REPORT
Report To: Development and Technical Services Committee
Date of Meeting: September 29, 2008
Submitted By: Jeff Willmer, Director of Planning (741-2325)
Prepared By: Della Ross, Manager Development Review (741-2327)
Juliane von Westerholt, Senior Planner (741-2667)
Ward(s) Involved: Ward 4
Date of Report: September 24, 2008
Report No.: DTS-08-157
Sub'ect: DOON SOUTH COMMUNITY PLAN PHASE 2
~ OFFICIAL PLAN AMENDMENT MP/XX1S/DR ,PLANS OF
SUBDIVISION 30T-06203 (Activa), 30T-07202(Monarch),30T-
07203 (Hallman), 30T-07204 (MonarchlDodge Drive),
ZONING BY-LAW AMENDMENTS ZC/06/29/S1DR,
ZC/071151N/JVW, ZC07/161G/JVW, ZC07/17/D/JVW
All currently under appeal to the Ontario Municipal Board
under Case No. PL061250 and PL061251
Recommendation
That Council endorse in principle the draft Official Plan Amendment for Doon
South (Phase2~ Community, draft conditions of approval for Subdivisions 30T-
0203, 30T-07202, 30T-07203, 30T-07204 and the proposed draft zoning -by-laws,
all as appended to Report No. DTS-08-157, to the extent they reflect matters in
agreementthrough the Ontario Municipal Board mediation process, and
That Council directs staff to continue mediation to resolve the outstanding issues
and appear on behalf of the City of Kitchener at the hearing of the appeals of the
above noted planning applications before the Ontario Municipal Board to
represent City interests in accordance with such further and other instructions
Council may provide.
EXECUTIVE SUMMARY:
This report relates to the following applications under the Planning Actthatare presently
under appeal to the Ontario Municipal Board:
• Activa Holdings Corporation Inc. OPA Doon South Community Phase 2,
• Activa Holdings Corporation Inc Plan of Subdivision 30T-06203
• Activa Holdings Corporation Inc ZC 06/291S1DR
• Monarch Corporation Limited Plan of Subdivision 30T-07202
• Monarch Corporation Limited OPA MP07108/N/JVW
• Monarch Corporation Limited ZC 07115/N/JVW
• Monarch Corporation Limited (Dodge Drive) Plan of Subdivision 30T-07204
• Monarch Corporation Limited (Dodge Drive)OPA MP07/10/D/JVW
• Monarch Corporation Limited (Dodge Drive) ZC 07/17/D/JVW
• Hallman Construction Limited Plan of Subdivision 30T-07203
• Hallman Construction Limited ZC 07/161G/JVW
Under Sections 22(7), 34(11) and 51(34) of the Planning Act where a decision is not
made on a complete application for official plan amendment, plan of subdivision or
zoning by-law, the applicant has the right to appeal the lack of a decision to the OMB.
When this is done the authority to approve of any such application lies with the Ontario
Municipal Board.
The applications for plans of subdivision for 30T-07203 by Hallman Construction
(hereinafter Hallman), 30T-07202 and 30T-07204 by Monarch Corporation (hereinafter
Monarch), were received in 2006. These plans were all located within Phase 2 of the
Doon South community. Under the direction of the City of Kitchener Council, these
plans were not circulated as the Phase 2 Community Plan was not completed and the
Upper Blair Creek (Kitchener) Functional Drainage Study (hereinafter the Upper
BlairCreek FDS) was also not finalized, thus making the consideration of these plans
premature. In January of 2007 Monarch/Dodge Drive appealed their respective
subdivision and zoning by-law amendment applications to the OMB because no
decision had been made within the statutory time frame. In addition, an appeal of the
Activa and Hallman subdivision and zoning by-law amendment applications was
submitted in August of 2007 to the OMB and subsequently these files were consolidated
with the other applications (Monarch) already before the OMB.
The application for plan of subdivision 30T-06203 by Activa Holdings Corporation
(hereinafter Activa) was received in November of 2006. This proposed plan of
subdivision is located on lands within Phase 1 of the Doon South Community Plan. The
application was a complete application under the Planning Act and was circulated for
comment in January 2007. In August 2007 Activa appealed their subdivision and
zoning by-law application to the OMB because no decision had been made on the
application within the statutory time frame. This appeal was consolidated with the other
appeals noted above. All of the Subdivisions together with the Official Plan Amendment
and Zoning By-law Amendments have been the subject of an on-going mediation
process at the OMB to resolve or reduce issues.
