HomeMy WebLinkAboutDTS-06-062 - Road Reconstruction - King St E & Madison Ave N - T06-011
Date: March 28, 2006
To: Mayor Carl Zehr & Members of Council
Subject: T06-0 11 - Road Reconstruction - King Street East & Madison Avenue North
RECOMMENDA TION
That tender T06-011, Road Construction - King Street East & Madison Avenue North, be
awarded to 969774 Ontario Limited (o/a Elgin Construction), St. Thomas, Ontario at their
adjusted tendered price of $3,347,398.32, including provisional and contingency items of
$326,805.55 and G.S.T., and further that the Mayor and City Clerk be authorized to execute an
agreement satisfactory to the City Solicitor.
REPORT
Tenders were advertised publicly in The Record, The Daily Commercial News, the City of
Kitchener web site and on the Interuet through the Ontario Public Buyers Electronic Tendering
Information System. Nine (9) potential bidders picked up tender documents, and by the closing
date of Thursday March 23rd, 2006, four (4) tenders had been received.
The tenders were reviewed by D. Lindner, MTE Consultants Inc., the City's Consultants for the
project, C. Curtis, Senior Project Manager, who concur with the above recommendation. All of
the tenders received contained minor arithmetic errors which have been corrected. The errors
did not affect the rankings.
The following tenders were received:
969774 Ontario Limited (Elgin Const.) St. Thomas ON $3,347,705.48
1. Weber Contracting Limited Breslau ON $3,530,530.00
Steed and Evans Limited Kitchener ON $3,576,974.21
Terra Infrastructure Limited London ON $4,263,520.73
Adjusted Bid
$3,347,398.32
$3,532,845.62
$3,576,832.81
$4,279,671.22
The existing infrastructure on King Street East and Madison A venue has reached the end of its
service life and is in need of replacement. The road structure, curbing and sidewalks are beyond
regular maintenance and should be replaced at this time. In addition, this portion of King Street
East falls within the Mixed Use Corridor and as such, appropriate streetscaping is proposed for
such a corridor.
Elgin Construction (969774 Ontario Limited), the low bidder, has done work of a similar nature
within the local area and has proven the ability to perform the work specified in this contract.
Engineering Services wishes to proceed with the reconstruction of King Street East (from
Stirling Avenue to Madison Avenue) and Madison Avenue (from King Street East to Weber
Street East). This work involves the replacement of the existing storm and sanitary sewers,
watermain, road surface, curb, sidewalks, service connections, and streetscaping appropriate for
the Mixed Use Corridor.
Construction for this project is anticipated to take approximately 100 working days and is
anticipated to have a construction start date of April 10th, 2006.
FINANCIAL IMPLICATIONS
Funding will be provided from Index 852415 King Street East Stirling to Madison
REVENUES
Capital out of Current
Contribution from Water
Contribution from Sewer
Contribution from General Unc1. (315905)
Contribution from Uncommitted (852420)
680,979.00
$ 918,563.00
$1,363,858.00
$ 52,000.00
$ 455218.00
TOTAL
$3,470,618.00
EXPENSES
Construction Cost
Tender T06-011 (including G.S.T.)
Less G.S.T Rebate
1,099.00
$3,347,398.32
($ 218 824.85)
$3,128,573.47
$3,128,573.47
$ 310,946.00
$ 30 000.00
Design Engineering & Consulting Fees
Structural Soil
TOTAL
$3,470,618.47
BALANCE
$0
* The breakdown of funding from the uncommitted account is CIC $104,700.00 waterworks
$141,118.00, sanitary sewer $209,400.00.
Larry Gordon
Director of Purchasing
)
c,_>
KITCHENER
Development &
Technical Services
~
Report To:
Date of Meeting:
Submitted By:
Prepared By:
Ward(s) Involved:
Date of Report:
Report No.:
Subject:
Larry Gordon, Director of Purchasing
April 3, 2006
Robert Shamess, P. Eng., Director of Engineering-DTS
Carrie Curtis, P. Eng., Senior Project Manager, Engineering -
DTS
Wards 1 and 6
March 24, 2006
DTS 06-062
TENDER T06-011
ROAD RECONSTRUCTION
KING STREET EAST (STIRLING AVE. TO MADISON AVE.)
MADISON AVENUE (KING ST. E. TO WEBER ST. E.)
