HomeMy WebLinkAboutCSD-08-039 - 2008 Winter Maintenance & Pot Hole Expenditures~ITCHEI'~E
Community Services
REPORT
Report To: Finance and Corporate Services Committee
Date of Meeting: May 12, 2008
Submitted By: Jim Witmer
Director of Operations
Prepared By: Scott Berry
Manager of Maintenance Operations
Wards}Involved: All
Date of Report: May 6, 2008
Report No.: CSD-08-039
Subject: 2008 WINTER MAINTENANCE & POT HOLE
EXPENDITURES
RECOMMENDATION:
Provided for Information purposes only.
EXECUTIVE SUMMARY:
The winter of 2007/2008 was quite severe compared to winters we have experienced in this part
of the province in recent years. The number of storm events, and the snow accumulation of
individual storm events were significant, with at least one weather record being broken this
season. As such, resources of the Operations Division were taxed beyond normal limits for
winter maintenance activities, and substantial expenditure beyond those normally budgeted for
was incurred.
A spin-off effect of the harsh winter with several freeze/thaw cycles was the abundance of pot
holes throughout the road system.
This report is intended to give Council an update on expenditures related to winter maintenance
and road repair activities to-date, and to discuss forecasted end of year expenditure levels.
BACKGROUND:
The budget for winter maintenance allows for expenditures on roadways, sidewalks, walkways,
Community Centres, City Hall and The Market, relating to plowing, salting/sanding,
loading/hauling/melting, patrolling and supervision.
The budget for road maintenance in terms of pot holes is broken into two areas: hot mix and
cold mix patching. These two areas relate to all road repair activities from patching small holes
to larger road sections encompassing resurfacing of entire lanes.
Report No: CSD-08-039
REPORT:
2
~A) Winter Maintenance
The annual winter maintenance budget allocates resources for the calendar year, with winter
activities generally being performed in January, February, March and then again in September,
November, December each year.
Full plows are initiated by the Operations Division when snow accumulation approaches or
exceeds 8cm on Class 4 and 5 roadways. A full plow generally involves utilizing all resources
available to plow every road section city-wide, and involves substantial overtime expenditures to
meet Minimum Maintenance Standards. Over the last 5 years the number of "full plows"
averaged 4.5 per year. During the first 3 months of 2008 alone, 7 full plows were incurred with
an average expenditure in 2008 per storm of approximately $220,000.
The significant snow accumulation of these events, some back to back, contributed to 49 days
of snow loading, hauling, and melting activities where required from January 1, 2008 to present.
Snow loading from road sections addresses potentially hazardous conditions related to
restricted road widths and ensures roads are wide enough to allow emergency vehicle
response, the ability of two-way traffic to pass safely on narrow streets, and appropriate sight
lines at intersections.
Contractors were required to address the snow loading workload, cul-de-sac plowing, and rutted
streets at various times this winter, with total contractor expenditures amounting to
approximately $130,000 in 2008.
~B) Road Repair
The annual road repair maintenance budget allocates resources for both hot mix patching and
cold mix patching activities. While hot mix is a preferred material, it is not usually available
throughout the winter months, and as such, cold mix patching material is used on a temporary
basis throughout the winter months.
The 2007/2008 winter had several freeze/thaw cycles which contributed to the formation of pot
holes throughout the road system. While most typical winters would have allowed the
Operations Division to apply substantial resources to address pot holes throughout the winter
months, the severity of the 2007/2008 winter did not allow these resources to be pulled away
from winter maintenance activities substantially to make the positive impact on pot holes that
would be the norm.
FINANCIAL IMPLICATIONS:
~A) Winter Maintenance
The winter maintenance budget for 2008 is approximately $3,728,000. Expenditures to date
total $3, 770, 000.
Historical trends indicate approximately 67% of annual winter maintenance expenditures are
incurred in the January thru March timeframe, and approximately 33% of annual winter
maintenance expenditures occur in the September thru December timeframe.
Over the last 5 years (2003 thru 2007), an average expenditure of approximately $1,041,000
has been incurred in the September thru December timeframe for winter maintenance activities.
The combination of the average expenditure (adjusted to 2008 dollars) and the costs incurred to
date for winter maintenance activities amounts to approximately $4,907,000 total winter
expenditure in 2008. This represents a potential $1,179,000 over-expenditure on winter
Report No: CSD-08-039
3
maintenance activities for 2008 should an "average" September thru December winter be
experienced this fall.
Actual expenditures versus budgeted amounts for winter maintenance over the last 5 years
(2003 thru 2007) are represented below:
Winter Maintenance Budaet vs Exaenditure 2003 - 2007
Budget Actual Variance
2003 $2,854,954 $3,378,457 over $523,503
2004 $2, 951, 225 $3,135, 253 over $184, 028
2005 $3,138,135 $3,741,274 over $603,139
2006 $3,248,092 $2,414,846 under $833,246
2007 $3,379,601 $4,420,598 over $1,040,997
Winter Maintenance Costs 2003.2007
$5,000,000
$4,500,000
$4,000,000
$3,500,000
$3,000,000
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$-
2003 2004 2005 2006 2007
+Actual
-Budget
(B~ Road Repair
The cold mix patching budget is $133,721, while the hot mix patching budget is $505,207
totaling $638,928 for the road repair budget for 2008.
Report No: CSD-08-039
4
The cold mix patching expenditure to date is only at $89,000 (67%). This is primarily because
resources normally working under this index could not be freed up from working under the
winter maintenance indexes this past winter.
Even though pot holes have been quite prevalent this winter and spring, the combined road
repair budget is expected to be sufficient for 2008 with no substantial overruns required to
address the pot hole issue.
CONCLUSION:
The Operations Division has identified a potential $1,179,000 over-expenditure in the winter
maintenance activity for 2008. An accompanying cost mitigation report will be tabled at the May
12, 2008 meeting discussing this issue and giving Council options to consider.
Jim Witmer
Director of Operations
Scott Berry
Manager of Maintenance Operations