Loading...
HomeMy WebLinkAboutCRPS-09-130 - Env Comm Recommendation - Cambridge Sanitary Servicing - Conestoga College South Campus & Blair Business Park EAREPORT T0: Mayor C. Zehr and Members of Council DATE OF MEETING: September 21, 2009 SUBMITTED BY: Environmental Committee PREPARED BY: Colin Goodeve, Committee Administrator (ext 2278) WARD(S) INVOLVED: All DATE OF REPORT: September 17, 2009 REPORT NO.: CRPS-09-130 SUBJECT: ENVIRONMENTAL COMMITTEE RECOMMENDATION: ADDENDUM TO ITEM 3 OF THE DEVELOPMENT AND TECHNICAL SERVICES COMMITTEE COUNCIL REPORT - CITY OFCAMBRIDGE -PROVISION FOR SANITARY SERVICING - CONESTOGA COLLEGE SOUTH CAMPUS AND BLAIR BUSINESS PARK EA RECOMMENDATION: That the City of Cambridge be encouraged to incorporate a one (1) hour emergency storage tank into the design of the proposed new Blair Sanitary Sewage Pumping Station to be located at the northwest corner of Morningside Drive and Fountain Street in the City of Cambridge. BACKGROUND: At the September 14, 2009 Development and Technical Services Committee meeting, representatives from MTE Consultants Inc. gave a presentation advising that the City of Cambridge has completed a Class Environmental Assessment study to identify the preferred means of providing sanitary service for Conestoga College's South Campus and the Blair Business Park to the Kitchener Wastewater Treatment Plant; including a location for a new sewage pumping station (in Cambridge}, and the preferred route for a sewage outlet from this new pumping station to the Treatment Plant. Subsequent to this presentation, the Committee passed the following recommendation: "That the Conestoga College South Campus and Blair Business Park Sanitary Servicing Class Environmental Assessment Study Report prepared by MTE Consultants Inc., dated August 2009, be endorsed; and further, That staff be directed to prepare a cross border servicing agreement with the City of Cambridge to outline: operational and maintenance requirements, easement requirements and the sewage rate charge for the flows being conveyed to and treated at the Kitchener Wastewater Treatment Plant. " REPORT: At the September 17, 2009 Environmental Committee meeting, representatives from MTE Consultants Inc. presented the Conestoga College South Campus and Blair Business Park Sanitary Servicing Class Environmental Assessment (EA) Study Report. A presentation was also given on the Doon South Sanitary Pumping Station and Forcemain Environmental Study Report, during which it was noted that included as part of the upgrades planned for the Homer Watson Pumping Station is the addition of a one hour emergency storage tank. The Committee was advised that the Ontario Ministry of the Environment (MOE} requires all new pumping stations to be designed to meet minimum standards for emergency situations, including alarm systems, standby power and emergency operations. However, the City of Kitchener standard requirement for the provision of one hour additional storage is beyond the minimum MOE requirements. This one hour storage provides additional response time to Operations staff to resolve the issue and reduce the potential for any spill or environmental impact. The plans outlined in the Conestoga College South Campus and Blair Business Park Sanitary Servicing EA identify a need to construct a new Blair Sanitary Sewage Pumping Station at the northwest corner of Morningside Drive and Fountain Street in the City of Cambridge. The existing project parameters call for this pumping station to be constructed based on City of Cambridge and MOE guidelines. While these guidelines provide for the incorporation of several safeguards into the design of the pumping station, they do not require the construction of an additional one hour emergency storage tank. Accordingly, the Environmental Committee requests that Council encourage the City of Cambridge to implement this standard as part of the design forthat pumping station. FINANCIAL IMPLICATIONS: Incorporating an additional one hour emergency storage tank would increase the costs and land requirements for the proposed Blair Sanitary Sewage Pumping Station; however, the exact figures would not be known until the detailed design phase. ACKNOWLEDGED BY: S. Turner, Acting General Manager, Corporate Services