scenarios of 'layered' incentive participation, combining Upper Storey, Fa<;ade/lnterior and Rebate programs. In summary, the cases represent a range of project sizes. The results of the analysis are as follows: Total Project Costs* Total Incentive Value Project % Case 1 : Case 2: Case 3: 40% 32% 28% $65,000 $142,000 $270,000 $26,000 $45,200 $76,750 * costs based on maximum incentives at each level of project scope and cost Please see the next page for detailed breakdown of each application case: SAMPLE INCENTIVE * APPLICATIONS CASE 1 SAMPLE SUBMISSION: Minimum Project DOWNTOWN INCENTIVES Concrete, Masonry, Metals Plaster Restoration Mechanical 1 HV AC Plumbing Sprinkler Electrical Millwork Fire Proofing Doors/Fram es/Hardware Partitions & Ceilings, acoustic. Floor Coverings Paint: Interior Final Cleaning Asbestos Abatement Allowance Contingency Entrance restoration (interior) Fagade Exterior $1,000 $3,000 $5,000 $2,000 $2,000 $4,000 $2,000 $2,000 $1,000 $3,900 $1,100 $1,000 $500 $4,500 $7,000 Upper Storey Costs: $6,000 9,000 Fagadel Interior Costs: $15,000 fs Architect, structural engineer, fees Building permits, fees, charges $5,000 5,000 Total Project Costs: $65,000 Other Costs: $10,000 FUTURE TAX INCREASE (3 yrs): 1,500 Upper Storey Loan> 1/2 project estimate (Less repayment 50% in 10 yrs) Fagade 1 Interior Loan (Less repayment 85% in 5 yrs) Feasibility Study Grant Permit 1 Fee Rebates Iwaives Future Tax Rebates (3 yrs) Heritage and other Total Downtown Incentives As percent of total project cost: $40,000 * code for incentives $20,000 (10,000) 15,000 (12,750) 5,000 5,000 750 3,000 $26,000 40.00% upper storey f = fagade fs = feasibility rebate Iwaive SAMPLE INCENTIVE * APPLICATIONS CASE 2 SAMPLE SUBMISSION: Medium Project DOWNTOWN INCENTIVES Project Administration Temp. construction (Site protection) Concrete, Masonry, Metals Plaster Restoration Mechanical 1 HV AC Plumbing Sprinkler Electrical Millwork Fire Proofing Doors/Fram es/Hardware Partitions & Ceilings, acoustic. Floor Coverings Paint: Interior Final Cleaning Asbestos Abatement Allowance Contingency Entrance restoration (interior) Fagade Exterior $1,200 800 6,000 5,000 15,000 4,000 3,000 7,000 2,000 3,000 2,000 10,000 3,000 2,000 1,000 20,000 15,000 Upper Storey Costs: $100,000 $14,000 16,000 Fagade 1 Interior Costs: $30,000 fs Architect, structural engineer, fees Building permits, fees, charges $5,000 7,000 Total Project Costs: $142,000 Other Costs: $12,000 FUTURE TAX INCREASE (3 yrs): 1,500 Upper Storey Loan> 1/2 project estimate (Less repayment 50% in 10 yrs) Fagade 1 Interior Loan (Less repayment 85% in 5 yrs) Feasibility Study Grant Permit 1 Fee Rebates Iwaives Future Tax Rebates (3 yrs) Heritage and other Total Downtown Incentives As percent of total project cost: * code for incentives $50,000 (25,000) 30,000 (25,500) 5,000 7,000 750 3,000 $45,250 31.87% upper storey f = fagade fs = feasibility rebate SAMPLE INCENTIVE * APPLICATIONS CASE 3 SAMPLE SUBMISSION: Maximum Project DOWNTOWN INCENTIVES Upper Storey Loan> 1/2 project estimate $100,000 Project Administration Temp. construction (Site protection) Concrete, Masonry, Metals Plaster Restoration Mechanical 1 HV AC Plumbing Sprinkler Electrical Millwork Fire Proofing Doors/Fram es/Hardware Partitions & Ceilings, acoustic. Floor Coverings Paint: Interior u Wheel Chair Lift Final Cleaning Asbestos Abatement Allowance Contingency $2,000 1,000 5,000 12,000 23,000 10,000 8,000 18,000 6,000 3,000 5,000 20,000 5,000 3,000 28,000 1,000 20,000 30,000 Upper Storey Costs: $200,000 Entrance restoration (interior) $15,000 Fagade Exterior 27,000 Glass & Glazing 3,000 Fagade 1 Interior Costs: $45,000 fs Architect, structural engineer, fees Building permits, fees, charges $15,000 10,000 Total Project Costs: $270,000 Other Costs: $25,000 FUTURE TAX INCREASE (3 yrs): 4,000 (Less repayment 50% in 10 yrs) Fagade 1 Interior Loan (Less repayment 85% in 5 yrs) Feasibility Study Grant Permit 1 Fee Rebates Iwaives Future Tax Rebates (3 yrs) Heritage and other Total Downtown Incentives As percent of total project cost: * code for incentives (50,000) 45,000 (38,250) 5,000 10,000 2,000 3,000 $76,750 28.43% upper storey f = fagade fs = feasibility rebate Rationale for 0% Interest in First Two Years of Program Life It was determined that to maximize participation in the program and accelerate support for downtown revitalization, 0% would be offered as additional incentive for the first two years. Currently the Upper Storey Renovation and Fa<;ade/lnterior Loan Programs are offered at 0% interest for the first two years, as per approvals of the Community Improvement Plan by-laws (April 2005) The Upper Storey Renovation Program (April 2005), and the updated terms for the Fa<;ade/lnterior program (April 2005.) As requested by Council, Report CAO-05-003, April 25, 2005 and Report CAO-05-14 was approved to change the last three years of the program from 0% to prime +.5%, supporting early participation and rebuilding the fund through future borrowing conditions. As indicated in the initial business case, the return on investment through increased tax assessment will exceed potential gains from interest charges during the first two years. Please see attached reports as reference. Upper Storey Renovation Program Application Timelines and Process The Economic Development Investment Fund has identified and approved $1,000,000 for the purpose of downtown residential intensification through upper storey renovation. Applications will be accepted from November 15, 2005 to February 28, 2006. They will be opened after February 28 and reviewed by an interdepartmental review committee of staff to consider required documentation, eligibility criteria and ranked with a rating sheet for best suiting revitalization objectives in the downtown. In the event of tied score applications and limited fund availability, the earliest dated application will be selected. Please see all attachments to this report to review: applications, rating sheet, C.I.P. boundaries.) In the first application period $400,000 will be available as accumulated funding through EDIF schedules. The expected fund activity timeline is as follows: Application Period: November 2005 to February 2006 $400,000 November 2006 to February 2007 $200,000 November 2007 to February 2008 $200,000 November 2008 to February 2009 $200,000 Total fund: $1,000,000 Silvia Wright Manager of Downtown Community Development Rod Regier, Executive Director Economic Development Attachments: CAO-05-037 - FCS October 31 , 2005 Financial Incentive Applications Forms, Rating Forms