2
As these development applications are now before the OMB, the final decision
concerning these applications rests with the OMB and not with Council. The draft
Official Plan Amendment and the draft conditions of Draft Approval are being presented
to Council, as an update on the progress made to date at the mediation sessions held
by the OMB on these files. These conditions are in draft form: they are a living
document and as studies are completed and approved and additional issues are
resolved, the conditions will be updated accordingly. Staff is seeking Council's
endorsement of the draft Official Plan Amendment, Zoning By-law Amendments and
the Draft Approval conditions forming Appendix B and C to this report. Staff will
continue to work through mediation and negotiation to further resolve or reduce issues
before the commencement of the hearing and will seek Council's further direction and
instruction as needed. Issues that remain unresolved will be the subject of the hearing
before the OMB and the OMB will render a decision based on the evidence presented.
REPORT:
Background
The Doon South Community is a large, developing area located in the southernmost
portion of the City of Kitchener. Phase 1 of the community is mostly developed with
communities completed, under construction or draft approved. Phase 2 of the Doon
South Community forms part of the Upper Blair Creek Drainage Area which is not yet
developed pending completion of the Upper Blair Creek FDS to assess capacity for full
municipal servicing. The Doon South Community is designated for urban development
within the Regional Official Plan and the Kitchener Official Plan.
In 2003, the City of Kitchener initiated further study of this area and the surrounding
sub-watershed of the Blair Creek in its Upper Blair Creek (Kitchener) Functional
Drainage Study in order to assess and determine the amount of development that could
be sustained in this environmentally unique area known as the Doon South Phase 2
area.
When the Upper Blair Creek FDS review was in process, three plans of subdivision
were received that staff did not circulate as per Council's direction. The plans were
considered premature until the Upper Blair Creek FDS was completed and approved,
and the Doon South Community Plan Phase 2 was approved, to determine if
development was appropriate and atwhat density. The plans of subdivision, including a
fourth plan of subdivision within the Phase 1 area of the Doon South Community, and
official plan amendment were appealed to the OMB, by the owners, after the legislated
180 days because no decision had been made. It was determined through several OMB
prehearing conferences, that the issues before the Board were very broad and very
numerous. In January of 2008 all parties agreed that mediation, Chaired by a member
of the OMB, would be an appropriate means to scope the issues for the Hearing.
Since January all of the parties have mediated in good faith to work toward resolution of
issues, including but not limited to the environment, transportation and servicing. The
purpose of this report is to provide Council with an update on the work completed to
date through the mediation process, to obtain endorsement from Council for the work
3
completed to date and direction for staff to continue with the mediation process and
future Hearing. The recommendations of Council will be provided to the Ontario
Municipal Board Chair at a prehearing on October 15, 2008.
The documents attached as appendices include the draft approval conditions for the
four plans of subdivision, draft Zoning By-law Amendments and the draft Official Plan
Amendment (OPA}. The OPA, Zoning By-laws and draft approval condition documents
are not final as work is on-going and being done to review technical information
primarily related to the Upper Blair Creek FDS and traffic matters in order to reach
conclusions/recommendations on the outstanding issues and conditions. The
appendices are draft at this point, understanding that there will be additions to the
conditions and policies as the studies are finalized and mediation continues. However,
the draft conditions and OPA do represent general agreement to date on what has been
discussed through the mediation process and outstanding issues are noted therein.
The three primary areas that have been
servicing, transportation and environment.
areas of consideration is provided below.
addressed in the mediation sessions are
A brief description of the status of these
1)Servicinq
The Upper Blair Creek FDS will identify an appropriate stormwater management
implementation strategy for development within the headwater area of the Upper Blair
Creek Subwatershed. The primary goal is to determine if residential development, of
higher density forms than allowable under current planning designations, can be
accommodated and potential impacts sufficiently mitigated, to achieve the
recommendations established within the original Blair, Bechtel, and Bauman Creeks
Subwatershed Plan (1997) (hereinafter the BBB Study).
The Upper Blair Creek FDS is expected to provide the City of Kitchener, the Regional
Municipality of Waterloo (hereinafter the RM011~, and the Grand River Conservation
Authority (hereinafter the GRCA) with an improved understanding of the potential
environmental impacts of the future development within the Doon South (Phase 2)
Community Plan and Upper Blair Creek areas, and the technical basis necessary to
review the future development applications and proposed mitigating measures
associated with fully serviced residential development across the subject lands.
