Loading...
HomeMy WebLinkAboutFIN-08-054 - T08-038 - Breithaupt St (Ahrens St to St Leger St) Reconstruction Report To: Mayor Carl Zehr & Members of Council Date of Meeting: 2008-05-05 Prepared By: Larry Gordon Date of Report: 2008-04-28 Report No: FIN 08-054 Subject: T08-038 - Breithaupt Street (Ahrens Street to St. Leger Street) Reconstruction RECOMMENDA TION That tender T08-038, Breithaupt Street (Ahrens Street to St. Leger Street) Reconstruction, be awarded to Steed and Evans Limited, Kitchener at their tendered price of $2,010,732.05, including provisional items and contingencies of $243,765. and G.S.T., and further that the Mayor and City Clerk be authorized to execute an agreement satisfactory to the City Solicitor. BACKGROUND Engineering Services wishes to proceed with the reconstruction of Breithaupt Street from Ahrens Street to St. Leger Street. The infrastructure has reached the end of its' useful life and is in need of replacement. The project involves the replacement of all underground services and surface works including road, curb and gutter and sidewalk. REPORT Tenders were advertised publicly in The Record, The Daily Commercial News, on the City of Kitchener website and on the Internet through the Ontario Public Buyers Electronic Tendering Information System. Twelve (12) potential bidders picked up tender documents, and by the closing date of Thursday April 17th, 2008, five (5) tenders had been received. The tenders of Elgin Construction and Bel-Air Excavating contained arithmetic errors that have been corrected as shown below. These adjustments do not affect the recommendation to award to the low bidder, Steed and Evans Limited. The following tenders were received: TOTAL BID PRICE CORRECTED BID PRICE Steed and Evans Limited Elgin Construction PCN Construction Group J. Weber Contracting Bel-Air Excavating & Grading Kitchener, ON $2,010,732.05 * St. Thomas, ON $2,142,494.49 $2,140,670.47 London, ON $2,185,340.69 Breslau, ON $2,361,361.00 Cambridge, ON $2,391,521.74 $2,402,021.74 The tenders were reviewed by D. McLeod, McCormick Rankin Corporation, the City's Consultants for the project, and K. Mick, Design Engineer, who concur with the above recommendation. FINANCIAL IMPLICATIONS Funding will be provided from Index 852249 Breithaupt St.- Ahrens to St. Leger REVENUES Capital out of Current Contribution from Water Contribution from Sewer Transfer from SWM Account TOTAL $ 728,000.00 $1,060,000.00 $1,573,000.00 $ 58~000.00 $3,419,000.00 EXPENSES Tender T08-038 Less G.S.T Rebate $2,010,732.05 ($ 95~749.15) $1,914,982.90 $1,914,982.90 $ 20.00 $1,076,465.00 $ 117,854.00 $ 245,142.00 $ 6~535.00 $3,360,998.90 YTD Expenditures Construction Phase 2 - 2009 Design, Engineering & Consulting (Phase 1) Design, Engineering & Consulting (Phase 2) Geotechnical TOTAL SURPLUS $ 58,001.10 * Any surplus funds will be returned to Uncommitted (852420) which are projects funded by Sanitary Sewer (46% ), Waterworks (31 %) and Capital out of Current (23%). Larry Gordon Director of Purchasing Breithaupt St - Ahrens to St Leger Index Code 852249 As at Apri I 14/08 Revenues Capital out of Current Contribution from Water Contribution from Sewer Transfer from SWM Account Total Revenues Expenses Construction (Phase 1 - 2008) Construction (Phase 2 - 2009) Design, Engineering & Consulting Fees (Phase 1) Design, Engineering & Consulting Fees (Phase 2) Geotechnical Total Expenses Projected Surplus of the Project * Note: Tender cost excludes all GST and includes any applicable PST YTD Actual ($728,000) ($1 ,060,000) ($1 ,573,000) ($3,361 ,000) $20 $46,268 $6,535 $52,823 ($3,308,177) Any surplus funds will be returned to Uncommitted (852420) which are projects funded by Sanitary Sewer (460/0), Waterworks (310/0) and Capital out of Current (230/0). Plus Projected ($58,000) ($58,000) $1 ,076,465 $71 ,586 $245, 142 $1 ,393,193 $1 ,335,193 (F avou rable ) Total U nfavou rable Projected Variance ($728,000) $0 ($1 ,060,000) $0 ($1 ,573,000) $0 ($58,000) $0 ($3,419,000) $0 $1 ,915,003 ($4,997) $1 ,076,465 ($58,000) $117,854 $4,854 $245, 142 $142 $6,535 $0 $3,361,000 ($58,000) ($58,000) ($58,000)