HomeMy WebLinkAboutDTS-08-108 - Demolition Control Application DC08/10/B/AP, 7 Briarmeadow Cres
)
Report To:
Date of Meeting:
Submitted By:
Prepared By:
Ward(s) Involved:
Date of Report:
Report No.:
Subject:
Council
June 23, 2008
Jeff Willmer, Director of Planning (519-741-2325)
Andrew Pinnell, Planner (519-741-2668)
Ward 2 - Chicopee-Grand River
June 20, 2008
DTS-08-1 08
DEMOLITION CONTROL APPLICATION DC08/1 O/B/ AP
7 BRIARMEADOW CRESCENT
MAJA KLUCIC
RECOMMENDATION:
That Demolition Control Application DC08/1 OIBI AP requesting permission to demolish one
single detached dwelling located at 7 Briarmeadow Crescent, owned by Maja Klucic, legally
described as Lot 34, Plan 58M-14, be approved~ without conditions.
BACKGROUND:
The subject property is an interior lot located on a crescent in the Idlewood Community of
Kitchener. The surrounding area is comprised almost exclusively of single detached dwellings
constructed in the late 1990s. The subject property contains a single detached dwelling with an
attached garage. The dwelling was severely damaged by fire in February 2008. The Building
Division has issued an order to remedy an unsafe building and an order to prohibit occupancy of
an unsafe building for the property (both issued March 5, 2008). By-law Enforcement Division
advises that they have received complaints related to the fire, including unsightliness, blowing
debris, and concern for safety of neighbourhood children due to broken construction materials
around the perimeter of the property. The applicant has stated that the dwelling is proposed to
be demolished down to the foundation and that a new dwelling will be constructed on the
existing foundation, with the timeframe for redevelopment unknown. The property is designated
Low Rise Residential in the Official Plan and is zoned Residential Four (R-4) in the Zoning By-
law.
It should be noted that this application was submitted to the Planning Division by Higgins
ProTeam Restorations on June 13, 2008. Although this application would normally have
proceeded to the August 11, 2008 Development and Technical Services Committee, due to a
number of neighbourhood complaints and a pressing need for action, the application is being
considered the first time at the June 23, 2008 Council Meeting.
Furthermore, it should be noted that satisfactory applicant authorization has not been provided
on the application form. After discussion with the applicant and the owner's insurance adjuster,
staff was made aware that communication with the owner of the property is difficult, being that
she is out of the country. The applicant has been unable to reach the owner to request
adequate authorization. In light of the situation, staff has considered it prudent to review the
application to consider whether demolition is justified despite the absence of proper
authorization. It is staff's intent in bringing this application forward at this time that the applicant
will pursue and obtain satisfactory applicant authorization so that a demolition permit may be
obtained as soon as possible.
REPORT:
Planning Comments
Planning staff inspected the exterior of the dwelling on June 20, 2008 and found that the
dwelling was boarded up with plywood on all four sides to contain the damaged structure. The
roof was covered in tarpaulins to prevent the elements from entering the roof cavity created by
the fire. Staff observed numerous birds entering and exiting the dwelling while undertaking the
inspection.
Under the Planning Act, the purpose of demolition control is to maintain residential properties
within the municipality and to prevent their premature or unjustified removal. The applicant has
stated that demolition is proposed at this time and that it is expected that a new dwelling will be
constructed on the original foundation. The timeframe for redevelopment is not known.
Notwithstanding the applicant's presumption that a new dwelling will be constructed, Planning
staff advises that from past experience demolition is not always followed by timely
redevelopment, even if a building permit is issued. In order to ensure timely development,
Planning staff often recommends a condition requiring the owner to obtain a building permit.
Upon issuance of a building permit, a demolition permit may be issued subject to a significant
fine if reconstruction has not been significantly completed within 2 years.
In this case, a City Building Inspector has indicated that the dwelling is in a very poor state of
repair and that the cost to renovate is approximately $150,000. In addition, Planning staff
affirms the concerns of neighbourhood complainants, including unsightliness and concerns over
safety of neighbourhood children due to broken construction materials on the property. The
Planning Division advises that even if timely redevelopment does not follow demolition, a vacant
property is preferred over the retention of the dwelling in its current state. Staff advises that the
standard redevelopmentlfine condition should not be applied considering the abovementioned
factors.
Building Inspector Comments
A City Building Inspector visited the property on June 17, 2008 and advises that the front of the
building is constructed as a one storey wood framed structure and the rear is one and a half
storeys in building height. The building was vacant at the time of the inspection and all visible
services have been disconnected. The roof has sustained heavy damage from the fire and
needs to be totally replaced including framing members. The interior of the building has
received extensive smoke and water damage and requires a complete makeover including
drywall, insulation, painting and flooring.
The following is a list of the required repairs and their associated costs:
Remove construction debris
Replace roof including roof shingles
Insulate and drywall exterior walls
Install new siding and fascia on the exterior
Install new doors and windows
Install new flooring, trim and paint entire house
New Kitchen and bathroom vanities
New electrical and repair plumbing
Total
$ 15,000
$ 30,000
$ 20,000
$ 10,000
$ 15,000
$ 25,000
$ 20,000
$ 20~000
$ 150,000
The Building Inspector estimates the size of this house to be approximately 1 ,400 Sq ft and at
current construction costs of $ 1 00.00 a Sq Ft the repair costs would be more then the
replacement costs.
Engineering Comments
Engineering Services staff has concerns with what will happen to the existing connections. If
the house is being rebuilt, Engineering Services will need a letter from the owner, or his agent,
stating that they will be reusing these connections and when. If the house is not being rebuilt,
then the connections would have to be capped at the expense of the owner.
FINANCIAL IMPLICATIONS:
None.
COMMUNICATIONS:
No neighbourhood circulation was undertaken in consideration of the short timeline between
receipt of the application and procession to the first available Council Meeting, and of staff and
the neighbourhood's desire to see the application acted on with haste.
CONCLUSION:
Planning staff is of the opinion that the proposed demolition is justified. As such, staff
recommends that demolition control application DC08/1 OIBI AP, requesting permission to
demolish one single detached dwelling located at 7 Briarmeadow Crescent, legally described
as, Lot 34, Plan 58M-14, be approved without conditions.
Andrew Pinnell, BES
Planner
Della Ross, MA, MCIP, RPP
Manager of Development Review
Jeff Willmer, MCIP, RPP
Director of Planning
Attachments:
· Appendix "A" - Site Photographs
· Appendix "B" - Survey submitted with application
· Appendix "C" - Internal agency comments