Loading...
HomeMy WebLinkAboutFIN-09-001 - Drinking Water Quality Management Standard - Management Review Summary1 KITC~~R Financial Services REPORT Report To: Finance and Corporate Services Committee Date of Meeting: January 19, 2009 Submitted By: Dan Chapman, General Manager Financial Services Prepared By: Wally Malcolm, P.Eng., Director Utilities Ward(s) Involved: All Date of Report: December 29, 2008 Report No.: FIN-09-001 Subject: DRINKING WATER QUALITY MANAGEMENT STANDARD - MANAGEMENTREVIEW SUMMARY RECOMMENDATION: For Information Purposes. BACKGROUND: As part of the Drinking Water Quality Management Standard (DWQMS}, "Top Management" shall "report the results of the management review, the identified deficiencies, decisions and action items to the owner." This report satisfies the requirements of the standard. Top Management is defined as "a person, persons or group of people at the highest management level within an Operating Authority that makes decisions respecting the QMS and recommendations to the owner respecting the subject system or subjects systems". REPORT: A Management Review was completed by Wally Malcolm and Barry Musselman along with Angela Mick on December 16, 2008 in accordance with the standards. Meeting minutes summarizing the review are attached. FINANCIAL IMPLICATIONS: N/A COMMUNICATIONS: N/A CONCLUSION: The Management Review was completed in accordance with the DWQMS. The next review has been scheduled within twelve months as per the DWQMS requirements. Wally Malcolm, P.Eng. Director, Utilities Dan Chapman, CA MPA General Manager of Financial Services DATE: December 16, 2008 TIME: 8:30am-10:30am LOCATION: Elmsdale Boardroom IN ATTENDANCE: Wally Malcolm, Barry Musselman, Angela Mick The Top Management review included the Kitchener, Mannheim and Shingletown Water Distribution Systems. The following items were discussed as part of the Management Review: a.) incidents of regulatory non-compliance -none noted during 2008 MOE inspection b.) incidents of adverse drinking-water tests - 26 AWQIs between January and November 30, 8 plumbing related lead exceedances c.) deviations from critical control point limits and response actions - watermain breaks, cross-connection, contractor control d.) the efficacy of the risk assessment process -completed in June 2008, to be reviewed annually e.) internal and third party audit results -internal audit corrective actions -how they were addressed, internal audit to be complete by the end of December, third party audit anticipated in spring 2009 f.) results of emergency response testing -training package has been developed, training to be completed in January, g.) operational performance -discussion of pressure issues and coordination with the Region, required transmission watermains for new development, Regional water supply, h.) raw water supply and drinking water quality trends -discussion of water quality complaints associated with specific supplies or areas i.) follow-up action items from previous management reviews - N/A, j.) the status of management action items identified between reviews - N/A, k.) changes that could affect the Quality Management System -discussion of G1S Conversion project, Regulatory changes, CityWorks/RIVA/SAP, l.) consumer feedback -related to water quality and pressure, Form #35 Rev. 0 Meeting Minutes page 1 of 2 m.)the resources needed to maintain the Quality Management System -ongoing internal audits, n.) the results of infrastructure review -discussion of replaced watermains in 2008 and proposed reconstructions in 2009, trenchless pilot project in 2009 o.) Operational Plan currency, content and updates -discussion of maintenance including dead-end watermain flushing, valve maintenance, hydrant maintenance, leak detection survey, watermain cleaning, corrosion protection. Discussion of parameters to determine the effectiveness of maintenance: water quality complaints, AWQIs, number of watermain breaks p.) Staff suggestions as related to the QMS The DWQMS is relatively new so it is anticipated that the review will evolve over time as staff become more familiar with the concept of a quality management system Item # Item Discussed Action By 1. Schedule Emergency Response Training for January AM 2, Complete Internal Audit in December AM 3, Report of Top Management Review with Council WM 4, Submission of Application -February 1, 2009 AM 5, Next Management Review to occur within 12 months AM to schedule Please report any errors or omissions. Minutes prepared by: An ela Mick