RECOMMENDATION:
That tender T06-011 - Road Reconstruction, King Street East (Stirling Ave. to Madison
Ave.), Madison Avenue (King St. E. to Madison Ave.), be awarded to Elgin Construction
(969774 Ontario Limited) at their corrected tendered price of $3,347,398.32 including
provisional items & contingencies of $326,805.55, and G.S.T. of $218,824.85, and
That the Mayor and City Clerk be authorized to execute an agreement satisfactory to the
City Solicitor.
BACKGROUND:
The existing infrastructure on King Street East and Madison Avenue has reached the end of its
service life and is in need of replacement. The road structure, curbing and sidewalks are beyond
regular maintenance and should be replaced at this time. In addition, this portion of King Street
East falls within the Mixed Use Corridor and as such, appropriate streetscaping is proposed for
such a corridor.
Tender T06-011 was advertised publicly for a minimum of two and a half weeks in The KW
Record, The Daily Commercial News, the City of Kitchener web site and through the Ontario
Public Buyers Electronic Tendering Information System. Four (4) tenders were received by the
closing date of Thursday, March 23th, 2006.
REPORT:
The Tender was advertised publicly for a minimum of two and a half weeks in The KW Record,
The Daily Commercial News, the City of Kitchener web site and through the Ontario Public
Buyers Electronic Tendering Information System. Eleven (11) potential bidders picked up tender
documents, and by the closing date of Thursday, March 23th, 2006, four (4) tenders were
received. Mathematical errors found in all tenders have been corrected but did not affect the
ranking.
The following tenders were received:
Elgin Construction (969774 Ontario Limited) St. Thomas, ON
J. Weber Contracting Limited Breslau, ON
Steed and Evans Limited Kitchener, ON
Terra Infrastructure Incorporated London, ON
Corrected Bid Price
(Ind Continaencv & G.S.T.)
$ 3,347,398.32
$ 3,532,845.62
$ 3,574,812.81
$ 4,277,681.10
The tenders were reviewed by D. Lindner, MTE Consultants Inc., the City's Consultants for the
project, and C. Curtis, Senior Project Manager, Engineering Infrastructure.
Elgin Construction (969774 Ontario Limited), the low bidder, has done work of a similar nature
within the local area and has proven the ability to perform the work specified in this contract.
Engineering Services wishes to proceed with the reconstruction of King Street East (from
Stirling Avenue to Madison Avenue) and Madison Avenue from (King Street East to Weber
Street East). This work involves the replacement of the existing storm and sanitary sewers,
watermain, road surface, curb, sidewalks, service connections, and streetscaping appropriate
for the Mixed Use Corridor.
Construction for this project is anticipated to take approximately 100 working days and is
anticipated to have a construction start date of April 1 Oth, 2006.
FINANCIAL IMPLICATIONS:
Funding will be provided from index code 852415 King St E - Madison to Stirling and Madison
Ave N - King St E to Weber St E.
REVENUES
Contribution from Revenue
Contribution from Water
Contribution from Sewer
Contributions from Capital to Capital
OGS Funding from SWM 315905
Contribution from Uncommitted 852420
$ 650,800
$ 908,863
$1,349,258
$ 54,479
$ 52,000
$ 455,218
$3,470,618
TOTAL
EXPENSES
Tender T06- (inc GST)
Less GST Rebate
$3,347,574
($219 000)
$3,128,574
Design, Engineering & Cons. Fees
Construction Costs
Structural Soil
$ 311,562
$3,129,056
$ 30,000
$3,470,618
TOTAL
BALANCE
Please note that $30,000 (before GST) was added to the construction costs as the City will be
purchasing, mixing and supplying the structural soil required independent from the contractor. It
will be the contractors responsibility to pick up and place the soil only.
CONCLUSION:
Elgin Construction (969774 Ontario Limited) has done work of similar nature within the local
area, has proven the ability and the necessary certification to perform the work specified in this
contract.
It is the recommendation of DTS Engineering Services that the project be awarded to Elgin
Construction Limited (969774 Ontario Limited), at the corrected tender price of $3,347,398.32
(including contingency and 7% G.S.T.).
Carrie Curtis, P. Eng.
Senior Project Manager, Engineering Infrastructure
Rob Shamess, P. Eng.
Director, Engineering