HomeMy WebLinkAboutCSD-09-006 - Victoria Park - David/Schneider/Dill Rd Reconstruction - Additional Consulting WorkREPORT Report To: Finance and Corporate Services Committee Date of Meeting: February 9, 2009 Submitted By: Jim Witmer Director of Operations Prepared By: William Sleeth Landscape Architect Ward(s) Involved: Ward 6, Victoria Park Date of Report: January 22, 2009 Report No.: CSD-09-006 Subject: VICTORIA PARK -DAVID/SCHNEIDER/DILL ROAD RECONSTRUCTION RECOMMENDATION: That the purchase of additional consulting work related to the Victoria Park-David- Schneider-Dill Road Reconstruction project, to an upset limit of fees of $26,000.00 (plus GST) be awarded to IBI Group, Waterloo ON. EXECUTIVE SUMMARY: Council approval of this purchase of additional consulting fees is required because it exceeds the upset limit of $20,000 for the direct purchase of consulting work as detailed in the Purchasing by-laws. This consulting work is in addition to the consulting work previously awarded to IBI group through the normal purchasing procedures for the road reconstruction project which includes David St., Schneider Ave., and Dill St. The original scope of work for this project did not include the portions of Dill St. and Schneider Ave. which pass through Victoria Park. The design and construction of storm, sanitary and surface works on these roadways within Victoria Park is best completed at the same time as the adjacent road reconstruction work on Dill St. and Schneider Ave. BACKGROUND: On August 18, 2008 Kitchener City Council awarded Expression of Interest E08-053 - Consulting Services -Road Reconstruction -David / Schneider /Dill to IBI Group, Waterloo, ON for an estimated fee of $232,502, including a contingency of $20,130 plus GST. Report No: CSD-09-006 2 This road reconstruction project is being administered on behalf of the City by Steve Allen of the Engineering Division of the Department of Technical Services. The allocated contingency is not sufficient to cover the additional consulting fees for design and road reconstruction work for the portion within Victoria Park. REPORT: David St., Schneider Ave. and Dill St. road reconstruction will be proceeding in 2009. The City's consultant, IBI Group, is completing the design work and preparing the construction drawings and tender documents for tendering in early 2009. Schneider Ave. and Dill St. are connected by a roadway which passes through Victoria Park and functions as a municipal roadway. This roadway provides access to Victoria Park parking areas, playgrounds and pavilion as well as serves as a neighbourhood roadway connection. It is maintained to the same standard as Schneider Ave. and Dill St. by the Operations Division. During a preliminary review by the Operations Division of the David/Schneider/Dill road reconstruction plans, there were a number of issues identified regarding the roadway connection through Victoria Park. These include roadway drainage and storm sewer connections affecting the drainage of parking and playground areas. Surface works were also identified as being required, including vehicle barrier curbs and walkway connections. The work within Victoria Park was not considered in scope of work for the original Expression of Interest for the road reconstruction project. The additional work required within Victoria Park is best completed under the David/Schneider/Dill road reconstruction contract for a variety of reasons including timing and cost effectiveness. These drainage and other roadway issues within Victoria Park had been previously identified as projects within the Victoria Park Strategic Plan, although the final design, costing or timing had not been identified. FINANCIAL IMPLICATIONS: Funding for all of the proposed roadway and walkway improvements within Victoria Park as part of this project shall be from the 2008 and 2009 capital budget for Victoria Park Strategic Plan. No additional funding is required or requested. COMMUNICATIONS: City Staff have communicated with the Victoria Park neighbourhood residents and the general public on a number of occasions regarding the Victoria Park Strategic Plan. This communication has also included regular meetings with the Victoria Park Working Group, a committee comprised of neighbourhood representatives and Operations Division staff. The proposed improvements to the Schneider/Dill roadway connection in Victoria Park is consistent with the Victoria Park Strategic Plan and the interests of the public. Report No: CSD-09-006 CONCLUSION: 3 Awarding of the additional consulting work to IBI Group, to an upset limit of fees of $26,000 plus GST, will facilitate a timely and cost effective resolution to the design and construction of the roadway and walkway work required within Victoria Park. Respectfully submitted, Jim Witmer Director of Operations William Sleeth Landscape Architect L a~ ~ ~ ao 0 O ~ N N i M ~ ~ O N V N L ~ i 0 ~ ~c~~~ ~a0 ~ ._ ~ - ~ v ~- ~ ~ ~ 0 i *r ~ +~ 0 ~ ._ .v ~ N ~>_Q N~ U O O O O O O O O O ~ ~ ~ ~ O ~ O ~ ~ LL ~ .~ ~ (~ ~ O O O O ~ T~ O O O 0 ~ U ~ NOO N 0 0('~ N O • ('~ ~ O 00 N 00 I~ 00 O ~ `-' N ~ I~ 00 00 f~ ~ `-' C'7 T ('~ T N T C~ T N i ~ O O O O O p O O O O ~ ~ O O O O ~ N O CD CD CD ~ ~ N f~ f~ N N N ~ ~ O ~ O ~ ~ ~ U Ln M C~ C'7 O O ~ ~ ~ O N ~ M M /1 T T T Q ~ ~~ ~~ ~~ ~~ N O O N X 0 0 ~ ~ ~ V NOO N QOM 00 C'~ Q (~ ~ O 00 N I~ I~ CO T `-' N ~ I~ O T CO " M T ('~ T O O ~ .~ O N O O O O ~ O~ O O ~~ NOO N 000(' N ~ m C'0 ~ O 00 N 00 I~ 00 " N ~ I~ 00 00 f~ `-' C'7 T C'0 T N T C`7 T N L.L ~ ~ v ~ ~ 0 LL ~ ' N ~ ~ o L a c~ ~ ~ U ~ ~ ~ > o s *~ (~ N U U OC w ~ ~ `~ 0 ~ N 3 O O O N N - i 000 ~ ~,Wo o N U Q ~ ~ ~ ~ N N ~ ~ ~ X O W ~ 0 ~ ~ cn •~ ~ ~ 0~~~ N~NN ~ .~ > 0 0 0 ~ Q O N •- O ~UUU ~ WUO~ ~ 0 a _W U Q cd (~ W U (~ '~ rl1 V a U N O i a O z N O .^ O ^Q W L ~ M ~N ,-. +~ N ~ O L N ~ ~U ~ O N ~ _~ ~ Q O ~ ~ ~ ~^ ^, /'1 W ~{ U U ~ ~ ~ (~ N ,~ ~ o T M O ~~ ~--~ ~ i ~ O L L ~ ~ ~~ a~ ~ 0 Cfl .~ ~ ~ `~ 3 ~o Q ~ ~ ~ Q~