Loading...
HomeMy WebLinkAboutFIN-09-100 - T09-045 - Make-Up Air Upgrades - KMACF~ari~a~dl,5~ers+k~s: REPORT , REPORT T0: Mayor Carl Zehr & Members of Council DATE OF MEETING: 2009-08-24 SUBMITTED BY: Larry Gordon, Chief Purchasing Officer PREPARED BY: Larry Gordon, Chief Purchasing Officer (2214) WARD(S) INVOLVED: 1 DATE OF REPORT: 2009-08-14 REPORT N0: FIN 09-100 SUBJECT: T09-045 -Make-Up Air Upgrades -Kitchener Memorial Auditorium Complex RECOMMENDATION: That tender T09-045, Make-Up Air Upgrades -Kitchener Memorial Auditorium Complex, be awarded to Nelco Mechanical Limited, Kitchener at their tendered price of $168,525., including G.S.T. BACKGROUND: Ice conditions during Ranger games in the Dom Cardillo Arena during the months of September and October of 2007 were found to not be ideal. Comments from the Operations staff at the time suggested that they were having difficulty maintaining proper temperature and humidity levels in the arena which quite likely led to poor ice conditions. In response to these comments, Totten Sims Hubicki, Consulting Engineers, was brought in to investigate. Several recommendations were made in their report dated January 9th, 2008, related to air balancing and dehumidification of the space, however, it was determined that air balancing issues within the arena needed to be addressed prior to finalizing a recommendation for improvements to the dehumidification system. Totten Sims Hubicki was then directed to prepare drawings and specifications to add air make-up units to the kitchen and concession areas located within the Dom Cardillo arena as per the recommendation in their report of January 2008. These documents were then put out for pricing under tender number T09-045. ii) - 1 REPORT: Tenders were requested from eleven (11) known contractors, advertised publicly in The Record, on the City of Kitchener website and the Internet through the Ontario Public Buyers Electronic Tendering Information System. Seventeen (17) potential bidders downloaded tender documents, and by the closing date of Thursday May 21St, 2009, six (6) tenders had been received. The tenders was reviewed by M. Petricevic, Manager Projects/Energy Management, B. Stevenson, Supervisor, Building Operations, S. Rossi, Aecom and R. Kruppa, Buyer, who concur with the above recommendation. The following tenders were received: Nelco Mechanical Ltd Climate Control Resource Industrial Group Brenner Mechanical Inc Axiom Millwrighting The Roberts Group FINANCIAL IMPLICATIONS: Kitchener ON London ON Ayr ON Waterloo ON Waterloo ON Kitchener ON TOTAL BID PRICE $168, 525.00 $181, 650.00 $182, 899.50 $186, 866.40 $241,484.25 $257, 250.00 Funding will be provided from Internal Order 59500414 -Replacements Building Exterior Components Financial Report is attached. Surplus funds will be used for future Building Exterior Components for City buildings. ACKNOWLEDGED BY: Dan Chapman, General Manager of Financial Services ii) - 2 O i 01 O i p N ~ ~ ~- ~ ~ _ s ~ ~ ~ ~ ~ ~ 0 V ,~ ~ ~ 0 0 ~- ~ ~ ~- as ~ ~ ~ ~ Q W ~ _~ ~ `~ ~ O ~+ ~ o ~~ ~ m ~ ~ ~ ~ _ ~ (~ ~ L 0 ,~ ~ ~ ~ ~ _ ~ +~+ '- ~ li~_ O N 00 >+ N a NON O O O N ~ O ~ ~ ~ ~ O (D ~ O O In c~ 00 N (D (fl to N M ~ ~ ~ vi c~ a C~ o ~ ~ ~ ~ o ~ ~ ~ ~ ~ rn ~ ~ ~ ~ N ~ p ~ ~k ~ . ~ 3`~ v ~ v N N ~ d ~ ~ ~ ~ O~ c c W ~ ~ c ~ m>> c W~ (~ ~ =c~~ d~ ~a~W ~ ~ _~ Q ~ ~ o ~ _ ~o ,tea= N ~ 0~ N N +~ +~ ° ._~ p ~iUc v~ aQw~ ~ z N C U (a Q N C N C O Q O U O .L N X N .~ .~ N c 0 a~i a~ .~ O .~ C Q 0 N N ii) - 3