HomeMy WebLinkAboutDTS-09-178 - Doon Creek Culvert Consultant Award1
Kl~rc~~R
Qevelo pment &
Technical Services
Report To: Chair Weylie and Members of DTS Committee
Date of Meeting: December 7,2009
Submitted By: K. Grant Murphy, P. Eng, Director of Engineering
Prepared By: Binu J. Korah, P. Eng, Manager, Development Engineering
(741 2974)
Ward(s) Involved: 4
Date of Report: November 23, 2009
Report No.: DTS - 09 -178
Subject: Detailed Design, Contract Administration and Inspection Service
-Culverts within the Doon Creek Subdivision
RECOMMENDATION:
That the normal procedure be waived for the selection of Engineering Consultants and that the
City retain MTE Consultants as the Engineering Consultant to undertake the detailed design,
contract administration and inspection for the two culverts located at Robert Ferrie Drive and
Forest Creek Road, within the Doon Creek Subdivision (30T-04204);
-and -
That the Mayor and Clerk be authorized to execute an Engineering Agreement for the provision
of professional engineering services between the City of Kitchener and MTE Consultants at a
total cost of $68,500 excluding applicable taxes for completion of the two culverts project upon
receipt of the necessary funds from LVH Developments (DC) Inc. who are providing front-end
financing for this project in exchange for development charge credits;
-and -
That the Mayor and Clerk be authorized to execute a Development Charges Credit Agreement
with LVH Developments (DC) Inc. payment of the costs of the consultant fees and the
construction of the two culverts project.
BACKGROUND:
As part of the Doon Creek Subdivision, the two culverts are required to cross Tributary J2 with
the extension of Robert Ferrie Drive and the crossing of Doon South Creek with Forest Creek
Drive (refer, culvert location map, Appendix A). As part of the Doon South Community Plan,
these two culverts were anticipated as part of the overall design of the community. The
proposed closure of Tilt Drive necessitates these additional crossings to preserve the scenic
road characteristics of Tilt Drive and ultimately Stauffer Drive and Groh Drive and further
enhance the connectivity of these neighbourhoods.
REPORT:
The City received a request from LVH Developments (DC) Inc. proposing that the City retain
MTE Consultants Inc. as City's engineering consultant to undertake the detailed design,
5-1
contract administration and inspection for the Doon Creek Culverts.
The overall planning and environmental reports and other studies have been completed as part
of the community planning process and in more detail as part of the subdivision applications
process.
In order to proceed with the development of this subdivision, staff recommend that the MTE
Consultants Inc. be appointed to complete this project.
MTE and their sub consultant will complete the following task as part of this project;
a) Final Design
• Compile detailed base plans generated from topographic survey data and
supplemented with information gathered through field visits to the site
• Assess proposed roadway and waterway geometrics, and develop preferred
cross-sections for roadway, creek and culvert
• Assess the hydraulic characteristics of the culvert and impacts to the adjacent
lands
• Coordinate details of the headwalls, railing and other appurtenances in
accordance with the City of Kitchener's design standards and in consultation
with Operations Staff.
b) Approval process
To complete these work there will be a minimum of two permits required to construct
these culverts. A fill permit will be needed from the GRCA and a Permit to Take Water
(PTTV~ will be required from MOE. MTE will prepare the permit applications, design
drawings and other required details to obtain the approvals.
c) Tendering, Inspection and Construction Administration
MTE Consultants Inc. will prepare tender documents, specifications and other details in
accordance with City of Kitchener standards. Further, MTE will provide tender analysis,
full time inspection and contract administration during this project.
FINANCIAL IMPLICATIONS:
The construction of the two culverts located on Robert Ferrie Drive and Forest Creek Drive are
identified items in the Development Charges Project #13.1.9, refer to attached document
Appendix B. LVH Developments (DC) Inc. have agreed to finance the cost of the detailed
design, contract administration, inspection and construction to advance the timing for
completion of same. Accordingly, the contributing developer will receive credits towards their
applicable Development Charges at the time of Building Permit application, in accordance with
the polices and procedures in place at that time.
5-2
CONCLUSION:
In order to support the development within this area, it is necessary to initiate the detailed
design, contract administration, inspection and construction for the two culverts at this time.
ACKNOWLEDGED BY: Jeff Willmer, Interim General Manager DTS
5-3
~+~~M/
~~S ~
~~
~ ~
-.. --.
'*, 'a yY
r ~ ~.
• , Q~~~
rr ~ ~
~1
j ~i ee
' 41. r~ ~ 4 ~' ~ ~ F
f 'Q ~ ~ r ~ ~
~4 ~r ~ S~ ~ d ~; ~ ~ w
r,.~ ~ rtitiZ,t~ a rE;r "sr~r~ ~ ! ~.
f i f J y y ~ ~
a ~~ z ~ ~e r` n ~ ~ m~
a 4 ~ ,,r ~~ to ~
~~ ~ ~ di ~ ~
t. ie~ ~ h 1 k • t 11 4
i~'1'~ti!1~~~.~ LG •9~~` ~~ ~l~y~~ SYI~ ! .~.:r_' ~iP r~~s' ~~I
I
------~~ T~~..~..~---.,..-....~............~........~..~..,...--....-...rte. _r-. ~ ~ ... ~ .. ~ ~ .. ~.. ...