The Upper Blair Creek FDS provides sufficient documentation such that it serves as an
implementation plan to be referenced by future detailed design proposals. The
implementation plan component of the study provides agency staff and the development
industry with design criteria that must be achieved within given development areas and
a storm-water management "tool-box" with which to achieve those goals. This "tool-box"
is intended to provide developers with a variety of viable options that, when
implemented as amulti-component approach, have the capacity to achieve the required
level of control; it is not intended to represent a "cookbook" set of SWM techniques to
be followed to the letter.
Finally, the UBFDS provides comprehensive risk management and adaptive
4
management strategies to minimize the potential for environmental impacts in the event
that components of the SWM system do not function precisely as designed, and to allow
for revisions to the planning and/or servicing approach as development proceeds,
should observations indicate that the receiving system is reacting to upstream changes
in unpredicted and undesirable ways. Implicit in the adaptive management strategy is
the implementation of a monitoring program that will serve to identify any changes to the
receiving system and, ideally, pinpoint the cause of such impacts so that remedial steps
can be undertaken. See AppendixAfor more detail on the Upper Blair Creek FDS.
2)Transportation
As part of the ongoing work related to the development of Official Plan policies for
Phase 2 of the Doon South Community, a collector road network had to be established
to service the traffic needs and to offset the load demands on existing collector roads
such as Robert Ferrie Drive and Doon South Drive. The collector road network was
determined after consideration of 6 alternatives, each of which evaluated the
environmental, social and cultural heritage impacts as well as examined the ability to
meet transportation needs of this growing community.
The Environmental Assessment (EA} process was combined with the Planning process
and this too became amalgamated with the OMB process. Phases 1 and 2 of the
Municipal Class EA Planning and Design Process are being dealt with in the context of
the comprehensive Municipal Plan Amendment. Phases 3, 4, and 5 of the Municipal
Class EA, which will finalize design and mitigation aspects, will be dealt with in the
context of the various plans of subdivision, including the subdivisions that are currently
before the OMB. As these are being dealt with through the OMB, the final approval also
rests with the OMB. The Collector Road alternative considered the findings of other
studies including the Doon South Scenic Roads Study and the BBB Study to determine
the preferred alternative which would cross the Blair Creek at a point with the least
impact to the environmental features, while providing an east -west collector to
Strasburg Road. Further studies are being conducted to assess the impacts of these
development applications on the broader transportation network including major arterial
roads, at both local and regional levels and to recommend mitigation measures to offset
the increase in traffic demand.
3)Environment
As per Council's direction, City staff together with the Region (hereinafter RMOUV} and
the GRCA, as well as the Ministry of Natural Resources and Department of Fisheries
and Oceans has been working closely together to identify and protect natural heritage
features including but not limited to significant woodlots, wetlands, ESPAs and other
natural features along the entire Upper Blair Creek Sub-watershed within the Doon
South Community. Staff continues to work closely with these agencies and their experts
in order to ensure the features are adequately protected as required by the Provincial
Policy Statement and other provincial or federal legislation. All mitigation measures are
reviewed very closely in order to minimize any negative impacts to these features.
Where the potential for threatened or endangered species exist, every opportunity is
seized to preserve and protect the species as well as their habitat in the Doon South
5
Phase 2 area. The open space land use designation forms part of the information
shown on the Land Use Schedule Map 5 in the Official Plan Amendment has been
updated to reflect the current information available about these areas. A significant
number of additional greenspace areas have been added to the open space designation
in order to ensure the preservation of these features including the designation of a
previously unknown wetland.
OFFICIAL PLAN AND DOOM SOUTH COMMUNITY PLAN:
Official Plan Amendment -Phase 2 Doon South Community
The purpose of this Amendment is to incorporate detailed land use boundaries for lands
within the established urban area; recognize the feasibility of fully serviced
development; expand and revise the collector road network serving the community;
designate Groh Drive from Thomas Slee to Dodge Drive, portion of Reidel at Stauffer as
well as Dodge Drive as Scenic-Heritage Roads; detail heritage policies for the Groh
Drive/Dodge Drive area and implement the technical findings associated with the Upper
Blair Creek Functional Drainage Study, update Open Space designations to implement
the Blair Bechtel Bauman Subwatershed Study Greenspace Management
recommendations and current floodplain and wetland mapping. The full Amendment, in
draft, is attached as Appendix B.
DRAFT PLANS:
30T-06203-Stauffer UUoods (Activa~
An application for a plan of subdivision on lands known as Part of Lot 3 Richard
Beasley's New Survey in the Doon South Community was received by the City of
Kitchener in November of 2006. The lands have a total area of 16.278 hectares and are
located south of Stauffer Drive and west of Groh Drive. Lands to the north of the
subject lands have already received Draft Approval for residential development, while
lands to the south and west are currently in cultivation and/or contain a woodlot. The
western boundary of the subject lands abuts ESPA 33. Lands to the east are developed
for residential uses. The applicant is seeking Draft Approval of this plan which is
comprised of 204 single and semi-detached residential lots and 185 multiple residential
lots including town-homes. The draft conditions of Draft Approval are attached as
Appendix C.
The subject lands are designated Low Rise Residential in the City of Kitchener Official
Plan and form part of Phase 1 of the Doon South Community Plan. In addition, the
lands are also to be rezoned from Agricultural (A-1) to appropriate residential zones
including Residential Four (R-4) and Residential Six (R-6) as well as zones for Public
Parks (P-1), storm water management facilities and Open Space (P-2) and Hazard
lands (P-3) where development will be prohibited. A draft by-law is also attached in
Appendix C.
30T-07203 Hallman Construction Ltd.
An application for a plan of subdivision on lands known as Part of Lot 2 Richard
Beasley's New Survey in the Doon South Community was received by the City of
Kitchener on October 27t", of 2006. The lands have a total area of 13.7 hectares and
are located south of the intersection of Stauffer Drive and Tilt Drive at Groh Drive. The
6
lands are located to the east of Groh Drive opposite the lands in the Activa subdivision
30T-06203 referred to above. Lands to the north of the subject lands have already
received Draft Approval for residential development, while lands to the south, east and
west are currently undeveloped. Further to the south of the subject lands is the Dodge
Drive Scenic Road and the estate residential uses along its corridor. The eastern
boundary of the subject lands abuts the Monarch lands also proposed for residential
uses in proposed draft Plans 30T-07204 (most adjacent) and 30T-07202 (further to the
east). The applicant is seeking Draft Approval of this plan which is comprised of 178
single and semi-detached residential lots, 23 residential condominium lots and 59
multiple residential lots including town-homes. The draft conditions of Draft Approval
are attached as Appendix C.
The subject lands are designated Limited Service Residential in the City of Kitchener
Official Plan and form part of Phase 2 of the Doon South Community Plan. The
applicant is seeking a an Official Plan Amendment which will be re-designating these
lands to Low Rise Residential, which will allow more traditional subdivision development
whereas the current designation would only permit a lower density development to a
maximum of 25 % impervious cover. This is more consistent with estate lot residential
development. In addition, the lands are also to be rezoned from Agricultural (A-1) to
appropriate residential zones including Residential Four (R-4) and Residential Six (R-6)
as well as zones for Public Parks (P-1 ), storm water management facilities and Open
Space (P-2) and Hazard lands (P-3) where development is prohibited. A draft by-law is
also attached in Appendix C.
The subject lands will be subject to the findings and recommendations of the Upper
Blair Creek FDS, which will assess and determine the amount of development that
could be sustained in the Doon South Phase 2 area.
30T-07202 (Topper Woods Stage 3) Monarch
An application for a plan of subdivision on lands known as Part of Lot 4, Biehn's Tract
and Part of Lot 1 Richard Beasley's New Survey in the Doon South Community was
received by the City of Kitchener on June 12t" in 2006. The lands have a total area of
21.62 hectares and are located north of New Dundee Road at Reichert Drive and are
directly adjacent and to the east of lands in the Dodge Drive subdivision 30T-07204.
Lands to the north of the subject lands have already been developed as Phases 1 and 2
of Topper Woods also owned by Monarch, while lands to the south, east and west are
currently undeveloped.
The applicant is seeking Draft Approval of this plan which is comprised of 118 single
and semi-detached residential lots and 99 multiple residential lots including town-homes
and or mixed use development. The draft conditions of Draft Approval are attached as
Appendix C.