,.
I ~ f ~', /' ;F F ~ I ~~r r~,V
Ii i I ~` ` I
~~ I I I f r
~.~ .a+~..~4-..+.1 .I..1..J-.1'r ~- w~ ~ .'
y~+ t` ire
~~. ~ .'~
II f I i 1 I ~ f ~ `i
1~ 4 1 ~ i a I'• ~ I i, t
i F+ r I I !k'I Ii~ ~~ x
-~.-~...if1...i_ j-~ 11 ti
~' ~~-tip _. .. ..~ ~-~~~W I M.. .J~ .. ~~ wi
~r~ ~ ~ r f M, ff ~ r ~r ~' _rk .fi~~ l 5 ~~
~~rr~r~.. s / ! ~ J %rf.f ~y l ~
yy tl '
I! k ~ i f y%
~~
~, f ~
I-r ~ ~f ~.~'~'~~,~ fir .~4 ~~~
f r!e , r
1~ r~ f r i~i r f ~~ 1 ff 1
I~~1 ~ ; ~ ~i ~Y ~, r'X J' ~ ~ f i
I1 *+ ff f ~ f
~ r '-~ ~, .~~..~. ~.~.~,..~ j ~ 1 ! I
_
~~~-~ ~ ~
I
~ I !
M I
_ ~ I _ I
~ ~ ~4 7
~ "
~ I
F
1
I d I `
I ~ ~~ ,
x71
~ i f +
i ~
~ ~ -~-
t
~ ~ ! ~ II I ,
~ ~ ~I
M
S ~
~1 I 'ti ' ~ ~ +I
I .. ~ x~'' f~l]' t ..
~ ° .4~ a ~
. 4 ww
._~
.
I
I i I
} I} 77
LL
r~ ~~ ~ ~ ~ I ~ ~ ~ 4 ~;~.~1 .~ i ~ ~
i~ ~ ~ ~ ~' y ~ ^ t.r
'
'
r 1 • ~ 1
r' f' ~ ~r ~~ =r' +~ ~ ~} 4 ~ F ' ~ F r tiY ~ ~r
+i e f ~.. ~ r-~ -r"
;ii77k~ i `, ~ r' l ~ 7ffi
r tS ~ ~ :~ ~ k ~~, ~ fir'; i ~ f
~~ }~~ it / ~~~. r s ~? r ~~ ~ ~ ~~/~ {~~ ~ ~. F '+ ~~~~ ~~4
r I~ ~ t .~`-" r
1
r. i }
}.f /!!/ ~ ~+ f ~y ~. ~ f r ~ Jam, f ~~_ 1'u ra' ` r ~ ~ ~ .5 f I~~ }
i r ~ ~ ~ r#FF S ~ t~~ +. ~ ~ r 1 ~ i ~ p
~.
r ~~`r' ~ ~ I f ,~ ~. r'y
_ ii~~ r ; '
~` .-!:l y~rti.'~~.. ;~ - I 15 111 ~'f 4~l' _ ~~ _ !r ~ ~1'~~ I ~ fj"ti., J' !
,1 ~ it * ~!+, I j~~ r r~ r ti,~~,~ .,~ t ~'r ~ 1 .* ,~`~ ~ ~ 1 I
I I"
J I µar { I s I ~ ! ~' 1 ~ k ~ ~ ~ ""~ ~ r
... ~-+. ,~ , ..1*-"'« S .mil ! j~ ~ -ti.~,, , I ..~ .~ ~~~ ~~~ ~ I` .-° . w•
1 '- ,.
i R I ti ~~ ~'A~lti`I~'. i ~ ~~ f~~ - ~ ~~~'~,1~'~! ~' I ~~ 1r~Sr'+.s~ lt'- ~' ~Y
! 1 r ?
f ~ f
f~ 1f f r
~ J ~
a
U
0
0
D
5-4
r
s
s
t
~~pe~~~ x-l3
PRJ, NAME Doan creek Limited ~u~lverts
PR~JEDT culverts ---
L~DATI~N Tilt Drive at Stauffer Drive~ust north of Stauffer
DECRI~TI~I~I ~ , ~~~
As part at the developr~ent in that area, the internal street
syster~ wili crass over the Doan youth creek in two
locatlar~s. As such tvva culverts will be re wired. The
Environmental Assessment far this infrastructure will be
completed as part of the Planning Act. ,
DERIPTI~N
culverts t"two~
~ontinaenav
ub~tatai
En ineerin and construction services
Environmental Assessment
Total Proieot host
~1Cistln~ In capital account
Crown Related Balance Required
C
..^
S24 =C ,--r~_
QTY UNIT CST PER TOTAL DOT
~ ~5a,~aa ~~~,~aa
1 ~,Oaa ~O,aQa
~~ °lo $~O,aaa
$fi0, aaa
~~ °lo 7~,Oaa
- 4~,aaa
~~