The subject lands are designated Limited Service Residential in the City of Kitchener
Official Plan and form part of Phase 2 of the Doon South Community Plan. The
applicant is seeking a an Official Plan Amendment which will be re-designating these
lands to Low Rise Residential, which too will allow more traditional subdivision
development as indicated above in the Hallman subdivision. In addition, the lands are
also to be rezoned from Agricultural (A-1) to appropriate residential zones including
7
Residential Four (R-4) and Residential Six (R-6) as well as zones for Public Parks (P-1 ),
storm water management facilities and Open Space (P-2) and Hazard lands (P-3)
where development is prohibited. The proposed by-law is also attached in Appendix C.
The subject lands will also be subject to the findings and recommendations of the Upper
Blair Creek FDS, which will assess and determine the amount of development that
could be sustained in the Doon South Phase 2 area.
30T-07204 Dodge Drive (Monarch)
An application for a plan of subdivision on lands known as Part of Lot 2 Richard
Beasley's New Surve~r in the Doon South Community was received by the City of
Kitchener on June 12t , 2006. The lands have a total area of 19.41 hectares and are
located north of New Dundee Road at Dodge Drive and are to the east of lands in the
Hallman subdivision 30T-07203. Lands to the north of the subject lands have already
been developed as Phases 1 and 2 of Topper Woods also owned by Monarch, and to
the northwest lands owned by Hallman Construction 30T-03203, while lands to the
south, east and west are currently undeveloped.
The applicant is seeking Draft Approval of this plan which is comprised of 133 single
and semi-detached residential lots and 80 multiple residential lots including town-
homes. The subject lands are designated Limited Service Residential in the City of
Kitchener Official Plan and form part of Phase 2 of the Doon South Community Plan.
The applicant is seeking a an Official Plan Amendment which will be re-designating
these lands to Low Rise Residential, which too will allow more traditional subdivision
development as indicated above in the Hallman and Monarch subdivisions. In addition,
the lands are also to be rezoned from Agricultural (A-1) to appropriate residential zones
including Residential Four (R-4) and Residential Six (R-6) as well as zones for Public
Parks (P-1), storm water management facilities and Open Space (P-2) and Hazard
lands (P-3) where development is prohibited. Both the draft conditions of approval and
the proposed by-law are attached as Appendix C.
As with the Hallman Lands in 30T-07203 and Monarch lands in 30T-07202 the subject
lands will also be subject to the findings and recommendations of the Upper Blair Creek
FDS, which is intended to assess and determine the amount of development that could
be sustained in the Doon South Phase 2 area.
Summary
To summarize, as these development applications are now before the OMB, the final
decision concerning these applications rests with the OMB and not with Council. The
draft Official Plan Amendment, draft Zoning By-law Amendments, and the draft
conditions of Draft Approval are being presented to Council, as an update on the
progress made to date at the mediation sessions held by the OMB on these files.
These conditions are in draft form: they are a living document and as studies are
completed and approved and additional issues are resolved, the conditions will be
updated accordingly. Staff is seeking Council's endorsement in principle of the draft
Official Plan Amendment, Zoning By-law Amendments, and the Draft Approval
conditions and of the work completed to date. On Council's Direction, staff will continue
8
to work through mediation and negotiation to further resolve ar reduce issues before the
commencement of the hearing and will seek Council's further direction and instruction
as needed. Gity Staff will continue to work with the developers and the public agencies
and all parties before the oMB to resolve andlor finalize issues as they relate to the
environment, the servicing and the transportation for the greater Doon South Area, as
well as any other issues that may arise from further mediation. Issues that remain
unresolved will be the subject of the hearing before the oMB and the oMB will render a
decision based on all of the evidence presented.
~ ~
Jeff Uvillmer MCIP, RPP
Director of Planning
Grant Murphy, P.
Director of Engine i Services
~f ~~
Ju one von Westerholt, DES, MCIP, RPP
nior Planner
Della Ross MA, CIP, RPP
Manager, Development Review
..:
:~
N
ra
Assis an ity Solicitor
ohn Mc Bride
Director, Transportation Planning
AppendixA-lJpper Blair Creek (Kitchener} Functional Drainage Study Update
Appendix B - Draft official Plan Amendment ~Doon Sough Community Phase 2~
A endix ~ - Draft Ap royal Conditi~nslproposd ~~nin~ Bylaws
pp p
Note: Dine. tv size, ~ pendices will be aveilable in electronic format enly on the City's webpage -
p
htt :llwww.ktchener.calcit hell~de ertmentslde~tech se~i~esl lanr~in ldoan south cam lan;ht~l
9